March 3, 2001
North Andover Planning Board
Town Hall Annex
27 Charles Street
North Andover, MA 01845
Re: 6 Timber Lane, North Andover
Dear Mr. Chairman:
New England Engineering has inspected the construction of the screen room and
associated storm water infiltration chambers and hereby certifies that construction is in
substantial conformance with the approved design plans.
If you have any questions or need additional information please advise.
Sincerel
Richar�angard,
60 BEEC°iVWOOD DRIVE-PdC7RTIA ANDOVER, MA 01845-(978)686.-1768..(888)359-7645- FAX(978)685-1099
NEW ENGLAND ENGINEERING SERVICE
INC
March 5, 2001
North Andover Planning Board
Town Hall Annex
27 Charles Street
North Andover, MA 01845
Re: 6 Timber Lane, North Andover
Dear Sus:
Enclosed are 3 copies of an as built plan for the above referenced property. These plans
and the enclosed certification letter are being sent to the board so the 500 dollar bond
held to guarantee completion of the project can be released.
If you need further information or clarification, please advise. I will be at your next
meeting to discuss this matter.
Sincerely, r
Benja 4 C. Osgood, J/,E T
President
60 BEEC.A-4W4'OD DRIVE-NORTH ANDOVER, MA 01M-(9 8)6€36-1768 (666)359-7645.. FAX(978)665-10199
6 Timber Lane—Watershed Special Permit
Project description: enclosing an existing deck with a roof and four walls to create a three-season
room within 325' of a wetland
Non-Disturbance Zone (100" from wetland):
No new work proposed,there is an existing shed and lawn
Non-Discharge Zone: (325' from wetland):
Enclose existing deck
Infiltrator area
Mitigation: a system of gutters, downspouts and infiltrator chambers has been designed so that
additional runoff from the site is infiltrated into the soil. The capacity of the system is designed
to hold all of the run-off from the 100-year storm.
Issues:
• House is not currently tied into the sewer however it will be tied in as soon as it becomes
available.
• Letter from Sandy Starr—concerned that the infiltrator is too close to the septic system,
requests that infiltrator not be constructed until such time as the house is tied into sewer.
Town of North over
11,41
Or,TICE OF 0
0
COMMUNITY DEVE LOPMENT AND SERVICES
27 Charles Street
North Andover,Massachusetts 01845
WILLIAM J. SCOTT ACHUSS
Director
(978)688-9531 Fax(978)688-9542
MEMORANDUM
DATE: November 23, 1998
TO: Kathleen Colwell,Town Planner
FROM: Sandra Starr,R.S.
RE: 6 Timber Lane
In reviewing the site plan for a Watershed Special Permit at the location referenced above,I noted
that the proposed infiltrator system is located too close to the existing leach area. I understand that
municipal sewer is available across the street so would,therefore,recommend that commencement of work
on this infiltrator system be deferred until such time as the dwelling is completely tied into the sewer.