November 21, 1997
Planning Board
c/o Ms.Kathleen Colwell
30 School Street
North Andover,MA 01845
RE: Engineering Review
Lot 6 Great Pond Estates
Salle way
Special Permit
Dear Ms Colwell:
At your request, Coler& Colantonio, Inc, has reviewed the plan for the above referenced
project. It is our understanding that we are to review the plans for compliance with the
Zoning By-Laws requirements for projects in the Watershed Protection District, We have
reviewed this plan for compliance with lots created before October 24, 1994. Reportedly
Mr. Nicetta, the building commissioner, has confirmed this by a letter sent to Civil
Construction Management. The following documents were reviewed:
® A plan entitled "Special Permit Site Plan, Lot 6 Great Pond Estates, Saile
Way, Nortb Andover, Mass. Drawn for Eight Meadows Realty "trust"
prepared by Civil Construction Management Inc.,dated October 31, 1997.
® Application for Special Permit dated October 31, 1997, prepared by Civil
Construction Management,Inc.
The parcel is located on Saile Way. The proposed dwelling is located over 400 feet
from Lake Cochichewick and outside the non-disturbance zone, but within the non-
discharge zone for wetland resource areas. it is proposed to build a new home,
including the installation of a sewer line,water service,cable utilities and storm water
management facilities.
101 Accord Park Drive 781 982,5400
Norwr,(I,MA 05061-1665 Fax:781-982-5490
11%'21!97 14:51 NO.078 D05
We offer the following comment:
1. Test pit data from 1983 and 1994 is shown on the plans. Note that a foundation:drain
is proposed for the building. Invert data should be included for the foundation drain.
The foundation drain appears to be it discharge within the "no discharge zone". The
house foundation and drain should be located above seasonal high water tables to
avoid being a discharge. We recommend that tests be perfonned at the actual location
of the proposed systems before or during construction. This test should be performed
by a soil evaluator and witnessed by an agent of the town. A note indicating testing is
to be perfomied is indicated on the plans.
We appreciate the opportunity to assist the Planning Board on this project and hope that
this uiformation is sufficient for your needs. If you have any questions please do not
hesitate to contact us.
Very truly yours,
COLER& COLANTONIO, INC.
John C.Chessia, F.E.
xc Civil Construction Management Inc.