Loading...
HomeMy WebLinkAboutCorrespondence - 6 TIMBER LANE 3/3/2001 NEW ENGLAND ENGINEERING SERVICES March 3, 2001 North Andover Planning Board Town Hall Annex 27 Charles Street North Andover, MA 01845 Re: 6 Timber Lane, North Andover Dear Mr. Chairman: New England Engineering has inspected the construction of the screen room and associated storm water infiltration chambers and hereby certifies that construction is in substantial conformance with the approved design plans. If you have any questions or need additional information please advise. Sincerel Richar�angard, 60 BEEC°iVWOOD DRIVE-PdC7RTIA ANDOVER, MA 01845-(978)686.-1768..(888)359-7645- FAX(978)685-1099 NEW ENGLAND ENGINEERING SERVICE INC March 5, 2001 North Andover Planning Board Town Hall Annex 27 Charles Street North Andover, MA 01845 Re: 6 Timber Lane, North Andover Dear Sus: Enclosed are 3 copies of an as built plan for the above referenced property. These plans and the enclosed certification letter are being sent to the board so the 500 dollar bond held to guarantee completion of the project can be released. If you need further information or clarification, please advise. I will be at your next meeting to discuss this matter. Sincerely, r Benja 4 C. Osgood, J/,E T President 60 BEEC.A-4W4'OD DRIVE-NORTH ANDOVER, MA 01M-(9 8)6€36-1768 (666)359-7645.. FAX(978)665-10199 6 Timber Lane—Watershed Special Permit Project description: enclosing an existing deck with a roof and four walls to create a three-season room within 325' of a wetland Non-Disturbance Zone (100" from wetland): No new work proposed,there is an existing shed and lawn Non-Discharge Zone: (325' from wetland): Enclose existing deck Infiltrator area Mitigation: a system of gutters, downspouts and infiltrator chambers has been designed so that additional runoff from the site is infiltrated into the soil. The capacity of the system is designed to hold all of the run-off from the 100-year storm. Issues: • House is not currently tied into the sewer however it will be tied in as soon as it becomes available. • Letter from Sandy Starr—concerned that the infiltrator is too close to the septic system, requests that infiltrator not be constructed until such time as the house is tied into sewer. Town of North over 11,41 Or,TICE OF 0 0 COMMUNITY DEVE LOPMENT AND SERVICES 27 Charles Street North Andover,Massachusetts 01845 WILLIAM J. SCOTT ACHUSS Director (978)688-9531 Fax(978)688-9542 MEMORANDUM DATE: November 23, 1998 TO: Kathleen Colwell,Town Planner FROM: Sandra Starr,R.S. RE: 6 Timber Lane In reviewing the site plan for a Watershed Special Permit at the location referenced above,I noted that the proposed infiltrator system is located too close to the existing leach area. I understand that municipal sewer is available across the street so would,therefore,recommend that commencement of work on this infiltrator system be deferred until such time as the dwelling is completely tied into the sewer. BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEAUFH 688-9540 PLANNING 689-9535