HomeMy WebLinkAboutApplication - 151 BOXFORD STREET 5/19/2015 Massachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection -Wetlands
WPA Form 8A — Request for Certificate of Compliance 242-1562
Massachusetts Wetlands Protection A §4
ct M.G.L. c. 131, 0 Provided by DEP
Lk
A. Project Information 1A E
Important:
When filling out 1. This request is being made by: IuJ
forms on the Jeff+AI son Kutz rf A Y 1 19 01
computer,use Name
only the tab NORTH ANI)OVVR
key to move 151 Boxford Street CONSERVATION COMMISSION
your cursor- Mailing Address
do not use the North Andover _MA 01845
return key. Cityfrown State Zip Code
E-mail: alysonkutz@verizon.net
Phone Number
2. This request is in reference to work regulated by a final Order of Conditions issued to:
Jeff+Alyson Kutz
Applicant
9117/2012 242-1562
Dated DEP File Number
Upon completion
of the work 3. The project site is located at:
authorized in 151 Boxford Street North Andover
an Order of Street Address City1rown
Conditions,the
property owner Tax Map 106A Parcel 257
must request a Assessors Map/Plat Number Parcel/Lot Number
Certificate of 4. The final Order of Conditions was recorded at the Registry of Deeds for:
Compliance
from the issuing
authority stating Property Owner(if different)
that the work or Essex-North 13169 282
portion of the
work has been County Book Page
satisfactorily
completed. Certificate(if registered land)
5. This request is for certification that(check one):
H the work regulated by the above-referenced Order of Conditions has been satisfactorily completed.
❑ the following portions of the work regulated by the above-referenced Order of Conditions have
been satisfactorily completed (use additional paper if necessary).
171 the above-referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
wpaform8a.doc--rev-7113104 Page I of 2
it
Massachusetts e t of Environmental Protection DEP File Number:
Bureau of Resource Protection -Wetlands
r for Certificate of Compliance 242-1562
Massachusetts Wetlands Protection Act M.G.L. c. 131, X40 Provided by DEP
A. Project Information (cont.)
6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
® Yes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
El No
B. Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions(OOC). If the project received an OOC from the Conservation Commission, submit
this request to that Commission. If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional
Office(see LiA =' _ :. .r mas q y a p/pkg t [i iogiA arj� q�jE.� ).
wpaformSa.doc^•rev.7113104
Page 2 of 2
Sullivan Engineering Group, LLC
Civil Engineers&Land Development Consultants
May 10,2015
Y 4l
Town oflorth Andover
Conservation Commission
1600 Osgood Street NORTH ANDOVER
North Andover,MA 01845 CONSERVATION COMMISSION
Re: COC Request—151 Boxford Street(Map 106A Parcel 257) DEP file#: 242-1562
Conservation Commission Members
On behalf of the owners,Jeff Alyson Kutz, of 151 Boxford Street,I am requesting a Certificate of
Compliance from the Order of Conditions,DEP File#: 242-1562.
The Order of Conditions was issued to the Kutz's for this project and they are still the current landowners.
They have read and understand the recorded Order of Conditions. The Certificate of Compliance is to be
granted to Jeff&Alyson Kutz.
As part of this request,I am attaching a completed WPA Form 8A application,a check for$200.00, and 2 full
size As-Built plans&7 reduced sized plans (for the Commission).
I personally inspected the site on May 1,2015 and found the site to be fully stabilized by means of grass and
other landscaped materials. Wetland emblems were in place along the 25 foot No Disturbance buffer zone.
The remains of the haybales and silt fencing are still in place and should be removed upon approval of the
Conservation Agent to do so. The site was constructed in substantial compliance with the Order of Conditions
and the approved plans with the following minor changes:
1) A proposed patio was approved to built to the rear of the proposed addition. A smaller deck was
constructed in this location in lieu of the paver patio.
2) A propane tank and AC unit were installed on the westerly side of the addition that were not shown on
the approved plans. These items are approximately 65 feet away from the wetland resource area.
3) A landscaped boulder retaining wall(<2 feet high+20 feet long)was constructed on the
northwesterly side of the recent addition that was not shown on the approved plan. The wall is
approximately 58 feet from the wetland.resource area at the closest point..
4) The front walkway on the approved plan was replaced with a paver walkway in a different
configuration than the original walkway. The closest portion of the walkway is 92 feet from the
wetlands.
I would ask that you schedule this request on your next available agenda. ��}
Very Tru Yours,:::
I st><
I �
No.41586
J S ,P.E.
ALA.
PO Box 2004 Woburn,MA 01888 (781) 854-8644 e-mail:jacksull53 @comcast.net
I
I