HomeMy WebLinkAboutMiscellaneous - 22 ASHLAND STREET Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 242-1481
Provided by DEP
A. Project Information
Important:
When filling out 1. This Certificate of Compliance is issued to:
forms on the
computer,use Joanne Comerford
only the tab key Name
to move your One Morkeski Meadows
cursor-do not
use the return Mailing Address
key. North Andover MA 01845
City/Town State Zip Code
rm 2. This Certificate of Compliance is issued for work regulated by a final Order of
Conditions issued to:
North Andover Housing Authority
Name
July 26, 2010 242-1481
Dated DEP File Number
3. The project site is located at:
22-24 Ashland Street North Andover
Street Address City/Town
Map 17 Parcel 19
Assessors Map/Plat Number Parcel/Lot Number
the final Order of Condition was recorded at the Registry of Deeds for:
Property Owner(if different)
Essex North 12141 144
County Book Page
9835
Certificate
4. A site inspection was made in the presence of the applicant, or the applicant's agent,
on:
2/22/12
Date
wpafrm8b.doc•rev.12/23/09 WPA Form 8B,Certificate of Compliance•Page 1 of 3
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number:
WPA Form 8B - Certificate of Compliance 242-1481
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
B. Certification
Check all that apply:
® Complete Certification: It is hereby certified that the work regulated by the
above-referenced Order of Conditions has been satisfactorily completed.
❑ Partial Certification: It is hereby certified that only the following portions of work
regulated by the above-referenced Order of Conditions have been satisfactorily
completed.The project areas or work subject to this partial certification that have
been completed and are released from this Order are:
❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the
above-referenced Order of Conditions never commenced. The Order of
Conditions has lapsed and is therefore no longer valid. No future work subject to
regulation under the Wetlands Protection Act may commence without filing a new
Notice of Intent and receiving a new Order of Conditions.
® Ongoing Conditions: The following conditions of the Order shall continue:
(Include any conditions contained in the Final Order, such as maintenance or
monitoring, that should continue for a longer period).
Condition Numbers:
80
C. Authorization
Issued by:
North Andover 4,93//,=,
Conservation Commission Date of Issuance
This Certificate must be signed by a majority of the Conservation Commission and a
copy sent to the applicant and appropriate DEP Regional Office (See
http://www.mass.gov/dep/about/region/findvour.htm).
Signatures: ,
/� VT i
IPP
wpafrm8b.doc•rev.12/23/09 WPA Form 8B,Certificate of Compliance•Page 2 of 3
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 8B - Certificate of Compliance 242-1481
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
D. Recording Confirmation
The applicant is responsible for ensuring that this Certificate of Compliance is recorded in
the Registry of Deeds or the Land Court for the district in which the land is located.
Detach on dotted line and submit to the Conservation Commission.
To:
North Andover
Conservation Commission
Please be advised that the Certificate of Compliance for the project at:
22-24 Ashland Street 242-1481
Project Location DEP File Number
Has been recorded at the Registry of Deeds of:
Essex North
County
for:
North Andover Housing Authority
Property Owner
and has been noted in the chain of title of the affected property on:
Date Book Page
If recorded land, the instrument number which identifies this transaction is:
If registered land, the document number which identifies this transaction is:
Document Number
Signature of Applicant
wpafrm8b.doc•rev.12/23/09 WPA Form 8B,Certificate of Compliance•Page 3 of 3
achusetts Department of Environmental Protection Provided by MassDEP:
Mass MassDEP File#:242-1481
eDEP Transaction#.32351
‘`,. _ Bureau of Resource Protection-Wetlands eDEP Tr aNORTH ANDOVER
�} WPA Form 5 Order of Conditions
'` Massachusetts Wetlands Protection Act M.G.L.c. 131,§40
--------
A. General Information NORTH ANDOVER
1.Conservation Commission a NORTH
OOC b.r Amended OOC
2.Issuance
3.Applicant Details b.Last Name COMERFORD
a.First Name JOANNE
NORTH ANDOVER HOUSING AUTHORITY
c.Organization
d.Mailing Address 1 MORKESKI MEADOWS £State MA g.Zip Code 01845
e.City/Town NORTH ANDOVER
4.Property Owner
b.Last Name
a.First Name
c.Organization
d.Mailing Address g.Zip Code
e.City/Town f.State
5.Project Location STREET
22-24 ASHLAND c.Zip Code 01845
a.Street Address 19
b.City/Town NORTH ANDOVER e.Parcel/Lot#
g.Longitude 19.13528W
f. Assessors s Map/Plat# 42 70624N
f.Latitude
6.Property recorded at the Registry of Deed for: d,Page
a.County
b.Certificate c.Book
NORTHERN ESSEX 9835
7.Dates
a.Date NOI Filed: 6/30/2010 b.Date Public Hearing Closed: 7/14/2010 c.Date Of Issuance:7/26/2010
8.Final Approved Plans and Other Documents
a.Plan Title:
b.Plan Prepared by: c.Plan Signed/Stamped by: d.Revised Final Date: e.Scale:
Page 1 of 10*ELECTRONIC COPY
Department of Environmental Protection Provided by Mas2DEP:
Massded File ssDE 1481
Massachusetts rte Pr eDEP Transaction#:242-1481
'N"----; Bureau of Resource Protection-Wetlands City/Town NORTH ANDOVER
,�� �--, WPA Form SetlOddProtection f o dttM.G.L.c. 131,§40
Massachusetts W
..._--•--------
SITE
DEVELOPMENT 1"=20'
PLANS FOR ALLEN&MAJOR 'TIMOTHY J.WILLIAMS,P.E. June 24,2010
MULTI-UNIT
MODULAR HOUSE, ASSOCIATES
22-24 ASHLAND
STREET,NORTH
ANDOVER,MA
B. Findings
and based on the information provided in this application and
1.Findings pursuant to the Massachusetts Wetlands Protection Act significant to the following interests of
presented the review li of the the this Commission Notice of
is ovide
presented at the public hearing,this Commission finds that the areas in which work is proposed
P
the Wetlands Protection Act.
Check all that apply: Shellfish c.F Prevention of Pollution
b. F Land Containing f. F Protection of Wildlife utio Habitat
a. F Public Water e. r Fisheries f. F Flood Control
g. F Private Water Supply h. F Storm Damage Prevention
g. F Ground Water Supply
2.Commission hereby finds the project,as proposed,is:
regulations.
Approved following n to: in accordance with the performance standards set forth in the wetlands
P conditions which are necessary
a.F The following all work shall be performed conditions modify or
that rformed m Order.To the extent that the following above,the following
This Commission l Conditions,orders
General Conditions,and any other special conditions attached to this O
other
proposals submitted with the Notice of Intent,these conditions shall control.
differ from the plans,specifications,o r P
Denied The proposed provides regulations.The which are
work cannot be conditioned to meet the performance Notic ofIntent is submitted submitted whichha pd regulaformance standards
b.r The proposed wo
work at this project ter not go forward unless and Order a ne
pate to protect interests of the Act,and a final Order of Conditions is issued.A description of the per
which the at proposed sub work cannot meet is attached to nets deOrder.
scribe not go work or the
unless and the work
a revised interests
the applicant is not sufficient to describe the site,the work or the effect of the work on the of the
c.I—The to iedin ion submitted by th PP nles a ro ti tar wised N
identified in the Wetlands Protection Act.Therefore,work on this project may g it o of
issued.A description of the specific information which is lacking and why
Intent is submitted which provides sufficient information and includes measures which are adequate is
Act,and a final Order of Conditions is O()10.05 6 c
necessary is attached to this Order as per 310 CMR '
eat disturbance and Bank or Bordering es a.
Buffer Zone Impacts: hortest distance between limit of pro
j
3 r Vegetated Weltand boundary lin
Inland Resource Area Impacts:(For Approvals Only): permitted
Proposed Permitted Proposed osed
Resource Area Replacement Replacement
p
Alteration Alteration
Page 2 of 10*ELECTRONIC COPY
Massachusetts Department of Environmental Protection Provided by MassDEP:
MassDEP File#:242-1481
eDEP Transaction#:323551
Bureau of Resource Protection-Wetlands
��..� Cityffown:NORTH323551 ANDOVER
WPA Form 5 -Order to Conditions
� . 131,§40
t Massachusetts Wetlands Protection Act M.G.L.MGL
c— d.linear 4. r Ban `rte c.linear feet
a.line ar feet b.linear 4. r Bank d.square t
5,r Bordering Vegetated Wetland a.square feet
b.square feet c.square feet
d.sq
6. r Land under Waterbodies and Waterways square _
a.square feet b.square feet
c.
e.c/y d— —
dredged d f.c/y dredged
g d
7,r Bordering Land Subject to Flooding � q-
a sq feet b.square c.square feet
d.square feet
—� cubic feet h.cubic feet
Cubic Feet Flood Storage
e.cubic feet f.cubic feet g
Subject to Flooding b.sq
g.r Isolated Land Subj a.square feet
f.cubic feet
c.cubic d.cubic feet e.cubic feet ic feet Cubic Feet Flood Storage 1067
____ 1067 _
�t b.total sq.feet
9.F Riverfront Area a.total sq.
40—_ 44_ f.square feet
Sq ft within 100 ft c.square feet
d.square feet e.square feet
Sq ft between 100-200 ft 1027 h s_ q f — —
g square feet i.square feet j•sq
Permitted Proposed Permitted
Coastal Resource Area Impacts: proposed Perm lacement
Alteration Alteration Replacement Rep
Resource Area
10.r Designated Port Areas below
Indicate size under Land Under the Ocean,
�_ �t
11.r Land Under the Ocean
a.square feet b.sq
d.c/y fired
c.c/
Indicate size under Coastal Beaches and/or Coastal Dunes below
12.r Bather Beaches nourishment d.c/y noshlnent
a.square feet b.square feet c.c/y 13.r Coastal Beaches no�shment
14.r Coastal Dunes a•square b.sq
c.�y nourishment d.c/y
15.r Coastal Banks a.linear b.linear
16.r Rocky Intertidal Shores Page 3 of 10*ELECTRONIC COPY
ent of Environmental Protection Provided by MassDEP:
Massachusetts etso Resource Protection
Masided File#:242-1481 DEP:
Wetlands eDEP Transaction#:323551
�� Bureau of Resource Protection- City/Town:NORTH ANDOVER
;' WPA Form 5 -Order of Conditions
�'ti Massachusetts Wetlands Protection Act M.G.L.c. 131,§40
a.square feet b.square feet
a.square feet b.square feet c.square feet
d.square 17.f Salt Marshes
_� �t
1 g,r Land Under Salt Ponds
a.square feet b.square
-c.cl d.c/y
�__ -- oar-t d.square feet
Shellfish a.square feet b.square feet c.square 19.r Land Containing Banks,inland Bank,Land Under the
Indicate size under Coastal Bank
Ocean,and/or inland Land Under Waterbodies and Waterways,
20.r Fish Runs
above
c.c/y dredged d.c/y dredged
21.r Land Subject to Coastal Storm Flowage
a square feet b.square t
22. Approvals Only) footage that has been
r Restoration/Enhancement(For App a wetland resource area in addition to the square footag
purpose of restoring or enhancing amount here.
If the d in St is for the pure please entered the additional am
entered in Section B.5.c&d or B.17.c&d above,P b.soars feet of Salt Marsh
q
a.square feet of BV W
23. s/number of replacement steam crossings.
r Streams Crossing(s)
If the project involves Stream Crossings,please enter the number of new steam crossing p
b.number of replacement stream crossings
a number of new stream crossings Massachusetts Wetlands Protection Act
C. General Conditions Under Ma Approved projects
applicable to App measures,shall be deemed
The following conditions ore only app and with all related statutes and other regulatory
1, Failure to comply with all conditions stated herein, to private property or
this Order. it does not authorize any injury p
cause to ervoke not modify rights or any exclusive privileges;
t any property with all other applicable federal,
2. The Order does not gran
invasion of private rights. remitter or any other person of the necessity of complying
3. T state,Order does not relieve rdinances,bylaws,or regulations.
The or work authorized statutes, within three years from the date of this Order unless either of the following
4, The work authorized hereunder shall be completed provided for in the Act;or
apply: project as p years,but less than five
a.b.the work is a maintenance dredging p ] years,the
the time from the date ssu been I extended f is Oder is specified intended to be valid for more than three y
b eriodare setforthas a
extension from the date of issuance.If this the extended time p
extension date and the special circumstances warranting
special condition in this Order.
Page 4 of 10*ELECTRONI C COPY
,
Provided by MassDEP:
MassDEP File#:242-1481
Massachusetts Department of Environmental Protection eDEP Transaction#:323551
�;w_- Bureau of Resource Protection-We Cif�o :NORTH ANDOVER
WPA Form 5 rder of Conditions
+' Massachusetts Wetlands Protection ActM.G•L•c. 131,§40 to the
r for one or more periods of up to three years each upon application
5. This Order may be extended by the issuing
authority
at least 30 days prior to the expiration date of the Order.
issuing Order co of Conditions,this Amended Order of Conditions does not exceed the issuance
Amended Order o
(, If this Order constitutes an Am fill shall contain no trash,refuse,rubbish,or debris,including of
date of the original Final Order of Conditions. refrigerators,motor vehicles,or parts
7. connection with this project shall be clean fill.Any tires,ashes, re
but fill used in t olu plaster,wire,lath,paper,cardboard,pipe,
but not limited to lumber,bricks,p sed,or if such an appeal has been taken,
any of the foregoing• inistrative appeal periods from this Order have elap
g, This Order is not final until all adm Department have been completed. is of Deeds or the Land
until all proceedings ll b before the until the
In the case of recorded land,
1 i undertaken n wit until the Order has within the ha of title of the affected property.owner In land upon which the
9. No work shat
Registry's Grantor Index under the name of the ownorination shah be submitted
Court for the distract m which the land is locate within
the Final work is to be be .In the in the of her registered land,the Final Or done.The recording e noted on the Land Court
work by the Registry e submitted proposed work is to be done.In the upon which the proposed
o the Cone Title of Che owner on on thland orm at the end of this Order,which form must be stamped Y
to the Conservation Commission square feet in size bearing the words,
prior to the commencement of work.. square feet or more than three sq
10. A sign shall be displayed at the site not less chen tts e ent of Environmental Protection"
Massachusetts Dept MassDEP"]
File Number:"242-1481" ission
Protection is requested to issue a Superseding Order,the Conservation Comm
of Environmental s before Mass DEP. Compliance(WPA Form
11. Wherb the Department tl agency proceedings and hearings Request for Certificate of Comp
shall a party the applicant shall submit a Req
12• Upon be
completion of the work described herein, PP
8A)to the Conservation Commission. Commission
Tans and special conditions referenced in this order. inquire of the Conservation Comm
applicant to inq
13. The change to the plans to the plans of a new Notice i Intent si to
14. Any change to the plans identified in Condition#13 brequire the filing of the app
e is significant enough q
in Wiring t or members change Commission and the Department of Environmental Protection shall have the rig
rat or members of the Conservation Co compliance with the conditions stated t for that
15. The Agent by th
Conservation nomp
en
Order,and may require the submittal of any subject to this Order an
evaluation.Order successor in interest or successor in control of the property J
1 to any this Order. of the
16. This any contractor a for or other shay n performing work conditioned by Vegetated Wetland,the boundary
to any coherstart or other person p es e flagging.Once in place,the boundary e start of work,and if the project involves work adjacent to a Bordering g ission.
17. wetland n to the the g.Once in Conservation Comm
Oro proposed work area shall be marked by wooden stakes by ell stabilized with vegetation or
wetland in the markers shall of the ai maintained until a Certificate of Comp as have the Y
boundary/oration shall babe rriers male ed in good repair until all disturbed areas have e f idly eta he d with vegetation
or ehti/her
pent.At o time s hulsediments maintained construction, applicant
18. All stator
immediately notify the Conservation
is on a daily basis and shall remove accumulated l sediments as needed.The aPpess
other means.At no time shall be deposited in a wetland or waterabllo�d . necessary.
designee medi inspect the any erosion problems that occur at the site and shall e prevention controls it may Cone Order.
Coll immediately which control any right to require additional erosion and/or damag P approved by
Commission,which reserves per rig
'ors shall serve as the limit of work unless another limit of work line NTbSeen app
Sedimentation dam MAINTENANCE REQUIREMENTS
NOTICE OF STORMW ATER CONTROL AND MAIN 2 F subject to the Massachusetts Stormwater Standards.
the Project")is(1) r is not( ) cosachuset
implemented in accordance
subject to Stormwater Standards,then the project is subject to the following
19. The work associated with this Order(
If the work is lud construction and redevelopment,shall be imp
a) All work,including site preparation,land disturbance,C0 Page 5 of 10*ELECTRONIC COPY
Massachusetts Department of Environmental Protection Provided by MassDEP:
MassDEP File#:242-1481
eDEP Transaction#:323551
�.-\-- Bureau of Resource Protection-Wetlands City1Town:NORTH ANDOVER
�,� WPA FormWetlOddProtection f AttM G.L.c. 131,§40
(''� Massachusetts
plan and,if applicable,the
-•
wi th the construction period pollution prevention and erosion and sedimentation control p
i a Pollution Prevention on Plan required by the National Pollutant Discharge Elim ination a i oS s m scttn Ge
Permit as required by Stormwater Standard 8.Construtionp�e de os sedimentation n pollution m es and
best management practices(BMPs)shall remain in place until stabilized.
b) No stormwater r runoff may be discharged to the post-construction BMPs
have been ss and until removed or will Registered e remo cedo Y
construction period BMPs intended to be co e M DEP stconwatcr
Professional Engineer provides a Certification that:i.all construction
operation iontfor specified r attenuation,Certification.n,T For any
eration for stormwater attenuation,recharge,and/or treatment,the conversion is allowed by
op construction
k BMP specifications and that the BMP has been properly anal outietrcontrol prepared
tructurest iio as built final�ti�onu,
Handbook ct the site s bully stabilized;const iii.
including plans are of all included,si nedcand to ri pe sedimentgist el ed Professional Engineer,ce ng t ieeme iss l ytormwaedr
d b a Regi
ny i cit dare rges to t signed and stormwater stamped by system have been removed,as p (including all planting
any illicit 10;iv.discharges to the pn cower manag and that they are in
Standard ap ro ed all the issuing stormwater have been inspected to ensure that they are of damaged established a withstand
plans) working by the in v.any vegetation and h post-construction BMPs is suitably
proper working condition;v.any vegetation associated with p has legally assumed
erosion. authority is notified that another party Compliance,the
a Certificate of Compliance,or Partial Certificate of Comp
c) The landowner is responsible for BMP maintenance until the issuing authority an Operation and
responsibility for BMP maintenance.General Prior Condition requesting 19(e))shall execute and submit to the issuing responsible for
Maintenance n party(defined St General("O&M 1eme for the Stormwater BMPs identifying the party p i.)the O&M
implementing Compliance ter BMP Statement) "O&M Plan")and certifying the following: .)
implementing the stormwater BMP Operation and Maintenance Plan( Compliance,and ii.)the future responsible parties
Plan is complete and will be implemented upon receipt of the Certificate of Comp the stormwater f management po s responsible p and
shall be notified in writing of their ongoing legal responsibility to operate and maintain
implement the Stormwater Pollution Prevention Plan.
implemented in accordance with the long term pollution
d) Post-construction pollution prevention and source control shall be imp ment the Stormwater accordance
Pollution Prevention Plan
prevention plan section of the approved Stormwater Report an if applicable,
the National Pollutant Discharge Elimination System Multi-Sector General Permit. easement,assumes
required by must submit to the
e) Unless and until another party accepts responsibility,the landowner,tio o the landowner of the properly
each B .To overcome this presume evidencing that another submit
has
issuing
responsibility for maintaining lallin agreement of record,acceptable to the issuing authority, shall c treated that as a errs entity for
accept accepted responsibility a legally binding ini the BMP,and that the proposed responsible party failure to the
purposes ed r f implementing for maintaining through 19(k)with respect to that B .Any
purposes of implementing the requirements requirements Conditions 19(f) through 19(k)with respect to that BMP shall to implement the requirements of Conditions 19(f)
proposed responsible party Compliance.In the case of stormwater BMPs that are serving more
and
agreement shall also identify the lots that will be serviced by the stormwater BMPs.A plan be a violation of the Order of Conditions or Certificate of Comp required operation and maintenance must be submitted
than one tot,the legally binding sp p access to perform the req p
easement deed that grants the responsible arty
plans,the O&M Plan,
along with the legally binding agreement all stormwater BMPs in accordance with the design p
� The responsible party shall operate and maintain
and the requirements of the Massachusetts Stormwater Handbook. calendar years of inspections,repairs,
g) The responsible party shall: consecutive
1.Maintain an operation and maintenance log for the last three 3)consecutive cu any part thereof,and disposal(for disposal the
maintenance and/or replacement of the stormwater management request;and
type of material and the disposal location); ("Commission")upon req
log shall indicate the anc
approved b
the MassDEP and the Commission to enter and inspect the site to evaluate and ensure
2.Make the maintenance agents of available to MassDEP and the Conservation Commission
in the O&M Plan app by
that Allow members and ag requirements for each BMP
that the responsible party is in compliance with the
licable
the issuing authority.
h)
All sediment or other contaminants removed from stormwater BMPs shall be disposed of in accordance with all app
Page 6 of 10 *ELECTRONIC COPY
•
Provided by MassDEP:
MassDEP File#:242-1481
Massachusetts Department of Environmental Protection eDEP Transaction 4:323551
Mass Wetl NORTH A48
L1MaSsettt1an Bureau of Resource Protection- City/Town:
wPA Form 5 rder of Conditions c. 131,§40
ds Protect ion Act M.G.L.
10.04 are prohibited.
federal,state,and local laws and regulations. stem as defined in 310 CMR ed without the prior written
water management system es to the emm
Illicit discharges ement system approved in the Order of Conditions shall not be changed �defined in the
j) The stormwater management act Site Design Credit
approval of the issuing authont'' purpose of the Low Imp Credits)shall not be altered
k) Areas designated as er qualifying db ok,pervious l areas for the pure Impact Development Site Design
Volume 3,Chapter 1,Low Imp constructed around
MassDEP Stormwater Handbook,�of the issuing authority. withheld.Any fencing
without for maintenance,i n app s shall not be withh grade fencing
acing con trusted pazue
repair,and/or replacement of BMP
n Access for BM Ps shall include access gates and shall be at least six inches above
stormwater BMPs shall
Special Conditions:
SEE ATTACHED
• Page 7 of 10*ELECTRONIC COPY
Provided by MassDEP:
Department of Environmental Protection Provided
File#:242-1481 DEP:
e art eDEP Transaction#:323551 AR
Massachusetts ets p Wetlands CaS D°PtFNORTH AND
r)•, Bureau of Form -Order of Conditions
WPAFor G.L.c. 131,§40 Massachusetts'Wetlands Protection Act M•
---------- al Wetlands Bylaw or Ordinance
D. Finding s Under Municip applicable?r Yes r No
1. Is a municipal wetlands bylaw or ordinance app
1 lies
Commission hereb check one that a
work which cannot be conditioned to
2. The Conservation S the proposed ca o be conditioned
or bylaw
a. r standards set forth in a municipal
meet the Stan 2.Citation
specifically: rovides
1.Municipal Ordinance or Bylaw Which are necessary d
to meet not go forward unless and until a revised°N Conditions is issued.submitted which p
uate to meet these standards,and a final Order or
Therefore,work on this project
measures which are adequate or bylaw: to
1 with a municipal ordinance
comply subject to the following
S the proposed work, ER 178
b. r APPROVES ANDOVER 2.Citation CHAPT
additional conditions. NORTH AN B�AW
1.Municipal conditions and with the Notice of
ci al Ordinance or Bylaw WETLAND accordance with the following specifications,or other
performed in acc ore following
from the plans, P
en ed orders To all work shall thbe e P conditions modify
3. The Comm To the extent that the following
Intent referenced above. the Notice of Intent,the conditions shall control•
proposals submitted with th ce or bylaw
are as follows:
special conditions relating to municipal ordinan
The s p
SEE ATTACHED
Page 8 of 10*ELECTRONIC COPY
b lvlassDEP
Provided Y 242_1481
tai Protection MassDEP File# 323551
Environmental eDEP Transaction E O�JER
e artment of E NORTH AND
Wetlands CitylTowri:
Massachusetts P Conditions
Bureau of Resource t anProtection Protection c.131,§40
wpAForm dsprotectionActM•C'•L•
Iiiimb,
�`` Massachusetts W etlan
ise specified 71261201Original Order
-----------
----rte unless other`` ended 1.Date of
Signatures time date of issuance, Conditions,the Am
pursuant• Sig ee ears from ended Order of 4
This Order is valid for thr Y #4 if this is an Am Conditions. ust be signed by ber of Signers
Plea e to General Condition the original Order t This Order m 2.N__. ustbemailed
the same date as this form. applicant.A COPY also m
ayes on embers who will sign to the apP if not filing
Order expires number of m d delivered
indicate the nurri ission. requested)or han oteo the R plica l Office,
PleaseoyofeCor�eivah°nComrn inail(retumreceiptreq entalPr
a raj certified rise Department of Environmental The Order must be mailed esa by time to the appropriate applicant.
d delivered an he property owner,if different from apP
or hand
electronically,
Joseph Lynch
Signatures..
Louis Napoli
Deborah Feltovic requested,on
� a -
F-15y certified mail,return receipt John
f yand delivery on O
Date
Date this Order,or any ten
the land subject to opriate MassDEP
an owner of land abutting the
to request the appropriate to the
Appeals this Order, Y ear nigh mail or hand delivery
F. ApP aggrieved by hereby notified of their made by certified Transmittal Form, Provided in
the owner,any Person aPP land is located are h uest Hoist be m Fee Trap e time be
applicant, u1 which such The request Departmental Action certified
the request shall at the y to
The aPP e city the town Order d Conditions. for Deparan as p
residents of the Superseding fee and a completed Request ce of this Order.A copy
Regional Office to issue a Sup and to the applicant,if he/she is not the appellant
with the appiopnate filing days from the date of issuance
will be required to demonstrate Prior
ent, business day Commission an oared P
Department, within ten busin to the Conservation C°rnrn this appeal written information to
310 CMR 10.030) d delivery associated with submission of
Certifies mail or hand superseding Order as s the ill b qur d tmitten formation
sent by areviou s Sup in the permit proceeding mean Order,or providing to appeal the DeP participation requesting a Superseding
appellants sery i seeking project Previous P ublic hearing,
Any �the review of this p e close of the P Order does not
participation ission prior to the Order. Baled and how the
rvation C°� of a Superseding G L o.131,§40),and is
the Conservation
prior to issuance e Order which is berg appealed
Act(M
to the Department objections to the Wetlands Protection ed on a municipal ordinance or bylaw,
d concisely the ifi e Massachusetts the Order based action.
identified in the To the extent that ent has no appellate municipal
ELECTRONIC COP`
______._-- Time request shall state clearly and interests 10.00)• the Department e 9 o f 10*
ssahs d the Wetlands ons(310 OAR regulations, Page contribute to the protection e wetlands Act or regu
the Massachusetts W etlands Protection A
inconsistent with th
and not on
Provided by Mas5DEP:
enta�Protection 242 1481
Department of Environmental MassDEP File#
Massachusetts Wetlands
Massa Protection Conditions ource P eDEP Transaction#
Bureau of Res 5 _ Order c. 131, §40
Form Protection Act M.G.L.L North Andover
WPA Wetlands P Cityrrown
Massachusetts W
E. Signatures ise specified as a special �I. ..to of 1 ante
ears,unless otherwise
the date of issuance. bet of Signers
valid for three y 2.Number This Order is General Conditions will sign this form.olr►mission. applicant.A
indicate t to embers who on n this on delivered to the
condition pursuant of members
of the Conservation
requested)or hand
signed by a majority t req hand to delivered to the
of
Please Indlcaust be number g appropriate
property owner,if different
This Order m certified mail(return rem►P and the
ailed by delivered at the same time to the app
The Order must be mailed electronically,
must be mailed or hand if not fling I
copY also m Regional Office, ,
ental Protection R g ,��
Environmicant.
from app iltra� II
Alf, 1 ' a-fr—0 rt j _....-.441‘. e Signatu s f
�l ail,return receipt
� �'by certified m
l�
a -
by hand delivery on requested,o
Date
Date er, any owner of landanduls►located,
Appeals this O o town in which such
F. ApP person aggrieved by Regional Office to Issue a
the owner, any p ten residents of the r a e Masspn Reg ail or hand delivery
The applicant, or any request the appropriate certified o Departmental
subject to this Order, ht to req must be made by Request of
land sub) request m completed Req s from
notified of their rig The req fee and a
are hereby Conditions. a within ten business day
Order of appropriate filing 10.�3� � e time be sent by
Superseding ent,with the app applicant,if hels m is
he Department, I Form,as provided in 310 CM est shall at the to he app
tot of the re quest salon and
Action Fee Transmittal or hand Order• e copy of this to the Conservation the date of issuance of
delivery ail or han with this appeal
certified m Order associated participation
appellant. Superseding Previous p
not the app Department's Sup of this project. Conservation
to appeal the�eP ation in the review Order,or
appellants seeking prior participation Superseding a demonstrate p submission of written information to the n Order.
Any pp uired to demo the subm requesting Superseding will m required proceeding means public hearing, S a Sup
in the permit Department prior to Issuance
prior to the close of the p
Commission p information to the DeP Order which is being
providing written inform concisely the objections to the of the interests identified in
pr and cone protection Late clearly t contribute to the rot §40),and i inconsistent on de municipal
in
The request shall s Order does no Act M.G•L•c• 131, Order is s S regulations,the
appealed and how the Act or a
Wetlands Protection T the extent that the A
the Massachusetts and not he Ma Wetlands
regulations( Massachusetts wetlands reg law and not°jurisdiction.
ordinance or by appellate
Department has no app
Page 11 0'
Npaform5.doc• rev.0312410
Provided by MassDEP:
ental Protection MDEP File#:242-1481
Massachusetts Department of Environm ass
Transaction#:3235 OAR
Wetlands City/1 own:NORTH
��—� Bureau of ResourceO�aer of 0-� ` WPA Form 5 c.131,§40
+ Massachusetts W etlands Protection Act M.G.L.M•
'�1
-—" which the land is located,
Information of Deeds or the Land Cow for the district in
G. Recording recorded the Registry recorded land the Final Order shall al,an� edOrder shall also be
In the case of recor registered information non
G a Ordende Conditions amebe eted owner of subject to the Order.In the case of
within the chain of title of the affected the owner of the land subj subject to the Order of Conditions.The recording
owner of the land subj
Grantor Index under the name ission listed below.
noted on the Land Court Certificate of Title of the own
this page shall be submitted to the Conservation Comm
NORTH ANDOVER
Commission Commission.
Conservation Comm
. ... ..................................................................
i of Deeds and submit to the Conservation Comm
dbytheReg and submit have stamped . ......................
Detach on dotted line,................................. . .
To: ANDOVER
NORTH AN
Conservation Commission
Please be ad
ect at:
advised that the Order of Conditions for the Proj 24�_1481
22. ASHLAND
STREET 42 l48P FileNumber
project ct Location
of Deeds of: �
Has been recorded at the Registry Book Page
County
for.
Proper Owner
of title of the affected proper in
and has
been noted in the chain page
Book
In accordance with the Order of Conditions issued on:
Date
ecorded land,the instrument number identifying this transaction is:
If r
Instrument Number
istered land,the document number identifying thus transaction is:
If re b
Document Number
Rev.31912010
Signature of Applicant *ELECTRONIC COPY
Page 10 of 10
DEP FILE#242 - 1481 Commission(hereafter the"NACC") hereby
Therefore,
the North Andover Conservation Commiaccordance with the Performance
to protect
finds that the following conditions are necessary, cal Bylaw and Regulations, o p
Standards set forth in the State Regulations, below. To those interests noted above.
The NACC orders that all work shall be performed in
ex
accordance with said conditions and with the Notice ffer from the .lans referenced
•ecifications or other
extent that the followin• conditions mods o
•ro•osals submitted with the Notice of Intent the conditions shall control.
GENERAL CONDITIONS
20.The proposed work includes: construction
of a two story residential duplex building,with
two affordable housing units,landscaping,
drainage and appurtenant site work and
grading adin portions of which are within Riverfront Area.
21. The work shall conform to the following:
Joanne Comerford
Applicant: North Andover Housing Authority
ows
One Morkeski MMA 01845
North Andover,
Property Owner:
same
Intent Prepared by: Allen&Major Associates,Inc.
Notice of In p P.O. Box 2118
100 Commerce Way
Woburn,Massachusetts 01888-0118
Dated: June 24, 2010
Timothy J.Williams,P.E.
Site Plans prepared by: Allen&Major Associates,Inc.
100 Commerce Way
Woburn,MA 018888-0118
Ti tled:Site Development Plans for Multi-Unit Modular
House,22-24 Ashland Street
North Andover, MA C1-05,D1-D3
Sheets : Cover Drawing,
Dated:June 24, 2010
22.The term"Applicant as used
in this Order of Conditions shall refer to the e owner,her, any of
in interest or successor in control of the property seThe NACC shall of notified
Inccessors
Intent, supporting documents and n eTOodtltle of any portion of property that takes place
in writing within 30 days of al
rior to the issuance of a Certificate of Compliance.
p NACC 7/26/2010
242-1481,22-24 Ashland OOC.doc
DEP FILE #242 - 1481
23. The conditions of this decision shall apply to, and be binding upon, the applicant, owner,
its employees and all successors and assigns in interest or control. These obligations shall
be expressed in covenants in all deeds to succeeding owners of portions of the property.
24. Failure to comply with all conditions stated herein, and with all related statutes and other
regulatory measures, shall be deemed cause to revoke or modify this Order.
25. This Order does not grant any property rights or any exclusive privileges; it does not
authorize any injury to private property or invasion of property rights. However, the
NACC, agent of the NACC or the Department of Environmental Protection (DEP)
reserves the right to enter and inspect the property at all reasonable times until a
Certificate of Compliance is issued, to evaluate compliance with this Order of Conditions,
the Act (310 CMR 10.00), the North Andover Wetland ByLaw and Regulations, and may
require any information, measurements, photographs, observations, and/or materials, or
may require the submittal of any data or information deemed necessary by the NACC for
that evaluation. Further, work shall be halted on the site if the NACC, agent or DEP
determines that any of the work is not in compliance with this Order of Conditions.
Work shall not resume until the NACC is satisfied that the work will comply and has so
notified the applicant in writing.
26. This Order does not relieve the permittee or any other person of the necessity of
complying with all other applicable federal, state or local statutes, ordinances,by-laws or
regulations.
27. The work authorized hereunder shall be completed within three years from the date of
this order.
28. This Order may be extended by the issuing authority for one but not more than two
periods of up to one year each upon application to the issuing authority at least thirty
days (30) prior to the expiration date of the Order (Refer to Section 8.3 (p.37) of the North
Andover Wetland Regulations).
29. The NACC reserves the right to amend this Order of Conditions after a legally advertised
public hearing if plans or circumstances are changed or if new conditions or information
so warrant.
30. Where the Department of Environmental Protection (DEP) is requested to make a
determination and to issue a Superseding Order, the Conservation Commission shall be a
party to all agency proceedings and hearings before the Department.
31. Any future project which proposes a wetland crossing in order to access certain portions
of the property will not be qualified as a limited project roadway under 310 CMR 10.53(e).
242-1481,22-24 Ashland OOC.doc 2 NACC 7/26/2010
DEP FILE#242 - 1481
32.The following wetland resource areas are affected by the proposed work: Riverfron Ve his
resource area is significant to the interests of the Act and Town
the Law presumption of
noted above
and therein. The applicant urce area to the identified mteres
significance of this resource
The NACC inspected and confirmed wetland flags of Mean High Water (MHW) (flags
TOB A1-A3) as shown on the revised plan dated and referenced herein.
34.The NACC finds that the intensive use of the upland areas and buffer one p to posed on
this site will cause further alteration of the wetland five foot 25' Zone and
any alteration of wetland resource areas a twent
adjacent
foot 50' No-Construction Zone shall be established fr ed the
heredg of Conservation the record plan
wetland land resource area as depicted oof the NACC do not have the authority to waive these
Administrator and/or other agents
setbacks as established under the local bylaw.
nt shall be included in all construction contracts, subcontracts,a fl and 35. This document any specifications dealing with the work proposed
assuredthat all contractors, subcontractors, and
contract requirements. The applicant
personnel per g
formin the permitting work are fully aware of the permits terms rms and
conditions. Thereafter, the contractor will be held jointly liable for any violation
resulting from failure to comply with its conditions.
36. Theo
owners of the project and their successors in title agree that the does not in drainage system
itself impose upon the Town any liable for any damage nn the event of failure. By
and that said Town shall not be
acceptance of
this Order,the owners agree to indemnify and hold harmless on this the Town
and its residents for any damage attributable iot doe not an any way imply or certify
pursuant to the Order. Issuance of these Conditions
that the site or downstream areas will not be subject to flooding, storm damage or any
other form of water damage.
PRIOR TO CONSTRUCTION
37. No work shall be undertaken until all administrative appeal periods from this Order{e
elapsed or, if such an appeal has been filed,until all proceedings before the Department
a
P
or Court have been completed.
Y
38. This Order shall be
recorded b the applicant at the Registry of Deeds immediately
p
Land after
- . the expiration of all appeal periods. No work shall d Court for the district in which the
has been recorded in the Registry of Deeds or the property.
ted within the chain of title of the affected r Index under the name the case of recorded
land it located,
the Final Order shall also be h in
proposed o ed wo k is to be done.In the case of
of the owner of the land upon which p p
NACC 7/26/2010
242-1481,22-24 Ashland OOC.doc
3
•
DEP FILE #242 - 1481
red land, the Final Order shall also be noted on the Land Court Certificate of Title
registered g
of the owner of the land upon which the proposed Andover work
Commission on the
information shall be submitted to the No
rder not
form at the end of this Order prior to commencement of the ked b Any Or NACC at the
recorded by the applicant before work commences may ere
recorded Y
applicant's expense.
gn
39. A
si shall be displayed at the site not less than two square feet or more an three
square feet in size bearing the words "Massachusetts DEP, File Number
40. Any g
n changes in the submitted plans caused by the applicant, another NACC fodecision
or resulting from this Order of Conditions must be submitted tot the
approval prior to implementation. If the NACC finds said changes to be significant,Within 21 the
app P
NACC will call for another public hearithe(at
NACC will issue an amended or new Order of
days of the close of said public hearing
Conditions. Any errors found in the plans or information submitted wd by the
approval applicant
has shall
be considered as changes. No work shall begin on a project until pp
been granted by the NACC.
41. It is the
responsibility of the applicant, owner, and/or successor(s) to ensure that and
cnditions of this Order of Conditions are complied with. The project engineer
co
contractors are to be provided with a copy of this Order of Conditions and referenced
documents before commencement of construction.
42. Pr y
for to an work commencing on site, the applicant shall submit to the o ACC for
approval, a detailed construction sequence, including a dated timetable
installation of erosion control devices and landscaping.
43.Wetland flagging in shall be checked prior to start of construction and shall be re-established
where missing. All wetland flagging shall remain until a Certificate of Compliance is
approved plan(s) throughout the life of the project and until
issued so that erosion control measures can be properly placed and wetland a impacts h ac s on
be monitored. The proposed limit of 1 be confirmed bythe NACC. Such barriers shall
controls or temporary fencing and s
is
be checked and replaced as necessary and shall be maintained unti l all ens machinery or
complete. Workers should be informed that no use of machinery, g
materials, stockpiling of soil, or construction activity is to occur beyond this line at any
time.
Y
44. A row of
staked ha bales backed by trenched siltation fence shall be placed between
ailed all
construction areas and wetlands. The erosion control barrier will be nd shall be inspected
and placed as shown on the plans approved a nd referenced herein an
and approved by the NACC or its agent prior to the start of ed to and d shall remain
All in
p prevent intact until all disturbed areas have been permanently stabs
erosion prevention revention and sedimentation protection measures found necessary during
242-1481,22-24 Ashland OOC.doc
4 NACC 7/26/2010
DEP FILE#242 - 1481
construction shall be implemented at the direction of the NACC or its agent. The NACC
reserves the right to impose additional conditions on portions of this project to mitigate
any impacts which could result from site erosion, or any noticeable degradation of surface
water quality discharging from the site. For example, installation of erosion control
measures required may be re uired in areas not shown on the plan(s) referenced in this Order led of
Conditions. Should such installation be required by the NACC,they shall be installed
48 hours of the Commission's request.
45. All existing and proposed catch basins on the site or on the streets adjacent to the s project
g entering drainage Y
shall be protected by Silt Sacks to prevent ecleaned fof sediments until all areas associated
Silt Sacks shall be maintained and regularly
with the work permitted by this Order have been permanently their removal.
stabilized and the NACC
and/or Conservation Department has formally approved
46.The applicant shall have on hand at the start of any soil disturbance, removal bales (or an
pP staking
stockpiling, a minimum of 10 hay bales and sufficient stakes for
equivalent amount of silt fence,1 hay bale to equal 3 feet of fence). Said bales shall be
used only for the control of emergency erosion problems and shall not be used for the
normal control of erosion.
47. A chec payable a able to the Town of North Andover shall be provided in the amount of$3,000
which shall be in all respects satisfactory to Town Counsel, Town Treasurer, and
C and shall be posted with the North Andover Town Treasurer through on the NACC
NACC, p
before commencement of work. Said deposit toned by ash arty or parties satisfactory to the
completion of all conditions hereof, shall be g y party
and Town Counsel, and shall be released after completion je t,provided
that provisions, satisfactory to the NACC,have been made for performance y
conditions which are of continuing nature. The applicant may propose project a monetary tart'NACC's
release schedule keyed to completion�fispuediunder portions
the authority of the local Bylaw.
review and approval. This condition
a applicant shall designate a Wetland Scientist (or other environmental professional
any al as
48. The pp
approved by the NACC or its agent) as an"Erosion Control Monitor" to oversee
emergency placement of controls and regular inspection or replacement of sedimentation
YP
control devices. The name and phone number of the erosion control monitor
provided to the NACC in the event that this person has to be contacted, due to an
emergency at the site, during any 24-hour period, including wee r
Environmental Professional will immediately notify the Conservation agent of any matte
that requires attention by the Commission or the agent. The erosion control
required to insp ect all such devices and oversee cleaning and the proper disposal of
waste products. Cleaning shall include removal of any entrapped silt.
49. At least once during each week in which construction activities occurs on-site an tenor as
long thereafter as ground remains unstabilized, the applicant shall submit
report from the "Erosion Control Monitor" to the NACC certifying that,to the best of
5 NACC 7/26/2010
242-1481,22-24 Ashland 00C.doc
DEP FILE#242 - 1481
his/her knowledge and belief based on a careful site inspection, all work
approved se bein g ks are
performed in compliance with this Order of Conditions and that
being adhered to. The erosion control monitor must visually inspect for their maintenance
g responsibility sedimentation/erosion control measures and assume response 1
y
on a
weekl basis and that they are functioning as intended. In addition, all wetland d
resource areas must be visually inspected for siltation, turbidity, and/or other
quality impacts. The Erosion Control Monitor shall be on site during and/or t following ls ia
q Y p
major storm event of 1" inch of rain and secure.ur event) to ensure
stable, and erosion controls areadequate
50. Prior
to construction, the applicant shall permanently mark the edge of the "25-foot No-
Disturbance ance Zone" with a minimum of three (3)wetland markers spaced eve d associated
feet incorporating the following text: "Protected Wetland Resource Area" an
rules (1 s 1 square sig n to every 2 circular signs). This will designate their sensitivity tient markers
assure no further inadvertent encroachment into the wetland. These perm
subject to review and approval by the NACC. The applicant shall instruct all agents
the
are su J taking to explain these markers to buyers/lessees/landscapers and all persons to
property from the applicant. The markers shall remain posted and be replaced as
P tY
necessary in perpetuity.
51. Prior to the commencement of any work on site, a Registered Land Surveyor (R.L.S.)verified
stake the limits of impervious area in the Riverfront. These measurements will be
in the field during the pre-construction meeting.
g
/
52. The applicant and/or the legal owner of that portion of land upon which these Orders of
, or
Conditions have been placed shall provide to the r NACC prior to
to said Orders ogConditions,
assigning any portion of said land to another party, subject
the "Compliance Certification Form Affidavit" attached via"Appendix A"
has read under
the pains and penalties of perjury, stating that said applicant and/or
e Orders of Conditions and is in compliance with each and every condition. T This
to
these provided document shall apply to each of the conditions business days prior tot e closing of said
the Conservation Department at least five (5)
land transaction.
the applicant
53. Once these above mentioned pre-construction requirements are conplete, the
and scan
shall contact the Conservation Office prior to site preparation o
the contractor,wetland
scientist and the applicant arrange an on-site nt to ensure that ll of the Conditions of this Order are
lic
understood. This Order shall be included in all construction ont , subcontracts, and
specifications dealing with the work proposed and shall supersede any conflicting
t requirements. The applicant shall assure that all contractors, subcontractors terms and
contrac q
other personnel performing the permitted work
e held jointly liable for any violation of this
conditions. Thereafter, the contractor l
Order of Conditions resulting from failure to comply with its co on
-site constr o applicant or
contractor shall notify the NACC in writing of the identity of
242-1481,22-24 Ashland OOC.doc
6 NACC 7/26/2010
DEP FILE #242 - 1481
supervisor hired to coordinate construction and to ensure compliance with this Order. A
reasonable period of time shall be provided as notice of the pre-construction meeting (e.g.
72 hours).
STORMWATER MANAGEMENT CONDITIONS
54. There shall be no
increase in the post development discharges from the storm drainage
system or any other changes in post development conditions n the Notice of Intent and
Y
development watershed boundaries as currently P
oved b this Order of Conditions,unless specifically approved in writing by the
appr Y
Commission.
55.Water qua ty
ing
li in down gradient BVW's shall not differ significantly followhall be no here s
completion of the project from the of om d sconditions.
harge pipes or surface runoff
sedimentation into wetlands or wa ter bodies
leaving the site
the issuance of the Certificate of Compliance,the applicant shall be
56. Prior to th
responsible for cleaning the on-site drainage system.
owners, and their successors and assignees, shall maintain all culverts,
57. The applicants,o
collections basins, traps, outlet structures, ture{o an easement to the Town of North
elements of the drainage system unless p
Andover, in order to avoid blockages and siltation which might
areas,failure and shall
the
system and/or detrimental impacts to on-site or off-site resource
maintain the integrity of vegetative cover on the site
DURING CONSTRUCTION
pp
58. Upon beginning work,the
applicant shall submit written monthly progress detailing be
what work has been done in or near resource areas, and d what ork is anticipated
done over the next period. This will update the construction
59. Accepted engineering
and construction standards and procedures shall be followed in
the completion of the project.
r will take all steps necessary to control dust onsite so that adverse
60. The contractor
effects on adjacent resource areas and / or habitat do not occur.
the contractor shall protect
61. Following completion of the on-site under Tdent sedimen/t from entering the resource
the drain outlet with erosion control p
area during the remainder of construction.
NACC 7/26/2010
242-1481,22-24 Ashland OOC.d0c
7
DEP FILE#242 - 1481
tel upon completion of the dwelling foundation, and
a
62. IMPORTANT: Immediately p the applicant to further construction activities associated oral Land tSurveyor of the Commonwealth
plan prepared by a Registered Professional
(R.P.L.S.) which accurately depicts the foundation location and is pr Said proximity to
shall
wetland resource areas as approved driistratoO or der
approval.
be submitted to the Conservation dm
63. A crushed stone prove
construction entrance shall be designated at the access location
tracking
shown on the approved plans referenced herein to entrance minimize shall be reinforced and cleaned
s
onto the roadways and paved e duration of construction.
as necessary throughout
entrapped silt shall be
64. Erosion control devices shall be inspected
oneuandywetland resource areas; silt fence
in
removed to an area outside of the buffer
and hay bales shall be replaced as necessary. The areas of construction ion controls on shall remain a i in
stable condition at the close of each construction o o on site or unless authorized by the
place throughout the duration of any
Conservation personnel.
are proposed. If emergency de-watering requirements hick
65.No dewatering activities ar p P Commission for app
the applicant shall submit a contingency in a settling basin to reduce turbidity
provides for the pumped water to be contained
into a resource area A ring of hay bales shall surround ant c d the anticipated shall be
prior to discharge
discharge area and a silt sock theldesignated Envirto rig Environmental Monitor. This designee
m st be on-site and witnessed while work by ensure
must be on-site while work sp
ecific to de-watering activities are occurring and until
hall sediment laden water is appropriately settled p
wetland resource a Andover areas. No discharge of water is allowed directly into
North area subject
jurisdiction'urisdiction under the MA Wetlands Protection Act and or
Wetlands Bylaw.
with this project shall be clean fill,containing no trash,,,
66. Any fill used in connection w P plaster,refuse,rubbish or debris,including but not limited to lumber,
motor vehicles or parts on any
lath, tires, ashes,refrigerators,lath,paper,cardboard, pipe,
of the foregoing.
s shall be immediately landscaped and stabilized,
67. All exposed soil finish grade surfaces
be loamed,
seeded and mulched,with a layer of mulch of each All
edis disturbed areas
the
be graded,loamed and seeded prior trade urfacees shall be stabilized with a layer of
mulch season, exposed soil finish grade a layer
mulch hay until climate conditions allow for seeding.During construction, area f
ed soils that will be left idle for more than 30 ays shall be stabilized exposed of mulch hay or other means app roved by the NA
NACC 7/26/2010
242-1481,22-24 Ashland OOC.doc
8
DEP FILE#242 - 1481
in the buffer zone shall have a slope steeper than 2: (horizontal:
68. No re-grading p_ pp
vertical). Slopes of steeper grade shall be rip-rapped ed to provide permanent
stabilization.
vehicles shall not be staged overnight within 100 feet of a
69. Construction equipment/
wetland resource area
no stockpiling of soil or other materials within 100 feet dob this resource
70. There shall be n p by
area Soils or other materials shall be
areas as shown on the approved plan referenced
department or within the designated
71.Washings from
concrete trucks, or surplus concrete, shall not be directed to, any
drainage system, or wetland resource area.
72. All waste generated by, or
associated with, the construction activity shall be contained
within the limit of work, and away from any wetland Waste on the site by anyaother
burying of spent construction materials or disposal of
means. The applicant shall maintain dumpsters (or other suitable means)I at io the site no
for thhe e storage e a and removal of such spent construction ub'ect to protection under the Act
trash dumpsters will be allowed within 50' areas of l
or local ByLaw.
pollutants this project,there shall be no discharge or spillage of fuel, or
73 .During and after work on p J
other ollutants into any wetland resource area. If there C shall be notified by the y
pollutant during any phase of construction the NACC
within one (1)business day. No construction vehicles are to e stored within i
100 feet of wetland resource areas, dfeet of a resource area.equipment
maintenance is to be done within 100
AFTER CONSTRUCTION
74. No underground storage of fuel oils shall be allowed on any lot within one-hundred d
(100) feet of any wetland resource area. This conditon This survive
d t on Order under
Conditions and shall run with the title of the property.
the authority of the Town's Wetland protection ByLaw.
75. Fertilizers utilized for landscaping and lawn care shall be slow releaase,1ow d-nitro age
types (< 5%), and shall not be used within
00 feet of a wetland�esource area.This condition
herbicides shall not be used within
shall survive this Order of Conditions and shall run with the title Protection of the pro
ByLaw and This
con
condition tion
is issued under the authority of the Town's Wetland
shall remain in perpetuity.
NACC 7/26/2010
242-1481,22 24 Ashland 00C.d0c
9
DEP FILE#242- 1481 ass clippings brush, or other debris into a
in of leaves, grass This condition shall remain in
76.There shall no dumping
wetland resource urce area or the No-Disturbance Zone.
perpetuity all disturbed areas located outside
om letion of construction and grading,
c entl against erosion. This shall be done erea
77. Upon p
resource areas shall be stabilized permanently
loaming and seeding
according to NRCS standards. Stabilization will be co
complete once full vegetative cover has been achieved. consols shall be
p
approved site stabilization by Conservation staff,the erosion
Upon a r and all exposed unvegetated areas shall be seeded. {
78. Up pp
removed and properly disposed of a
79,Upon completion of the project the applicant shall submit the following the
Commission as part of a request for a Certificate ce of Compliance:
Conservation Co Compliance.
a. WPA Form 8A- "Request for a Certificate of o P
the applicant requesting a Certificate of
b. A letter from t Pp
c. The name and address of the current p open y owners shall be e d a aed with
d. Signed statements from the individual Hance indicating that they r
for a Certificate of Compliance
prior to purchasing their property.
therequest
understood the of Order individual/trust or corporation to whom t
e. The name and address
compliance is to be gr anted. parcel number for the project.
The street address and assessor's map/p and or
f. /
h
g.. The DEP file number. Commonwealth certifying that the
statement from a Registered Professional Engineer
h R written sta of the
shown on the plan(s) and documents referenced
Registered Professional Land Surveyor)
work has been conducted Commission.
signed and stamped by a Registered Professional
above and as conditioned d and s gn or of the
i. An"As-Built plan prepared
Engineer (and/or Registered Professional Land Wd Surveyor)
Civil g public record. P
Commonwealth, for the p
➢
"As-Built" nt post-development structures c
elevations of all drainage &stormwater resource
ement structures constructed within 100 feet of any wetland
ana water systems exist partially within the
management
area. NOTE: If portions of the stormwater
---- Buffer Zone than
the entire structure must be depicted to accurately verify
compliance.
t elevations and grades of all filled o whiched
➢ "As-Built" post-development encompassing buffer zone wetland resource areas including the e to°a Wetland Protection Bylaw.
regulated as a resource area under the uctures include (but
• •ons,fences, sheds, stone walls,
Distances from structures to wetland resource areas. Str
are not limited to) septic b urface utilities and decks.
pools, retaining walls, s
NACC 7/2612010
10
242-1481,22-24 Ashland 00C.doc
DEP FILE#242 - 1481
A line showing the limit of work and the extent of existing erosion control
➢
devices. "Work" includes any disturbance of soils or vegetation.
➢ Location of all subsurface utilities entering the property.
p
80.The following special conditions shall survive the issuance of a Certificate of
Compliance (COC) for this project:
25' No-Disturbance Zone and a 50' No-Construction Zone shall be
oved
established from the edge of adjacent wetland resource areas approved
under DEP # 242-1481. Future work within 100' of existing f et a w th the ing
resource areas or the 200' Riverfront will require a separate
NACC (refer to Section 3.4 (page 15) of the Regulations for perfor
a d ore
standards within these zones) authority to waive these setbacks
other agents of the NACC do not have the a
as established under the local ByLaw;
➢ Resource Area Markers (Condition#50);
➢ Discharge or spillage of pollutants (Condition#73);
➢ Prohibition of underground fuels (Condition#74);
Lim itations on the use of fertilizers,herbicides, and pesticides (Conditions
➢
#75).
➢ No dumping of leaves or brush (Condition#76)
NACC 7/26/2010
242-1481,22-24 Ashland 00C.d0C
11
DEP FILE#242 - 1481
APPENDIX A-AFFIDAVIT
on oath do hereby depose and state:
(authorized agent applicant and/or current owner)
(PLEASE CHECK AT LEAST ONE BLOCK)
1. Iamthe of
(position with applicant) (applicant name or company name)
the applicant upon whom Order of Conditions
have been placed upon by (DEP or NACC number)
the North Andover Conservation Commission.
&/or
2. Iamthe of
(position with owner) (owner name)
the owner upon whose land Order of Conditions
have been placed up by (DEP or NACC number)
the North Andover Conservation Commission.
3. I hereby affirm and acknowledge that I have received said Order of Conditions
and have read the same and understand each
(DEP File#) and every condition which has been set forth
in said Order of Conditions.
4. I hereby affirm and acknowledge that on this day of 19
I inspected said property together with any and all improvements which have
been made to the same and hereby certify that each and every condition set
forth in Order of Conditions are presently in compliance.
(DEP File#)
5. I hereby affirm and acknowledge that this document will be relied upon by the
North Andover Conservation Commission as well as any potential buyers of
said property which is subject to said Order of Conditions
(DEP File#)
Signed under the pains and penalties of perjury this day of 19
(Signature-authorized agent of applicant or owner)
242-1481,22-24 Ashland OOC.doc 12
NACC 7/26/2010