Loading...
HomeMy WebLinkAboutCertificate of Compliance - 182 OLYMPIC LANE 12/14/2015 i i PUBLIC HEALTH DEPARTMENT Town of North Andover Community Development Division CERTIFICATE OF COMPLIANCE As of: 12/14/15 This is to certify that the individual subsurface disposal system received a SATISFACTORY INSPECTION of the: Complete Repair of D-Box, riser and Tee By: Todd Bateson At: 182 Olympic Lane Ma p 106.B Lot 0127 Nort .Andover, MA 01845 The I nce f this certific„_ �.,sha n t tb on rued as a guarantee that the system will function satisfactorily. Michele Grant Public Health Agent 1600 Osgood Street,North Andover,Massachusetts 01845 Phone 978.688.9540 Fax 978.688.8476 Web www.townofnorthandover.com 1 g�a���i')��1�)l1Vl11�A,i1101�141%„�• I 1 North Andover Health Deportment Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 182 Olympic Lane MAP: 106.8 LOT: 0127 INSTALLER: Todd Bateson DESIGNER: PLAN DATE: BOH APPROVAL DATE ON PLAN: INSPECTIONS D-Box, riser and T INSPECTION: 12/14/15 DATE OF BED BOTTOM INSPECTION: DATE OF FINAL CONSTRUCTION INSPECTION: DATE OF FINAL GRADE INSPECTION: SITE CONDITIONS ❑ Contractor reports any changes to design plan ❑ Existing septic tank properly abandoned ❑ Internal plumbing all to one building sewer ❑ Topography not appreciably altered Comments: SEPTIC TANK ❑ Building sewer in continuous grade, on compacted firm base ❑ Cleanouts per plan ❑ Bottom of tank hole has 6” stone base ❑ Weep hole plugged ❑ 1500 gallon tank has been installed H-10 loading ❑ Monolithic tank construction ❑ Water tightness of tank has been achieved by visual testing ❑ Inlet tee installed, centered under access port i ❑ Outlet tee installed, centered under access port (gas baffle/effluent filter) ❑ inch cover to within 6" of finish grade installed over one access port ❑ Hydraulic cement around inlet & outlet Comments: PUMP CHAMBER ❑ Bottom of tank hole has 6" stone base ❑ Weep hole plugged ❑ 1500 gallon Pump Chamber installed ❑ H-10 loading ❑ Monolithic tank construction ❑ Inlet tee installed, centered under access port ❑ Pump(s) installed on stable base ❑ Alarm float working ❑ Pump On/Off floats working ❑ Separate on/off floats ❑ Drain hole in pressure line ❑ cover at final grade installed over pump access port ❑ Water tightness of tank has been achieved by testing ❑ Hydraulic cement around inlet & outlet Comments: CONTROL PANEL ❑ Alarm & Pump are on separate circuits ❑ Alarm sounds when float is tripped ❑ Location of control panel: basement ❑ Alarm signal located inside: basement Comments: DISTRIBUTION-BOX Installed on stable stone base H-20 D-Box ❑ , ' Inlet tee (if pumped or >0.08'/foot) Hydraulic cement around inlet & outlets Observed even distribution ❑�. Speed levelers provided (not required) chedule 40 PVC Pipe Comments: