HomeMy WebLinkAboutAs-Built Plan / Installation Certificate Form - 1831 GREAT POND ROAD 7/22/2014 PROFESSIONAL ENGINEERS AND LAND SURVEYORS C-51 160 SUMMER STREET,HAVERHILL,NIA 01830 tel:978-373-0310 mm.cskengr.com fax 978-372-3960 July 22, 2014 [CONSFWATION North Andover Conservation Commission JUL 33 0 10-14 Jennifer Hughes, Conservation Agent NC�F�Y'IIANl�oV[;-n 1600 Osgood Street, Suite 2035 CC On�iir,►- North Andover, MA 01845 Re: Certificate of Compliance for 1831 Great Pond Road Anthony Sciuto DEP File#242-1590 Dear Commission Members and Ms. Hughes: On behalf of Owner of 1831 Great bond Road of the above referenced project, and in accordance with Condition 72 of the Order of Conditions issued for the project, l hereby certify that the completed construction at the above referenced project has been performed in substantial compliance with the plans approved in the Order of Conditions. I have reviewed the attached as built plan and list the following changes from the approved plans. These were on site adjustments, reviewed by J Hughes and signed off on site 7-26-13: 1. Erosion control was moved to the northwest comer, limit of work expanded to allow for placement of material stockpile. 2. Southeast portion of site, removed invasive species(Approved plan shows trees to remain here). Landscaped with stones and bark mulch. 3. Sewer line relocated, area disturbed was made into lawn. 4. Eliminated portion of retaining wall on eastern wide of house near lot line landscaped with mulch and at rear of house, area was graded in contours 136 to 142, landscaped with lawn. 5. On west side of house limit of work e*anded. Erosion control moved closer to lot line and roof runoff infiltrators installed closer to lot line than shown on design plan 6. Roof runoff infiltrator at south side of house rotated and moved slightly south. A retaining wall was originally designed forthis area. No retaining wall was built there. Other plan deviations. 1 Underground propane tank 2 Underground utility box installed 3 Mulched area on eastern side retaining wall of house expanded. 4 Air conditioner units have been added to the north side of the house. 5 Irrigation control box added to western side of house. 6 Sidewalks have been moved closer to the house and porch areas are slightly different than designed, but within the approved limits of work. 7 Downspouts identified to roof runoff infiltrators. 8 Stone was placed for 50' on both sided of the driveway, between the existing stone wall and pavement on Great Pond Road Please contact me if you have any questions regarding this matter. Very, o r Philip '. ristiansen -�� Christiansen &Sergi, Inc. GENERAL ZONE TREE-LINE 5 OMIT OF WORK(TYP.) FRENC F M ROAD SITE 9 � \ NON-DISTURBANCE ab ZONE AIC UNIT k (TYR) ROOF RUNOFF INFILTRATOR (TYR) / fi — ' \\�� �\\.a< \\ EDGE OF LAWN LOCUS MAP / AWN \fie SCALE:1"=1000'+/- IRRIGATION d 'z,�, ` ASSESSOR'S MAP 35 LOT 38 CONTROL BOX - \\ 6 \ \ \ DOWNSPOUT DEP FILE NO.242-1590 4"PING(TYP.) / DECK �\ %/ \ \\� \ BURIED PROPANE TANK CHANGES APPROVED BY JENNIFER HUGHES - / \ LIMIT OF WORK TOP OF FIND.=135.30' \ o ) ) DURING JULY 12,2013 SITE MEETING ` 1.EXTEND EROSION CONTROL IN NORTI FWEST CORNER OF LOT TO EXPAND LIMIT OF \LAWN WORK AND ALLOW FOR STOCK PILE OF MATERIAL. \ 1'S TONE RET. 2.MOVE EROSION CONTROL,REMOVE INVASIVE SPECIES AND ADD SUMP AREA FOR A 1 TEMPORARY STONE SWALE AT THE SOUTH-EASTERN PORTION OF THE LET(TO BE LANDSCAPED WITH PLANTS APPROVED BY THE NACC UPON COMPLETION). GRAVEL SEWER LINE TO BE MOVED AND RUN STRAIGHT INTO HOUSE FROM GREAT POND LANDSCAPED UNDF UND ) ROAD TO AVOID FUTURE MAINTENANCE PROBLEMS.DISTURBED AREA TO BE ` ARESCAIF) // ELECT N I LANDSCAPEDANDSTABILIZEDUPONCOMPLETION - y PORTION OF RETAINING WALL BEHIND HOUSE WAS NOT NEEDED. 100'BUFFER 6Z4 /- - \\( MULCH ZONE y LANDSCAPED SEWER SERVICE'---_ AREA(TYP.) EXISTING SEWER LINE Ae, CONC.PAVERS `(TYR) - WATERSERVIC —WATER GATE PAVED --___ DRIVEWAY - STONE TRENCH\ AS-BUILT PLAN - SRAVEL FOR LANDSCAPED RREAAP.) " 50'NO BUILD LOT 38 GREAT POND ROAD 25 NO DISTURB IN z .. NORTH ANDOVER,MASS. PREPARED FOR- . EXISTING WATER MARGUERITE&ANTHONY SCIUTO LINE DATE:JULY 21,2014 _-A EDGE OF BANK SITE PLAN � PROFESSIONAL ENGINEERS&LAND SURVEYORS 210—r B ^40 FT CS1 CHRISTIANSEN A SERGI,INC. 1605UMMER ST.HAVERHILL,MA 01030 VVWW.C51-ENGR.COM SCALE:1"=20' TEL 97&373-0370 FAX.970-372-3960 COPYRIGHT 2014 DWG.NO.12011006