Loading...
HomeMy WebLinkAboutConsultant Review - 1831 GREAT POND ROAD 5/6/2013 CHRISTIANSEN & SERGI, INC PROFESSIONAL ENGINEERS AND LAND SURVEYORS 160 SUMMER STREET, HA),/EFZFflt.L NIA 01880 C51 lel: 978-273­0310 A,ww.csi-ef1gr.cr,,n1 fax 978-.372-,39430, May 6, 2013 Ms. Judy Tymon Town Planner Town of North Andover 1600 Osgood St North Andover MA 01845 Re: Great Pond Road, Map 35 Lot 38, Watershed Special Permit Plan Dear Ms. Tymon: After receiving comments from Lisa Eggleston,the Town's peer review consultant, and corresponding with her via e-mail I have made the following changes in the plans. 1. 1 have provided the NRCS soils to Ms. Eggleston,which shows that the site is primarily composed of Paxton and Woodbridge soils. Soil testing took place on Monday May 6,2013 and the results were added to the plan. 2. The porous pavement for the driveway has been replaced by conventional asphalt pavement and a crushed stone infiltration area adjacent to the drive. 3. 1 have reduced the total land disturbance to 19,000 square feet. This compares favorably with three lots that abut the property to the north averaging 43,000 square feet each. 4. The limit of work is shown on the plan as a tree cut line and has been labeled Limit of Work. As shown on the plan with the exception of the driveway entrance and the area of the utilities not trees will be cut along Great Pond Road. There is on average 60 feet of natural vegetation to remain between the house and Great Pond Road on the left side of the property and 50 feet on average on the right side of the property. The vegetation to be planted will be lawn and ornamental shrubs and trees. Notes regarding fertilizers and landscaping have been added to the plan 5. A note has been added restricting the use of copper downspouts and gutters. 6. A note has been added to the plans regarding maintenance of stormwater management structures. 7. A construction sequence has been added to the plan. 8. The stone size for the construction entrance has been increased to a minimum of two inches. C" CHRIS TIANSEN & SERGI, INC PROFESSIONAL, ENGINEERS AND LAND SURVE YORS 160 SUMMEP STREET.F�AVERHU, MA 01830 teii978-3-73-03101 wvwcsi-engrrcrn 9. Ms. Eggleston raised the issue as to whether the lot should be considered a new lot or an existing lot. This issue was addressed during the Zoning Board of Appeals meeting and is outlined in note 2 on the special permit plan. The conclusion reached and certified by the signing of the Variance plan by the Zoning Board of Appeals is that the lot existed as such prior to 1994. 10. The alternative development plan for the property which we submitted puts the house outside of the 400 ft radius from the lake. The area is flat compared to the rest of the property. The owners could build this house and the driveway that is shown but chose to build closer to the Lake because the impact would be less. The location of the house shown in the special permit plan is the location for which a variance has already been obtained from the Board of Appeals as required by the regulations. I understand Ms. Eggleston's concern about limiting work as much as possible but the applicant has already reduced the impact from 37,000 s.f. to 19,000 s.f. That is a reduction of 49%. Also following the regulations the applicant should be allowed to build as allowed in the underlying zoning district. Section 4.136 3cii Uses allowed by Special Permit(3) Construction of a new or permanent structure only after a variance has been granted by the Zoning Board of Appeals. The permit has been granted for the house shown on the plan. Section 4.136 3c(i)Allowed Uses All of the Allowed Uses listed in Section 3 (a)(i) of this Watershed Protection District Bylaw are allowed in the Non-Disturbance Zone except as noted Section 4.136 3 a i Allowed Uses (1)All permitted uses allowed in Section 4.121 "Permitted Uses Residence 1.2 and 3 District" of the Zoning Bylaw Section 4.121 Residence I District Nothing in the allowed activities in the section limits house size or clearing. The table of Dimensional Requirements at the end of the Zoning book does not include any limitations concerning house size or extent of clearing. Following the above review of the rules it seems to me our application and proposed site plans meets all of the zoning requirements specified. 7 Ver t h sen P. � Enright, From: Lisa Eggleston <|isa@eggledonenvronmenta|zom> � Sent: Wednesday, May Ol2013 4:06 PM To: 'Phil Christiansen, PE' Cc: Tvmon,Judy; Hughes,Jennifer ! Subject: RE: ycuito | � � Phil, � In response to your emails, I'm not sure that I would recommend that the Planning Board to condition that the soil � testing be done prior to construction. I think it's going to have to be done in advance so that we know that the runoff � can all be recharged on site and how Much area is going tobe required tmdmso. |agree that the soils on this site may be particularly prone to sedimentation,so erosion controls should be used during testing. � Regarding my comment#3,an infiltration trench along the side of the driveway would be preferable to pervious � pavement interms of providing an opportunity tm intercept any spills but it will have the same problem regarding slope. � � Just asareminder,the DEP Standards prohibit ANY stormwater BMPs within Zone A.I recognize that as a single family home this project isnotSubiec1totheEtandards, butiLissnnmething that all parties should at least he aware of.Your design should both maximize the treatment provided and minimize the area of disturbance needed. As far as the alternatives analysis(my comment#4) it is up to the Planning Board whether the one you did for the ZBA suffices,or whether the option of a smaller building footprint should also be considered. Re comment#5 the total area of disturbance should be as small as possible.Whatever tightening up you can do should be done and the owners should recognize that their view of the lake may be limited. The Planning Board or Conservation Commission may also want to see a landscape plan for the property. Let nne know if you have any questions. 1JBa D. Eyg�eStQn, P.F. Eggleston Environmental 32 Old Framingham Rd., Unit #2g Sudbury, MA 01776 tel 508.259.1137 fax 866.820.7840 From: Phil Christiansen, PE Sent: Wednesday, May 01, 2013 3:03 PM To: Cc: 'TVmon, Judy' Smbject: scuitn _ � Lisa � | have received your comment letter from Judy. Comment 5. | did have the limit of work and clearing shown on the plan as o tree line, | will label it as |hnd of clearing. The area (n front of the house has tobe cleared for the driveway as well os the sewer installation and water line installation. The opening at the street is only 37 feet and contains the water sewer and driveway. If you think it appropriate | could voduno it to 20 feet allowing for 10 feet between the water and sewer and 5 feet beyond each line to allow for construction. Your comments regarding landscaping will be added to the plan � Comment 6.We will add a note to the plan to prohibit copper gutters and downspouts. Comment 7 We will address maintenance of stormwater systems Comment 8 A construction sequence will be provided Comment 9. 1 will change the construction entrance to minimum 2 inch. Regards, Phil Christiansen, P.E. CHRISTIANSEN & SERGI, INC. PROFESSIONAL ENGINEERS AND LAND SURVEYORS 160 Summer Street Haverhill, MA 01830 (978)-373-0310 (978) 372-3960 fax Please note the Massachusetts Secretary of State's office has determined that most emails to and from Municipal offices and officials are public records.For more information please refer to:htto:lhvww,sec,state,ma.us/pre/preidx.htm, Please consider the environment before printing this email. 2 | i | � | | Enright, Jean | � From: Phil Christiansen,pE <phi|@oj-engrzom> Sent: Thursday, May 02, 20I3I1:0OAK4 To: 'Uuu Eggleston' � Cc: Tynxon Judy Attachments: sbeolanrevpdf, detmi|revodf, � � � Categories: Red Category � Lisa I thought it best to have all of my responses in one e-mail. I have also attached pdfs of changes in the plans Comments 1. No response needed 2. Soils testing has been moved b/ Monday May S' 2O13 3. 1 have removed porous pavement and added a stone treatment area along the drive. I have included water stops ao the water will not rush down hill 4. | understand your concerns about limiting work as much as possible but the applicant has already reduced the impact from 37,000 s.f. to 21,000 s.f. That is a reduction of 43%.Also following the regulations the applicant should be allowed to build anallowed in the underlying zoning district. Section 4.1383oii Uses allowed by Special Permit/3> Construction ofa new or permanent structure only after a variance has been granted by the Zoning Board of Appeals. The permit has been granted for the � house shown on the plan. | Section 4.13O3c(i) Allowed Uses All of the Allowed Uses listed in Section 3(e)0of this Watershed Protection District Bylaw are allowed/n the Non-Disturbance Zone except oanoted. Section 4.13O3ai Allowed Uses (1)/\8ponn8bpd uses allowed/n Section 4.12Y "Permitted Uses Residence Y.2 and 3 District"ofthe Zoning Bylaw Section 4.121 Residence 1 District Nothing in the allowed activities in the section limits house size or clearing. The table of Dimensional Requirements at the end ofthe Zoning book does not include any limitations concerning house size o/extent ofclearing. Following the above review of the rules it seems to me our application and proposed site plans meets all of the zoning requirements specified. 5. A label for the limit of work has been added to the plan. I have reduced the area of clearing. I have narrowed the width of the entrance. I have added a note about six inches of top soil and native vegetation 0. 1 have added o note to restrict the use of copper 7. | have added notes regarding maintenance ofstormwahersystems 8. A construction schedule has been added Q. The size of the stone has been changed Regarde, Phil Christiansen, P.E. CHRWSTIANSEN & SERGU INC.pmOpEmGomAL ENGINEERS AND LAND SURVEYORS 1OO Summer Street Haverhill, K8A0183O � (978) 373-0310 � Eggleston Environmental April 22, 2013 North Andover Planning Board 1600 Osgood Street North Andover, MA 01845 Attn: Judy Tymon, Town Planner RE: Stormwater Review Great Pond Rd, Map 35 Lot 38 Dear Ms. Tyrnon and Board Members: Per your request, I have conducted a technical review of the March 14, 2013 Watershed Special Permit Application packet submitted by Christiansen& Sergi, Inc. for the above- referenced project. Included in the materials I received and reviewed were the following: Watershed Special Permit Application, Map 35, Lot 38, Anthony Scuito, Petitioner, prepared by Christiansen& Sergi,Inc. and dated March 13, 2013. Variance and Watershed Special Permit Site Plan (3 sheets), Assessor's Map 35 Lot 38, prepared for Marguerite and Anthony Scuito, prepared by Christiansen & Sergi, Inc. and dated March 5, 2013. My primary focus in this technical review is on the overall stormwater management approach and design concepts used in the project, as well as its compliance with the Town of North Andover's zoning requirements for Watershed Protection Districts, the Massachusetts Department of Environmental Protection (DEP) Stormwater Management Standards and Regulations, and the North Andover Wetlands Bylaw. It is my understanding that a Notice of Intent (NOI) application for the project has been or will be filed concurrently with the Conservation Commission. My review is aimed at assisting both the Planning Board and the Conservation Commission in their respective reviews of the project. The proposed project entails the construction of a single family home on an undeveloped lot on the north side of Great Pond Road, portions of which are in the Watershed Protection District as well as within the buffer zone of a regulated wetland. The lot is presently wooded. Drainage fi-om the property is in a southerly direction, toward Lake Cochichewick. The proposed development activity is located wholly within Non-Disturbance Zone of the Watershed District. As proposed, it includes clearing of approximately 20,780 sf of land, grading and landscaping within that area, construction of a porous pavement driveway and walkways and a house and garage with a footprint of 3,665 sf. The project 32 Old Framingham Rd Unit 29 Sudbury MA 01776 tel 508.259.1137 fax 866.820.7840 Great Pond Road, Map 35 Lot 38, Storniwater Review 2 April 22, 2013 entails a change in topography or grade as well as vegetation removal, both of which are allowable in the Non-Disturbance Zone only by Special Permit. Construction of a new permanent structure is also allowed within the Non-Disturbance Zone only by Special Permit and only after a variance has been granted by the Zoning Board of Appeals. It is my understanding that such a variance has been granted for this project. My comments on the proposed plan are outlined below: 1. The proposed project is entirely within the Zone A for the Lake Cochichewick public water supply, defined by the Massachusetts Drinking Water Regulations (310 CMR 22.02) as including the land area within a 400 foot lateral distance from the upper boundary of the bank of a Class A surface water source. The Zone A boundary should be shown on the site plans. 2. The plan calls for infiltration of runoff through roof infiltrators and porous pavement, however no soils data have been provided to document the suitability of the site for onsite infiltration. 3. Per the DEP Stormwater Handbook, porous pavement is not suitable for use within a Zone A recharge area, and should only be used on slopes less than 5 percent. 4. The application includes an alternatives analysis for locating the building out of the Non-Disturbance Zone, and indicated that it would require greater net disturbance in land area. If the project is to be located within the Non-Disturbance Zone consideration should also be given to shrinking the building footprint and the overall impact area. 5. The limit of work, including vegetation clearing, should be shown on the site plan per the Special Permit requirements, and the proposed landscaping should be described. I would also add that the area enclosed by the proposed erosion controls appears to be quite a bit larger than is absolutely necessary and should not all have to be cleared, particularly the vegetated buffer between the house and the lake. I recommend that the creation of new lawn area be limited to that which is absolutely necessary, and that any new landscape area be constructed in such a manner as to minimize the maintenance that is required, e.g. the soil should be well aerated, it should have a minimum of 6-inches of topsoil and, where possible, native vegetation should be planted to minimize the need for fertilizer and watering. As with similar projects permitted within the Watershed Protection District, both the limits of approved clearing and the restriction on lawn care products should be permanently recorded on the deed to the property. 6. It is not clear from the architectural drawings whether the proposed house design calls for any copper or other architectural metal. Runoff fi-om metal roofs (or roofing elements) cannot be infiltrated in a Zone A. Great Pond Road,Map 35 Lot 38, Storniwater Review 3 April 22, 2013 7. Ongoing maintenance of proposed stormwater management structures should be addressed. 8. A Construction Sequence aimed at minimizing the total area and duration of soil disturbance should be provided. 9. The stone used for the proposed construction entrance should be a minimum of 2- in diameter. I appreciate the opportunity to assist the North Andover Planning Board and Conservation Commission with the review of this project, and hope that this information is suitable for your needs. Please feel free to contact me if you or the applicants have any questions regarding the issues addressed herein. Sincerely, EGGLESTON ENVIRONMENTAL Lisa D. Eggleston,P.E. C: Jennifer Hughes, Conservation Coordinator FaP nfG,SiaY(/Sfdnv ` H��r'S0'g1 slTe� \ C\IM NTATON noun ovens \\ \� i cEar+EVmnrmisaux cox wnsro \ � \,1A / rs (� F — onre 6/L3 ROOF R \ l � `INELTRAT R CONSTRUCTION SEQUENCE \� \ \ �01 I _l / i LOCUS MAP N- 1.STAKE OUT LIMIT OFWORK 2.CLEAR ENTRANCE BY REMOVING NOTESeJecraaaeEarr+swuiEO Vnmwmarowxov VEGETATIONAND TOP SOIL SUFFICIENTLY TO ' \ L�_ sxm Prearmrox+nsraicraxo suscmrroms u+avnErvrs ovsECriory INSTALLCONSTRUCTION ENTRANCE \ \ \\� \ \ 1 q.+se oErnEimvn orxoamauoavea zawxc aruws.�e 3.CUTAND REMOVE TREES AND STUMPS WITHIN THE TREE CUT LINE _ ((( \ pr xswcorsaxo rxeossir+urrouef rxeriacel.asuaxm 4.INS TALL SEDIMENTATION CONTROL ` G R`735 \ \ \ `\\\ / aafa=sq�oeisc smfn.woscw eomxrArm er,swx easanNEe xovEU,sEre ro+s �_ F\ 5.CONSTRUCT THE WALL LOCATED BEHIND - �?\ \8 \ \\� I d.rucss+rxxwcn a+s o_uxEnreweuxos. Do THE HOUSE _ \ \ 1, ry 6.INSTALL THE FOUNDATION ,\ \\ \ / / \ r ss comcmExru.vmm�ErnEU+HiexwA,FR o 7.START CONSTRUCTION OF THE HOME B.INSTALL WATER AND SEWER EET,AININ� \fit \ IJ I / / aEVxmmaouar+dN�ra ro,z. "uro,r.�a„E�xxNeEazsaoseo�,cazs�x�a" 9.INSTALL ROOF RUNOFF INFILTRATION — � e(V ^r' //. \ xoxaacavcafsrw oesansn�+e cosssNEaaon srzm au re�PaoPExrr CHAMBERS �, arE�meaa mule o+Exo 10.INSTALL DRIVEWAY AND SIDEWALK ?� ^� �0 /j /j1:� / / o eErwrleorauxu�mexem iaa E>:anureanrvowarEwnc. _ CONSTRUCTION \ �- n - R9 NM OCwx saoors aaa xorro sausmx-ECCxsrnvcnoxar fl.FINISH LANDSCAPING ENTRANCE \ / �% rxexouse n rAPeEAas oxmsvvwsxnu sf EOUOxm 12.REMOVE SEDIMENTATION CONTROL AFTER - E� / "'• � III rxEcoxsmucnoxsmuwce+.+ ESTABLISHMENT OF PERMANENT m scxmu+.e ArES SVSnv nssw,u sErwxrnnm amoao xG.o meAnacneo LANDS CAPING I \ TREE57 WA ER TONE\ �� sr'ax mus saorEa,rns ssum sv me xcam u+oovEx a \�2 •�REMAfN�\70P\ TRI�NC � � auxx xc soaao � ^ \ \ �pj \ \ \ \ SOIL TEST RESULTS-MAY 6,2013 oescurvrion caeuxmvarea \ ��""� ��.` s ,roa zav oEmr ox \ � B-9 oral„ oREFx L B-12 B \ ry � \��——\ SITE PLAN r"= ' 14' 6- \ 32' 16' SITE PLAN E—E.,-dx =: ,Droll+ srLrr_oa,., qd NNaEreos4� 0 5 2 7✓ scaE,=,a ASSESSOR'S MAP 35 LOT 38 1, 2 5' Nw SITE PLAN OF LAND PLANNING BOARD GREAT POND ROAD SPECIAL PERMIT 0 33' i0� N TOWN OF NORTH ANDOVER AREA OF BUFFER ZONE —5 DISTURBED a NORTH ANDOVER,MA. PLAN '.. N 11 100 FT ZONE-3900 SQUARE'm Pw � x . C? a 50 FEET ♦ePUCnut MRGR E TIN THON YI U VU T ZONE60 SQUARE FEET S OPEV O 6.5' 8.67' _ NORANDOER,M 045 PROFEIONAL EGINEERSd CHRISTIANSEN&SJEJ D R SUGRVI,E INC. HOUSE DIMENSIONS ' xz+2on.aDi:.nWU / I 1• o , O II j'�'sa•„'w \ SITE--\ \ i LOCUS MAP sine r-r000•.< '.. TL _w `, N TNEAL7ERNATIVE LOCATION FOR THE PROPOSED HOUSE OUTSIDE THE GENERAL ZONE IS SNOWNONTHISPLAN.THE LOCATION WAS CHOSEN BECAJSE ISIS RELATIVELY LEVEL.THE AREA BETWEEN T,HS LOCAVONAND THE END OF THE NON-DISTURBANCE ZONE IS VERY STEEP ANOTHEGRADECHANOE OVER THE DEPTH OF THE HOUSE WOULD BE 20 FEET,SUCH Illlti LOCATION WOULD REQUIREA MASSIVE DISTURBANCE OF EARTH AS WELL AS THE \\ CONSTRUCTION OF EXTENSIVE WALLS.THE DIFFERENCE IN IMPACT BETWEEN THE PROPOSED �( LOCATION AND THE ALTERNATIVE LOCATION IS TABULATED BELOW PROPOSED PROJECT ALTERNATIVE "0-R a Qy\� \\�\ AREA DISTURBED 19,1155.E 37,300 S.F LENGTH OF DRIVE 730 FT 590 F7 \ AREA OF DRIVE 1970S.F. 6580S.F. PROPOSED PROJECT ALTERNATIVE DESIGN OUTSIDE NON—DISTURBANCE ZONE ASSESSOR'S MAP 35 LOT 38 SITE PLAN OF LAND VARIANCE AND GREAT POND ROAD WATERSHED IR NORTH ANDOVER,MA. SPECIAL PERMIT SITE PLAN SITE PLAN = , RGUER,TE.O.,RoNYsc,uro ALTERNATIVES i5 CORLEY ROAD scuff as PP NORTH ANDOVER, Al_ A0=AIN 0 PROFESSIONAL ENGINEERS&lANO SURVEYORS it CHRISTlAVSEN&SERG1,INC. �N2o,�o I NSPECTCH PORT. MIN B•M(UNPAVEO AREASIFILL F-IWRSENF FINISH CAI ARE fv I �O 0 j4a �f1�1(1 WIiHN60 0 0.00E c°nER FINISHED 3 GNACE .-�,• _ S 6 O ; I t,. WLT DUND •. rq ¢ fir. - C-DEL—PE SS}} WyL,. MIN.OF aS%COMPPCTED S ¢� aC G (PAVED nREA47 h-4 w� 5!z sav acv 1dS 1 s � MDM .a Y: =ra E aAMw 1. t LULTECONNO.41B FLTER m r7 c IAw+onraavl. CRUSHED STONE CON r- c_mss oes AND CONSTRUCTION ENTRANCE 40Tr0A1 ourvonna+ 1z,i. ` sPGUxwroNra THEAwACExT ROADwnv. o _ '...,. STONE LULTELRFI' �— a'OAGEETONEt-1rz H-1 N4d RDER CHnA1BER VYf CLEAN WASHED BROKEN STONE ,¢L7 S '� y ' �,1 LEV.1atE nosy rD ��. o°d�r '.. 12'-tB' PUN -\ FO1 1_ DOWNSP011T AND ROOFRINOFF P2.2G.Etp H, II IT111- �- 3g` Q.IFILTRATION ARE DETAIL _ pE PiPC I: A ¢ a rip 35 ROOF RUNOFF fNFILTRATION CHAMBER MAINTENANCE AGGREGATE ci ,Ja o«; z00 amPora �m S{8 >a m d� SOmh `kS�rySoii e e a Da,aaMx,ETNAra<,.oErNE�SreHAEDRA�NEDFR M�,NEDNA,I Ear�° .. �, ,,,r /62�+o�a v � ¢� oD�m v eyW9�a°iee>�WC � co sraw rD DETEaerixEtETxs wATea $Q _ rrx oE C wM,a EIS A+x : At-,ERn HD°aG s�RY DEWATERING SUMP TxE LrwasEasnaE xOrrvxcnoxrxc vNDPErtrcaxracrA n.l.s. 1 �� e sroaA,wATea Paoress�oxW.roDETEaBnxE wHaracnoxsArsENECE /�5'o g`rnw � DRIVEWAY RUNOFF TREATMENT STRIP wro�.,.rsrowF MAINTENANCE ° FDx°RW, R.xarANANDxrD,xaDaEFRDpERSaaN�,�GNWD ��` �=�:s / ��� m¢��;�'�,e` I--�--I FNEREST - Nas DTwxEC nNouasAFrEaasrDaMro DETEaAIw� LExGTH ��N �.�cL�a�*R��!!))`n�CakaO � / ,.`E' ,xsmw..oso. ♦cLES++�als FxroaroNE FRnPPF.ws TO eE FIRED x+TN SSOwExr ED—� ° F� �Pz, .cESDreF rcDxrAG A I {4{ 1�3"{'7'zzFUY��X II Z 3+jY e 1Db00 ca D mb—�bdas, }1 � e gh4h[o r DRIVEWAY DETAIL — D— s>t>w.NVpEEA>ER PRr>;`s,axaL rooETFnMINexwTUrapermNS,v+F T xuc D �A FED f+ll 1jtT,4`lae02�0z1 '.y ahr \ M, ECESSU+ seoauNS �sraNEPAOEas NOTE. r —I NATEmusuSP RED u wArASS ° M wE CHr NCCRr,AT axruLlaaae�s zaea (� r1F 1 � �31+'t 3�� �� -LE-..F fYy^Y� i \` 5N -h sPEC1E,P.NONaur BOO x rAUED N 1.os.,Da_wv ELSaaRav zcoTmHPEAACwrrEEDR.AUSNAU-sEls NlzWCIfuETSANDTN—SHL1 rH SC-310 STORMTE SIDEWALK POROUS PAVEMENT DETAIL r rr t�.�,f�.✓E{�.� 11,�,]'„h j I�II h1��r�s. �.i b A-�W i��s t t [3� F'�r x.�K�av eYy s.t• 'E�y{5�`I.�s..���..I�'.>1k'l�i{Y 1F'>��1,.i..t.�.'a a:..f ,a 7-. \ IxOrroscuEl 05wrc„Rm,;,aOFS: �•�, �as •M ROOF RECHARGE i LCLTIONSCAA ). •n Dr.:T k.H.r .�.,Y..wL1'✓nk!•sAENB1sUi..T LT.t ERS 4.a.�WG..:lIsT.\H....I N 300 FEET e„W���s>.,xuamo,ay r«wuam.Ne Ml�s�xrnx'N,�ssr'1 °°m.wNllsFyTSn=s.ecP H� aaECATED EwArMENr Gsw .mrnwr� aECw•aGE ° V.EER DEAS SIDE VIEW roruA -B,a.l s.e-ao,ncP HA ��� memeuNFUeimrMS VG =a,cE,cpnMBPn Eae'�gq'-aN l" USED aE <. a��.a�ae.»°��P�°.: ���„"�, �DL DF�°IDaINGT�xExNDEaLHAM EaE �=�rrA,l�� au FE� « ASSESSOR'S MAP 35 LOT 38 SITE PLAN OF LAND WATERSHED GREAT P �aa"a•""�«a1.,.� —�a-wF Aar, '« "'' I aQ� OND ROAD °^" t SPECIAL PERMIT MY NORTH ANDOVER,MA. SITE PLAN .= B "°`m"� mm.•>w awl ` `"""' ..T„r«,"r,«,T,.<E •oa<°T.��wPl DETAILS r m:m ae �me:m"m°a I�•Da.r,m, mi; mP _ yw- ooaga v.Ann+ � MPUGwr AIARGUERRE ANO ANTHONY SCIUTO p5«amn n�,o a"�Hmr Ano1ow ; �y'-''U cNa.«ro 1GCOPLEYROAD — ,_ B zno+la measetlm xs panne stress N^ I �` � �y�r?L; {c?, NORTN ANDOVER.MA OIM6 wmm Panay exwn meu,blmar �L _- tleryen.'nwvren nemti b��. —T Jill IIIIJIIIIIIIIIII ee ~s ue pRDFILE ® PROEESSIONALENGINEERSB fANOSURVEVORS GFZ TOP VIEW ' CHR/ST/ANSEN&SERGI,INC. SEDIMENTATION CONTROL DETAIL cED.CO e'THae.errEAHaaTimm rnx NC 110�I(b] DEWATERING BAG NDr rG SCALE I