Loading...
HomeMy WebLinkAboutConsultant Review - 41 SAILE WAY 11/21/1997 11:'21%97 14:51 N0.0?9 @04 U Z rNRINCER S AND SCiENTOT3 November 21, 1997 Planning Board c/o Ms.Kathleen Colwell 30 School Street North Andover,MA 01845 RE: Engineering Review Lot 6 Great Pond Estates Salle way Special Permit Dear Ms Colwell: At your request, Coler& Colantonio, Inc, has reviewed the plan for the above referenced project. It is our understanding that we are to review the plans for compliance with the Zoning By-Laws requirements for projects in the Watershed Protection District, We have reviewed this plan for compliance with lots created before October 24, 1994. Reportedly Mr. Nicetta, the building commissioner, has confirmed this by a letter sent to Civil Construction Management. The following documents were reviewed: ® A plan entitled "Special Permit Site Plan, Lot 6 Great Pond Estates, Saile Way, Nortb Andover, Mass. Drawn for Eight Meadows Realty "trust" prepared by Civil Construction Management Inc.,dated October 31, 1997. ® Application for Special Permit dated October 31, 1997, prepared by Civil Construction Management,Inc. The parcel is located on Saile Way. The proposed dwelling is located over 400 feet from Lake Cochichewick and outside the non-disturbance zone, but within the non- discharge zone for wetland resource areas. it is proposed to build a new home, including the installation of a sewer line,water service,cable utilities and storm water management facilities. 101 Accord Park Drive 781 982,5400 Norwr,(I,MA 05061-1665 Fax:781-982-5490 11%'21!97 14:51 NO.078 D05 We offer the following comment: 1. Test pit data from 1983 and 1994 is shown on the plans. Note that a foundation:drain is proposed for the building. Invert data should be included for the foundation drain. The foundation drain appears to be it discharge within the "no discharge zone". The house foundation and drain should be located above seasonal high water tables to avoid being a discharge. We recommend that tests be perfonned at the actual location of the proposed systems before or during construction. This test should be performed by a soil evaluator and witnessed by an agent of the town. A note indicating testing is to be perfomied is indicated on the plans. We appreciate the opportunity to assist the Planning Board on this project and hope that this uiformation is sufficient for your needs. If you have any questions please do not hesitate to contact us. Very truly yours, COLER& COLANTONIO, INC. John C.Chessia, F.E. xc Civil Construction Management Inc.