Loading...
HomeMy WebLinkAboutApplication - 80 SAILE WAY 11/7/1997 IID d f l a�a S11AW ORM Town of North Andover Planning Boar v 9 42 'nf)':;}'))%"f;Ff�:::}.::%ri ii�)Ya::�fti�iiii aii�f'f%h�)� /�ii i�d�%M%//M'.%/U//%>S�)%I////.9///1/x%/////,)))I%/�G}})S}'fl.}ris))�@gWT>})%/h'i/.)'• N�)%a:)•r.):))}:w%r.)•riiiiirin//rru f'•f i:f 'ff�ftff%% ,�Yfff%fff�ttffff�ffff [� ;f„ y'%,,.,.ff,,...fftfff'/.Y.ftffffff :f `i. �'�' {� ftf/ttf . �:lN, .fi f:...,::.,. Y..'S1Cttt.:St....,�.,ttf✓.tY/,'/,t:,,,ttfGt"'✓,.«ttY///.t5'rY/// ///,/.,//„':f � � ta t%/.ttKff.,...,..ttttt,.wtttSS,t %iSi1IH%'i.aifff✓,f ;2 '.... Please type or print clearly. 1. Petitioner: Marilyn S. & Felecia Elias Address: 700 Great Pond Road, North Andover, Ma. Telephone number: 508 - 685 - 2885 2. Owners of the Land: Same Address: Telephone number: Number of years of ownership: If applicant is not the owner, please state interest in property: J. Request for a Special Permit under Section 4�i 36 of the North Andover Zoning Bylaw to obtain approval for construction of a single family dwelling with grading and associated appurtances on Lot 3 Saile Way. This lot is in the Non-Discharge Zone of the North Andover Watershed Protection District In accordance with G.L. Chapter 40A, Section 6, this Application is made pursuant to Section 4.136 of the Zoning By?-Law in effect on Nove er 1Z,'19S2, the date on which the Application for Approval of a Defin;r;vp Slibdiv s o was submitted to the Board. 4. Location of Property: Lot 3 Saile Way, off Great Pond Road Zoning District: Residential-1 (R-1) ; Watershed Protection District. Assessors: Map: 63 Lot #; _ 3 Registry of Deeds: Book -r"r:: 3315 Pave m:; 295 5. Existing Lot: Lot Area (Sq.Ft.): N/A Building Height: Street Frontage: Side Setbacks: Front Setback: Rear Setback: Floor Area Ratio: Lot Coverage: 6. Proposed Lot (if applicable): Lot Area (Sq.Ft.): 225,266 Building Height: 3 Story Street Frontage: 175 ft. Side Setbacks: 30 ft. Front Setback: .30 ft. Rear Setback: 30 ft. Floor Area Ratio: N/A Lot Coverage: �� S 7. Required Lot (as required by Zoning Bylaw): Lot Area (Sq.Ft.): 87,120 s.f. Building Height: 35 ft. Street Frontage: 175 ft. Side Setbacks: 30 ft. Front.Setback: 30 ft. Rear Setback: 30 ft. Floor Area Ratio: N/A Lot Coverage: N/A 8. Existing Building (if applicable): of Floors: Ground Floor (Sq. Ft.): N/A Total Sq. Ft.: Height: Use: Type of Construction: 9. Proposed Building: Ground Floor (Sq. Ft.): 2000 (approx.) T of Floors: 3 Total Sq. Ft.: 4500 ( Wrox. ) Heia t: 32 ft. Use: Residential Type of Construction: 10. Has there been a previous application for a Special Permit from the Planning Board on these premises? Yes . If so, when and for what type of construction ? Road construction for this subdivision. 11.. Petitioner and Landowner signature(s): Every application for a Special Permit shall be me�d this th the Town Clerk's Offi e.f Its of the Planning Board. Every application shall b shall be the responsibility of the petitioner to furnish all supporting documentation with this application. The dated copy of this application received by the Town Clerk or Planning Office does not absolve the applicant from this responsibility. The petitioner shall be responsible for all expenses for filin; and legal notification. Failure to comply with application requirements, as cited herein an d in the Planning Board Rules and regulations may result in a dismissal by the Planning Board of this application as incomplete. Petitioner's Signature: Print or type name here: a Owner's Signature: Print or type name here: .✓ -� ��''� ABUTTER'S LIST for Lot 3 5aile Way TAX MAP 63 LOT 3 Eigth Meadows Realty Trust (Applicant) 700 Great Pond Road North Andover, Ma. 01845 ` 11 Southern New England Conference 566 Commonwealth Ave. Boston, Ma. rrp NO. 103 t ^ 42 ,�� .•ii a /� t �W 6 A7 J1µ r 11i 40 AIL 4zb •L 0 r lot A 4^ j 41 3 � V ,..So �N 10 It" SAiL aa'a t4 • l.oT 3. ,.r•� f �h s� O Z CL �o W 7Q W . y 3 0.38 - � . CIVIL CONSTRUCTION MANAGEMENT, INC. 8 Merrimac Road ® P.O. Box 225 • Newton, N.H. 03858 (603) 382-7650 October 30, 1997. Planning&Community Development Town of North Andover 120 Main Street North Andover, Ma. 01845 On behalf of Marilyn and Felecia Elias, Trustees of Eight Meadows Realty Trust, Civil Construction Management, Inc. is pleased to submit this application for Special Pen-nit for construction of a single family dwelling on Lot 3, Saile Way. This lot is part of the Great Pond Estates Subdivision, for which the road construction is near completion. The owners of the subdivision are actively marketing Lot 3, and by this application seek the Board's approval of the proposed building envelope and associated site improvements, including erosion, siltation and storrriwater management controls. The applicants are aware of the sensitivity of the site and will work closely with all agencies of the Town of North Andover to assure that current best management practices are followed during and after construction. This application is subject to the North Andover Zoning By-Law in effect as of November 12, 1992,the date the definitive plan for Great Pond Estates was filed with the Planning Board. General Laws Chapter 40A, Section 6, provides that all land shown on a definitive plan shall be governed by the provisions of the Zoning By-Law in effect at the time of submission of the definitive plan, for a period of eight years following Planning Board endorsement..The Definitive Plan for Great Pond Estates was endorsed in November 1994. By letter dated June 13, 1997, Mr.Nicetta, the Building Commissioner, confirmed that lots within Great Pond Estates are subject to the 1992 Zoning By-Law. A Special Permit is required under Section 4.136.4.a.I of the 1992 Zoning By-Law for stormwater discharges resulting from construction of a residential structure in the Watershed Protection District. As shown on the enclosed site plan,the proposed dwell r is located entirely outside the non-disturbance zone(which under the 1992 Zoning By-Law includes all land within 250 feet of the Lake Cochichewick shoreline and 100 feet from the edge of wetland resource areas), but within thellnondischarge zone which is between 100 and 325 feet from the wetland resource areas and 250 to 325 feet from the lake). The proposed dwelling is over 260 feet from the edge of Lake Cochichewick. m m mm Enclosed please find the following supporting materials: 1. Application for Special Permit; 2. Certified Abutters'List; 3. Plan entitled"Special Permit Site Plan,Lot 2, Great Pond Estates, Saile Way,North Andover, Ma." (Site Plan); 4. Information regarding Infiltrator leaching chamber units; and 5. Two checks, one in the amount of$100 for the filing fee and one in the amount of$2,000 for the plan review fee. Given the relative simplicity of the proposed project,the applicant is hopeful that plan review can be completed or substantially less that$2,000. A Notice of intent for Lot 3 has been filed with the North Andover Conservation Commission. A meeting is expected to be scheduled within the next month with the Commission. The results of the meeting will be provided to the Board. The proposed site development is shown on the attached Site Plan. The dwelling proposed for this lot will be connected to the Town waterjM11 and sewer disposal system. In design of this �o pmmmmmmmmmouowm lot, care has been taken to employ the current best management practices or erosion, siltation, and stormwater control, as required by the Town Regulations. These practices will protect the water supply acid ground water of the watershed. Temporary erosion control shall be placed prior to �m4 construction to reduce and filter the surface runoff from storm water during the constriction process. (See the erosion control siltation barrier detail on the Plan.) The Site Plan also shows a detail for the construction of a temporary stone entrance to the lot. During construction many vehicles will enter and leave the site. is stone area, located at the end of the driveway, near the edge of the pavement will help prevent tracking of mud and sediment from the site. The area will also filter stormwater runoff from the site during construction. It will be the responsibility of the owner and contractor to maintain and modify, if necessary,these erosion control devices to fulfill the intent of minimizing surface sediment carrying runoff from this site during the construction process. This design also incorporates long term stormwater control measures. To collect and treat roof runoff, all roof drains will flow into a subsurface storm ter collections st where the water will then leac un o e groan to ro e filtrator Units will be installed as shown on the Plan. The Infiltrator Units will be plac aye of sand and covered with sand and topsoil. Roof runoff will flow into the units an m o e san�ayer,then into the ground. These units have a large subsurface storage volume for stormwater. For small rain storms storage is not necessary. During time of peak flow from a 10 year storm event, the amount of runoff will be about one inch. The intent of this design is to have storage volume for this one inch of rainfall. The following is the calculation for the number of units to be used: 2 Impervious roof area= 3600 s.f. Analyze 1" of storm water to treat. 3600 s.f. x 1"/12' = 300 cu. ft. 300 cu. ft. / 16.3 cu. ft./unit = 18.4 units required. Propose using 20 High Profile Infiltrator Units. Effective Roof Area for treatment=3912 s.f. The final grade of the paved driveway shall be slightly pitched to the north or down hill side, to shed surface runoff into a catch basin and stone leach trench on the edge of the driveway. This will minimize the surface runoff from the driveway. Within the catch basin a trap is designed to hold any grease or oils. The water will flow to the trench, leach into the soil,be filtered and help recharge the ground water. The entire lot is within the Watershed Protection District. All of the dwelling will be located outside the non-disturbance zone. Only driveway construction, grading and landscaping work are proposed in the non-disturbance zone. The proposed grade of the structure has been set to minimize lot disturbance and to maintain the natural vegetative cover. The dwelling is located as far back from the Lake as possible, on the least sensitive area of the lot. There are no reasonable alternative locations outside the non- discharge zone. The proposed driveway location is identical to that shown on the subdivision plans previously approved by the Planning Board and the Conservation Commission. The driveway is located within 100 feet of the so-called unclassified isolated drainage area, resource area under the North Andover Wetlands By-law. As we have previously stated to the Board,the applicants do not agree with the Conservation Commission's decision, but in the spirit of cooperation are willing for purposes of this application to fully comply with the setback and other requirements applicable to work in the non-disturbance zone.—I/ The applicant also proposes to establish the front lawn approximately sixty feet into the non- disturbance zone. The purpose is to establish a uniform lawn area around the dwelling. The edge of the lawn would be approximately 200 feet from the Lake. According to the USDA Soil Conservation Service, there is less storm runoff from a good conditioned lawn than from the existing fair conditioned woods. The grass on the lawn will reduce the velocity of sheet flow storm runoff and filter the water. The lawn will provide a better medium for infiltration into the groundwater, thereby protecting the water quality of the Lake, fulfilling the intent of the By-law. The actual construction work on the site will be carefully planned to minimize the time of site disturbance. There will be no onsite storage or unnecessary soil or fill material. All excess will be removed from the site and disposed of properly. Final grading, spreading of topsoil, seeding, mulching and landscaping will be conducted in the shortest time possible from the start of construction. Erosion control shall not be removed until the total site is completely stabilized and approved by the Town. 3 By following the Town Regulations and this Site Plan for lot development, it is my professional opinion that there will not be any significant degradation of the quality or quantity of water in or entering Lake Cochichewick as a result of the proposed construction on Lot 3, Saile Way. It shall be the responsibility of the future homeowner to follow the Town Regulations within this District for proper long term care of the site to fulfill the intent of the management plan for this district. Sincerely, Dennis G. Quintal, P.E. President I/ The Eliases nonetheless reserve their rights with respect to whether the isolated wet areas are "wetland resource areas" as that term is defined under the Zoning By-law. 4