HomeMy WebLinkAboutConsultant Review - 1895 GREAT POND ROAD 2/17/1999 COLANTONIOV
ENGINEEQS AND SCIENTISTS
February 15, 1999
Planning Board
C/o William Scott
Town Hall Annex
27 Charles Street
North Andover, MA 01845
RE: Supplemental Engineering Review
Great fond Road
Special Permit for Watershed District
Dear Mr. Scott:
In response to your request, Coler & Colantonio, Inc., has reviewed the requirements
under the Zoning Bylaws relative to the Watershed District Special Permit for the above
referenced project. This property was previously reviewed under a different filing for the
development of two house lots. The proposal has since been modified to include only one
lot. We also visited the site to observe existing conditions. The plan has been reviewed
for conformance under these submittal requirements and standard engineering practice.
The submittal package included the following information.:
Plan Entitled:
® "Proposed Lot Development Great Pond Road in North Andover, Mass" one
sheet dated December 2, 1998, Revised February 3, 1999. Prepared by
DeVellis Associates Inc. Washington Street Newton Lower Falls, MA
Received February 4, 1999.
Reports Entitled:
Letter of Response including culvert analyses, test pit log, TR-20 output data
and recharge calculations Prepared by DeVellis Associates Inc. Received
February 4, 1999.
Our latest comments are in italics:
ZoningBylaw.,
1. Section 4.136)4.)c.)ii.) 1.)The Lake Cochichewick high water mark,should be
shown on the plan. It should be noted that the lake may flood into Lot A through the
reported 6"VC pipe. Based on our site visit we do not agree that the existing pipe is
a 6 in.V.C.pipe. No further comment
tot Accord Park Drive 781-982-5400
Norwell, MA 02061-1685 Fax: 781-982-5490
2. Section 4.136)4.) c.)ii.)2.)It is unclear if the Conservation Commission has
confirmed the wetland limits. No further comment.
3. Section 4.136)4.) g.) The entire lot is located within the designated 325' non-
discharge zone. Design calculations and invert elevations for the proposed infiltration
systems have not been included, It is not clear that the proposed crushed stone drains
are adequate for collection of all pavement runoff. Test pits for the proposed site
development were not included, We recommend that test pits,performed by a
certified soil evaluator and witnessed by an agent of the town be performed a the
location of proposed infiltration structures. These test pits should identify soil type,
permeability and maximum seasonal groundwater. The plan states that final design
of the leaching dry well is subject to soil testing. It is unclear when testing is
proposed and what would be done if testing indicates unsatisfactory material. The
submitted test pit data indicates unsuitable infiltration conditions in the proposed
leaching pit. It may not be feasible to provide infiltration on this site. This issue
should be addressed by the Planning Board.
AMtional Co ents:
4, According to the proposed contours, the culvert at the intersection of Great Pond
Road and the proposed common driveway would not properly drain. Calculations
and analysis of the existing and proposed culvert should be included and address
existing and proposed elevations. The capacity of the existing pipe should be
calculated. It has not been demonstrated that this project will not increase flooding at
the culvert. Calculations indicate a small increase in peak run off rates. We disagree
with the assumption of the proposed twin 12"diameter culverts being modeled under
inlet control conditions, the culverts appear to be surcharged. The existing 12"
R.CA culvert, which crosses under Great Pond Road, would also be surcharged
when Lake Cochichewick is at its annual high water elevation_ This condition should
be modeled
S. We note that Barker Street is listed as an abutter. Satisfactorily addressed.
6. The proposed wetland replication area is not located in proximity of the wetland to be
filled. This may impact flood storage volume. No further comment,
7. The crowning of the proposed common driveway should be indicated in the plan
view,together with the proposed crushed stone strip. The grading does not appear to
reflect the crushed stone area. Based on our review of the grading plan, it appears
that most of the runoff from the driveway would concentrate near wetland flag A-6.
No further comment,
8. It is possible that the proposed earth cuts for the construction of the northern half of
the drive will experience groundwater weeping. This is counter to the intent of the
BY-Law. We recommend that groundwater depth be determined in these areas. It has
been acknowledged that weeping may occur. The Planning Board should address this
issue.
We appreciate the opportunity to assist the Planning Board on this project and hope that
this information is sufficient for your needs. If you have any questions please do not
hesitate to contact us.
Very truly yours,
COLER&COLANTONIO,INC.
C CKd-,W
John C. Chessia, P.E.
XC: DeVellis Associates
Jim Rand, DPW
COLANTONIOZ
F N(jINE-EIS ANO 5UIENT1575
December 21, 1998
Kathleen Colwell
Town Hall Annex
27 Charles Street
North Andover, MA 01845
RE: Engineering Review
Great Pond Road
Special Permit for Watershed District
Dear Ms. Colwell:
In response to your request, Coler & Colantonio, Inc., has reviewed the requirements
under the Zoning Bylaws relative to the Watershed District Special Permit for the above
referenced project. This property was previously reviewed under a different filing on
October 5, 1998. We also visited the site to observe existing conditions. The plan has
been reviewed for conformance under these submittal requirements and standard
engineering practice. The submittal package included the following information:
Plan Entitled:
o "Proposed Lot Development Great Pond Road in North Andover, Mass" one
sheet dated December 2, 1998. Prepared by DeVellis Associates Inc.
Washington Street Newton Lower Falls, MA Received December 10, 1998.
Reports Entitled:
• Special Permit Application. Prepared by DeVellis Associates Inc. Received
December 10, 1998.
• Letter of Potential Degradation. Prepared by DeVellis Associates Inc.
Received September 24, 1998.
We offer the following comments:
A complete review of the drainage system was not performed. No calculations or support
data was provided regarding the drainage design.
101 Accord Park Drive 781-982-5400
Norwell, MA 02061.1685 Fax: 781-982-5490
Zoning Bylaw:
1. Section 4.136)4.)c.)ii.) 1.) The Lake Cochichewiek high water mark should be
shown on the plan. It should be noted that the lake may flood into Lot A through the
reported 6"VC pipe. Based on our site visit we do not agree that the existing pipe is
a 6 in. V.C.pipe.
2. Section 4.136)4.) c.)ii.)2.) It is unclear if the Conservation Commission has
confirmed the wetland limits.
3. Section 4.136)4.) g.)The entire lot is located within the designated 325' non-
discharge zone. Design calculations and invert elevations for the proposed infiltration
systems have not been included. It is not clear that the proposed crushed stone drains
are adequate for collection of all pavement runoff. Test pits for the proposed site
development were not included. We recommend that test pits, performed by a
certified soil evaluator and witnessed by an agent of the town be performed a the
location of proposed infiltration structures. These test pits should identify soil type,
permeability and maximum seasonal groundwater. The plan states that final design
of the leaching dry well is subject to soil testing. It is unclear when testing is
proposed and what would be dome if testing indicates unsatisfactory material.
Additional Comments:
4. According to the proposed contours,the culvert at the intersection of Great Pond
Road and the proposed common driveway would not properly drain. Calculations
and analysis of the existing and proposed culvert should be included and address
existing and proposed elevations. The capacity of the existing pipe should be
calculated. It has not been demonstrated that this project will not increase flooding at
the culvert.
5. We note that Barker Street is listed as an abutter.
6. The proposed wetland replication area is not located in proximity of the wetland to be
filled. This may impact flood storage volume.
7. The crowning of the proposed common driveway should be indicated in the plan
view,together with the proposed crushed stone strip. The grading does not appear to
reflect the crushed stone area. Based on our review of the grading plan, it appears
that most of the runoff'from the driveway would concentrate near wetland flag A-6.
g. It is possible that the proposed earth cuts for the construction of the northern half of
the drive will experience groundwater weeping. This is counter to the intent of the
By-Law. We recommend that groundwater depth be determined in these areas.
We appreciate the opportunity to assist the Planning Board on this project and hope that
this information is sufficient for your needs. If you have any questions please do not
hesitate to contact us.
Very truly yours,
COLER& COLANTONIO, INC.
n� ,
ohn C. Chessia, P.E.
XC: DeVellis,Associates
Jim Rand,DPW