Massachusetts Department of Environmental Protection Provided by MassDEP:
N:):: MassDEP File#:242-1558
Bureau PA Form of Resource 5 Protection-Wetlands
eDEP Transaction#:486718
W -Order of Conditions City/Town:NORTH ANDOVER
,\ Massachusetts Wetlands Protection Act M.G.L.c. 131, §40
i
I
A. General Information
' 1.Conservation Commission NORTH ANDOVER 1
1 2. Issuance a. F OOC b.r Amended OOC
3.Applicant Details
a.First Name LAURIE b.Last Name ARRIA
c.Organization
1 d.Mailing Address 225 ABBOTT STREET
} e.City/Town NORTH ANDOVER f.State MA g.Zip Code 01845
4.Property Owner
a.First Name LAURIE b.Last Name ARRIA
C.Organization
1 d.Mailing Address 225 ABBOTT STREET
e.City/Town NORTH ANDOVER f.State MA g.Zip Code 01845
5.Project Location
a.Street Address 225 ABBOTT STREET
i b.City/Town NORTH ANDOVER c.Zip Code 01845
d.Assessors Map/Plat#38 e.Parcel/Lot# 78
f.Latitude 42.66999N g.Longitude 71.09492W
6.Property recorded at the Registry of Deed for:
a.County b.Certificate c.Book d.Page
NORTHERN ESSEX 11441 148
i
7.Dates
4
, a.Date NOI Filed: 5/29/2012 b.Date Public Hearing Closed: 7/11/2012 c.Date Of Issuance: 7/13/2012
1
8.Final Approved Plans and Other Documents
I a.Plan Title: b.Plan Prepared by: c.Plan Signed/Stamped by: d.Revised Final Date: e. Scale:
225 ABBOTT SULLIVAN
STREET,PLOT ENGINEERING JOHN D.SULLIVAN III,P.E. 07/09/2012 1"=20'
1 PLAN OF LAND GROUP,LLC
B. Findings
I.Findings pursuant to the Massachusetts Wetlands Protection Act
q Page 1 of 10 * ELECTRONIC COPY
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection-Wetlands MassDEP File#:242-1558
WPA Form 5 - Order of Conditions eDEP Transaction#:486718
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Cityffown:NORTH ANDOVER
Following the review of the the above-referenced Notice of Intent and based on the information provided in this application and
presented at the public hearing,this Commission finds that the areas in which work is proposed is significant to the following interests of
the Wetlands Protection Act.
Check all that apply:
a. F Public Water Supply b. r Land Containing Shellfish c.F Prevention of Pollution
d. F Private Water Supply e. r Fisheries f. F Protection of Wildlife Habitat
g. F Ground Water Supply h. F Storm Damage Prevention i. F Flood Control
2.Commission hereby finds the project,as proposed,is:
4
Approved subject to:
a.F The following conditions which are necessary in accordance with the performance standards set forth in the wetlands regulations.
This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above,the following
General Conditions,and any other special conditions attached to this Order.To the extent that the following conditions modify or
differ from the plans,specifications,or other proposals submitted with the Notice of Intent,these conditions shall control.
? Denied because:
d b.r The proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations.Therefore,
work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are
i adequate to protect interests of the Act,and a final Order of Conditions is issued.A description of the performance standards
which the proposed work cannot meet is attached to this Order.
c.E The information submitted by the applicant is not sufficient to describe the site,the work or the effect of the work on the interests
, identified in the Wetlands Protection Act.Therefore,work on this project may not go forward unless and until a revised Notice of
Intent is submitted which provides sufficient information and includes measures which are adequate to protect the interests of the
1 Act,and a final Order of Conditions is issued.A description of the specific information which is lacking and why it is
necessary is attached to this Order as per 310 CMR 10.05(6)(c).
1
is
3 F Buffer Zone Impacts:Shortest distance between limit of project disturbance and the wetland resource 55
area specified in 310CMR10.02(1)(a).
a.linear feet
1 Inland Resource Area Impacts:(For Approvals Only):
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
4. r Bank
a.linear feet b.linear feet c.linear feet d.linear feet
5.r Bordering Vegetated Wetland
a.square feet b.square feet c.square feet d.square feet
1 6. r Land under Waterbodies and Waterways
a.square feet b.square feet c.square feet d.square feet
1
e.c/y dredged f.c/y dredged
I
7.E Bordering Land Subject to Flooding
a.square feet b.square feet c.square feet d.square feet
' Page 2 of 10* ELECTRONIC COPY
s
S
Massachusetts Department of Environmental Protection Provided by MassDEP:
MassDEP File#:242-1558
Bureau of Resource Protection-Wetlands eDEP Transaction#:486718
WPA Form 5 - Order of Conditions City/Town:NORTH ANDOVER
N),,,,,
---.1
L Massachusetts Wetlands Protection Act M.G.L.c. 131, §40
Cubic Feet Flood Storage
e.cubic feet f.cubic feet g.cubic feet h.cubic feet
8.r Isolated Land Subject to Flooding
a.square feet b.square feet
Cubic Feet Flood Storage
c.cubic feet d.cubic feet e.cubic feet f.cubic feet
9.r Riverfront Area
a.total sq.feet b.total sq.feet
Sq ft within 100 ft
c.square feet d.square feet e.square feet f.square feet
Sq ft between 100-200 ft
g.square feet h.square feet i.square feet j.square feet
Coastal Resource Area Impacts:
Proposed Permitted Proposed Permitted
Resource Area Alteration Alteration Replacement Replacement
10.r Designated Port Areas Indicate size under Land Under the Ocean,below
11.r Land Under the Ocean
a.square feet b.square feet
` c.c/y dredged d.c/y dredged
1 12.r Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below
13.r Coastal Beaches
a.square feet b.square feet c.c/y nourishment d.c/y nourishment
". 14.r Coastal Dunes
s a.square feet b.square feet c.c/y nourishment d.c/y nourishment
15.E Coastal Banks
a.linear feet b.linear feet
16.r Rocky Intertidal Shores
a.square feet b.square feet
17.r Salt Marshes
a.square feet b.square feet c.square feet d.square feet
18.r Land Under Salt Ponds
a.square feet b.square feet
c.c/y dredged d.c/y dredged
19.r Land Containing Shellfish
a.square feet b.square feet c.square feet d.square feet
Page 3 of 10* ELECTRONIC COPY
i
-411 Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection-Wetlands MassDEP File#:242-1558
WPA Form 5 - Order of Conditions eDEP Transaction#:486718
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 City/Iown:NORTH ANDOVER
Indicate size under Coastal Banks,inland Bank,Land Under the i
20.I—Fish Runs Ocean,and/or inland Land Under Waterbodies and Waterways,
above
i
c.eiy dredged d.ay dredged
21.E Land Subject to Coastal Storm Flowage
a.square feet b.square feet
22.
F Restoration/Enhancement(For Approvals Only)
If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has been
entered in Section B.5.c&d or B.17.c&d above,please entered the additional amount here.
a.square feet of B V W b.square feet of Salt Marsh
23.
F Streams Crossing(s)
If the project involves Stream Crossings,please enter the number of new stream crossings/number of replacement stream crossings.
a.number of new stream crossings b.number of replacement stream crossings
C. General Conditions Under Massachusetts Wetlands Protection Act
The following conditions are only applicable to Approved projects
1. Failure to comply with all conditions stated herein,and with all related statutes and other regulatory measures,shall be deemed
cause to revoke or modify this Order.
2. The Order does not grant any property rights or any exclusive privileges;it does not authorize any injury to private property or
invasion of private rights.
3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal,
state,or local statutes,ordinances,bylaws,or regulations.
4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following
apply:
a.the work is a maintenance dredging project as provided for in the Act;or
b.the time for completion has been extended to a specified date more than three years,but less than five
years,from the date of issuance.If this Order is intended to be valid for more than three years,the
extension date and the special circumstances warranting the extended time period are set forth as a
special condition in this Order.
5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the
issuing authority at least 30 days prior to the expiration date of the Order.
6. If this Order constitutes an Amended Order of Conditions,this Amended Order of Conditions does not exceed the issuance
date of the original Final Order of Conditions.
7. Any fill used in connection with this project shall be clean fill.Any fill shall contain no trash,refuse,rubbish,or debris,including
but not limited to lumber,bricks,plaster,wire,lath,paper,cardboard,pipe,tires,ashes,refrigerators,motor vehicles,or parts of
any of the foregoing.
8. This Order is not final until all administrative appeal periods from this Order have elapsed,or if such an appeal has been taken,
until all proceedings before the Department have been completed.
9. No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land
Court for the district in which the land is located,within the chain of title of the affected property.In the case of recorded land, P;
r
Page 4 of 10 * ELECTRONIC COPY f.
1
l
t
(
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection-Wetlands MassDEP File#:242-1558
WPA Form 5 - Order of Conditions eDEP Transaction#:486718
Massachusetts Wetlands Protection Act M.G.L.c. 131, §40 CityfI own:NORTH ANDOVER
the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the
proposed work is to be done.In the case of the registered land,the Final Order shall also be noted on the Land Court
Certificate of Title of the owner of the land upon which the proposed work is done.The recording information shall be submitted
to the Conservation Commission on the form at the end of this Order,which form must be stamped by the Registry of Deeds,
prior to the commencement of work..
10. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words,
"Massachusetts Department of Environmental Protection"
[or'MassDEP"]
File Number:"242-1558"
11. Where the Department of Environmental Protection is requested to issue a Superseding Order,the Conservation Commission
shall be a party to all agency proceedings and hearings before Mass DEP.
12. Upon completion of the work described herein,the applicant shall submit a Request for Certificate of Compliance(WPA Form
8A)to the Conservation Commission.
13. The work shall conform to the plans and special conditions referenced in this order.
14. Any change to the plans identified in Condition#13 above shall require the applicant to inquire of the Conservation Commission
in writing whether the change is significant enough to require the filing of a new Notice of Intent.
15. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to
enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this
Order,and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that
evaluation.
16. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and
to any contractor or other person performing work conditioned by this Order.
17. Prior to the start of work,and if the project involves work adjacent to a Bordering Vegetated Wetland,the boundary of the
wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging.Once in place,the wetland
boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission.
18. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or
other means.At no time shall sediments be deposited in a wetland or water body.During construction,the applicant or his/her
designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed.The applicant
shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation
Commission,which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary.
Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order.
NOTICE OF STORMWATER CONTROL AND MAINTENANCE REQUIREMENTS
19. The work associated with this Order(the"Project")is(1) E is not(2)F subject to the Massachusetts Stormwater Standards.
If the work is subject to Stormwater Standards,then the project is subject to the following conditions;
a) All work,including site preparation,land disturbance,construction and redevelopment,shall be implemented in accordance
with the construction period pollution prevention and erosion and sedimentation control plan and,if applicable,the PA
Stormwater Pollution Prevention Plan required by the National Pollutant Discharge Elimination System Construction General
Permit as required by Stormwater Standard 8.Construction period erosion,sedimentation and pollution control measures and
best management practices(BMPs)shall remain in place until the site is fully stabilized.
b) No stormwater runoff may be discharged to the post-construction stormwater BMPs unless and until a Registered
Professional Engineer provides a Certification that:i. all construction period BMPs have been removed or will be removed by
a date certain specified in the Certification.For any construction period BMPs intended to be converted to post construction
operation for stormwater attenuation,recharge,and/or treatment,the conversion is allowed by the MassDEP Stormwater
Handbook BMP specifications and that the BMP has been properly cleaned or prepared for post construction operation,
including removal of all construction period sediment trapped in inlet and outlet control structures;ii..as-built fmal construction
BMP plans are included,signed and stamped by a Registered Professional Engineer,certifying the site is fully stabilized;iii.
any illicit discharges to the stormwater management system have been removed,as per the requirements of Stormwater
Page 5 of 10 * ELECTRONIC COPY
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection-Wetlands
1 L
MassDEP File#:242-1558
WPA Form 5 - Order of Conditions eDEP Transaction#:486718
Massachusetts Wetlands Protection Act M.G.L.c. 131, §40 City/Town:NORTH ANDOVER
Standard 10;iv. all post-construction stormwater BMPs are installed in accordance with the plans(including all planting
plans)approved by the issuing authority,and have been inspected to ensure that they are not damaged and that they are in
proper working condition;v. any vegetation associated with post-construction BMPs is suitably established to withstand
erosion.
c) The landowner is responsible for BMP maintenance until the issuing authority is notified that another party has legally assumed
responsibility for BMP maintenance.Prior to requesting a Certificate of Compliance,or Partial Certificate of Compliance,the
responsible party(defined in General Condition 19(e))shall execute and submit to the issuing authority an Operation and
Maintenance Compliance Statement("O&M Statement")for the Stormwater BMPs identifying the party responsible for
implementing the stormwater BMP Operation and Maintenance Plan("O&M Plan")and certifying the following:i.)the O&M
Plan is complete and will be implemented upon receipt of the Certificate of Compliance,and ii.)the future responsible parties
shall be notified in writing of their ongoing legal responsibility to operate and maintain the stormwater management BMPs and
implement the Stormwater Pollution Prevention Plan.
d) Post-construction pollution prevention and source control shall be implemented in accordance with the long-term pollution
prevention plan section of the approved Stormwater Report and,if applicable,the Stormwater Pollution Prevention Plan
required by the National Pollutant Discharge Elimination System Multi-Sector General Permit.
e) Unless and until another party accepts responsibility,the landowner,or owner of any drainage easement,assumes
responsibility for maintaining each BMP.To overcome this presumption,the landowner of the property must submit to the
issuing authority a legally binding agreement of record,acceptable to the issuing authority,evidencing that another entity has
accepted responsibility for maintaining the BMP,and that the proposed responsible party shall be treated as a permittee for
purposes of implementing the requirements of Conditions 19(f)through 19(k)with respect to that BMP.Any failure of the
proposed responsible party to implement the requirements of Conditions 19(f)through 19(k)with respect to that BMP shall
be a violation of the Order of Conditions or Certificate of Compliance.In the case of stormwater BMPs that are serving more
than one lot,the legally binding agreement shall also identify the lots that will be serviced by the stormwater BMPs.A plan and
easement deed that grants the responsible party access to perform the required operation and maintenance must be submitted
along with the legally binding agreement.
f) The responsible party shall operate and maintain all stormwater BMPs in accordance with the design plans,the O&M Plan,
and the requirements of the Massachusetts Stormwater Handbook.
g) The responsible party shall:
1.Maintain an operation and maintenance log for the last three(3)consecutive calendar years of inspections,repairs,
maintenance and/or replacement of the stormwater management system or any part thereof,and disposal(for disposal the
log shall indicate the type of material and the disposal location);
2.Make the maintenance log available to MassDEP and the Conservation Commission("Commission")upon request;and
3.Allow members and agents of the MassDEP and the Commission to enter and inspect the site to evaluate and ensure
that the responsible party is in compliance with the requirements for each BMP established in the O&M Plan approved by
the issuing authority.
h) All sediment or other contaminants removed from stormwater BMPs shall be disposed of in accordance with all applicable
federal,state,and local laws and regulations.
i) Illicit discharges to the stormwater management system as defined in 310 CMR 10.04 are prohibited.
j) The stormwater management system approved in the Order of Conditions shall not be changed without the prior written
approval of the issuing authority.
k) Areas designated as qualifying pervious areas for the purpose of the Low Impact Site Design Credit(as defined in the
MassDEP Stormwater Handbook,Volume 3,Chapter 1,Low Impact Development Site Design Credits)shall not be altered
without the prior written approval of the issuing authority.
1) Access for maintenance,repair,and/or replacement of BMPs shall not be withheld.Any fencing constructed around
stormwater BMPs shall include access gates and shall be at least six inches above grade to allow for wildlife passage. I?
Special Conditions:
SEE ATTACHED. (,
Page 6 of 10* ELECTRONIC COPY
i'
i
i
g
V
i
i
LkMassachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection-Wetlands MassDEP File#:242-1558
.1111111 WPA Form 5 - Order of Conditions eDEP Transaction Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 City/Town:NORTH ANDOVER
I
I
I
1
I
1
i
1
it
Page 7 of 10 * ELECTRONIC COPY
I
•
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection-Wetlands MassDEP File#:242-1558
Li,k
WPA Form 5 - Order of Conditions eDEP Transaction#:486718
t' Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
City/Town:NORTH ANDOVER
i
D. Findings Under Municipal Wetlands Bylaw or Ordinance
1. Is a municipal wetlands bylaw or ordinance applicable?E Yes E No
2. The Conservation Commission hereby(check one that applies):
a. E DENIES the proposed work which cannot be conditioned to
meet the standards set forth in a municipal ordinance or bylaw
specifically:
1.Municipal Ordinance or Bylaw 2.Citation
Therefore,work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides
measures which are adequate to meet these standards,and a final Order or Conditions is issued.Which are necessary to
comply with a municipal ordinance or bylaw:
b.
F APPROVES the proposed work,subject to the following
additional conditions.
1.Municipal Ordinance or Bylaw NORTH ANDOVER 2.Citation CHAPTER 178
WETLANDS BYLAW
3. The Commission orders that all work shall be performed in accordance with the following conditions and with the Notice of
Intent referenced above.To the extent that the following conditions modify or differ from the plans,specifications,or other
proposals submitted with the Notice of Intent,the conditions shall control.
The special conditions relating to municipal ordinance or bylaw are as follows:
SEE ATTACHED.
1
I
Page 8 of 10* ELECTRONIC COPY
I
t:
I
i
I
LikMassachusetts Department of Environmental Protection Provided by MassDEP:
N)y,
Bureau of Resource Protection- Wetlands MassDEP File#:242-1558
WPA Form 5 -Order of Conditions eDEP Transaction#:486718
Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 City/Town:NORTH ANDOVER
E. Signatures
This Order is valid for three years from the date of issuance,unless otherwise specified 7 — f/
3 - j I
pursuant to General Condition#4.If this is an Amended Order of Conditions,the Amended 1.Date of Original Order I'
Order expires on the same date as the original Order of Conditions. �Q
Please indicate the number of members who will sign this form.This Order must be signed by 2 Number o igners
a majority of the Conservation Commission.
The Order must be mailed by certified mail(return receipt requested)or hand delivered to the applicant.A copy also must be mailed
or hand delivered at the same time to the appropriate Department of Environmental Protection Regional Office,if not filing
electronically,and the property owner,if different from applicant.
Signatures:
%' " .d 1Al
=L 7 4 4/4
ff-y,_
r b and delivery on by certified mail, receipt requested,on
7X3)/0
Date Date
F. Appeals
The applicant,the owner,any person aggrieved by this Order,any owner of land abutting the land subject to this Order,or any ten
residents of the city or town in which such land is located,are hereby notified of their right to request the appropriate MassDEP
Regional Office to issue a Superseding Order of Conditions.The request must be made by certified mail or hand delivery to the
Department,with the appropriate filing fee and a completed Request for Departmental Action Fee Transmittal Form,as provided in
310 CMR 10.03(7)within ten business days from the date of issuance of this Order.A copy of the request shall at the same time be
sent by certified mail or hand delivery to the Conservation Commission and to the applicant,if he/she is not the appellant.
Any appellants seeking to appeal the Department's Superseding Order associated with this appeal will be required to demonstrate prior
participation in the review of this project.Previous participation in the permit proceeding means the submission of written information to
the Conservation Commission prior to the close of the public hearing,requesting a Superseding Order,or providing written information
to the Department prior to issuance of a Superseding Order.
The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not
contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act(M.G.L.c. 131,§40),and is
inconsistent with the wetlands regulations(310 CMR 10.00).To the extent that the Order is based on a municipal ordinance or bylaw,
and not on the Massachusetts Wetlands Protection Act or regulations,the Department has no appellate jurisdiction.
Page 9 of 10*ELECTRONIC COPY
I
I
DEP FILE#242- 1558 i
Therefore,the North Andover Conservation Commission(hereafter the "NACC")hereby finds
that the following conditions are necessary,in accordance with the Performance Standards set
forth in the State Regulations, the local ByLaw and Regulations, to protect those interests
noted above. The NACC orders that all work shall be performed in accordance with said t
conditions and with the Notice of Intent referenced below. To the extent that the following
conditions modify or differ from the plans, specifications or other proposals submitted with
the Notice of Intent, the conditions shall control.
it
GENERAL CONDITIONS
I
20. The proposed work includes: The construction of a retaining wall and steps,a 4' x 6'
roofed front entry porch,an addition connecting the main house to the garage and a
concrete patio off of the addition within 100 feet of a Bordering Vegetated Wetland
(BVW) and Vernal/Ephemeral Pool and Habitat. Utility installation,landscaping and
buffer zone restoration are also proposed.
21. The work shall conform to the following(except as noted in the remainder of this
document where revisions may be required):
Notice of Intent filed by John Sullivan,P.E.
Sullivan Engineering Group, LLC
22 Mount Vernon Road
Boxford, MA 01921
1
Property Owner: Laurie Arria
225 Abbott Street
North Andover, MA
Site Plans prepared by Sullivan Engineering Group,LLC
Title: 225 Abbott Street, Plot Plan of Land
Dated: May 23,2012 Last Revised: 7/9/12
Signed and Stamped by John D. Sullivan III, PE
is
Wetland Delineation by Norse Environmental Services
May 21, 2012
22. The term"Applicant" as used in this Order of Conditions shall refer to the owner, any
successor in interest or successor in control of the property referenced in the Notice of
Intent, supporting documents and this Order of Conditions. The NACC shall be I
notified in writing within 30 days of all transfers of title of any portion of property that
takes place prior to the issuance of a Certificate of Compliance.
r
23. The conditions of this decision shall apply to, and be binding upon,the applicant, t
owner, its employees and all successors and assigns in interest or control. These
t
242-1558,225 Abbott Street OOC 1 NACC 7/11/2012 it
i
DEP FILE#242 - 1558
Pool/Ephemeral Pool Habitat. These resource areas are significant to the interests of
the Act and Town ByLaw as noted above and therein. The applicant has not attempted
to overcome the presumption of significance of these resource areas to the identified
interests.
33.The NACC agrees with the applicant's delineation of the wetland resource areas (A, B
and C-series flags) and the associated buffer zone on the site as shown on the plans
dated and referenced herein.
34. The NACC finds that the intensive use of the upland areas and buffer zone proposed on
this site will cause further alteration of the wetland resource areas. In order to prevent
any alteration of wetland resource areas a twenty five foot(25') No-Disturbance Zone
and a fifty foot(50') No-Construction Zone (BVW) and fifty foot(50') No-Disturbance
Zone and seventy-five foot (75') No-Construction Zone (Ephemeral Pool) shall be
established from the edge of the adjacent wetland resource area except for existing
structures shown on the herein referenced plan. The Conservation Administrator
and/or other agents of the NACC do not have the authority to waive these setbacks as
established under the local bylaw. No disturbance of existing grade, soils or vegetation
is permitted in the No-Disturbance zone. (See Section 3.4 &Appendix F of the local
Regulations).
8u .�
35. The NACC finds the applicant's proposal for Buffer Zone restoration planting at the 25'
No-Disturbance Zone, as shown on the herein referenced Plan,to be adequate. In
addition,the applicant shall remove debris between wetland flags 3B and 6B. No
machinery shall enter the wetland for debris removal.
36. This document shall be included in all construction contracts, subcontracts, and
specifications dealing with the work proposed and shall supersede any conflicting
contract requirements. The applicant shall assure that all contractors, subcontractors,
and other personnel performing the permitting work are fully aware of the permits
terms and conditions. Thereafter,the contractor will be held jointly liable for any
violation of this Order resulting from failure to comply with its conditions.
37. Issuance of these Conditions does not in any way imply or certify that the site or
downstream areas will not be subject to flooding, storm damage or any other form of
water damage.
PRIOR TO CONSTRUCTION
38. No work shall be undertaken until all administrative appeal periods from this Order
have elapsed or,if such an appeal has been filed,until all proceedings before the
Department or Court have been completed.
242-1558,225 Abbott Street 00C 3 NACC 7/11/2012
I.
DEP FILE#242- 1558
45. A staked silt sock (minimum 12" diameter) shall be placed between all construction
areas and wetlands. The erosion control barrier will be properly installed and placed as
shown on the plans approved and referenced herein and shall be inspected and
approved by the NACC or its agent prior to the start of construction and shall remain
intact until all disturbed areas have been permanently stabilized to prevent erosion. All
erosion prevention and sedimentation protection measures found necessary during
construction shall be implemented at the direction of the NACC or its agent. The
NACC reserves the right to impose additional conditions on portions of this project to
mitigate any impacts which could result from site erosion, or any noticeable
degradation of surface water quality discharging from the site For example,
installation of erosion control measures may be required in areas not shown on the
plan(s)referenced in this Order of Conditions. Should such installation be required by
the NACC, they shall be installed within 48 hours of the Commission's request.
46. The applicant shall have on hand at the start of any soil disturbance,removal or
stockpiling,a minimum of 15' of additional sock and stakes for staking or 5 hay bales.
Extra erosion controls shall be used only for the control of emergency erosion problems
and shall not be used for the normal control of erosion.
47. A check payable to the Town of North Andover shall be provided in the amount of
$1,500 which shall be in all respects satisfactory to Town Counsel,Town Treasurer, and
the NACC, and shall be posted with the North Andover Town Treasurer through the
NACC before commencement of work. Said deposit of money shall be conditioned on
the completion of all conditions hereof, shall be signed by a party or parties satisfactory
}
to the NACC, and Town Counsel, and shall be released after completion of the project,
provided that provisions,satisfactory to the NACC,have been made for performance of
any conditions which are of continuing nature. The applicant may propose a monetary
release schedule keyed to completion of specific portions of the project for the NACC's
review and approval. This condition is issued under the authority of the local ByLaw.
} 48. The applicant shall designate a Wetland Scientist (or other environmental professional
as approved by the NACC or its agent) as an"Erosion Control Monitor" to oversee any
emergency placement of controls and regular inspection or replacement of
sedimentation control devices. The name and phone number of the erosion control
monitor must be provided to the NACC in the event that this person has to be
contacted, due to an emergency at the site, during any 24-hour period, including
weekends. Proof of the retained monitor must be submitted to the Conservation
Department on letterhead by the retained consulting firm. This person shall be given
the authority to stop construction for erosion control purposes and the Environmental
Professional will immediately notify the Conservation agent of any matter that requires
attention by the Commission or the agent. The erosion control monitor will be required
to inspect all such devices and oversee cleaning and the proper disposal of waste
products. Cleaning shall include removal of any entrapped silt.
242-1558,225 Abbott Street OOC 5 NACC 7/11/2012
DEPFILE#242 - 1558
of the on-site construction supervisor hired to coordinate construction and to ensure
compliance with this Order. A reasonable period of time shall be provided as notice of
the pre-construction meeting (e.g. 72 hours).
STORMWATER MANAGEMENT CONDITIONS
53. There shall be no changes in post development conditions that alter the post
development watershed boundaries as currently depicted in the Notice of Intent and
approved by this Order of Conditions, unless specifically approved in writing by the
Commission.
54. Water quality in down gradient BVW's shall not differ significantly following
completion of the project from the pre-development conditions. There shall be no
sedimentation into wetlands or water bodies from discharge pipes or surface runoff
leaving the site
DURING CONSTRUCTION
55. Upon beginning work, the applicant shall submit written progress reports weekly (as
part of the erosion control monitoring report Condition#49 above) detailing what work
has been done in or near resource areas, and what work is anticipated to be done over
the next period. This will update the construction sequence.
56. De-watering activities are not anticipated as part of the proposed project. No discharge
of water is allowed directly into an area subject to jurisdiction of the Wetlands
Protection Act and/or the North Andover Wetland Bylaw. If emergency de-watering
requirements arise, the applicant shall submit a contingency plan to the Commission for
approval,which provides for the pumped water to be contained in a settling basin, to
reduce turbidity prior to discharge into a resource area
57. Any fill used in connection with this project shall be clean fill, containing no trash,
refuse, rubbish or debris, including but not limited to lumber, bricks,plaster,wire,lath,
paper, cardboard, pipe, tires, ashes,refrigerators, motor vehicles or parts on any of the
foregoing.
58. All exposed soil finish grade surfaces shall be immediately landscaped and stabilized,
or loamed, seeded and mulched, with a layer of mulch hay. All disturbed areas must be
graded, loamed and seeded prior to November 1st of each year Outside of the growing
season, exposed soil finish grade surfaces shall be stabilized with a layer of mulch hay
until climate conditions allow for seeding. During construction, any area of exposed
soils that will be left idle for more than 30 days shall be stabilized with a layer of mulch
hay or other means approved by the NACC.
242-1558,225 Abbott Street OOC 7 NACC 7/10/2012
DEP FILE#242 - 1558
shall survive this Order of Conditions and shall run with the title of the property. This
condition is issued under the authority of the Town's Wetland Protection ByLaw and
shall remain in er etui
p P tY.
68. There shall be no dumping of leaves, grass clippings,brush, or other debris into a
wetland resource areas or the 25-foot No-Disturb Zone. This condition shall remain in
perpetuity.
69. Upon completion of construction and grading, all disturbed areas located outside
resource areas shall be stabilized permanently against erosion. This shall be done by
loaming and seeding according to NRCS standards. Stabilization will be considered
complete once full vegetative cover has been achieved.
70. Upon approved site stabilization by Conservation staff, the erosion controls shall be
removed and properly disposed of and all exposed unvegetated areas shall be seeded.
71. Upon completion of the project the applicant shall submit the following to the
Conservation Commission as part of a request for a Certificate of Compliance:
a. WPA Form 8A- "Request for a Certificate of Compliance."
b. A letter from the applicant requesting a Certificate of Compliance.
c. The name and address of the current landowner.
d. Signed statements from the individual property owners shall be submitted with the
request for a Certificate of Compliance indicating that they read and understood the
recorded Order of Conditions prior to purchasing their property.
e. The name and address of the individual/trust or corporation to whom the
compliance is to be granted.
f. The street address and assessor's map/parcel number for the project.
g. The DEP file number.
h. A written statement from a Registered Professional Civil Engineer (and/or
Registered Professional Land Surveyor) of the Commonwealth certifying that the
work has been conducted as shown on the plan(s) and documents referenced above,
and as conditioned by the Commission.
i. An"As-Built" plan prepared and signed and stamped by a Registered Professional
Civil Engineer (and/or Registered Professional Land Surveyor) of the
Commonwealth,for the public record. This plan will include:
➢ "As-Built" ost-develo ment elevations of all drainage & stormwater
p P g
management structures constructed within 100 feet of any wetland resource
area NOTE: If portions of the stormwater systems exist partially within the
Buffer Zone than the entire structure must be depicted to accurately verify
compliance.
➢ "As-Built" post-development elevations and grades of all filled or altered
wetland resource areas including the encompassing buffer zone which is
regulated as a resource area under the local Wetland Protection Bylaw. 1
242-1558,225 Abbott Street OOC 9 NACC 7/10/2012
.,
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection-Wetlands MassDEP File#:242 1558
WPA Form 5 - Order of Conditions MassDEP
Transaction#:486718
' Massachusetts Wetlands Protection Act M.G.L.c. 131, §40 City/Town:NORTH ANDOVER
G. Recording Information
This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located,
within the chain of title of the affected property.In the case of recorded land,the Final Order shall also be noted in the Registry's
Grantor Index under the name of the owner of the land subject to the Order.In the case of registered land,this Order shall also be
noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions.The recording information on
this page shall be submitted to the Conservation Commission listed below.
NORTH ANDOVER r,,,
Conservation Commission
Detach on dotted line,have stamped by the Registry of Deeds and submit to the Conservation Commission.
To:
NORTH ANDOVER
Conservation Commission
Please be advised that the Order of Conditions for the Project at:
225 ABBOTT STREET 242-1558
Project Location MassDEP File Number
Has been recorded at the Registry of Deeds of:
County Book Page
for.
Property Owner LAURIE ARRIA
and has been noted in the chain of title of the affected property in:
Book Page
In accordance with the Order of Conditions issued on:
Date
If recorded land,the instrument number identifying this transaction is:
Instrument Number
If registered land,the document number identifying this transaction is:
Document Number
Signature of Applicant Rev.4/1/2010
Page 10 of 10 ELECTRONIC COPY
. .
DEP FILE#242 - 1558
APPENDIX A-AFFIDAVIT
on oath do hereby depose and state:
(authorized agent applicant and/or current owner)
(PLEASE CHECK AT LEAST ONE BLOCK)
1. Iamthe of
(position with applicant) (applicant name or company name)
the applicant upon whom Order of Conditions
have been placed upon by (DEP or NACC number)
the North Andover Conservation Commission.
&/or
2. I am the of
(position with owner) (owner name)
the owner upon whose land Order of Conditions
have been placed up by (DEP or NACC number)
the North Andover Conservation Commission.
3. I hereby affirm and acknowledge that I have received said Order of Conditions and
have read the same and understand each
(DEP File#) and every condition which has been set forth
in said Order of Conditions.
4. I hereby affirm and acknowledge that on this day of 19
I inspected said property together with any and all improvements which have
been made to the same and hereby certify that each and every condition set
forth in Order of Conditions are presently in compliance.
(DEP File#)
5. I hereby affirm and acknowledge that this document will be relied upon by the
North Andover Conservation Commission as well as any potential buyers of
said property which is subject to said Order of Conditions .
(DEP File#)
Signed under the pains and penalties of perjury this day of 19
(Signature-authorized agent of applicant or owner)
I