Loading...
HomeMy WebLinkAboutMiscellaneous - 73 FARNUM STREET 11/3/2015 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 73 Farnum St. MAP: 107.A LOT: 0055 INSTALLER: Todd Bateson DESIGNER: PLAN DATE: BOH APPROVAL DATE ON PLAN: INSPECTIONS D-Box & T INSPECTION: 11/3/15 DATE OF BED BOTTOM INSPECTION: DATE OF FINAL CONSTRUCTION INSPECTION: DATE OF FINAL GRADE INSPECTION: SITE CONDITIONS ❑ Contractor reports any changes to design plan ❑ Existing septic tank properly abandoned ❑ Internal plumbing all to one building sewer ❑ Topography not appreciably altered Comments: SEPTIC TANK ❑ Building sewer in continuous grade, on compacted firm base ❑ Cleanouts per plan ❑ Bottom of tank hole has 6" stone base ❑ Weep hole plugged ❑ 1500 gallon tank has been installed H-10 loading ❑ Monolithic tank construction ❑ Water tightness of tank has been achieved by visual testing X Inlet tee installed, centered under access port ❑ Outlet tee installed, centered under access port (gas baffle/effluent filter) ❑ inch cover to within 6" of finish grade installed over one access port ❑ Hydraulic cement around inlet & outlet Comments: PUMP CHAMBER ❑ Bottom of tank hole has 6" stone base ❑ Weep hole plugged ❑ 1500 gallon Pump Chamber installed ❑ H-10 loading ❑ Monolithic tank construction ❑ Inlet tee installed, centered under access port ❑ Pump(s) installed on stable base ❑ Alarm float working ❑ Pump On/Off floats working ❑ Separate on/off floats ❑ Drain hole in pressure line ❑ cover at final grade installed over pump access port ❑ Water tightness of tank has been achieved by testing ❑ Hydraulic cement around inlet & outlet Comments: CONTROL PANEL ❑ Alarm & Pump are on separate circuits ❑ Alarm sounds when float is tripped ❑ Location of control panel: basement ❑ Alarm signal located inside: basement Comments- DISTRIBUTION-BOX X Installed on stable stone base X H-20 D-Box ❑ Inlet tee (if pumped or >0.08'/foot) X Hydraulic cement around inlet & outlets X Observed even distribution X Speed levelers provided (not required) X Schedule 40 PVC Pipe Comments: 2 outlet pipes