Loading...
HomeMy WebLinkAboutMiscellaneous - 78 VEST WAY 12/3/2015 n + l Ub_ T .f „rF >tC1 B r -qtr _ _icier o� �z o �Gr�h mot - Lt_- a -k_ _r_____ _ -_ CITY/TOWN NORTH ANDOVER FILE NUMBER 242- 17s` Lacy, Street Realty'' Trust 200 L!7 -\T Str^et NAME ADDRESS North Andover, 111A CERTIFIED MAIL NUMBER PROJECT LOCATIONd Address Lot 46 Vest .Way Recorded at Registry of North Essex ' Book 1600 ' Page 147 Certificate (if registered) REGARDING: October 12, 1982 Notice of Intent Dated and plans titled and dated see condition eleven (ll ) THIS ORDER IS ISSUED ON (date) November 19, 1982 ------------------------------------------ ------®_--- ----- --- Pursuant to the authority of G.L. c. 131 , s. 40, the North Andover Conservation Commission has reviewed your Notice of Intent and plans i-dent-ified above, an 1�as idetermined that the area on which the proposed work is to be done is significant to one or more of the interests listed in G.L. c.. 131, s. 40. Town of North Andover bylaws, Section 3, 5 A & B Wetlands Protection. The North Andover Conservation Commission hereby orders that the following conditions are necessary to protect said interests and all work shall be performed in strict accordance with them and with the Notice of intent and plans identified above-except®where-such_plans-are modified-by_said®conditions®-_--- _®__®- _-__-® CONDITIONS 1 . Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures , shall be deemed cause to revoke or modify this order. 2 . This order does not grant any property rights or any exclusive privileges ; it does not authorize any injury to priviate property or invasion of private rights. 3. This order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal , state or local statutes, ordinances, by-laws and/or regulations . 4. The work authorized hereunder shall be completed within one (1 ) year from the date of this order unless it is for a maintenance dredging project subject to Section 5(9) . This order may be extended by the issuing authority for one or more additional one-year eriods uper application to the said issuing authority at least thirty �30) days prior to the expiration date of the order or its extension. C., C t i C' C LIl T I 4 4 s o t q s r e f i i s e ru 11,b i s h o ut limit n the generality of the rforcToil­ bricks , plaster, vxire a th, paper, carboard, pipe, tires ashes , refrigerators , motor vehicles or parts of any of the foregoing. 6. No work may be commenced until all appeal periods have elapsed from the order of the Conservation Commission or from a final order by the Department of Environmental Quality Engineering. 7. No work shall be undertaken until the final order, with respect to the proposed project, has been recorded in the Registry of Deeds for the district in which the land is located within the chain of title of the affected property. The Document number indicating such recording shall be submitted on the form at the end of this order to the issuer of this order prior to commencement of work. 8 . A sign shall be displayed at the site not less that two square feet or more than three square feet bearing the works , "Massachuse Department of Environmental Quality Egnineering. Number .242- 9. Where the Department of Environmental Quality Engineering is -requested to make a determination and to issue a superseding order, the Conser- vation Commission shall be a party to all agency proceedings and hearings before the Department. 10. Upon completion of the work described herein, the applicant shall forthwith request, in writing, that a Certificate of Compliance be issued stating that the work has been satisfactorily completed . 11. The work shall conform to the following described plans and additional conditions: 1. Notice of intent and Environmental Data Fonit Dated October 12, 1982/ prepared by Flynn Associates P.C. /nine (9) pages . CI 2 . Plan titled "Pl_sn. Shaing a g�,ellin Location and Proposed Site CD Alterations , Location. Lot Z,.() VLS,- "�'71­v, ­­2-,-re�i Flynn. Lacv Street R,_:--alty Trust, Ds.te,_I Associate.- , P.C. 17 . A row of staked hay bales sh,911 be placed beLween all Con S ''ruc t ion M l_'-d Ti-et,IEJ_K: a-fean .. ­ _ TIP�I b _int all uacl L_ e ­s ha­ eL- s < ii �:i L.!^) _ alT-1 �: 0 S'-i-C'f i 13. All disturbed areas shall be graded, loaaqp-d and seeded to provide restabilization of disturbed areas . After restabillzation, hay bales shall be removed and sedimentation shall be removed from areas of accumulation. 11 , All vrosion pievention knd qHKvyntation prutection measures found neccssary during construction by the North Andover Conservation Commission will be implemented at the direction of the NACC or Highway Surveyor. 15 . Any changes in the submitted plans , Notice of Intent, or resulting from the aforementioned conditions must be sub- mitted to the NACC for approval prior to implementation® If the NACC finds , by majority vote, said changes to be significant and/or deviate from the original plans , Notice of Intent or this Order of Conditions to such an extent that the interests of the Wetlands Protection Act cannot be protected by this Order of Conditions and would best be served by the issuance of additional conditions , then the NACC will call for another public hearing within 21 days , at the expense of the applicant, in order to take testimony from all interested parties . Within 21 days of the close of said public hearing, the NACC will issue an amended or new Order of Conditions . 16. Any errors found in the plans or information submitted by the applicant shall be considered as changes and procedures outlined for changes shall be followed. 17. The provisions of this Order shall apply to and be binding Upon the applicant, its e _;Ioyees , and all successors and a._ .signs in interest or control, 13 . Prior to the issuance of a Certificate of Compliance, the applicant shall submit a letter to the Conservation Commission from a registered professional engineer certifying that the work 0 in compliance Ylth the lons rMerenacd abo-e are L condiLions stated above. 10® Members of the NACC shall have the right to enter upon and inspnct the premises to evaluate compliance with this Order 206 Accepted engineering and construction standards and procedures shall be followed in the completion of the project. 19SUMOV O !EW UOTAILiOnS nl - that the Site 01 &WnOlw _._- aZOLS Will nOt he SUbj.Lt LO flooding, storm damage, or any other form of damage due to wetness . 7nSid o¢ tI} cit�r or LC,''-1 1n C.7 7 S h IaT,d, aC71C re 1Cr( n7�if?f` of tt eir riryht to au:�ea1 th_ s o -��e2 O the Dc Dc )a - t r rj r:7r - mental Oualit�, Engineering. provided the request i s made in \1°ritinF and by certified mail to the Department within ten (10) datrs from the issuance of thi s' order. ISSUED BY NORTH ANDOVER CONSERVATION COM^1ISSION 4 On this 19Anthon daU`alof November 19 82 , before me personally appeared y b to me known to e t e person described in, an w o execute , t e oregoing instrument and acknowledged that he executed the same as his free act and deed. '''%% �C. My Commission expires DETACH ON DOTTED LINE AND SUBMIT TO THE . ISSUER OF THIS ORDER PRIOR TO COMMENCEMENT OF WORK. To NORTH ANDOVER CONSERVATION COMMISSION (Issuing Authority) PLEASE BE ADVISED THAT THE ORDER OF CONDITIONS FOR THE PROJECT AT FILE NUMBER 242- , HAS BEEN RECORDED AT THE REGISTRY OF ON (DATE) If recorded land, the instrument number which identifies this transaction is If registere an , t e document number which identifies this transaction is Signed Applicant CMMISJILAs' ',e I IM,Z. COM 'J 5S>IUk i vw C'a 6u T H f r TELEPHONE 693-710.� :4 a 4 gp"75,5^A CAN iJSEK Pursuant to the authority of the Wetlands Protection Act, Massachusetts General Laws Chapter 131, Section 40, as amended, and the Town of North Andover' s Wetland Protection By Law, the North Andover Conservation Commission will hold a Public Hearing on November .3,_ 1982 at 8 :00 P.M. at the Town Building Meeting Room, 120 Main Street, North Andover, MA on the Notice of Intent of Lacy Street Realty Trust to alter land at Lot 46 Vest Way for purposes of constructing a single family dwelling and related site develo ruent. Plans are available at the Conservation Commission Office, Town Building, 120 Main Street North Andover, MA, on Tuesday_ from 12 :00 noon to 2 :00 p.m® and by appointment. BY: A. Galvagna Chairman run ante in the N.A. Citizen on _ October 28, 192 „ Copies sent to : Planning Board ­ Board of Health Public Works Highway Dept® Applicant Engineer DEQE