Loading...
HomeMy WebLinkAboutBuilding Permit # 11/2/2015 TOWN OF NORTH ANDOVER NORT„ APPLICATION FOR PLAN EXAMINATION �2°y L s Permit No : �® Date Received p=� �¢ 4 �9SSACNUs�4 y Date Issued: IMPORTANT: Applicant must complete all items on this page LOCATION 72 Mablin Avenue North Andover, MA 01845 Print PROPERTY OWNER Brian Birchall ' "-11_I Print MAP NO.: '' PARCEL: 1 ZONING DISTRICT: TYPE AND USE OF BUILDING HISTORIC DISTRICT YES ❑ TYPE OF IMPROVEMENT PROPOSED USE Res' ential Non- Residential New Building Vone family ddition Two or more family_ Industrial Alteration No. of units.- Repair, nits:Repan-,replacement I Assessor_c Bldg Commercial IJ Demolition Moving(relocation) !Other Others: I Foundation only DESCRIPTION OF WORK TO BE PREFORNIED install 6.24 kw solar panels on roof.will not exceed roof panel but will add 6"to roof height. 24 panels total Identification Please Type or Print Clearly) OWNER: Name: Brian Birchall Phone: 978-208-1473 Address: 72 Mablin Avenue North Andover, MA 01845 CONTRACTOR Name: Gregg Lacasse Phone: 508-291-0007 Address: 20 Patterson Brook Road West Wareham, MA 02176 Supervisor's Construction License: 103631 Exp. Date: 8/30/17 Home Improvement License: 170355 Exp. Date: 10/12/15 w ARCHITECT/ENGINEER Richard Gordon Name: Phone: 434-574-6138 Address: PO Box 264 Farmville,VA 23401 Reg. NO. 49993 FEE SCHEDULE:BULDIAG PERVIT:512.00 PER vS1000.00 OF THE TOTAL ESIT11A7 J)COST R.(SED O:'V,S 125.00 PER S.F Total Project Cost :$ 25,000 x12.00=FEE:$ ®` Check No.: '"p� Receipt No.: 'I Page 1<,ra i 'i IA®RT H Town of Andover ® to . • - - . C' h ver, bass, �1I�1n1► COC MI CMEW#CK A°RgTEo PP�,�'�� S UEll BOARD OF HEALTH RM T LD P IT Food/Kitchen Septic System • p THIS CERTIFIES THAT .......... 1. .. BUILDING INSPECTOR ..... . . .... . has permission to erect 2........... � , .�� Foundation p .......................... buildings on ... . IL s Rough tobe occupied as .. ..................... ... ... .................. .......'..��... .. ............ Chimney provided that the person accepting this permit shall in every respect conform to the terms of the application Final on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection,Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR Rough VIOLATION of the Zoning or Building Regulations Voids this Permit. Final PERMIT E PIE IN 6 MONTHS ELECTRICAL INSPECTOR LESS CONSTRUCTIO S RTSRough - . Service ................................................................................ Final BUILDING INSPECTOR 7� g GAS INSPECTOR Occupancy Permit squired to Occupy l,Lllldl3Z� Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. Smoke Det. gg � l� ( s SUMMARY IIouico«'uei'dame an'l Adciies;; Co-0nm r dame(It' In�lalla[ion LocationLucaiio G1111'actor IJCCn9C Brian Birchall 72 Mablin Avenue,North Trinity Heating and Air Inc. 72 i✓tablin Avenue,North Andover,MA 01845 Trinity Solar Andover,MA 01845 2211 Allenwood Rd Wall,New Jersey 07719 Coniitwt ID 13VH01244300 New Jersey OOKN15K Estimated Solar Energy Production Estimated First Year Amoral Production: 7,568 kWh Estimated Initial Term Total Production: 178,134 kWh Payment Terms Annual Increase of Solar Energy Rate: 2.90%/year First Year Solar Energy Rate, if paid by ACH: $0.110/kWh First Year Solar Energy Rate, if not paid by ACH: $0.121 /kWh Monthly Bill in First Year, if paid by ACH: $69.37!month Monthly Sunnova in First Year, if not paid by ACH: $76.31 ,r month 1. Introduction. continuing until the day prior to the anniversary of the Interconnection Date. Sunnova will notify you by email This Power Purchase Agreement(this"Power Purchase when the System is ready to be turned on. Agreement"or"PPA") is the agreement between you and Sunnova Energy Corporation(together with its successors 3 power Purchase At_reement Payments; Amounts. and assigns, '`Sunnova"or"we"),covering the sale to you of the power produced by the solar panel system(the (a Power Price. You are purchasing the power the "System")described below. Sunnova agrees to sell to you, System produces. The price of that power is set forth and you agree to buy from Sunnova,all of the power on the"Value Statement"attached as Schedule A. produced by the System on the terms and conditions described in this Power Purchase Agreement. The System (b) Payments. Schedule A details,among other things, will be installed by Sunnova or a contractor acting on (i)the price per kWh you will be charged per Year; Sunnova's behalf at the address you listed above. This (ii)the annual price per kWH percentage increase(if Power Purchase Agreement will refer to this address as the any); (iii) Sunnova's estimate of the power that is "Property" or your"Home." Sunnova provides you with a expected to be produced by the System during the Limited Warranty(the"Limited Warranty"). The Limited fust Year;(iv)Sunnova's estimate of the amount of Warranty is attached as Exhibit 1. This is a legally binding power that is expected to be produced by the System agreement with disclosures required by law,so please read over the entire Term (excluding any renewal everything carefully. If you have any questions regarding period(s)extending the Terms as provided in Section this Power Purchase Agreement,please ask the sales 10); and(v)Your Monthly Payment amount for the consultant who provided you this PPA. Note that first Year. Your"Monthly Payment" is calculated references in this PPA to the term"day"means a calendar based on the following: (A)the annual price per day. kWh multiplied by(B)the estimated kWh output per Year("Estimated Annual Production")divided by 2. Term. ((,.)twelve(12). Each Monthly Payment is due on Sunnova agrees to sell Vol'the power generated by the the seventeenth(l7th) calendar day of the month for System for 25 years(300 months),plus, if the the previous calendar month unless it is not a Interconnection Date is not on the first day of a calendar business day,in which event, the Monthly Payment month,the number of days left in that partial calendar for such month will be due on the first business day month. We refer to this period of time as the"Term." The after the seventeenth calendar day of such month. Term begins on the Interconnection Date, The Any payments due upon installation are due .'Interconnection Date"is the date that the System is turned immediately prior to commencement of installation. on and generating power. A"Year"is the twelve(12) You will not make a Monthly Payment if you fully month period beginning on the interconnection Date and prepay this PPA as provided in Section 4(j). C r ntrr:t nr >,ir �I P„rtcr Pttrchati \ancm� t ,�r5i� it �ir_i" �OUh-'QI-!Sunn�na F,ne 2•�Cui�x .iiun, rill R.i��hC: 'f)I I reduces the output of the System. or(iii)you don't (c) Yearly Adiustment to Monthly Payment(s) & trim your bushes or trees to their appearance when Estimated Annual Production. You will have regular you signed this PPA to avoid foliage growth from access to information on the System's actual output shading the System,then Sunnova will reasonably via your Sunnova online account. The actual kWh estimate the amount of power that would have been delivered to you during such outages or reduced output per Year("Actual Annual Production")may production periods and shad treat this reasonable vary from the Estimated Annual Production due to 1 estimate as part of the Actual Annual Production for weather and other conditions. You agree that the exclusive means to monitor and measure the Actual that Year for purposes of this paragraph. You will not be charged for the System being off line due to Annual Production is via the System's meter; Sunnova's fault,or if it's due to grid failure or power provided,however, if the System's meter va will outages caused by someone other than you. malfunctions or becomes inoperable,Sunno reasonably estimate the amournt of power that would have been delivered to you during the period in which the System"s meter was malfunctioning or 4. Power Purchase Agreement Oblisrations. inoperable and shall treat this reasonable estimate as (a) System,Home and Property Maintenance part ofthe Actual Annual Production for that Year for purposes of this paragraph. Your Monthly You agree to: Payment may adjust each Year if(i) there is a price (i) only have the Systern repaired pursuant to per kWh annual increase during the Term as set forth the Limited Warranty and reasonably in Schedule A and/or(ii)Actual Annual Production cooperate when repairs are being made; varies from the Estimated Annual Production as set forth on Schedule A. After the end of each Year keep trees,bushes and hedges trimmed so during the Term. Sunnova will notify you of the that the System receives as much sunlight as Actual Annual Production for the previous Year and it did when initially installed; of any adjustment to the Estimated Annual Production and Monthly Payments for the current keep the panels clean, pursuant to the Year and thereafter. If the Actual Annual Production Limited Warranty and the Guide(as such is less than the Estimated Annual Production for the term is defined in Exhibit 1); previous Year, Sunnova (i)will pay you an amount equal to the difference between the Estimated (iv) not modify your Home in a way that shades Annual Production and the Actual Annual the System; Production("Overestimate of Production") multiplied by the annual price per kWh for that Year (v) be responsible for any conditions at your (including any annual kWh price percentage increase Home that affect the installation (e.g., previously agreed upon as provided in Schedule A) blocking access to the roof,or removing a and(ii) may,at its option,decrease the Estimated tree that is in the way,prior work you have Annual Production and the Monthly Payments for done on your home that was not permitted); the current Year. If the Actual Annual Production is more than the Estimated Annual Production for the (vi) not remove any markings or identification previous Year, Sunnova may, at its option,(i) apply tags on the System; the difference between the Actual Annual Production and the Estimated Annual Production to an (vii) permit a service provider retained by Overestimate of Production for the current Year or a Sunnova,after we give you reasonable subsequent Year andior(ii)increase the Estimated notice, to inspect the System for proper Annual Production and the Monthly Payments for operation as we reasonably determine the current Year and thereafter. In no event shall necessary; Sunnova increase the Estimated Annual Production by more than I I O%of the Estimated Annual Production for the fust Year. (viii) use the System primarily for personal. family or household purposes,but not to (d) Payment Reconciliation. If(i)the System is off lune heat a swimming pool;. for more than seven(7) full twenty-four(34)hour (ix) not do anything,permit or allow to exist any days cumulatively during the Term(for example, condition or circumstance that would cause you remove the System to do renovations to your Home); or(ii)you take some action that significantly "[III jcl �tulh-'lII !`;w nor�i F,II� C��rprn',iiton, -Vit Rirh,s 12°�,cr:a1. a� t./ i���cr P,ir6h11 cc in,�nt �eriii,n i�fi�l?'{11a - n the System not to operate as intended at the and the repair and maintenance of the Property; System in accordance with this PPA even it Sunnova ceases to operate; and (x) notify Sunnova if you thunk the System is (ix) not put a lien on your[-Ionic or Property. damaged or appears unsafe; if the System is stolen; and prior to changing your power supplier; (c) Home Renovations or Repairs If you want to make any repairs or improvements to (xi) have anyone who has an ownership interest the Property that could interfere with the System in your Home sign this Power Purchase (such as repairing the roof where the System is Agreement; located),you may only remove and replace the System pursuant to the Limited Warranty,return any documents we send you for Automatic Payment,Fees; Late.Charges signature(like incentive claim forms) (d) within seven(7)days of receiving therwand In addition to the other amounts you agree to pay in this Power Purchase Agreement,you agree to pay the (xiii) authorize Sunnova to make inquiries following: concerning your credit history and standing from time to time. (x) Automatic Payment Discount: All prices include a ten percent(I()%) monthly discount for using automatic payment. You (b) Syste►n Construction,Repair,Insurance and will not receive a ten percent(10%) Sunnova's obligations: monthly discount if you do not make automatic Monthly Payments through your Sunnova agrees to cause our contractors to: checking or savings account. (h) schedule the installation of the System at a (xi) Late Payments: accrue interest at the mutually convenient date and time; lesser of twelve percent(121/,)annually or the maximum allowable rate by (ii) construct the System according to written applicable law beginning on the sixteenth plans you review; (16th)day after the date the payment was due and continuing until paid in full; and provide you with a meter to accurately meaSUre the amount of power the System (xii) Product Change Fee: if after you sign this delivers to you, Power Purchase Agreement,but before we begin installation,you decide you would (iv) notify you if the System design has to be prefer an alternative Sunnova product you materially changed so that you can review will pay a$250 change fee. any such changes; (v) clean up after ourselves during the (e) Estimated Tates construction of the System; You agree to pay any applicable sales or use taxes on the Monthly Payments(or prepayment,as (vi) insure the System against all damage or Loss unless that damage or loss is caused by (,A) applicable)due under this PPA. if this PPA contains a purchase option, you agree to pay any applicable your negligence; or(B)your intentionally tax on the purchase price for the System. You also damaging the System; agree to pay as invoiced any applicable personal property taxes on the System that your local (vii) repair the System pursuant to the Limited jurisdiction may levy. The total estimated amount Warranty and reasonably cooperate with you will pay for taxes over the Term is$0.00 you when scheduling repairs; assuming that tax rates stay the same as they are on the date of this PPA. In the event the tax rates (viii) create a priority stream of operation and change during the Term that amount will change. maintenance payments to provide enough cash flow ill our financing transactions to Pay for the Limited Warranty obligations Cotttr i iO, ;'O(}i;->til d Sinnu�-i F,na r,,<:rn�xa,iiion =AII Ri=rhes R :rr:cd. ti�I F7 Po ��i �'�ncVin: A�ri�mc urii�in ,fi21 r 1 (f) No Alterations To the fullest extent permitted by law, you shall indemnify,defend, protect,save and hold harmless You agree that you wilt not make or allow any other Sunnova, its employees,officers,directors,agents, party to make any modifications, improvements, successors and assigns From any and all third party revisions or additions to the System or take any other claims,actions, costs,expenses(including attorneys' action that could void the Limited Warranty on the fees and expenses), damages,liabilities,penalties, System without Sunnova's prior written consent. If losses,obligations.. injuries, demands and liens of you make or allow any other party to make any any kind or nature arising out of, connected with, modifications, improvements,revisions or additions relating to or resulting from your negligence or to the System, they will become part of the System willful misconduct; provided,that nothing herein and shall be Sumlova's property. shall require you to indemnify Sunnova for its own negligence or willful misconduct.The provisions of (g) Access to the System this paragraph shall survive termination or expiration of this Power Purchase Agreement. (i) You grant to Sunnova and its employees, agents and contractors the right to (1) Payments reasonably access all of the Property as necessary for the purposes of(A)installing, operating,owning,repairing, Schedule A describes your payment obligations constructing, P g' g' p g' under this PPA. SUBJECT TO SECTION 3 removing and replacing the System or ABOVE, YOU AGREE THAT THE OBLIGATION making any additions to the System or TO PAY ALL PAYMENTS AND ALL OTHER installing complementary technologies on AMOUNTS DUE UNDER THIS PPA SHALL BE or about the location of the System; (B) ABSOLUTE AND UNCONDITIONAL UNDER enforcing Sunnova's rights as to this Power ALL CIRCUMSTANCES AND SHALL NOT BE Purchase Agreement and the System; (C) SUBJECT TO ANY ABATEMENT,DEFENSE, installing,using and maintaining electric COUNTERCLAIM, SETOFF,RECOUPMENT OR lines and inverters and meters, necessary to REDUCTION FOR ANY REASON interconnect the System to your electric system at the Property and,'or to the utility's WHATSOEVER, IT BEING THE EXPRESS electric distribution system;or(D)taking INTENT OF THE PARTIES THAT ALL AMOUNTS PAYABLE BY YOU HEREUNDER any other action reasonably necessary in SHALL BE,AND CONTINUE TO BE, PAYABLE connection with the construction, IN ALL EVENTS INCLUDING BY YOUR HEIRS installation,operation,maintenance, AND ESTATE AND, EXCEPT AS SET FORTH removal or repair of the System.This access BELOW IN SECTIONS 5 AND 25,YOU HEREBY right shalt continue for up to ninety(90) NAIVE ALL RIGHTS YOU MAY HAVE TO days after this Power Purchase Agreement REJECT OR CANCEL THIS PPA,TO REVOKE expires to provide Sunnova with time to ACCEPTANCE OF THE SYSTEM, OR TO remove the System at the end of the Power GRANT A SECURITY INTEREST IN THE Purchase Agreement. Sunnova shall SYSTEM. provide you with reasonable notice of its need to access the Property whenever commercially reasonable, (j) Option to Prepay all Payments Remaining on the PPA (ii) Daring the time that Sunnova has access tights you shall ensure that its access rights You may prepay all payments remaining on this PPA are preserved and shall not interfere with or at any time provided you noti,y Sunnova of your permit any third party to interfere with such desire to prepay. The aunount you prepay will be based on the following:6)all accrued but unpaid rights or access. You agree that the System is not a fixture, bun Sunnova has the right to Monthly Payments, taxes,late charges,penalties, file any UCC-t financing statement or interest and all or any other sums then accrued or due and owing,plus (ii)the amount set forth on Schedule fixhue filing that confirms its interest in the A in the column titled"Prepay Option,"which System. amount may be adjusted at the time of prepayment to reflect Sunnova's estimate of'the kWh output per (h) Indemnity Year from the time of prepayment to the end of the Tenn("Estimated Post-Prepayment Production")and discounted to present value at 5%per annual plus �p ->(?I-#Surnu ra Fn -ncr��v C� Ix, .�tiun. Jni.n F,7 Piei ('urchaaA�recm�i ,.,;ii n U%1"'tl{-4 pnnrA (iii) reasonable compensation,on a net after tax basis (ii) approval of this Power Purchase Agreement assuming a tax rate of 35°'0, for the loss or recapture by SU1111OVa'8 financing sources, of(A) the investment tax credit equal to thirty percent(301,S,)of the System cost, including (iii) your meeting Sunnova's credit underwriting installation; and(B)accelerated depreciation over criteria then in effect; live(5)years equal to eighty five percent(85%)of the System cost, including installation,and for the (Iv) confirmation of rebate. tax credit and loss of any anticipated benefits pursuant to Section 8 renewable energy credit payment of this PPA(Sunnova shall furnish you with a availability in the amount used to calculate detailed calculation of such compensation if such a the Monthly Payments set forth in this claim is made). After you notify Sunnova of your Power Purchase Agreement desire to prepay, Sunnova will provide a notice to you("Prepayment Notice") informing you of the (v) confirmation that Sunnova will obtain all Estimated Post-Prepayment Production and the applicable benefits referred to in Section 8; amount you need to pay to prepay the PPA (the "Prepayment Amount)". The Prepayment Amount is (vi) receipt of all necessary zoning, land use and due within fifteen (15)days from the(late of the building permits; and Prepayment Notice. After you timely pay the Prepayment Amount in full,you will not make any (vii) completion of any renovations, further Monthly Payments. At the end of the Term. improvements or changes reasonably Sunnova will notify you of the actual kWh output per required at your Home or on the Property Year from the date of your prepayment to the end of (e.g..removal of a tree or necessary roof the Term("Actual Post-Prepayment Production"). repairs to enable us to safely install the If,at the end of the Term,the Estimated Post- System). Prepayment Production is greater than the Actual Post-Prepayment Production,Sunnova will pay you, Sunnova may terminate this Power Purchase the homeowner who prepaid this PPA,within sixty Agreement without liability if, in its judgment,any (60)days after the end of the Term an amount equal of the above listed conditions will not be satisfied for to the difference, if any, between the Actual Post- any reasons. Once Sunnova starts installation, Prepayment Production and the Estimated however, it may not terminate this Power Purchase Prepayment Production multiplied by the price per Agreement for your failure to satisfy the above listed kWh at the end of the Term(a"Prepayment conditions. Rebate"). Sunnova will send the Prepayment Rebate to the last address we have for you in our file and it (b) Amendments, Right to Terminate for Material is your responsibility to notify Sunnova if you move. Changes Before installation. If the Estimated Post-Prepayment Production is less than the Actual Post-Prepayment Production,you Both parties will have the right to terminate this will owe nothing to Sunnova. PPA, without penalty or fee, if Stmnova determines after the engineering site audit of your Home that it 5. Conditions Prior to Installation of the System; Change has misestimated the System's annual production by Orders. more than ten percent(10'%). Such termination right will expire at the earlier of(i)one(1)week prior to (a) Sunnova's obligation to install the System and sell the scheduled System installation date and (ii)one you the p ver it p rod ces is conditioned on the (l) month after we inform you in writing of the y r following items having been completed to its revised production estimate. If neither party xercises their right to terminate this PPA as set forth reasonable satisfaction: e above, then any changes to the System will be ( documented in an amendment to this PPA, including i) completion of(A)the engineering site audit (a thorough physical inspection of the Schedule A. You authorize Sunnova to make corrections to the utility paperwork to conform to Property, including,if applicable, this PPA or any amendments to this PPA we both geotechnical work),(B)the final System design,and (C)real estate due diligence to sign. confirm the suitability of the Property for the construction,installation and operation (c) Notification of Non-Materiat Changes Before of the System; Installation. onua t II) o4ir FJ Power Pm,n ha,u' �, rccnr r. �rsion u�i"014 (io,,-1i11--!Cunnw . f.nei,•9 t�urpoiatu>n.,All (Zi�_his IZ r,e<';. n .� If Sunnova determines after the engineering site YOU UNDERSTAND AND AGREE THAT ANY AND audit of your Home that it has misestimated the ALL (i)TAX CREDITS(ii)TAX INCENTIVES, (iii) System's estimated first Year annual production by RENF_.WABLE ENERGY CREDITS, GREEN TAGS, OR less than ten percent(10%),you authorize Sunnova CARBON OFFSET CREDITS, (iv)UTILITY REBATES, to amend the PPA, including Schedule A, to reflect OR(v) ANY OTLIER NON-POWER ATTRIBUTES OF the revised production, and to notify you of such THE SYSTEM ARE THE PROPERTY OF AND FOR revised production by providing you with a revised THF BENEFIT OF SUNNOVA, USABLE AT ITS SOLE: Schedule A. You also authorize Sunnova to make DISCRETION. SUN'NOVA SHALL HAVE THE corrections to the utility paperwork to conform to EXCLUSIVE RIGHT TO ENJOY AND USE ALL SUCH this PPA or any non-material amendments to this BENEFITS,WHETHER SUCH BENEFITS EXIST NOW PPA. OR IN THE FUTURE. YOU AGREE TO REFRAIN FROM ENTERING INTO ANY AGREEMENT WITH YOUR UTILITY THAT WOULD ENTITLE YOUR 6. Warranty. UTILITY TO CLAIM ANY SUCI I BENEFITS YOU UNDERSTAND THAT THE SYSTEM IS RETAINED BY SUNNOVA. YOU AGREE TO REASONABLY COOPERATE WITH SUNNOVA SO WARRANTED SOLELY UNDER THE LIMITED THAT IT MAY CLAIM ANY TAX CREDITS, WARRANTY ATTACHED AS EXHIBIT 1,AND THAT RENEWABLE ENERGY CREDITS, REBATES, THERE ARE NO OTHER REPRESENTATIONS OR CARBON OFFSET CREDITS OR ANY OTHER WARRANTIES, EXPRESS OR IMPLIED, AS TO THECARBON FROM THE SYSTEM.THIS MAY INCLUDE MERCHANTABILITY, FITNESS FOR ANY PURPOSE, TO THE EXTENT ALLOWABLE BY LAW, ENTERING CONDITION,DESIGN,CAPACITY, SUI'T'ABILITY OR INTO NET METERING AGREEMENTS, PERFORMANCE OF THE SYSTEM OR ITS INTERCONNECTION AGREEMENTS,AND FILING INSTALLATION. THE WARRANTY SET FORTH RENEWABLE ENERGY/CARBON OFFSET CREDIT HEREIN REPRESENTS THE SOLE AND EXCLUSIVE REGISTRATIONS AND/OR APPLICATIONS FOR REMEDY YOU HAVE AGAINST SLFN_NOVA REBATES FROM THE FEDERAL,STATE OR LOCAL RELATING TO THE SYSTEM OR THE POWER GOVERNMENT OR A LOCAL UTILITY.AND GIVING PURCHASED THEREUNDER. THESE TAX CREDITS, RENEWABLE ENERGY/CARBON CREDITS, REBATES OR OTHER BENEFITS TO SUNNOVA. 7. Transfer. Sunnova works with banks,companies and other financing g Purchasing the Svstem Prior to the End of the parties to finance the System. As a result, Sunnova may Term. assign this PPA to one of its financing parties. In addition, Sunnova may assign this PPA to its affiliates or a third In addition to purchasing the System at the end of the Term party that purchases the PPA. You agree that Sunnova may (see Schedule A),you have the option to purchase the pledge, assign, sell or transfer the System and this Power System prior to the end of the Tenn. To exercise this Purchase Agreement,or any part of this Power Purchase option you must be in good standing under this Power Agreement or•the exhibits,without your consent. Purchase Agreement and you need to give us at least one Assignment,sale or transfer generally cleans that Sunnova (1)month's, but not more than three(3) months' prior would transfer all or a portion of its rights and certain of its written notice. You can purchase this System: obligations under this Power Purchase Agreement to (i) on the five(5)year anniversary of the another party. beginning of the Term anis every annual anniversary after the Five(5)year anniversary; and 8. Ownership of the System; Tax Credits and Rebates. (ii) at any time after the five(5)year anniversary of the beginning of the Term, You agree that the System is and shall remain Sunnova's when you sell your Home: and exclusive personal property under the Uniform Commercial (iii) if Sunnova ever ceases its operations. Code or otherwise. You understand and agree that this PPA Tu each of(i),(ii) and(iii) above, the price you will pay for is not a contract to sell or lease the System to you. Sunnova file System will be tine greater of the System's fair market owns the System for all purposes,including any data value('"FMV")and the amount shown on Schedule A. The generated from the System. You shall at all times keep the interests of any financing party shall not be taken into System free and clear of all liens,claims, levies and legal account when determining the FMV; a third party processes not created by Sunnova,and shall at your expense independent appraiser will be retained to compute the protect and defend Sunnova against the same. System's FMV. Sunnova's maintenance and repair C',ntruc( ff): �o!ji 1=.7 f'o��cr ni�'h:h�' iecmcio` �rrsiun iu�???'7(�f ! h 'oW,'..'UI-!'Imimno� t F tic ,p ( Ewwiation.:V11 Pi,,his Rc­[ncd. d: :, obligations will end when you purchase the System unless If you are moving to a neve home in the same You enter into a new maintenance and repair agreement utility district,where permitted by the local with Sunnova,provided that you will have no less than a utility, the System can be moved to your new ten(10)year warranty on the System beginning on the home pursuant to the Limited Warranty.You Interconnection Date that guarantees that the System will be will need to pay all costs associated with free from defects in workmanship or defects in,or relocating the System, execute and provide the breakdown of, materials or components. same access and ownership rights to Sunnova as provided for in this PPA and provide any 10. Renewal. third party consents or releases required by Sunnova in connection with the substitute Provided you are in compliance rvitlt your PPA,you have premises. the option to renew your PPA for up to ten (10) Years in two (2)consecutive five(5) Year renewal periods. We will (iii) Prepay this Poster Purchase Agreement send you renewal forms at least ninety(90)days prior to the and Transfer only the Use of the System expiration of'the Term, which fornis shall set.1brth the new rates per kwh applicable for the renewal term as well as the You can prepay this Power Purchase rates applicable in the event the PPA is renewed.for one(1) Agreement as set forth in Section 4(il. The Year as providedfin-herein. The renewal forins will give Person buying your Home will only need to you the option to: (a)elect to renew the PPA for an sign a transfer agreement to assume your additional five(5) Year term at the rates specified in the rights(excluding the right to receive a renewal notice;or(b)elect not to renew the PPA. Fou must Prepayment Rebate) and non-Monthly nake your election whether to renew or not at least thirty, Payment obligations raider this PPA in (39)days prior to the end of'the then current term of the substantially the same form as Exhibit 3 to PPA. In the event that you affirmatively elect not to renew this PPA(a"Transfer Agreement''). this PPA as provider!for in part(b)above this PPA shall expire by its terms on the expiration of the then current (b) You agree to give Sunnova at least fifteen(15}clays term. If yon don't send its anything in writing you will be but not more than three(3)months' prior written deemed to have renewed for additional one(1) Year terms notice if you want someone to assume your PPA at a rate which equals the rate per kwh applicable at the obligations. In connection with this assumption, expiration of the then current terur phis two point nine you,your approved buyer and Slnlnova shall execute percent(2.9%);and this PPA shall continue to renew for a Transfer Agreement Unless we have released you additional one(1) Year terns on the above described rate from your obligations in writing, you are still until(i)you give its notice at least thirty(30) dims prior to responsible for performing under this PPA. If your the expiration of the then current term that you do not wish buyer defaults on this PPA and we have not yet to renefv;or(ii) we send you a notice terminating the PPA signed theTransfer Agreement,you will be at least thirty(30) days prior to the expiration of the then responsible for their default. We will release you current term. from your obligations tinder this PPA in writing once we have a signed Transfer Agreement with the person buying your Home(provided such person has 11. Selling Your Home. been approved as a transferee by Sunnova in writing). (a) If you sell your Home you can: (c) if you sell your Home and can't comply with any of (i) Transfer this Power Purchase Agreement the options in subsection (a)above.you will be in and the MonthIN Payments default under this Power Purchase Agreement. Section I1(a)includes a Home sale by your estate or If the person buying your Home meets heirs. Sunnova's credit requirements, then where permitted by the local utility, the person (d) EXCEPT AS SET FORTH IN THIS SECTION, buying your Home can sign a transfer YOU WILL NOT ASSIGN, SELL.PLEDGE OR IN agreement assuring all of your rights and ANY OTHER WAY TRANSFER YOUR obligations under this Power Purchase INTEREST IN THE SYSTEM OR THIS PPA Agreement. WITHOUT OUR PRIOR WRITTEN CONSENT, WHICH SHALL NOT BE UNREASONABLY (ii) Move the System to Your New Home WITHHELD AS LONG AS YOU AND THE `;unnc�a F.ner � G'.ir��o� ��iun. QUI Rights i" .. AM, y PROPOSED TRANSFEREE MEET THE OTHER something you have agreed not to do., like alter the REQUIREMENTS SET FORTH HEREIN. System)and such failure continues for a period of fourteen(14)days after written notice; 12. Loss or Datna(_,re. (c) you or your guarantor have provided any false or misleading financial or other information to obtain Unless (a) you are negligent or(b)you intentionally this Power Purchase Agreement; damage the System, Sunnova will bear all of the risk of loss, damage,theft, destruction or similar occurrence to any (d) you assign,transfer, encumber, sublet or sell this or all of the System. PPA or any part of the System without Sunnova's prior written consent;or In the event you are negligent or intentionally damage the System you shall be liable to pay Sunnova the greater of(a) (.e) you or any guarantor makes an assignment for the the actual damages suffered by Sunnova; or(b) the amount benefit of creditors, admits in writing its insolvency, determined in Section 4(J). Except as expressly provided in tiles or there is filed against you or it a voluntary this PPA,no loss, damage, theft or destruction will excuse petition in bankruptcy, is adjudicated bankrupt or you from your obligations under this PPA, including insolvent or undertakes or experiences any Monthly Payments. substantially similar activity. 13. limitation of Liability. 15. Remedies in Case of Default. (a) No Consequential Damages If this Power Purchase Agreement is in default, we may take any one or more of the following actions. If the law SUNNOVA'S LIABILITY TO YOU UNDER THIS requires us to do so,we will give you notice and wait any POWER PURCHASE AGREEMENT SHALL BE period of time required before taking any of these actions. LIMITED TO DIRECT, ACTUAL DAMAGES We may: ONLY. YOU AGREE THAT IN NO EVENT SHALL EITHER PARTY BE LIABLE TO THE (a) terminate this PPA; OTHER FOR CONSEQUENTIAL, INCIDENTAL, PUNITIVE, EXEMPLARY, SPECIAL OR (b) take any reasonable action to correct your default or INDIRECT DAMAGES. to prevent our loss; any amount we pay will be added to the amount_you owe us and will be immediately (b) Actual Damages due: EXCEPT FOR CLAIMS UNDER SECTION 4(H), (c) require you,at your expense, to return the System or NEITHER PARTY'S LIABILITY TO THE OTHER make it available to us in a reasonable manner; WILL EXCEED AN AMOUNT EQUAL TO THE MAXIMUM AMOUNT THAT COULD BE (d) proceed, by appropriate court action, to enforce PAYABLE BY YOU UNDER SECTION 15(H). performance of this PPA and to recover damages for DAMAGES TO YOUR HOME, BELONGINGS OR your breach; PROPERTY RESULTING FROM THE INSTALLATION OR OPERATION OF THE (e) disconnect,turn off or take back the System by legal SYSTEM ARE COVERED IN THE LIMITED process or self-help, but we may not disturb the WARRANTY. peace or violate the law; 14. Default. (t) report such non-operational status of the System to your utility, informing them that you are no longer You will be in default under this Power Purchase net metering; Agreement if any one of the following occurs: (g) charge you a reasonable reconnection fee for (a) you fail to make any payment when it is due and reconnecting the SN stein to your utility or turning the such failure continues fora period of ten(10)days; System back on after we disconnect or turn off the System due to your default; (b) you fail to perforin any material obligation that you have undertaken in this PPA(which includes doing Conu:.ct fl): Soiai F.? Pw,�c i,Flmchai A_ie, iwni 14 �;.-;01!f;unnr, t ii rrs C rr�xir,Hion, All Fti«ht,,Res.i,cd. proceedings unifier Section 18,and not the Arbitration acts. (In) recover from you (i)all accrued but unpaid Monthly statutes or rules of any otherjurisdiction. Payments, taxes, late charges,penalties, interest and all or any other sums then accrued or clue and owing, plus(ii) the estimated amount of ILlture Monthly 18. Arbitration. Payments,each payment discounted to present value PLEASE READ THIS SECTION CAREFULLY. at 51!%per annum, plus(iii) reasonable compensation, ARBITRATION REPLACES THE RIGHT TO GO TO on a net after tax basis assuming a tax rate of 35%i for the loss or recapture of(A) the investment tax COURT,INCLUDING THE RIGHT TO A JURY AND credit equal to thirty percent(30°4,)of the System THE RIGHT TO PARTICIPATE [N A CLASS ACTION cost, including installation: and(B)accelerated OR SIMILAR PROCEEDING. IN ARBITRATION,A depreciation over five (5)years equal to eighty Live DISPUTE IS RESOLVED BY AN ARBITRATOR percent(RS°,))of the System cost, including INSTEAD OF A JUDGE OR JURY. installation, and for the loss of any anticipated benefits pursuant to Section 8 of this PPA(Sunnova We agree that any dispute,claim or disagreement between shall furnish you with a detailed calculation of such us (a"Dispute")shall be resolved exclusively by arbitration. compensation if such a claim is made); or The arbitration, including the selecting of the arbitrator,will (i) use any other remedy available to us in this PPA or be administered by the American Arbitration Association by law. ("AAA"),under its Commercial Arbitration Rules(the "Rules")by a single neutral arbitrator agreed on by the report in about your performance under parties within thirty(30)days of the commencement of the We may r this PPA e consumer credit agencies(credit bureaus). Late arbitration. The arbitration will be governed by the Federal nursed � mems or other defaults hereunder Arbitration Act(Title 9 of the U.S. Code). Either party may payments, p`y initiate the arbitration process by filing the necessary forms may be be reflected in your credit report. with AAA.To learn more about arbitration.you can call any AAA office or review the materials at www.adr.org. The You agree to repay us for any reasonable amounts we incur to correct or cover your default and to enforce our rights arbitration shall be held in the location that is closest to your under this PPA including,but not limited to,attorney's� fees Home. and court costs.You also agree to reimburse us for any If you initiate the arbitration,you will be required to pay all costs and expenses we incur relating to the System's return of the filing fees and all of the arbitration fees and costs. If resulting from early termination. By choosing any one or we initiate the arbitration,we will pay all of the filing fees More of these remedies, Sunnova does not give up its right and all of the arbitration fees and costs. We will each bear to use another remedy. By deciding not to use any remedy all of our own attorney's fees and costs except that: (A)you should this Power Purchase Agreement be in default, are entitled to recover your attorney's fees and costs from Sunnova does not give up our right to use that remedy in Sunnova if you prevail in the arbitration and the award you case of a subsequent default. receive from the arbitrator is higher than Sunnova's last written settlement offer; and (B) Sunnova is entitled to 16. System Removal; Return. recover its attorney's fees and costs from you if it prevails in the arbitration or if the award you receive from the At the end of the Term or the termination of this PPA, if arbitrator is equal to or less than Sunnova's last written you have not renewed this PPA or exercised your purchase option(if any)and you have not defaulted,then within settlement offer. When determining whether your award is ver than Sunnova's last written higher,equal to or loN ninety(90)days you agree to call Sunnova at the telephone settlement offer your attorney's fees and costs will not be number listed in Exhibit 1,or any other number we notify included. you of in the future,to schedule a convenient tine for Sunnova to ren-love the System fi-onn your Home at no cost Only Disputes involving you and Sunnova may be addressed to you unless the termination was clue to your default which in the arbitration. Disputes must be brought in the name of is addressed in Section 15. an individual person or entity and must proceed on an individual(non-class,non-representative)basis.The 17. Applicable Law. arbitrator will not award relief for or against anyone wino is not a party. If either of us arbitrates a Dispute, neither of us. The laws of the state where your Home is located, without nor any other person.may pursue the Dispute in arbitration as a class action,class arbitration, private attorney general giving effect to conflict of laws principles, shall govern this PPA,except the Federal Arbitration Act,9 U.S.C. § t,et action or other representative action,nor may any such seq.,shall govern interpretation,enforcement and Dispute be pursued on your or our behatf in any litigation in any court. Claims regarding any Dispute and remedies Conti t II) 2iu) -'ul ,tion ur-:i Foo �n'�xxurn>n. All Ri,htt;R >tr�ccl. sought as part of a class action,class arbitration,private not be construed to(i) be a waiver of such provisions or a attorney general or other representative action are subject to party's right to enforce that provision; or(ii) affect the arbitration on an individual (non-class, non-representative) validity ol'this PPA. basis, anis the arbitrator may award relief only on an 20. Notices. individual (non-class, non-representative) basis.This means that the arbitration may not address disputes involving other All notices under this PPA shall be in writing and shall be persons with disputes similar to the Disputes between you by personal delivery, facsimile transmission,electronic and Sunnova. mail. overnight courier, or certified or registered mail. The arbitrator shall have the authority to award any legal or return receipt requested,and deerned received upon equitable remedy or relief that a court could order or grant personal delivery,acknowledgment of receipt of electronic under this agreement. The arbitrator, however, is not transmission, the promised delivery date after deposit with authorized to change or alter the terms of this agreement or overnight courier, or five(5)days after deposit in the mail. to make any award that would extend to any transaction Notices shall be sent to the person identified in this PPA at other than yours. All statutes of limitations that are the addresses set forth in this PPA or such other address as applicable to any dispute shall apply to any arbitration either parry may specify in writing. Each party shall deem between us. The Arbitrator will issue a decision or award in a document faxed to it as an original document writing, briefly stating the essential findings of fact and 21. Entire Aureement; Chances. conclusions of law. This PPA contains the parties' entire agreement regarding BECAUSE,YOU AND WE HAVE AGREED TO the sale and purchase of power generated by the System. ARBITRATE ALL DISPUTES EXCEPT AS PROVIDED There are no other agreements regarding this PPA,either FOR IN THE LAST PARAGRAPH OF THIS SECTION written or oral. Any change to this PPA must be in writing 18,NEITHER OF US WILL HAVE THE RIGHT TO and signed by both parties. If any portion of this PPA is LITIGATE THAT DISPUTE IN COURT, OR TO HAVE A determined to be unenforceable,the remaining provisions JURY TRIAL ON THAT DISPUTE,OR ENGAGE IN shall be enforced in accordance with their terms or shall be DISCOVERY EXCEPT AS PROVIDED FOR IN TI IE interpreted or re-written so as to make them enforceable. RULES. FURTIIER,YOU WILL NOT HAVE THE RIGHT TO PARTICIPATE AS A REPRESENTATIVE OR 22. Publicih. MEMBER OF ANY CLASS PERTAINING TO ANY DISPUTE.THE ARBITRATOR'S DECISION WILL BE Sunnova will not publicly use or display any images of the FINAL AND BINDING ON THE PARTIES AND MAY System unless you initial the space below. If you initial the BE ENTERED AND ENFORCED IN ANY COURT space below,you give us permission to take pictures of the HAVING JURISDICTION. EXCEPT TO THE EXTENT System as installed on your Home to show to other IT IS SUBJECT TO REVIEW IN ACCORDANCE WITH customers or display on our website. APPLICABLE LAW GOVERNING ARBITRATION AWARDS. OTHER RIGI-ITS THAT YOU OR WE WOULD HAVE IN COURT MAY ALSO NOT BE Homeowner's Initials AVAILABLE IN ARBITRATION. NOTWITHSTANDING THE FOREGOING,NOTHING HEREIN CONTAINED SHALL BAR THE RIGHT OF SUNNOVA TO: (1)OBTAIN INJUNCTIVE RELIEF FROM A COURT AGAINST THREATENED CONDUCT THAT COULD CAUSE IT LOSS OR DAMAGES, 23. Counterparts. UNDER THE USUAL EQUITY RULES. INCLUDING THE APPLICABLE RULES FOR OBTAINING Phis PPA may be executed simultaneously in any number RESTRAINING ORDERS AND PRELIMINARY of counterparts. Each counterpart shall be deemed to be an INJUNCTIONS; OR(II)OBTAIN A JUDGMENT FROM original,and all such counterparts shall constitute one and A COURT HAVING JUSRISDICTION CONFIRMING the same instrument. The parties agree that this PPA and THE AWARD OF THE ARBITRATORS. signature pages may be signed electronically and transmitted between them by facsimile or by electronic mail 19. Waiver, and that electronic, fared and PDF signatures shall constitute original signatures and that an electronic, faxed Any delay or failure ofa,party to enforce any of the or PDF signature page containing the signature(electronic, provisions of this PYA,including but not limited to any faxed, PDF or original) is binding upon the parties. remedies listed in this PPA,or to require performance by the other party of any of the provisions of this PPA, shall Cvnuact t[a: `�otar F„/ ('nicer Pur f),r,c.l 21ccrncti r";inn .0_>1':'tV14 10 1 u)',-_(ll !`,unnuc,i Fn ,_y('nipo �iiioi7. ?\ I Rishl.. R�:atr.cd. s n n 24. Further Assurances. You will cooperate fully with us to effect the intent and provisions of this PPA and, From time to time, to execute and deliver any and all other agreements,documents or instruments, and to take such other actions, as Sunnova may determine to be reasonably necessary or desirable to effect the intent and provisions of this PPA. REST OF PAGE INTENTIONALLY LEFT BLANK o1 F7 (',mt'r 11,11 crncn� iino i E neIt, urpmra!iun !VII��i ht:Rc.�rvcci. SU-nfl-l ", MIDNIGHT OF THE SEVENTH CALENDAR DAY 25. NOTICE OF RIGHT TO CANCEL. AFTER THE DATE OF THIS TRANSACTION. SEE YOti,THE OWNER, MAY CANCEL THIS EXHIBIT 4,THE ATTACHED NOTICE OF TRANSACTION AT ANY TIME PRIOR TO CANCELLATION FORM FOR AN I?XPLANATION OF THIS RIGHT. I have read this Power Purchase Agreeulent and the Exhibits in their entirety and I acknowledge that 1 have received a complete copy Of this Power Purchase Agreement. Owner's Name: Brian Birchall �] Signature: Date: July 28th 20715 Co-Owner's Name (if my): Erin Birchall Signature: Date: r\ Sunnova Energy Corporation: ynda Attaway SVP Operations Sunnova Energy Corporation Date: C uliti'm II)_ ti>1ar F,7 Po,\cr PjI f,t•,c A Ttument tii ,n nit'1"til I �i1OF->tiI I -uno;;t Fmc; C n u�auor r\fl F�irhi,R� I �cn�1. Trinity Solar 20 Patterson Brook Road Wareham, MA 02571 508-291-0007 Date: 7/28/15 I Brian Birehall do hereby grant Trinity Solar the right to sign on (Homenwrer'z\mnel '., my behalf in all matters regarding the permit applications through the township of North andover for the installation of solar panels and all other (A(un:ciPnuty) related work on my property at 72 Mablin Avenue . Please accept this (SL—,Address) '... document,with full signature, in place of all application signatures. Furthermore, should there be any issues or discrepancies with the paperwork, please contact Danielle DeVito at Trinity Solar, 732-780-3779 ext, 9044 or danielle.devito@trinitysolarsystems.com. Sincerely, 5V-VI Dk"q 72 Mablin Avenue Homeowner's Signature Street Address Brian Birchali North Andover MA 01845 Print name City,State,Zip Code 978-208-1473 Phone Number Optimize Engineering Co", LLC C P.O. Box 264°Parmmvi|leoVA 23901 Ph:434.674.E138wE-nmai]: grichardpe@aol.com � Richard EiGordon, P.E. President August 3,2018 North Andover Building Department North Andover, K8A Re: Solar Panels Roof Structural Framing Support ToWhom |tMay Concern: � I hereby certify that I am a Licensed Professional Engineer in the State of Massachusetts. Please note the following conclusions regarding framing structure,roof loading,and proposed site location of installation: 1. Existing roof framing: Conventional frai is 2x6 at 16" with 12' i1"span(horizontal rafter projection). This existing structure is definitely capable to support all of the loads that are indicated below for this photovoltaic project after sister rafters with a 2x8 using (2)10u nails o.c. us=q,pv � Guard DogTm FMGDO02 screws is approved,or equal shear strength of approx.120 lb, V o.c.at areas where little space is available only with remainder of member secured with(2)10d nails Vo.c. If do not sister,then install a 2x4 @ 16"o.c. knee wall over an interior bearing wall to limit span of rafters between supports tmS''6". 2' Roof Loading ° 4.33pof dead load (modules plus all mounting hardware) ° 33pofsnow live load(55pefground snow live load reference) * 4.5pefdead load roof materials 0 Exposure Category B, 115 mph wind uplift live load of 19.6 psf(wind resistance) 3. Address of proposed installation: Residence ofBrian Birchall,72 Mablin Avenue, North Andover, Wassachusetts This installation design will be in general conformance to the manufacturer's specifications,and is in compliance with all applicable laws,codes,and ordinances,and specifically,International Residential Code/ IRC 2O09.2O11NEC,and 2012 ICC Energy Code. The spacing and fastening pfthe Uniraumounting brackets is to have a maximum of 64"o.c.span along the rail between mounting brackets and secured using 5116"x31/2' length corrosive resistant steel lag bolts. |norder toevenly distribute the load across the roof rafters,there shall be a minimum of 2 mounting brackets per rafter&min.2" penetration of lag bolt per bracket,which is adequate to resist all 115 mph wind live loads including wind shear. The mounting brackets shall alternate between adjacent rafters between rail rows for better distribution of roof load. Penetration of anchors for modules mounted within 18" of ridge and edges of roof is to be a minimum of 3". Rails may be attached to either of two mounting holes in the L-feet. Mounting in the lower hole for a low profile,more aesthetically pleasing installation or mount in the upper hole for a higher profile to maximize airflow under the modules to cool them more.Slide the N-Inch mounting bolts into the footing bolt slots. The rails will baattached tmthe footings with the flange nuts. Very truly yours, Optimize Engineering Co° LLC YNnommchuae�sP.E. Lioeneallo.49893 . MECHANICAL ENGINEERING CIVIL ENGINEERING ELECTRICAL ENGINEERING Massachusetts Home Improvement Sample Contract This form satisfies all basic regtnrem encs of the status Home Improvement Conuacloi Law(MGL chapter 142A),but does not include standard language to protect hen nicoi vers, Seek legal advice if necessary Any person planning home improvements should first obtain a copy of"A Massachusetts Consumer cruide io Home improvement"before agreeing to tiny work on your residence You may obtain a free copy by calling the Office of Consumer Affnirs and Business Refill lilt lou s Consumer information Hotline in 617-973-8787 or I-888-283-3757 or on our website_ Homeowner information Contractor hlformation Name Comp:my Name Brian Birchall Trinity Solar Succt Address(dc not use a Post Otbc°box ad(Itz�s) Contractor/Sale;pzrsoa Qmlei Name 72 Mablin Ave Gregg LaCasse - - CltylTovm Stefc Zip Code kiuuness,\dates nnnst inchade a ser•al address} North Andover, MA 01845 20 Patterson Brook Road Unit 10 ------- Ilatmnme phore Fvening phone — - CityrFown State Zip CMC 978-208-1473 West Wareham MA 02571 Afeultng lit d Address i Cr mil from d vc) --— —� Business phene508-291-0007 Pedzral ftmph}<r V c r S.c..*lamb•r - na,R anprovmam coras�tor r,�t.,a.t<r =.xp,�et„ml< r,n..rop,"v<:ma most htn,t Imp ratemen+tt(,aYGOn have 170355 slid n�,trvdon namh"' The Contractor agrees to do the following work for the Homeowner: 1Describein detail the work to completed,specifying he ly7.a,brand,mrd grade of materials to be used,use additional sheets if cecesSin') install 6.24kw solar panels on roof. Not to exceed roof panel but will add 6"to roof height. 24 panels total. Panel type Trina-260,for more detailed info see attached"Snap Rack" packet Required Permits-The following building permits are required Proposed Start and Completion Schedule-The following schedule will and will be secured by the contractor as the bomeowner's agent: be adhered to unless circumstances beyond tyle contractor's control arise (Owners who secut-e their own pei-inits will be excluded front the Guaranty Fund provisions of __TB D _Datc when contractor will begin contracted work. MGL chapter 142A,) TBD Date when contracted work will be substantially completed. 'Dotal Contract Price and Payment Schedule ' The Contractor agrees to perform the work,furnish the material and labor specified above for the total sum of: _$25;0_00 _M Tzryments will be made according to the following schedule: please see attached contract S upon signing contract(not to exceed 113 of the total contract price a the cost of special order items,whichever is grester) S by _/ / or upon completion of _- _ —__ ------- S__ by_/ / or upon completion of S upon completion of the contract (Lew forbids demanding full payment until contract is completed to both party's satisfaction) The following materiaUequipmenl merit be special S to be paid for ordered before the contracted work begins in order to meat the completion schedule.("') S.__—._-__. to be paid for NOTES:(')Including all finance charges("1 Laev reyuiies that;my deposit or dorm-payment required by the amiraelor beford work b=gins may not exceed the greater of(a)one-third of the total contact price or(b)the actual cost of any special equipment or canteen mall:material wllch must be special ordered in advarmoc to meet Ila completion seluedule. s\5 r 1 r re smrarrnntm telae arom idea dm mho rnnlrador7 ❑No01'am:falu ro,oftl,au sunt•must he attached to lite contract) Subcontractors-The contractor agrees to be solely responsible for completion of the work described regardless of the actions of an}tli n9 party/subcontractor utilized by the contractor. The contractor further a reel to be solely responsibie for all payments to alt subcontractors for materials and labor Linder this a regiment not a lieable to soar installation Contract Acceptance-Upon signing,this document becomes a binding contract under law. Unless otherwise noted within Umis document,the contract shall not imply that any lien or other security interest has been placed on the residence. Review the following cautions and notices carefully before signing this contract • Don't be pressured into signing the contract fake time to read and fully understand it Ask questions if something is unclear • Make surethe etantrncior utas n unit!Ilotttn Tntarovomont Guntrnttor Resllsttatipn. The law requires most home improvement contractors and subcontractors to he registered with the Director of Home Improvement Contractor Registration You may inquire about contractor registration by writing to the Director at 10 Park Plaza,Room 5170,Boston.MA 02116 or by calling 617-973-8787 or 888-283-3757, foes the contractor have insurance? Ask the Contractor for his insurance company information so that you can confirm coverage.or ask to see a copy of a"proof of insurance"document. • Know your rights and responsibilities. Read the Important Information on the reverse side of this form and get a copy of the Consumer Ouide to the Home Improvement Contractor Law. You may cancel this agreement if it has been signed at a piece other than the contractor's normal place of business,provided you notify the contractor in wr ting at his/liner main office or branch c fttice by ordinary mail posted•by telegram sent or by delivery,not later than midnight of the third business in}'following the signing of this agreement. See the attached notice of cancellation form for an erplanatlon of this right DO NOT SIGN THIS CONTRACT IF THERE ARE ANY BLANK SPACES!!! Tn•o identical copies of the contract mart be completed and sussed.(?"e copy d,add go la the homer ¢r.TLe other co py dtould be kejA by the cotdnctor. lease see attached — Homeowner'sSignature Conlrator Signature 10/28/15 10/28/15 Date Date Contractor Arbitration The Home Improvement Contractor Law provides homeowners with the right to initiate an arbitration action(as an alternative to court action)if they have a dispute with a contractor. The same right is not automatically afforded to a contractor,however. The contractor would have to resolve any dispute heishe has with a homeowner in court unless both parties agree to the optional clause provided below. This clause would give the contractor the same right to arbitration as is afforded to the homeowner by the Hone tmprovement Contractor Law. The contractor and the homeowner hereby mutually agree in,advance that in the event the contractor has a dispute concerting this contract,the contractor may submit the dispute to a private arbitration fine ,NIiicli has been approved by the Secretary of the Executive Office of Consumer Affairs and Business Regulation and the consumer shall be required to submit to such arbitration as provided In Massachusetts General LawsAchcr 142A. please see attached IIa»eownet s Stgnatiure Contractor's,ignature NOTICE:The signatures of the parties above apply only to the agreement of the parties to alternative dispute resolution initiated by the contractor. The homeowner may initiate alternative dispute resolution even where this section is not separately signed by the parties. Homeowner's Rights A homeowner's rights under the Home Improvement Contractor Law(MGL chapter 142A)and other consumer protection laws(i.e.MGL chapter 93A)may not be waived in any vial',even by agreement. However,homeowners may be excluded from certain rights if the contractor they choose is not properly registered as prescribed by law. Homeowners who secure their oven building permits are automatically excluded from all Guaranty Fund provisions of the Home Improvement Contractor Law. The contractor is responsible for completing the work as described,in a timely and workmanlike manner. Homeowners stay be entitled to other specific legal rights if the contractor guarantees or provides an express warranty for workmanship or materials: In addition to guarantees or warranties provided by the contractor,all goods sold in Massachusetts carry an implied warranty of merchantability and fitness for a particular purpose. An enumeration of other matters on which the homeowner and contractor lawfully agree may be added to the terms of the contract as long as they do not restrict a homeowner's basic consumer rights. If you have questions about your consmner/homeowner rights,contact the Consumer information Hotline(listed below). Execution of Contract The contract must be executed in duplicate and should not be signed until a copy of all exhibits and referenced documents have been attached. Parties are also advised not to sign the chxument until all blank sections have been filled in or marked as void,deleted,or not applicable. One original signed copy of the contract with attachments is to be given to the owner and the other kept by the contractor. Any modification to the original contract must be in writing and agreed to by both parties.Contracted work may not begin until both parties have received a fully executed copy of the contract,and Elie three day rescission period has expired. Accelerated Payments A contractor may not demand payments in advance of the dates specified on the payment schedule in cases where the homeowner deems him/herself to be financially insecure. However,in instances where a contractor deems him./herself to be financially insecure,the contractor may require that the balance of funds not yet due be placed in ajoint escrow account as a prerequisite to continuing the contracted work. Withdrawal of finds from said account would require the signatures of both parties. Additional Information If yon have general questions or need additional information about the Home Improvement Contractor Law or other consumer rights,or if you wish to obtain a free copy of "A Massachusetts Consumer Guide to Home Improvement" contact: Consumer Information Hotline Office of Consumer Affairs and Business Regulation 10 Park Plaza,Room 5170,Boston,MA 02116 617-973-8787,888-283-3757 or visit the OCABR website at http:lwww mass.eov/ocabr! If•you want to vent} the registration of a contractor or if you have questions or need additional information specifically about the contractor registration component of the Home Improvement Contractor Law,contact: Director of Home Improvement Contractor Registration Office of Consumer Affairs and Business Regulation 10 Park Plaza-,Room 5170,Boston,MA 02116 617-973-8787,888-283-3757 or visit the HIC website at http://wxx w mass goviocalin' Go online to view the status of a Home Improvement Contractor's Registration hit rsidbccnscciistus r For assistance with informal mediation of disputes or to register formal complaints against a business,call: Consumer Complaint Section Office of the Attorney General 617-727-8400 AND/OR Better Business Bureau 508-652-4800,508-755-2548 or 413-734-3114 Version 2.1-11121/20 10 pV2() � E �.Si'('4ilbS'e.V �iLi SCe 17J. 1.JC)l]_i1011, X770,1Sun-� 1. 281 9'3 5.9900 v:v 1. Lrntur .r om SUMMARY Homeowner Name and Address Co-Owner Name(If Any) Installation Location Contractor License Brian Birchall 72 Mablin Avenue,North Trinity Heating and Air Inc. 72 Mablin Avenue,North Andover,MA 01845 Trinity, Solar Andover,MA 01845 2211 Allenwood Rd Wall,New Jersey 07719 Contract ID OOKMSK 13VH01244300 New Jersey Estimated Solar Energy Production Estimated First Year Annual Production: 7,568 kWh Estimated Initial Term Total Production: 178,134 kWh i Payment Terms Annual Increase of Solar Energy Rate: 2.90%/year First Year Solar Energy Rate, if paid by ACH: $0,110/kWh First Year Solar Energy Rate, if not paid by ACH: $0.121/kWh Monthly Bill in First Year, if paid by ACH: $69.37/month Monthly Sunnova in First Year, if not paid by ACH: $76.31/month 1. Introduction. continuing until the day prior to the anniversary of the This Power Purchase Agreement(this"Power Purchase Interconnection Date. Sunnova will notify you by email Agreement"or"PPA")is the agreement between you and when the System is ready to be turned on. Sunnova Energy Corporation(together with its successors 3. Power Purchase Agreement Payments;Amounts. and assigns,"Sunnova"or"we"),covering the sale to you of the power produced by the solar panel system(the "System")described below. Sunnova agrees to sell to you, (a) Power Price. You are purchasing the power the and you agree to buy from Sunnova,all of the power System produces. The price of that power is set forth on the"Value Statement"attached as Schedule A. produced by the System on the terms and conditions described in this Power Purchase Agreement. The System will be installed by Sunnova or a contractor acting on (b) Pam. Schedule A details,among other things, Sunnova's behalf at the address you listed above. This (i)the price per kWh you will be charged per Year; Power Purchase Agreement will refer to this address as the (ii)the annual price per kWH percentage increase(if "Property"or your"Home." Sunnova provides you with a any);(iii)Sunnova's estimate of the power that is Limited Warranty(the"Limited Warranty"). The Limited expected to produced the System during the Warranty is attached as Exhibit 1. This is a legally binding first Year;(ivv))Sunnova's estimate of the amount of power that is expected to be produced by the System agreement with disclosures required by law,so please read everything carefully. If you have any questions regarding over the entire Term(excluding any renewal period(s)extending the Term as provided in Section this Power Purchase Agreement,please ask the sales c 10);and(v)your Monthly Payment amount for the consultant who provided you this PPA. Note that first Year. Your"Monthly Payment"is calculated references in this PPA to the term"day"means a calendar based on the following: (A)the annual price per day. kWh multiplied by(B)the estimated kWh output per 2. Term. Year("Estimated Annual Production")divided by (C)twelve(12). Each Monthly Payment is due on Sunnova agrees to sell you the power generated by the the seventeenth(17th)calendar day of the month for System for 25 years(300 months),plus,if the the previous calendar month unless it is not a Interconnection Date is not on the first day of a calendar business day,in which event,the Monthly Payment month,the number of days left in that partial calendar for such month will be due on the first business day month. We refer to this period of time as the"Term." The after the seventeenth calendar day of such month. Term begins on the Interconnection Date. The Any payments due upon installation are due "Interconnection Date"is the date that the System is turned immediately prior to commencement of installation. on and generating power.A"Year"is the twelve(12) You will not make a Monthly Payment if you fully month period beginning on the Interconnection Date and prepay this PPA as provided in Section 40). Contract ID: Solar EZ PoNver Purchase Agreement version p02 172014 1 s 2008-2014 Sunnova Energy Corporation.All Rights Reserved. . )v a s u 2+; `r , t (,:ec n v,3.i 1'11/.B SAC 4-5, 11 a S1011. t`t '7(1,1{ 1 281 X35.9900v. unt)cv-t ct,tn MIDNIGHT OF THE SEVENTH CALENDAR DAY 25. NOTICE OF RIGHT TO CANCEL. AFTER THE DATE OF THIS TRANSACTION. SEE YOU,THE OWNER,MAY CANCEL THIS EXHIBIT 4,THE ATTACHED NOTICE OF TRANSACTION AT ANY TIME PRIOR TO CANCELLATION FORM FOR AN EXPLANATION OF THIS RIGHT. I have read this Power Purchase Agreement and the Exhibits in their entirety and I acknowledge that I have received a complete copy of this Power Purchase Agreement. Owner's Name: Brian Birchall LSignature: Date: July 28th 2015 Co-Owner's Name(if any): Erin BirChall Signature: Date: �►\ Sunnova Energy Corporation: ynda Attaway SVP Operations Sunnova Energy Corporation Date: Contract ID: Solar EZ Power Purchase Agreement version p02172014 12 S 2008-2014 Sunnova Energy Corporation,All Rights Reserved DocuSign Envelope ID:081596F1-474D-428E-B62C-B8E76BA4D589 SOLAR SYSTEM WORK ORDER AMENDMENT This Work Order Amendment is hereby made and entered into by and between Sunnova Energy Corporation and Trinity Heating and Air Inc. ("Parties") on August 7, 2015. WHEREAS, the above stated parties have previously entered into Solar System Work Order Agreement("Work Order")and the Parties wish to amend the Work Order as stated below. Sunnova and Contractor agree as follows: 1. The Solar System that is the subject of this Work Order shall be designed,engineered,procured,constructed, and installed as follows: Sunnova System ID OOKMSK Contract Amount($) $25,423.92 Job Site Address 72.0 Mablin Avenue North Andover,MA 01845 Job Site Utility Company Massachusetts Electric-National Grid System Size(STC DC kW) 6.240kW Incentives(Rebate)Authority Commonwealth Solar II Incentives(Rebate) Amount $0.00 Module Model and Count Trina Solar TSM-260PD05.08(16) Trina Solar TSM-260PD05.08(4) Trina Solar TSM-260PD05.08(4) Inverter Model and Count SolarEdge SE5000(240V)(1) SolarEdge SE5000(240V)(0) SolarEdge SE5000(240V)(0) Racking IronRidge Monitor Itron Year 1 Annual Production 7568 IN WITNESS WHEREOF,the Parties have caused this Amended Work Order to be executed as of the respective dates set forth below. Sunnova Energy Corporation Trinity Heating and Air Inc. DocuSiignned by: By: Efa vubt L�yc(a ��tawa� CF0586497CA147C Lynda Attaway Name: SVP Operations Title: Sunnova Energy Corporation Date: Copyright©2013 by Sunnova Energy Corporation All rights reserved. 20 East Greenway Plaza Ste 475, Houston,--',X 77046 T 231.98.5.9900 wtivw.sumnova.cain Schedule A:Value Statement Estimated Solar Energy Production Estimated First Year Annual Production: 7,568 kWh Estimated Initial Term Total Production: 178,134 kWh Payment Terms Amount Due at Contract Signing: $0.00 Installation Fee: $0.00 Annual Increase of Solar Energy Rate: 2.90%/year First Year Solar Energy Rate, if paid by ACH: $0.110/kWh First Year Solar Energy Rate, if not paid by ACH: $0.121/kWh Monthly Bill in First Year, if paid by ACH: $69.37/month Monthly Bill in First Year, if not paid by ACH: $76.31/month m ner s I dols By your initials here you acknowledge that you have reviewed this Schedule A: Prepay Option Purchase Option End of Annual Price per kWh Annual Price per Estimated kWh per Estimated Price to Minimum Cash Year (assuming payment by kWh Year'("Estimated Prepay the Remainder of Purchase Price3 Credit Card) (assuming payment Annual Production") the Term' by ACH 1 $0.121 $0.110 7,568 $15,194.58 $0.00 2 $0.125 $0.113 7,530 $15,079.04 $0.00 3 $0.128 $0.116 71492 $14,936.83 $0.00 4 $0.132 $0.120 7,454 $14,766.14 $0.00 5 $0.136 $0.123 7,416 $14,567.07 $0.00 6 $0.140 $0.127 7,378 $14,333.59 $24,059.08 7 $0.144 $0.131 7,341 $14,065.50 $23,066.66 8 $0.148 $0.134 7,304 $13,760.51 $22,000.41 9 $0.152 $0.138 7,267 $13,418.11 $20,858.78 10 $0.157 $0.142 7,230 $13,032.07 $19,630.83 11 $0.161 $0.146 7,193 $12,601.52 $18,329.56 12 $0.166 $0.151 7,157 $12,123.62 $17,102.07 13 $0.171 $0.155 7,121 $11,597.06 $15,787.07 14 $0.175 $0.160 7,085 $11,015.45 $14,374.49 15 $0.181 $0.164 7,049 $10,377.05 $12,860.67 16 $0.186 $0.169 7,013 $9,678.36 $11,239.43 17 $0.191 $0.174 6,977 $8,917.01 $10,098.05 18 $0.197 $0.179 6,942 $8,086.54 $9,161.63 19 $0.202 $0.184 6,907 $7,184.10 $8,147.76 20 $0.208 $0.189 6,872 $6,205.36 $7,051.80 21 $0.214 $0.195 6,837 $5,146.60 $5,869.76 22 $0.221 $0.201 6,802 $4,001.39 $4,594.64 23 $0.227 $0.206 6,767 $2,765.47 $3,221.87 24 $0.234 $0.212 6,733 $1,433.50 $1,745.71 25 $0.240 $0.218 6,699 1 $0.00 $0.00 Per Section 3(c)of the PPA,after each Year,Sunnova may adjust the Estimated kWh per Year based on the historic production of the System. Any increase in the Estimated Annual Production for any Year shall not be greater than 110%of the Estimated Annual Production for the first Year. z Per Section 4 0)of the PPA,the prepayment amounts shown above reflect a 5%present value discount rate;provided,however,such amounts are subject to an adjustment at the time of prepayment on the basis of the estimated kWh output per Year from the time of prepayment to the end of the Term. Any such adjustment shall not exceed 110%of the estimated kWh per Year for the first Year. 3 Per Section 9 of the PPA,the price you will pay to purchase the System will be the greater of the System's fair market value("FMV")and the amount shown above on Schedule A. Contract ID: ©2008-2014 Sunnova Energy Corporation.All Rights Reserved. Solar EZ Power Purchase Agreement version p02172014 13 �'•-`"moi „� ( oA�t'nrrroor�r,,r --- ACC)pCERTIFICATE IFIL F L(ABILITY. INSURANCE THIS CERTIFICATEIS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND EXTEND OR ALTER THE COVERAGE AFFORDED B THE POLICIES BELOW THIS CERTIFICATC OF (NSJRANCE DOES NOT CONSTITUTE A CONTRACT BET�^JEEii THE ISSUING 'IhSURER.iS?, AUT",ORIZE"J ftEFFESEt.- T!/n ' R PRCGU ANC TAE CEP.T':FICATE HOLDER. IMPOR APT- If'he car lilcate holder is an ADD!Tict AL INSURE_. the polic7(es. mi,lsi be endorsed. ij SUBROGATION IS WAIVES) suhlc-eL I, the terms ario c rdiurns o�il'e policy CG?ai€, po[ic(es may reQU1re ars 2ndors@r11enL A Statement cn rhi%: ,er iticale aces nei rcnfe' 'Ights to the certificate ho!cer in lieu orsuch endomement(s). �ROOUCER CONTACT Barbara Halide. NAtdE. DITT IAR AGI NCY PHONE (732)1662 23 3 FAX vii: t 'z; 01 N. EAV E-MAIL :,ahalydfln(d -_rna r-fur n e COM i { u 1S NAlc.-4 INSURERA HLA-Ger= !IQ P.zr.erica INsurED mSURERBINOrti ns C_pmpar:y Trlr.lty Ha_aclrc & a=r IncDFS .: ' rir_ity Sc Lar tNSURERC:L10 d"s, London RPTF Future Holdings LLC NsuRERo: — — 22i1 TilIGnwood Road NsuRERE Waiii THE NJ 07719 INSURERF: COVERAGES CERTIFICATE NUMBER:2014-15 Liab Master REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUEC TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED NOTWITHSTANIDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS. EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHG WN MAY HAVE BEEN REDUCED B't PAID CLAIMS. NSR POLICY EFF POLICY EXP LIMITS LTR TYPE OF INSURANCE I OL POLICY NUMBER M1" m fYYYY MWD. GENERAL LIABILITY EACH OCCURRENCE S .1,000,000 X CCMUF:RCIAI-GENERALLIABIUT/ PREMISE aoct Cei F 500,000 �v' i/1/2014 .1/t/2tl1' MED EXP(Any one Person) S A CLiJMS-MACE o OCCUR GGCC000065614 PERSONAL&ADV INJURY 3 1,000,000 GENERAL AGGREGATE S 2,000,000 PRODUCTS-COMPIOPAGG 5 21000,000 GEVL AGGREGATE UMIT APPLIES PER. S X POLICY PRO- LOC aNdeD SINGLE uMI 5 1,000,000 AUTOMOBR.E UABILITY BODILY INJURY(Per person) S A X ANY AUTO ALL OWNED SCHEDULED ISAGCC000065614 1/1/2014 1/1/2015 BODILY INJURY tPer accident) S AUTOS AUTOS PROPERTY DAMAGE S NON-OWNED, Per axtdent HIRED AUTOS AUTOS LoasayLoan Gen $ UMBRELLALIABOCGUR LNDER11012014 1/1/2014 1/1/2015 EACH OCCURRENCE S 15,000,000 B x EXCESS UAB CLAIMS AGGREGATE S 15,000,000 DEORETENTIONS INDERIJO12019 1/1/2014 1/1/2015 Umit x of sio,DOD ODO S $15,000,000 WC STATU• I OTH- A WORKERS COMPENSATION I TORY LIM1111R AND EMPLOYERS'UABIUTY E.L.EACH ACCIDENT £ 1,000,000 ANY PROPRIETOWPARI;ISR/EXG'UTIVE YIN Of F,CERI&JEMBER E)(CLUDEDI Q N r A C0000650'14 1(1/2014 1f 1/2015 E.L DISEASE•EA EMPLOYE S 1-,000,000 (Mandatory in NH) It y9s,describe under EL DISEASE-POLICY LIMIT- a 1,000,000 DESCRIPTION OF OPERATIONS D010W C Errors & OmissionsGrARK0201402 /30/2014 5/30/2015 PerOccurence $2,000,000 Pollution Liability Aggregate $2,000,000 DESCRIPTION OF OPERATIONS I LOCATIONS(VEHICLES(Attach ACORD IDI,Additional Remarks Schedule,if more space is required) NJ CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. Trinity Heating & Air, Inc. T/A_ Trinity Solar AUTNORIZEDREPRESENTATIVE 2211 Allenwood Road Wall Twp, NJ 07719 _ Barbara Hayden/BA-H erved. ACORD 25;2010(05 ©i988-2010 ACORD CORPORAT{ON. All rights res INS025 z0wo5ioi The ACORD name and logo are registered marks of ACORD 7� w ;1 i a leu 311 elnP*(jYi.'I'!Cliculk tile approtmate 611 Type of projela(rf,,quiredl: I am T1 M P i e T',V I(11 emplov�ty I ru;killejor tsirt-11(itc! 7, [] New construction 2[]1 am a sole proprietor cr partremh�p and have no crnp(o-ecs Yorkin2 for nic in 8. 0 Remodeling any.rapacity [Nn,�.orkers comp 1eSUTaJ1C-_ Fe'4LITedl 9 Demolition tO Building addition 4 1;w, ,hurnt;wrneT and mil be hmn2 cora actor to conduct til wcik un rr.y proitcrt-r I ,vAl 1171 Electrical renairs or additions emote titairall c(jitnictor,�jdjeT J:a%"t vorkeis eumpumak('11 la�ul-allct Ul we a(Ilc Lai proprietors with no annplovccs 12.E]Plumbing repairs or additions 5 1 arri i 2.eneml urintractorand(have hired the ;ub-connactor-;listed an the atuched sheet I [:]Roof repairs Vheso ijb-contractors have.„rnptoyees and nal P,porker Coln.0 insmince' t 4. Other 6 %a are a Corporation Ind its officers have exercised their nght of exemption per M(_71. li�.gh­t).and eve ha-re fl,aemployees [Noivokers':romp lfl.SLIr'dr1Celtqt1lF-,d] 'Any apphun,11 that chec',s hox.11 rnim,ilso till out the-,cruor below qhowrig their workers conipencatron pohcv Intonliation llorne(mricrs who submit this-i._Pdavir indicating Thep ar?doim;dil work mid then hin_t outside contractors rniast submit a new aftidavtt indicating;tich, _Contractors that check this box must attached an additional sheer itovorl?,the flialrid ol,1110 and tate whether or nut those entities have cmplo);ocs 11'rhe 3trb-con tractors have employees,they must provide their -,vor1v_rs*comp policy no rnbor I tint an employer drat is providing workers'compensation insuranrejor my employees. Below is thepolicy acrd job site information. I / insurance Company Niarite: ar 4,al 2/111�`* 'n I- -Self -n Date: Folic) Lic, 4 Expi I y rf o, — Job Site Address: 72 Mablin Avenue city/state/zip: North Andover, MA 01845 Attack a copy of the workers' I`ompeasmion pofl.c7 d,"laration page(showing the policy number and expitration date), Failure to secure coverage as required tinder MGL c, 152,§25A is a criminal violation punishable by a fine tip to$1,500,00 and/or one-year imprisonment,as well as civil penalties in the f(-g)rrn of STOP WORK ORDER and a fine or up to$250.00 a day against the violator, A copy of this statement may be romarded to the Oft-ice of Investigations of the DIA for insurance coverage verification. I(to hereby cerd y under dre pains at iddles ofperjury tinformation the infortion provided above is true and correct. itf�MI I , - /.1 10/5/15 ­ _ Signature: b `OBate: Phone 1 Oj,iiciai ttxe oydr, Dry trot wri2l? Mis area,h-P 150 Comp"Pted by 1 ci!") or tfnv ol- '? Citi or 1,nWn,- Ptrmft/Licerise 0 lssutug Author y(circle one)': BlWllrd Ufflcfilth 2, BUI'Ming Depat-time'T'It I Civ}/Trt�,,n Cler4, 'E rel lnspei:lror 5.Plumbialz f),Other ("mi-art 11t!q­"0W__ 111,+1 J Optimize Engineering Co., LLC P.O. Box 264•Farmville•VA 23901 Ph: 434.574.6138.E-mail: grichardpe@aol.com Richard B. Gordon, P.E. President August 3, 2015 North Andover Building Department North Andover,MA Re: Solar Panels Roof Structural Framing Support To Whom It May Concern: hereby certify that I am a Licensed Professional Engineer in the State of Massachusetts. Please note the following conclusions regarding framing structure, roof loading,and proposed site location of installation: 1. Existing roof framing: Conventional framing is 2x6 at 16"o.c.with 12'-11"span (horizontal rafter projection). This existing structure is definitely capable to support all of the loads that are indicated below for this photovoltaic project after sister rafters with a 2x8 using(2)10d nails 1'o.c. Use of(2) Guard DogTm FMGD002 screws is approved,or equal shear strength of approx. 120 Ib, 1'o.c.at areas where little space is available only with remainder of member secured with (2)10d nails V o.c. If do not sister,then install a 2x4 @ 16"o.c. knee wall over an interior bearing wall to limit span of rafters between supports to 9'-6". 2. Roof Loading • 4.33 psf dead load (modules plus all mounting hardware) • 33 psf snow live load (55 psf ground snow live load reference) • 4.5 psf dead load roof materials • Exposure Category B, 115 mph wind uplift live load of 19.6 psf(wind resistance) 3. Address of proposed installation: Residence of Brian Birchall 72 Mablin Avenue, North Andover, Massachusetts This installation design will be in general conformance to the manufacturer's specifications,and is in compliance with all applicable laws,codes,and ordinances,and specifically, International Residential Code/ IRC 2009,2011 NEC,and 2012 ICC Energy Code. The spacing and fastening of the Unirac mounting brackets is to have a maximum of 64"o.c.span along the rail between mounting brackets and secured using 5/16"x 3%" length corrosive resistant steel lag bolts. In order to evenly distribute the load across the roof rafters,there shall be a minimum of 2 mounting brackets per rafter&min.2" penetration of lag bolt per bracket,which is adequate to resist all 115 mph wind live loads including wind shear. The mounting brackets shall alternate between adjacent rafters between rail rows for better distribution of roof load. Penetration of anchors for modules mounted within 18"of ridge and edges of roof is to be a minimum of 3". Rails may be attached to either of two mounting holes in the L-feet.Mounting in the lower hole for a low profile,more aesthetically pleasing installation or mount in the upper hole for a higher profile to maximize airflow under the modules to cool them more.Slide the N-inch mounting bolts into the footing bolt slots. The rails will be attached to the footings with the flange nuts. Very truly yours, Optimize Engineering Co., LLC Richard B. r on, P. . Massachusetts P.E. License No.49993 MECHANICAL ENGINEERING CIVIL ENGINEERING ELECTRICAL ENGINEERING P�rH aFMgss O RICHARDg. �c- CHA�Orn MEC At rn P N0,49993 0 'STERV- �4 MAKIN A�r'Es U4 INSTALLATION OOF NTE 6.24kW PV SYSTEM N 72 MABLIN AVENUE S v, NORTH ANDOVER, AVIA 01845 Duca r R-111-1 /"1 VICINITY MAP SITE Na ` Cf,PI,GN DAZE SCALE:NTS Project Title: BI RCHALL,BRIAN T%INII ACCT:'tial5-54324 P,q-i Addro— 72 MABLIN AVENUE NORTIHAWDOVER,MA 0184S SHEET INDEX Drav+INa Tile: ;, Fa1 r TF eLnLRnLNDTesrD r1N eo r RA.I No— nun er Ad R_�nA1au can D PV-1 COVER SHEET W(SITE INFO&NOTES E UN ION 1. t L:r w ]J1FJ. (i1 rs --cG+.oL E a ntft�r.NeLs is I - aRP v v IbU -Irk 1L Tao wr IR rI F;I:nrl.6 FE ES11 l AJU'L--NF PIn II Ff L1I1N A_ 4 N5 PRE JT l 1 G C DNF FEC i PROPOSED Y6$T.2E1MW A PV-2 ROOF PLAN W/MODULE LOCATIONS 'A T W 1 11 4 1111,1L11 PV-3 ELECTRICAL 3 LINE DIAGRAM ,Sol 1111IED1- I.I NEG E II f ..E til- D1,UO HT HOURS, RERBO 5 FEGAIIEC O THE UFP INE N P I IC n FG7lC,11 INIT'. !OR J..OIR1,1 0 VEC11.THE I I?AL YO EM1 YR IE nU U 421 IY !t fE,iK�r. 0 IM Tal Orl .t IOTG'OL 1IO \STEM',RE 1IR17D GFI U AI I Fl 7F Pt H L \CF 11 P,TT F TI fN F.\.EL IE 3-__ 1It t LIN':•V T .THE SO .00VCtS AOT DC UTI I2ECI 'S'F<U I9'Te ML All L ffM1t: E t1 ENT r ..I J RG?FA V ICIIEVFA THEY F.Rc TN- Tll F ISEDI I fl '+ \,t,NT Eft LJt UI L fJNr IN IJf 11'f:I ff'+I TINE['. -.POSED IO IG T, LF'.-OR IRU".I 1 lT+- 11.IIINTIN+. Y[\ + M i 'Lt J PGR'10 SJ HI SC- 6 ALL I.,FOC. 1 HO IN Itf,..t.� r NEIlTRAL 17 J T -T N F -�R I, Oi J:'OI lk IC 51 TE 1 So 0[ C ERl lilt G'SE K ti I AL tL f:I KI.:AL CODE t t t•CI NrR.EC GLEIP I'A„CORJ t1'eNtTH COUSIRUCIIDN,0:I:IIE.J- N DTII ITFI Slst.11,1IOf1a6w Lt 1 1111 F III" 1 Et:,-.TIO el CTRIC CODE ARTICLE 1 U .�4kW N1 ,,n0 t C T F I N IEP. 0 t11n110NS 1 .T. I�iir PROR TOT NST1.11ON Or His _ yFA FF Yl'-t"-1EOilON f 1 -'1 IP;E[ nk`E HOTOVO IG Y CEM'1 t y 1 y ,,C 6JLC 11,11A211 I I' ` II Nr IT 1Y TH fF INS AL-Ilol COJ R Oft G EnN TINE I.kHENI I' ! UU C C� T 4EL r4—D,,0,,F rINS iTIO�A—I G L,_I wA E t N L J t:E R IEA G TIE 1 Cr 110 1 J ?R \E J f t It Li.KIGE.:ONCUIT 1 Ell '1 t FIN,. OCEDUI-E 't}c1FE1:AND ELF JJF i-VEP - L rf� J N L fE U'tFI F d tlt FN'-1 +1-cl L....r+F1t OR'NNA 101 ft O^E YI HEC FOE i 1c iN II I Il L[,IHLI Il \Itv Pn OR 101 451 h.5 ART P fE J `.EER 1lIF U..E .'�I •+N_ED.AVEC ,[tL ItF- �UNNJJt E STI.L'"'AAO CONT $ L- J I E -:?Er?`,:f(- 5 '.t_IL LI EC T E tiIII,ATTM r.'.. ;SSI It: ORA 'LII i - A RJ 1I- FS J V J VI Ht \I P IN .:1 I,N D A•Rt CN} C C 1411`e Ec Ito 1 Tr' L 1 O O"'`I\Ii GHE O-141—EO 'N T I t'CIV.TFC E F E Ft I 1 ND OdY AHE OR HE PROPERM NTE. E 1L CIFC.UI IJEAIHtRFRDC N t t :� ,111 It 11:TC1TI Ir O '10^0 IE 1U ER- ER'G w i CFI::EK R iPid 41F1 F tI FAIF 1111!1(1111 7 SCL�ICJHM EO EANI - ,1 -.FCk \1C UtR L1�.IVSJ�-CI.I ,.PKI t ETR ARC T-nT OVEPl TI"1t Al L 1.IL UIR G-CURRENT JF W r1 n1.1HE0 hL00R OR ( f:.t 1 PCF Ou.T I PMO t i liCI Se SCEP 'CW NFIRST110.v1C NU TECEEH N I LIIIESAIL_--t E-11N E-11- to FfN 1FP O F O1Tltz ELECT- 3—— LECT IC 1 "tSitM1f 10 "RPROFRIFTF U ICI\COM.AN ESANC L 1—IC—+.TALLIC I IBI Baa H IN (1•- hI ERS. 1 'AEI E Y ULH -PT F 7 AEN Tf N ELI E.-TFII' 1.4TEPV 6 OST\HN 'IP NO U F>c VtYI Lt JI II.I \- 0$.RUG of OR 15 - FOL L EF F C'lIC i.lL„ IN- If1PFal-El NO1M1 a tIN HCL FI ROUND. ULT rT-R Uu-f ER `»\ It+11 AL II0 EI'TC EE IVACC01 W C 1111:: 117 rA'OC,C eS PER II I L h1TH HI l'. fv CDRFtNI P E AILIN 'NI.NPI.L „E-1,111 LI fl.fn S.,'ANpkno AIID RLGUIMEAENTS }f+�■ yam/ tNEK T., if Nl -..,.c"TTt�W+v.EJ:lc-�,.\i+IL oLITtOF EOJIPf,1ENT. I-I.,f_[[t�.4�-11-1 IA 1i�U--111 n.Af.E\1:T�N HAIA._ft JTHCRi�+�Nt',PL'E�?SE dEF.O\-ISEG T,v11FN..L LOUIFIE'.i-D t, .=1:1+'f{AI' TEhI-TIt:::APE I JIN,I Fl-,GLANtO 10 I-P 1100ILI S-LAR M,41,,LF, ..­C,POOT SPI-Pli MOD,ILI E., TIl.1111. PEFIR T0 MDUNI 51Ilkl E �N�LAYEP A�P A�.TSHINGLLS N-LINIRAC R—I IPICP Ulifq,l-L-I M 111-1 1!15LL-11-- 5�41,,,Oru FLASHING Ar,-�SEAIANT NEN EI L CUP NI, Fj I LF,-0'1;--'NIRAC ,LJPUI[JT IN -l-M INCa 4A TEF "OLLPV,�j:;LtF�SIIALI W?l -M�L 325108- CF 1u0 LXCLLD ILLM,HLI.1-11, r 1111.11!1.CUP — Tl-.--,-,I LK J 1,11'JN­- II uEIGHT FROM GROUND I-F%FL 70 PEAK OF ROOF ATTAL vIENT J CLIP DETAIL V MODULE ATTAGMENT CN ASPHALT S[IIN(,LE ROOF FRONT Fl-,eCt—Title: BIRCHALL.BRIAN PrCjoCl,Addro.s,- 72 MABLIN AVENUE CM (•P NURTIIA'OOVER,MAQ1845 UD D Drav;inq Tale: Du f,C J----- ------- R3 R2 i E� i System Irformationi 1 0 T� BACK Irl T-- R— LH Op 1 E�'C�SEYOND 0I -E�c PLUMBINGSCM-DULE �_QUIPNIFNTSOIIIEDULL ARRAY SCI SYMBOL LLGEND IL J`Ll-c 'CliP�l�4TI�4S]ALLATit,f�F,14N�L LID 44 -NA Z��l I'M-_5J.1)01 061 R IFI.A-HU-11—FOR C—vlol --OLLST AL .,�l T�I El 1.iLl—P—1 I K I A—TI.11,VII-I mov TIl 1. rl ll�A It ILS T-n i A Z-1 1 11 -1 0 SI-111DULI 01 HER OBSTRUCTIONS 1='l W.IL.Cl QN llE 1.1 1 Jab L r TSF I'Ll"ATI I'll •IRS�R O NLL P RIP ;IE, ZIP-1-1 1171IM C6I�.IN`l'SCHED-L Eg.nccr%Lleense Holder. Charles P Bonicker Tt 9tiy HeO ing G AI,, Inc DBA Trinlly Snlar MOUNTED 2211 4,11—ODd Rd.Wall.NJ U771 bloat LI-oULES MOUNI,Did RoU,On saav-'.re UNDER SOLAR MODULE +C-,,A .I lt$A,t)J �[�L+1i:C 'x.N'OOUIE NEC 690.34 13.15 AIIC M�%t'EK ST+:'G e bTl;n;;stl l_AODU .,hU[..:E'-tiU:/']I::n 8"x8• _- JUNCTION -- -- - __ -- -_ _- -_ __ __ -—- s FISGS`aI 11-1:1-1.1i`4iv.E.�t 1-r WCF.TU,I - -. BOX Issued!Revrsians :11 DLI �4Ti Projeol Tille, BIRCHALL,BRIAN ARRAY CIRCUIT WIRING NOTES ^� Tr`.L Ti,tC't '-"3S-S•�3l{ i COMPLIES WITH 3011 NEC GFCI RECEPTACLE PrajCc;Adtlrc,5 T.)LOWE5T EXPECTED AMBIENT TEMPERATURE BASED ONEXISTING - -. - 1P15A BREAKER TM 240V 10 14/2 NM CABLE TEMPERATURAERE MINIMUM MEAN EXTREME DRY BULB 120J240 ATURE FOR ASHRAE LOCATION MOST SIMILAR TO UTILITY 200A MAIN BREAKER 7>_ls9ABLIN AVENUE INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT METER 200A BUSBAR7_71 NORTII AtioUVER,MA 0194S TEMP--IEE 1- i 2.)HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST MONTH 2%CRY BULB Dravrinq TiIIE: TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO LOCKABLE 60A INSTALLATION LOCATION. HIGHEST CONIINUOUS TEMP= DISCONNECT FUSED W/ 33'C30A FUSES PROPOSEC 6.24kW 3.)2005 ASHRAE OTEXCEED FUNDAMENTALS 'C DESIGN BREAKERE LOAD CENTER 301SCONNEC PRODUCTION MD —a.+ D a LQ Ilfc�^lal OnYSTEM TEMPERATURES DO NOT EXCEED 4]'C IN THE UNITED INVERTER&1 Q STATES(PALM SPRINGS.CA IS 44J-D), FOR LESS THAN 240V 10 240V im 9 CURRENT CARRYING CONDUCTORS IN A R00F SUNLIT CONDUIT AT LEAST 0.5"ABOVE 'I -- ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE of OF 47-C OR LESS(ALL OF UNITED STATES), lr'T r' (` - p I, -g p C m 4.)PHOTOVOLTAIC POWER SYSTEMS MALL BE - - JI-J —' \7 f p - i-r- O }L J $StC 111Df0YN5dGOn NEERCMGBTTEDSTO OPERATE WITH UNGROUNDED ® EXISTING MAIN BREAKER LOAD S D SQUARE Lin^,c� �r �'. N PHOTOVOLTAIC SOURCE AND OUTPUT CIRCUIT AS PER I ?4A`.V 5.)ALL EQUIPMENT INSTALLED OUTDOORS SHALL HAVE CENTER INSULATED LINE TAPS PN. D222N PN. D222RB A NEMA3 RATING. INSTALLED ON MAIN FEEDERSul['r' NEC 690.64 ., .,I•t- CALCULATIONS FOR CURRENT CARRYING 'JIILIf1'r•C.:: - >CSui CONDUCTORS UllUry M[i<�x'. REQUIRED CONDUCTOR AMPACITY PER STRING I'LA,v4E,. .L•--tL;V r. [NEC 69D.3(B)(1)}. (t5A0`t.25}7=18.75A AWG#10,DERATED AMPACITY fti 4IOGULF 3FECIFICATIONS AMBIENT TEMP_ 55'C,TEMP DERATING FACTOR: .76 n:INA.'-6:1(Isht2du p6a5.Et3; RACEWAY DERATING-4 CCC: 0.80 (40'.76)0.80=24.32A JS dJ P1 PV — 3 24.32A_18.75A,THEREFORE tMRE SIZE IS VALID tp TOTAL AC REQUIRED CONDUCTOR AMPACITY 23.00A•1_25-28.75A '+"s-n i f- •.TnW;, .runour:c• AWC bnO,DERATED AMPACITY `r AMBIENT TEMP: 30'C.TEMP DERATING: 1.0 VJ TR ai-5C- -US _ RACEWAY DERATING`-3 CCC: N/A ,IL -E 4DA41.0 a 40A r Wua .�„r-earl #OA-3.7St�THEREFORE AC WIRE 512E IS VALID V r© -� I 3 CALCULATION FOR PV OVERCURRENT PROTECTIONI .X71 NCLIGf -.� TOTAL INVERTER CURRENT: 23.00A .+-p�:Nwn I,JIH.�n �,.r:J .. �+.+ 23.00A*1.25 28.75A -->30A 04ERCURRENT PROTECTION IS VALID , INSTALLATION OF NEW ROOF MOUNTED MABLIN A V E IN LIE!b 6 N. STEM 24kW PV SY 72 MABLIN AVENUE NORTH ANDOVER, MA 01845 Issued R-S-, VICINITY MAP L.J-SCALENTS Pmjc.[Title BIRCHALL,BRIAN Prcjc,-,Addrcs,, 72MABUN AVENUE NURTI 1ANDL)VER,Nlfi 0184S I--LIMES GLINORALNOTT'SCONTINILIFF G11F.—INFLITAEOITINUID A-Rimv!Aili li—to SHEET INDEX IS 11, 6.CIkR—PRE-LING it 3` —i 11 011 PV-1 COVER SHEET W1 SITE INFO&NOTES Dra.inq Ttle TH0,SANDCI�'IIIAi ASPP ESE[4-1 H-C nOMP-IN,SPECIFICATIONS '�JUO-A,T��Af'1E PROPOSED b.24kW S�A—,DS.ANID PEO—E-i'll ROOF PLAN W/MODULE LOCATIONS AND FOU OS N L DISCONNICTENCIOSU11A.—I D, PV-2 IFEN111-501 SOLAR 5�STEM -.1111ILCIN 11-F 11111 O')JOIT i PIRS61S liEP-M-'HE- 1- "IF PV-3 ELECTRICAL 3 LINE DIAGRAM 10111 L-1-..El��- 1,,.-rN- 101411 NO ON 0.1 1E1OL 1E.—1,E MU NIGIRIL IN U A""`­ ItYl 2 INS' ILOTOVOLTME S,STEM 4REA-Eb FPPIIOVAL,IHIS SEI OF PLINS SrS­ �l L- MAIN;1-01T [:i D.9 11 tfCt'[t"d�iOrl l,-,TTRESE1R1,NOi A- 110T Dr UTILIZED ,101-l— Wr NI IN COLI 1EM1T-N 11L -r A-1 LNIEGI-i iAl- bEAAINCS UNTIL RE D I, 11L, -111 1111! -E Ll E-CIS-.10-Ci .11CILIFO FOR ON TRU 1- 1 liI ALLINI'DINIATION81OW I, ILL.. -1 11 POP!10.5 0,Tii SO11,7pi1r1N-T;i1-11-'1k i LrAlCSISTE $Li 81 EEETIINEU Pi JS NCI FAL N., I i_At Eo­ 1:1- N.1�L= M-0-LEARIN tk ACCEIPTALJ-EWITLI CONSTIRL—ON—PT EL 71", ARTICLEI- N1 tl,fo-atiori 11TII PRIOR TOT—ONSILL110IN 01-1115 NT I I i 6 I"I aHpiOVG_ IC SYSTEM. t1E INLP P IT ITW-, 0E, :� TI- THE NSAL-AAtON CONI-CTGR FALL '11 11C,�LIPLL]I P, I � I �-i P-E NS1I LTIO,1111TINS IN RE"LL,0, (HEI H,INS, 'oil 'OKICULT Di,LES,SIFI I SOVE FINI—i 1i li,—'NUU, OED�IES SG- -IIIANO I , ;L"VCP IF. �O, N I PR,OR fi�l,,ESYSTimMSTAPTL P ill I JISTAL—IONCONT0,0TOE SNALL 'IRE IiALIF 1U— VIIQHA1ATTi I91ST IN PEIFORMING'L1 IN11FIAL 'OVAY PREJI[L AS -T- UVI- I 11 1EC IFOLS Al.DI"i I'l-I ul I ITL -OND Q11-C— �Ll I E- I L'i N�E$SETFER kI.R lNi _F� E. 1c,IA1I.1D=O III,TI L, '09 THE-ROAE1 11,14111 INC II F -AL1flC1 So""ON 0,-LIE N!E.-E�ORPER'0 NEAll E-00- IC Na. h I A I-�A AIR Il 11111,.Cr III T-1.0i IN I- FFZ,, PTHAT 01 FS�IINIIIJ-- D ELR7F7-UPIPPIT ­_U I Li ILI- �SF�O—�T lilfl�ld -PAI IH FIRST 110 AND -IR U.G Q-11. NN -EPHONI,,T JI El-1, 1 ..TJ I3L AIC I.-LIALREPA.111-- F LLI­7F­l,1T-- -R.OIRIT U1111-11- 10 ISAND 0 IN,-N - 0 VING H, O f ERS I I�IBI i�-�A I I C-17—i-II—IFT117-TIONN TLE TRU, 1� I'.I—RIA'S A—I F—E 'U TN' E— LH Yll 1-0-1 CONSTI OTO.ION 11 $11, -D O'GENO Ill 11.-11-L LAP CA—INTSEHOAN-41,1LI-Ai 11 G—INUFAULlINTER-PILR COLPON 1 E Ill FEQ11NCT 11GLCSFC1 C 511—CIE01i INS IA IlTIA AN .-COUNT"SPI PCA ITI.N., �- 111- , STANDARDS- �S-Di UNPLiElPi SOL"jif L—L—LE .Ol+-3€0=CLt-.TYPI:Af Vf"L A;CLARIH iE SAtYJ G4.N 1I _ NEt S •,%CFOOT 'TA­DENT 1f�R M14Crpl1LE ii1LARNI,41IILC- P INT`.Tt 1--_ [RCr ER TO ­1NEEN 10 LET':EN TOH GPAGING - i(FC HFILT+'PICAL _ 11Nl - L .nl Y. 1� ,RLFEf OE UNI C NL hFW LAYER ,PTaHIOLES _ UNC• tPJ T I O.d UCl'_"FLASHING 4tAMi 1 0R 5. -1 G CS G '::Ila; i H - nE cu. r PI „anw.us IF EF OI EL,l-AC \ fIPU/IJT ST/-. nN - AfANI :r'.5 r014 SPE FANL, C"' SCO - --- O - CET.IL,sI GL 1P fJ tJVLE IiAI_IVOT E%I•rTIN�RAFTEF. G.cE51=FJrf LICIl11, ( -I -1 CNP.TS PICrI'. - - .:�n�Fu nFuki wra°4 "Ll 1,,rpriINTINS�I: `ANE-�irLIPSJFNT INS-A a C�: n1, ,,i2.ti:GP'sR v;5�LY3 �ATTACHh9ENT F,f.UP DETAIL nETAIL=,1 APV MODULI ATTACNMENT ON ASPHALT SHINt�LE ROOFGFii FROM>LGROUNDLEVELTOPEAKOFROOF �7. �r r•,_-rwE re-n LFER rorippm_e sHEcs FOP - �-=c scsl� pec=�Npr rescE A-111IOAULE piAlENy'rOnS Issucd t Revs Ns r1G' n�CftlP rlilN FRONT Project Title: BIRCHALL,3RIAN TFC If"CT u-3G1SSnx>r Praj=.Addrns M EP 72 MARLIN AVENUE NORTIi ANDOVER,NIA01R4S IDD P D-uinq Title: PROPOSED 6.24MIJ SOAR SYSTEM DL L -_ O a 1pfcr sI on R3 R2 FIL — i S+stmn InTGrmatlpm - I J Ili vPEi SVRri0*>`M BACK t.�__ L M1�LNI>I1iNL cINTI�LLEp IN L)3p+` 11'-.'i- 11-11 S,lN- L_EE I 'T,.iNNUhN :.H K?:!'iN�,. RIl.NCi. Sh�:ci -�IELI IL�11U1:. ARRAY SCh JOULE SYNI OL LEGEND PLUMBING SCHEDULE EQUIPMENT SCHEDULE Ri NL LFIp IF l ICAL IC THE pNIRAG OTl' C- II Ir'TTLS F F SIGMA=i 1 TO INLI Na r L vkiCPY-Sr i TJ BE Ivl '_i. Rt „a ,i;HLI .. un,l0Sri4*CR13rT10hl �-�� Ir�LL� LLUOJ�i>[ O �EOTI0011 JF 1.11'lnC.��NJ�D�TWLS.L '_M1INA_'6t1(I_IN_EJ"OJUArtli INC IE L PV ri J l r- 1111LI1 El; ll F k I E Ef C HEU NIC 1 SE>p0nA-LS f^ u TINT IN TNI-ATINIMIJA1L Ili— t 1 J ;?L 'M I INI-IN: ii IN �kE:EP LC n 10� � INGI EPI+] 'IIS U 1401N FT R 11 U 1 - UL�rLtV r IIL--JII FEFER G i�i.-N S H U C-:II FL...i. 11 N t 1 E 1 U S _ - - -- --OTHER OBSTRUCT IONS ?' If[I - �� I i L- 11.-Lw1J[L r/-�-� INpIGA ESh hKC�J�1.N.,lE.LRTn NELF Ek- GC OAPLISNif^� -ilt•t1ITP T.! .. I IIU a.Ai1,t10.t11 aL FiR FEGb AN69ETRIL51 �,f a1 i A E' l Iti-I p.$GVNNEGT T06E ® I'dG I S \-E Et t n I-AT t-MLtfT PGI�+nS. .IIT-.T LIH rl PAtiLL IV51L DI T110E i i tECEF ENr.INEEF INC LETTERsOP. i r i. i,,, 1 _U R, Lh DAUIPL Et15CHLU'.LE Fu Ar.itk-WI.ETAI > Eng-:neer!License Holde,. Charles P Bonicker Trinity Haut:ng&Air, Inc DBk Trinity Sola MOUNTED 2211 Alll:nwoad Rd.Wall,hid 071151 awr:!„c�uLc�nlDUNr l i n L 3 i a�,�AYs UNDER SOLAR MODULE \+ L S h 1IU 11 n-r.r300 p.rc r✓o—'r NEC 690,34 ti.%'=AOi r1I.F PLR[TPI NG 2-T M1' tF v`'-UL=, Sk1;lES-"10Vn- 8.,%$- -- UNCTION - - - - -- - - - - - - --- --—- . 16L�iO Ei'TCFIl NATE6=:P+Rnl:El t6 Ut,Yl ERT.R'1 _ JUBox Issuod I Revisions NO I Ey;�4Y�IGN Project Titic' BIRCHALL,BRIAN ARRAY CIRCUIT VfIRING NOTES T+INITY,iCTN2G1 S5432s. COMPETES WITH 3G1 NEC GFCI RECEPTACLE PfOJeCt AddreS=_. 1.)LOWEST EXPECTED AMBIENT TEMPERATURE BASED ON EXISTING _ 1p15A BREAKER ASHRAE MINIMUM MEAN EXTREME DRY BULB 120/2.0V 240V 10-- 14/2 NM CABLE TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION, LOWEST EXPECTED AMBIENT METER 2002 MAIN BREAKER R _ 2o0A Bu58AR TEMP--Ice Mv._-- NURTI172 1,A,1,DUVCRABLIN V METEMAOl E4S 2.)HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED Dray.ing Title: ON ASHRAE HIGHEST MONTH 2%DRY BULB - TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO LOCKABLE 6DA INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMP DISCONNECT FUSED W/ 'iTC 302 FUSES PROPOSED:1" T OR Wf MAIN 302 UNFUSED PRODUCTIONSYSTEIJi 3.)2005 ASHRAE FUNDAMENTALS?^.DESIGN _ BREAKER LOAD CENTER DISCONNECT METER D TEMPERATURES DO NOT EXCEED 47'C IN THE UNITED STATES(PALM SPRINGS,CA 15 44.1'C). FOR LESS THAN 240V 1D 240V 10 ^-' IN VERTFR et D B l Information B CURRENT-CARRYING CONDUCTORS IN A ,"'��S„-,s;-.-�'_. „�-�'„'_�—Y'.', ILS � ROOF-MOUNTED SUNLIT CONDUIT E LEAST 0.5'ABOVE --- ( IL-Irr_ . ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE - OF 47'C OR LESS(ALL OF UNITED STATES), r 4.)PHOTOVOLTAIC P01vF.R SYSTEMS SHALL BE f,�, D - _ _ D I ' i N --- PERMITTED TO OPERATE WITH UNGROUNDED `✓ ,., {_,, CJ D PHOTOVOLTAIC SOURCE AND OUTPUT CIRCUIT AS PER -�-» - �L.J '1 r i! m S toil I fOrrnat On NEC 6x6.35 @ SQUARE D SQUARE D EXISTING MAIN BREAKER LOAD ...______ I 5.)ALL EQUIPMENT INSTALLED OUTDOORS SHALL HAVE CENTER INSULATED LINE TAPS PN: 0222N PN: D222RB „_�.___ n�� I�.a er•. A rvEMa3 RATING. INSTALLED ON MAIN FEEDERS NEC 690.64 CALCULATIONS FOR CURRENT CARRYING 'JiIIIT':ILL I -JOJI CONDUCTORS 110,”, ” REQUIRED CONDUCTOR AMPACITY PER STRING [NEC 690.8(B)(11I (15.G0'1.25)i a 18.75A L vlk. S,FIDvfi AWO#10,DERATED AMPACITY PF AiC-_U_E:F'ELi9G�NON: AMBIENT TEMP: 55'C,TEMP DERATING FACTOR: .76 RACEWAY DERATING-4 CCC: 0.80 TIfINA:uT�' M1-,c0 PY4.taC7 (40`_76)0.80=24.32h onr Ret ND. ShcCt 24,32A i 18.75A,THEREFORE WIRE SIZE IS VALID %ISYIr�G�f TOTAL AC REQUIRED CONDUCTOR AMPACITY 23.0OA"1.25 28.752 n AWG#10,DERATED AMPACITY AMBIENT TEMP: 30'C,TEMP DERATING 1.0 lruv[FTLF.�I sLsooc,:-u- RACEWAY DERATING S 3 CCC: N/A -v1 '' # 40A"1.0=40A - 40A >`A THEREFORE AC WIRE SIZE IS VALID Vmr 3,. icu; r� v c.. �v..u.; r CALCULATION FOR PY OVERCURRENT PROTECT[ON S00 I'+x fi.-!> TOTAL INVERTER CURRENP. 23.00A ,p Vr,w 2C \+f u rH+h v.vJr;t.1 23.00A'1.25=28.75A -->30A OVERCURRENT PROTECTION IS VALID \ ,. Snap rack, Solar Mounting Solutions Series 100 Residential Roof Mount System j(­ 1w1-1'iaII,-'-_1t1(-,n yste!'- e r i 10 I'L i s i 11,b�d t e The systern'c'; con-iponenis, o,-ov --,i n n(:I 'r r c I ass i c a t l), oj I I I I-,hi has ehr-ninated the need for grouirldir-ig I u cjs .end Pi a,,, I 0 t 0 g r o n d i ri q a.-, ,00)ding jurnpers between sphces_ In additl i'l h rnoduie, ancj 1 -)g, the i­no(_�r-4t systeryi, Series 100 UL, is A Fire Rate(:1 vvhen It) - C'# h�oncik cltalk�d wil.h ci -F y I-,)e s I i,Ioc SnapNrack's UL 2703 Ce)rtffication and C( [':)Hanc, en ,._fines Hhat GinapNrack installers can continuo to providehe b test in class !nst,GWations M cjt.iality, safety anci efficiency, • Appealing design with built-in aesthetics • No grounding lugs required for modules • All bonding hardware is fully integrated into the components h , Rail splices bond rails together, no rail jump- Ad ers required 0 Proprietary SnapNrack grounding lug snaps in the rail channel No drilling of rail or reaching for other tools required J, 0 Class A Fire Rating for Type I and 2 modules NMI, System Features Include Snap in Single Tool Easy No Cutting Hardware Installation Leveling or Drilling Intecgrated Wire mPreassebied Integrated bonding UL 2703 Certified Management hardwat e Ro-sources sri -_Ajf'cr�s "11� Where to Buy re D(aSigrl R%SION SNAPNRACK SERIES 100 ON FLASHED L FEET FLASHED L-FEET ARE OPTIMIZED FOR QkACK AND ROBUST INSTALLATION ON STANDARD COMPOSITION SHINGLE ROOF SURFACES FOR OTHER ROOF TYPES STANDOFFS ARE RECOMMENDED SNA NRACK STANDARD RAIL ROOF RAFTERT(P(ROOF ATTACHMENTS SHOULD ALWAYS BE EMBEDDED INTO ROOF RAFTERS OR STRUCTURAL MEMBERS SUCH AS STEEL PURLINS❑ ROOF SHEATHING,UNDERLAYMENT, AND ROOFING MATERIAL -_ - ivLtiltiS-)-REA.A ENERGY COftP DESEGNt:R' G McPherir`s SGAIE. PART NUMBER: DESCRiP ICN RtV DRAFTER D arae DATE STUD D01 SERIES 100 ON FLASHED ;- APPROVED BY, SNAPNRACK SERIES 100 PACKING SYSTEM TYPICAL ROOF LAYOUT Rt &C"N NOTES: -STANDARD LAG BOLT SPEC ASSUMES 5/16"LAG BOLTS WITH 2.5" EMBEDMENT IN ROOF STRUCTURAL MEMBERS/RAFTERS -TORQUE ALL A"HARDWARE THE FOLLOWING: ROOF RAFTERS OR SILVER S.S. 10 16 FT-LBS STRUCTURAL MEMBERS BLACK S.S. 7-9 FT-LBS RAIL CAN MOUNT TO EITHER SIDE OF POST(UPSLOPE CE DOWNSLOPE) SNAPNRACK MODULE -FOR UNEVEN ROOF SURFACES, USE MID CLAMPS MODULE OVERHANG UP TO TWO LEVELING SPACERS PER L FOOT OR STANDOFF.SEE DRAWING (NOT TO EXCEED 30L-1 "STANDARD RAIL LEVELING"FOR OR MANUFACTURER'S DETAILS AND LIMITATIONS RECOMMENDAHONS", MODULE OVERHANG STANDOFFS ARE BOLTED INTO ROOF RAFTERS OR STRUCTURAL MEMBER "RAILSPAN" DISTANCE BETVVEEN ROOF-ATTACHMENTS "RAIL END OVERHANG"(NOT TO EXCEED 340)b OF ACCEPTABLE RAIL SPAN) 1,1116TREANI ENERG',CUKR D E_z I GN E t,: C Wprw-tlSCALE ONS PART NUMBER UESCRIP'l ION ccy ��, — ,t, D R�ar, DRAFT ER 2�,3 S100 D05 SERIES 100 TYPICnL._A'(OU T APFRO,ED BY DATE 120113 USE TILT KIT OPTION FOR INSTALLATIONS 1 HA I RE UIRE MODUI FS TO BE TILTED ABOVE THE EXISTING ROOF SLOPE SYSTEM SHOWN IS DESIGNED FOR TILT a ANGLES FROM 10 TO CI?DEGREES ABOVE ROOF SURFACE USE OF ANTI-SEIZE ON TILT HARDWARE IS RECOMMENDED(PARTICULARLY FOR MAX LENGTH: Cl" STAINLESS TO STAINLESS HARDWARE) WITH STANDARD ENGINEERING REFER TO S100 TKT SERIES 17C TILT K T TOOL FOR A SIMPLE TOOL THAT DRAMATICALLY CK SIMPLIFIES TILT KIT INSTALLATION BY PARA IL STANDARD D SUPPORTING THE UPPER RAIL AHEAD OF RAIL MODULE INSfALLAT[ON SNAPP RACK MTD CLAMP ASSEMBL" CUT REAR TILT LEG FROM SCRAP OF STANDARD RAIL SNAPNRACK CHANNEL NNIS, TORQUE TO 10-16 ET-LBS WHEN SNAPNP.ACK L FOOF USING WEEBS.WHEN USING ALI-PURPOSE OP. SNAPNRACK BONDING CHANNEL [ FOOT COMPOSE Ord NOTES: NUTS,TORQUE TO 14-16 IFT-LBS. WEEBS ARE NOT REQUIRED WITH TORQUE " HARDWARE TO THE FOLLOWING UNLESS OTHERWISE NOTED: BONDING CHANNEL NUTS. -SILVER S.S. 10-16 FT-LBS - BLACK S.S. 7-9 FT-LBS REFER TO ENGINEERING CHARTS FOR RAIL SPAN BASED ON MODULE TILT " X 1"(CR 1.25') S.S. BOLT ANGLE,WIND SPEED,AND SNOW LOAD WITH SPLIT LOCK WASHER - BACK SUPPORT"LEG"IS FABRICATED FROM A SCRAP OF RAIL. CALCULATE REQUIRED TILT LEG LENGTH. USE WEEB GROUNDING WASHERS AT CIDINTS BETWEEN L-FEET AND SNAPNRACK STANDARD RAIL SCRAP PIECE FOR LOWER TILT APPLICATIONS SEE"SERIES 100 TILT KIT 0-15 DEG" SNAPNRACK RAIL COVER CAN BE USED TO COVER CHANNEL IN REAR 111_T LEG nFIN_TPEAM ENERGY COFP D_SIGNER C-Ni Fh. te­ DNS PARTW,16ER DESCPIPTIO4d SERIES 100 TILT KITS 1f}-45 DEG WITH L S10D D10 _00T FOOTMOUf•1T aPPHOVLL eY 120113 NOTES: P.EviklKlIN 5/16" LAG BOLTS MUST EMBED 2-5"INTO ROOF STRUCTURAL MEMBERS/RAFTERS STEP 3: PLACE L FOOT —TORQUE ALL 5f16"HARDWARE TO ON TOP OF FLASHING SNAPNRACK THE FOLLOWING: AND TIGHTEN NUT COMPOSITION L FOOT —SILVER S.S. 10-16 FT—LBS CAN BE MOUNTED IN SSFLANGE NUT —BLACK S.S. 7-9 FT—LBS STEP 2: SLIP FLASHING OVER ANY ORIENTATION S.S. —PAILS CAN MOUNT TO EITHER SIDE L FOOT BASE AND UNDER,ROW AX l` (OR 1.25") OF L FOOT(UPSLOPE VS DOWNSLOPE) OF SHINGLES ABOVE SNAPNRACK S.S. BOLT AND CHANNEL NUT SPLIT WASHER S.S. LAG SCREW WITH FLAT WASHER SNAPNRACK 2.5"MINIMUM EMBEDMENT STANDARD RAIL IS STANDARD SNAPNRACK COMPOSITION STEP 1: BOLO L FOOT ROOF FLASHING BASE TO ROOFWITH LAG BOLT SNAPNRACK L FOOT BASE ROOF DECKING TYP. ROOF DECKING TYP. FLASHED L FOOT MOUNTING POINT FOR USE ON COMPOSITION ROOF SURFACES VVETH LOW TO MODERATE TILT RAILS CAN BE LEVELED UP TO 3"USING UP TO TWO LEVELING SPACERS AS COMPLETED INSTALLAT'ION SHOWN IN"SERIES 100 RAIL LEVELING" RAFTER TYP fWNSTREAM ENERGY CORP DESIGNER: G Mcllh=e1.15 SCALE DNS PART NUMBER DESCRIPTION F'Ef -4 DE-1 Al I t 'SHL I OU I I RA- -R D -TF D Ryan ogre. `s` PEN D01 T E 120113 APPROVED BY CAMMING SEAM CLAMPS ARE SPECIFIED WITH A BLACK OXIDE STAIN LE55 STEEL BOLT. ITIS IMPORTANT TO USE THE PROVIDED BOLT AND TO TIGHTEN TO 16 FT-LBS FOR FULL LOAD CAPABILITY CLAMP CAN BE USED TO SECURE RAILS OR DIRECTLY SUPPORT SOLAR MODULES TO DETERMINE BOLT SIZE ADD WITH MODULE CLAMPS 1.17"TO THE"STACK"ON TOP OF THE CLAMP(X)AND ROUND UP TO NEAREST BOLT SIZE L FOOT OR SIMILAR TILT BRACKETS CAN BE ATTACHED TO THE TOP OF THE CLAMP AND PROVIDE A MOUNTING POINT FOR RAILS OR OTHER 3: BOLT IS STRUCTURAL MEMBERS TIGHTENED, SECURING CLAMP AND L 1,❑)TOPQUE BOLT FOOT AT THE FO 10-6 �-LBS SAME TIME SEAM CLAMP BASE (STD BASE SHOWN BUT INSTALLATION OF WIDE BASE 15 SEAM IDENTICAL) CLAVP 9 CAM 2- OPEN CLAMP GETS I: INSTALLATION STARTS SEAM LOWERED 't I y yp' WITH CLAMP IN CLAMP ONTO SEAM OPEN POSITION THREAD WITH BOLT LOOSE INSERT 2 3 ij MAINS1 REAM ENERGY CORP, DESIGNER: G McPh—le( SCALEFARI NUMBER DESCRIPTION DHAI-;FR 13100 PEN D04 . ..... u Ryan DNS -,EN©ET AIS 04 SEAM CLAMP D8,-E 120113 APPROVED BY solar, " v� "'�j ,S-)o la r E d g e Single Phase Inverters For North America S1--310(ji)t\4 US L3 1300'A-iUSi vE X0'00 CJS S 000A'U.S ; SE17G0Cf> (.S ;' IQ)E100I10"0A US ; SL1140OA. 0S i Ito n ' �'QJlo�a� The best choice for SolarEdge enabled systems Integrated arc fault prate cdon (Type 1)for NEC 2011690.11 compliance Superior efficiency(98%) Small, lightweight and easy to install on provided bracket Built-in module-level monitoring Internet connection through Ethernet or Wireless Outdoor and indoor installation Fixed voltage inverter, DC/AC conversion only Pre-assembled Safety Switch for faster installation Optional -revenue grade data,ANSI 012.2 cif - 1 k l ! Y r� solar M �" mss' SolarEdge Power Optimizer Module Add-On For North America P300 P400� , P40 yf , PV power optimization at the module-level Up to 25%more energy Superior efficiency (99.5%) © Mitigates all types of module mismatch losses, from manufacturing tolerance to partial shading ® Flexible system design for maximum space utilization Fast installation with a single bolt Next generation maintenance with module-level monitoring Module-level voltage shutdown for installer and firefighter safety ;1A t, 1 A llioo; ME 60 CELL MULTICRYSTAELINE MODULE <,.J5 8 POWER OUTPUT RANGE MAXIMUM EFFICIENCY '° + POWER OUTPUT GUARANTEE 10 Yeqr �--- j L t CaOftice of Consumer Affairs and Business Regulation 10 Park Plaza- Suite 5170 Boston, Massachusetts 02116 Home Improvement Contractor Registration Registration: 170355 Type: Corporation Expiration: 10/12/2017 Tr# 271078 TRINITY HEATING & AIR, INC. _ -- TOM BLUMETTI- -_ - - 20 PATTERSON BROOK ROAD UNIT 10 WEST WAREHAM, MA 02576 Update Address and return card.Mark reason for change. F� Address FJ Renewal ❑ Employment Lost Card SCA 1 di Porn-05P 1 Office of Consumer Affairs&Business Regulation License or registration valid for individul use only --'FHOME IMPROVEMENT CONTRACTOR before the expiration date. If found return to: Registration: 170355 Type: Office of Consumer Affairs and Business Regulation Expiration: 10/12/2017 Corporation 10 Park Plaza-Suite 5170 Boston,MA 02116 TRINITY HEATING&AIR,INC. r TOM BIUMETTi 20 PATTERSON BROOK ROAD U `-- W�V WAREHAM,MA 02576 Undersecretary _ Not va td without signature C, J. Office of Consumer Affairs nd Business Regulation 10 Park Plaza - Suite 5170 Boston, Massachusetts 02116 Home Improvement Contractor Registration Registration: 170355 Type: Supplement Card TRINITY HEATING & AIR, INC. Expiration: 10/12/2017 GREGG LACASSE - - 20 PATTERSON BROOK ROAD UNIT 10 - - - -- - WEST WAREHAM, MA 02576 Update Address and return card.Nlark reason for change. SCA i t; 20m1-05i11 Address J Renewal ❑ Employment ❑ Lost Card -1 Ce or{consumer Affairs&Ilusincss Regulation License or registration valid for individul use only ^COME IMPROVEMENT CONTRACTOR before the expiration date. If found return to: Office of Consumer Affairs and Business Regulation Registration: 170355 Type: 10 Park Plaza-Suite 5170 Expiration: 10/12/2017 Supplement pP Boston,MA 02116 TRINITY HEATING&AIR;INC. GREGG LACASSE 20 PATTERSON BROOK ROAD U -- WE9?WAREHAM,MA 02576 m ..._ _ undersecretary N va ithaut si afore , . m,a C,10:3 ^ 2 . . . GREGo LACAsSE ^5 r t PINE ISLAND RD. MATTaes TT M& 36/ . . . mr+o, . n /302rn7