HomeMy WebLinkAboutCorrespondence - 41 SAILE WAY 10/31/1997 |
�
K—UYJUU �
CONSTRUCTION �
Mu����&������y�7� INC.
.""^^. .^"~~~~.~�. ~ ~� .. .~~ �
8 Merrimac Road " PI1 Box 225 ° Newton, N.H. 0385O
(603) 382-7650 �
�
|
October 3l, lgR?.
`
�� �
Planning_ — --_--_—� Development �
Town ofNorth Andover �
�
l2O Main Street �
�
|
North Andover, Ma. 0 184
On behalf of Marilyn and Fe4ecia Elias, Trustees of Eight Meadows Realty Trust,� [lvil Construction
Inc. ia pleased tu submit this application for Special Permit for construction ofa single family
dwelling ou Lot 6, 8adoWay. This lot in part of the Great Pond Estates Subdivision, for which the road
construction is near completion. The owners of the subdivision are actively ouorkcthzg Lot 6, and hythis
application seek the Board's approval oy the proposed building envelope and associated site improvements,
including erosion, siltation and stormwater management controls. The applicants are aware ofthe sensitivity
of the site and will work closely with all agencies of the Town of North Andover to asstire that current best
management practices are followed during and after construction
This application is subject to the North Andover Zoning By-Law in effect as of November 12, 1992,
the date the definitive plan for Great Pond Estates was filed with the Planning Board. General Laws Chapter
40A, Section 6, provides that all land shown on a definitive plan shall be governed by the provisions ofthe
Zoning By-Law bu effect mtthe time of submission of the dofiuitiveplan, for u period oy eight years fbllovviug
Planning Board endorsement. The Definitive Plan for Great Pond Estates was endorsed ho November lgg4.
E3y letter dated June l3, 1997, Mr. Nicetta,the Building Comrnissioner, confinned that lots within Great Pond
Estates are subject to the l492Zoning By-Law.
A Special Pnrnoitie required under Section 4.l3h.4.a.l of the l992 Zoning By-Law for otoonwater
discharges resulting from construction of a residential structure iii the Watershed Protection District. As
shown cm the enclosed site plan,the proposed dwelling ialocated entirely outside the non-disturbance zone
(vYbicbunder the l99% ��ooing|�y-Law inuludesaU land vvdhbz ��Of�ato�t�nla�o(�ncbichnvvc�oborc\ioe
and 100 feet from the edge of wetland resource areas), but p/ithio the non-discharge zone(which is between
l0O and 325 feet from the wetland resource areas and 25Oto325 feet from the l~ak*). The proposed dwelling
ia over 7OOfeet from the edge wf Lake Cochichewick. �
�
Enclosed please find the following supporting materials:
1. Application for Special Permit;
2. Certified Abutters' List;
3.Plan entitled"Special Permit Site Plan,Lot 2, Great Pond Estates, Saile Way,North Andover,
Ma." (Site Plan);
4. Information regarding Infiltrator leaching chamber units; and
5. Two checks, one in the amount of$100 for the filing fee and one in the amount of$2,000 for
the plan review fee. Given the relative simplicity of the proposed project,the applicant is
hopeful that plan review can be completed or substantially less that$2,000.
A Request for Determination of Applicability for Lot 6 has been filed with the North Andover
Conservation Commission. A meeting is expected to be scheduled within the next month with the
Commission. The results of the meeting will be provided to the Board.
The proposed site development is shown on the attached Site Plan. The dwelling proposed for this lot
will be cone to the Town water and sewer dis asal system. In design of this lot, care has been
taken to employ the current best management practices for erosion, si tation, and stormwater control, as
required by the Town Regulations. These practices will protect the water supply and ground water of the
watershed. 12M 22L2 erosion control shall be placed prior to construction to reduce and filter the surface
runoff from storm water during the construction process. (See the erosion control siltation barrier detail on
the Plan.) The Site Plan also shows a detail for the construction of a tem stone entrance to the lot.
During construction many vehicles will enter and leave the site. This stone area, located at the end o tie
driveway,near the edge of the pavement will help prevent tracking of mud and sediment from the site. The
area will also filter stormwater runoff from the site during construction. It will be the res onsibilit of the
owner and contractor to maintain and modify, if necessary,these erosion control devices to u i e intent of
minimizing su ace sediment carrying runoff from this site during the construction process.
This design also incorporates long term stormwater control measures. To collect and treat roof runoff,
all roof drains will flow into a subs , r collection system,where the water will then leach into
the ground. Hi Profile Infiltrator Units will be installed as shown on e Plan. The Infiltrator Units will be
placed on a la er of sand and covered with sand and topsoil. Roof runoff will flow alto the units and leach
into the sand layer, en undo e ground. These units have a large subsurface storage volume for stormwater.
For small rain storms storage is not necessary. During time of peak flow from a 10 year storm event, the
amount of runoff will be about one inch. The intent of this design is to have storage volume for this one inch
of rainfall. The following is the calculation for the number of units to be used:
Impervious roof area= 3600 s.f.
Analyze 1" of storm water to treat. 3600 s.f. x 1"/12' = 300 cu. ft.
300 cu. ft. / 16.3 cu. ft./unit = 18.4 units required.
Propose using 20 High Profile Infiltrator Units. Effective roof area=3912 s.f.
2
|
�
�
�
�
�
|
The final grade oy the paved shall be slightly pitched to the northwest or down hill side,to
slied surface runoff into a catch basin and stone leach trench on the ead e of the driveway. This will minimize
;�M;2fMoo;7e—driv—eway—Tithin the—catch basin a trap is esijFeMoToglany grease or oils. The
re surf traD is 7esq
water will flow to the trench, leach into the soil, be filtered and help recharge ground water. �
The entire lot is located within the Non-Discharge Zone and all proposed construction will hmoutside
the Zone. The proposed grade of the structure has been set to minimize the impact for lot
disturbance and maintain the natural vegetation cover. The proposed project iokooadndmutho least ouoaitbe
area of the lot. There are no reasonable alternative locations outside the Non-Discharge Zone for the proposed
structure,
�
The proposed identical to that obuvm/uu the subdivision plans approved bythe
PlonuungI�oardand C moioo. The actual construction work ou the site will bncarefully
planned to minimi tbotbnn of site disturbance. There will be
material. All excess will be removed from the site and disposed of properly. .FLwaml 7grading,7=�rea_=g ol�
topsoir,16ding, mulching and landscaping will be conducted in the shortest time possible from the start of
oa^uuucum,. Erosion control shall not be removed until the total site is completely stabilized and approved by
the Town.
'.".'MMMMM
By following the Town Regulations and this Site Plan for lot development, itiomyprofessional
opinion that there
��ater in or entering Lake
Cochichewick7as a'result of the proposed construction on Lot 6, Saile Way,
lt shall bo the responsibility of the future homeowner to follow the Town Regulations within this District for
proper long term care of the site to ftilfill the intent of management plan for this district.
Sincerely,
042'7�_A
Dennis G. Quintal, P.E.
President
3
Town of North Andover Q NQRTH q
OFFICE OF }O ,'eo i6.6�0L
COMMUNITY DEVELOPMENT AND SERVICES 4
27 Charles Street
WILLIAM J. SCOTT North Andover, Massachusetts 01845 ssqCNUSE��y
Director
(978)688-9531 Fax (978)688-9542
October 25, 1999
Marilyn&Felicia Elias,Trustees
700 Great Pond Road
North Andover,MA 01845
=coo
RE: Request for Extension for Lots 3 &6 Saile Way �0)
Dear Ms.Elias: .
Please be advised that at their regularly scheduled meeting of October 19, 1999 the North Andover
Planning Board voted to GRANT your request for an extension of the watershed special permits for Lots 3
&6 Saile Way for an additional ltwo years.
Lot 3's extension has been granted until 12/18/2001,and Lot 6's extension has been granted until
12/18/2001.
If you have any further questions,please do not hesitate to contact me.
Sincerely,
Heidi Griffin
Town Planner
BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535
RACKEMANN, SAWYER & BREWSTER
PIROFESS. ONAL CORPORATION
COU 6qSELLORS Ar LAW
ES'TABLISHED 1886
ONIP FINANCIA1, CENTF'R
B(3SI-ON, M.ASSACHTTSETTS 02111-2650
AREA CODE 617-542-2300
TEL.ECOPFR 6[7-54L 7437
DANIEL J. BAILEY, M
(617)951-1107 October 5, 1999
By Certified Mail,Return Receipt Requested
North Andover Planning Board
North Andover Town Hall
North Andover,MA 01845
Re: Lots 3 and 6, Saile Way
Request for Extension of Special Pen-nits
Dear Members of the Board:
I am writing on behalf of Marilyn and Felecia Elias, the owners of Lots 3 and 6,
Saile Way,to request a one-year extension of the Watershed Special Permits ("Special
Permits")which authorize the construction and use of a single family dwelling on each of
Lots 3 and 6.
The Special Permits were issued on December 19, 1997 and will lapse on
December 18, 1999, unless substantial use or construction has commenced by that date.
Section 10.31.3 of the North Andover Zoning By-law provides that the Special Permit
Granting Authority may, for good cause, extend a special permit for an additional one
year period.
The Eliases have sold two of the five lots on Saile Way. Construction on those
lots (numbers 1 and 2)has begun. The Watershed Special Permit for Lot 5 has been
extended by one year, and will now expire on October 28, 2000.
The Eliases hope to sell Lots 3 and 6 well before the Watershed Special Permit
for each Lot lapses. Given the current real estate market,however, it will be very
difficult for a buyer to complete all the steps necessary to commence construction prior to
the December 18 lapse date. it is virtually impossible to engage an architect or a builder
for a project which must be started this building season. Accordingly, the Eliases request
a one year extension of the Special Permits.
RAC1{MANN, S WYE'R & 13REAS1:ER
North Andover Planning Board
October 5, 1999
Page 2
Please contact me if you have any questions or need any further information.
Thank you for your consideration of this request.
Sincerely yours,
Daniel J. Bai
DJB:sc
cc: Marilyn and Felecia Elias
GAENV RE\2317\1\A0027144.DOC