Loading...
HomeMy WebLinkAboutMiscellaneous - 59 BANNAN DRIVE 0 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection-Wetlands MassDEP File#:242-1609 WPA Form 5-Order of Conditions eDEP Transaction#:605592 Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 0tyflbwn:NORT14 ANDOVER A. General Information 1.Conservation Commission NORTH ANDOVER 2.Issuance a. ❑ DOC b.❑ Amended DOC 3.Applicant Details a First Name THOMAS&SANDRA I.Last Name BLACKSHAW c.OrganGation d Mailing Address 59 BANNAN DRIVE e.Cnyfrown NORTH ANDOVER f State MA g.Zip Code 01845 4.Property Owner a First Name THOMAS&SANDRA I.Last Name BLACKSHAW c.Organization d Mailing Addres 59 BANNAN DRIVE C.City?awn NORTH ANDOVER Estate MA g.Zip Code 01845 5.Project Location &Street Address 59 BANNAN DRIVE b.Cayfrown NORTH ANDOVER eZip Code 01845 d.Assessors Map/Plat#38 e.Parcel/Losi 0113 f.Latitude ON g.Lon®mde OW 6.Property recorded at the Registry of Deed for: a.County b.Certificate c.Book d.Page NORTHERN ESSEX 3940 108 7.Dates &Date NOI Filed: 10/15/2013 It.Date Public Hearing Closed: 10/23/2013 c.Dats Oflssuance: 10242013 8.Final Approved Plans and Other Documents a.Plan Title: b.Plan Prepared by: e.Plan Signed/Stamped by: d.Revised Final Date: e.Scale: 59 BANNAN DRIVE PENNONI BENJAMIN C.OSGOOD,JR. -SEWERDISPOSAL ASSOCIATES INC. P.E. 1021/13 P'�0- SYSTEM PLAN B. Findings LFindings pursuant to the Massachusetts Wetlands Protection Act Page 1 of 10 a ELECTRONIC COPY Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection-Wetlands MessDEP File#:242-1609 WPA Form 5-Order of Conditions eDEP Transection#:605592 Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 City/fown:NORTH ANDOVER Following da review of the the above-referenced Notice of Intent and based on the information provided in this application and presented 9the public hearing this Commission finds that the areas in which work is proposed is significant w the following infaests of the Wetlands Protection Act Check a0 that apply: a. o Public Water Supply b. o load Containing Shellfish c.0 Prevention of Pollution d. o Private Water Supply e. o Fisheries f. o PrOteationofWOdlife Habitat g. o Ground Water Supply It 0 Smmm Damage prevention i. 0 Flood Conuol 2.Commission hereby finds the project,w proposed,is: Approved subject to: ao The following conditions whichare necessary in accordance with the pertormance standards set forth in the wetlands regulations This Commission orders that all work shall be performed in accordance wirhtheNofice of Intent referenced above,the following Gerwml Conditions,and any other special conditions attached to this Order.To the exmrrc that the following conditions modify or differ from the plans,specifications,or other proposals submitted with the Notice of Intent these conditions shall control. Denied because: b.o The proposed work cannot be conditioned in meet the performance standards set forth in the wetland regulations.Therefore, work on this project may not go forward unless and until anew Notice of Intent is submitted which provides measures which are adequate to protea interests of the Act,and a final Order of Conditions is issued A description of the performance standards which the proposed work cannot meet is attached to this Order. c The information submitted by the appficant is not sufficient to describe the sit,the work en-the effect of the work on the interests identified in the Wetlands Protection Act Therefore,weak on this pmjectrnly act go forward unless and until a revised Notice of Went is submitted which provides sufficient information and includes measures which are adequate to protect the interests ofthe Act,and a final Order of Conditions is issued.A description of the specific information which is lacking and why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c). 30 Buffer Zone Impacts:Shortest distance between limit of project disturbance and the wetland resource area specified in 3 IOCMR10.02(1)(a). 40 a lirrear feet Inland Resource Area Impacts:(ForApprovals Drily): Resource Area Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement 4, o Bank alinearfed b.Wumfea ,lmem fret d.lmearfeet 5.0 Bordering Vegetated Wetland feet a square fed -t square c.square feet d.square fed 6. o Land under Waterbodies and Waterways a spume fed b.square feet c.square feet d.square fed n dy dredged E Ny dredged 7.o Bordering Land Subject to Flooding a square feet b.square fed c.square feet d square feet Page 2 of 10*ELECTRONIC COPY Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection-Wetlands MaMDEP File#:242-1609 WPA Form 5-Order of Conditions eDEP Transaction#:605592 Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 Clty/fown:NORTH ANDOVER Cubic Feet Flood Storage e.cubic fed f,cubic fed g cubic feet h.cubic feet 8.❑ LsolmW Land Subject to Flooding a spasm feet b.square feet Cubic Feet Flood Storage c.cubicfed d.cubic feet e.cubicfeet £cubic feet 9.o Rwerfmnt Area a coral sq.feet b.total sq.feet Sq R wiatin 100 ft c.square feet d square feet e.square feet f square fed Sq ft between 100-200 ft g square feet h.square fat i.square feet j.square feet Coastal Resource Area Impacts: Resource Area Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement 10.0 Designated Port Areas Indicate a=under Lend Under the Ocean,below 11.0 Land Underthe Ocean a square fat b.square feet c.Gy dredged d.dy dredged 12.0 Barrier Beaches Indicate sin under Coastal Beeches and/or Coastal Dunes below 13.o Coastal Beaches a square feet b.square feet c.dyrwmishmmt d dy nourishment 14.0 Gospel Duua a square feet b.square feet c dYuomiskneN d dy npuiebmmt 15.n Coastal Banks alinemfeet b.linearfeet 16.0 Rocky Intertidal Shores a square fed b.square feet 17.o Salt Marshes a square feet b.square Fat c.square feet d.square feet 18.0 Land Under Salt Ponds a spume feet b.square feet c.dy dredged d dy dredged 19,0 Land Coatairdng Shellfish T;-quare fed b.square feet c.square feet d.square fee[ Page 3 of 10•ELECTROMC COPY Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection-Wetlands Ma%DEP File#.,242-1609 WPA Form 5-Order of Conditions eDEP Transaction#:605592 Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 Cltyfrown:NORTHANDOVER Indicate sin Under Coastal Banks,inland Bank,Lard Under the 20.0 � Ocean,and/or irdand Land Under Wated odies and Waterways, above a.dy dredged d.Gy dredged 21.❑ Land Subject to Coastal Storm Flowage a.square felt b.square feet 22. ❑ Restomtion/Enhancement(For Approvals Only) If the Project is for the purpose of restoring or enhancing wetland resource area in addition to the square footage that has been entered in Section B.sc&d or B.17x&d above,please entered the additional amount here. a.square feet of BW W b,square feet of Salt Marsh 23. ❑ Streams Crossing(s) If the Pmjectinvolves Sheem Crossings,please enter the number of new stream crossings/number of replacement stream crossings, a number ofnew stream crossings b.number of replacement stream crossings C. General Conditions Under Massachusetts Wetlands Protection Act The fal owing conditions are only applicable to Approved projects 1. Failure to comply with all conditions stated herein,and with all related statutes and other regulatory measwes,shall be deemed cause to revokc or modify this Order. 2. The Order does not grant any property rights or any exclusive Privileges,it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permiaee or any other person of the necessity of complying with all other applicablefederal, stare,or local shames,ordinances,bylaws,or regulations. 4. The work amhod&d heremrdershall be completed within duce years from the dam of this Order mdess either of the following apply: a the work is a maintenance dredging project as provided for in the Aa;or b.the time for completion has been emended to a specified date more tan tum years,bra leas than five years forn the date of issuance.If this Order is intended to be valid for more than three years,the extension date and the special chcnmstanoes warroming the ertendeitime period are set forth as a special condition in this Order. 5. This Order may be extended by the issuing authority for one or more periods of up to than years each upon application to the isming authority m least 30 days prior to the expuation date of the Order. 6. If this Order constitutes an Amended Order ofCon litions tits Amended Order of Conditions does net exceed the issmance date of the original Final Order ofCondifims. 7. Any fill used in comsection with this project shall be clean fill.Any fill shall contain ro baslh,refuse,rubbish,or debris including but not limited an lumber,bricks,Plaster,wire,lath,paper,cardboard,Pipe,tines ashes,refrigehators,motor vehicles or parts of arY of the foregoing. 8. This Order is not final hmtil all administrative appeal periods from this Order have elapsed,or if such an appeal has been Wren, until all proceedings before the Depmanem have been completed. 9. No work shall be hmdertaken until the Order has become final and then has been recorded in the Registry of Deeds or the land Court for the district in which the land is located within the chain of fide of the affected property.In the case of recorded land, Page 4 of 10 a ELECTRONIC COPY LJMassachusetts Department of Environmental Protection Provided by MascDEP: Bureau of Resource Protection- Wetlands MassDEP File#:242-1609 WPA Form 5-Order of Conditions eDEP Transaction#:605592 Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 ClyTown:NORTH ANDOVER the Final Order shall also be noted in Ore Registry,Grantor.Wdc,nude,the name of the owner of the land upon which the proposed work is to be done.In the case of the registered land,the Final Order shall also be noted on the Land Court Certificate of Title ofthe owner ofthe land upon which the proposed work's done.The recording information shall be submitted m the Conservation Commission om the format the end oftltis order,which form must bestamped by the Registry ofDerds, Prior m the commencement of work. 10. Asign shall be displayed at the site not less Orentwo square feetormorethan three square feet in size bearing the tmrwords, "Massachusetts Depaent oflowmamental Protection" (or'MassDEP"1 File Number:"242-1609" IL Where the Department ofEndom mem Protection is requested m issue a Superseding Order,the Conservation Commission Shall be a party m all agency proceedings and hearings before Mass DEP, 12. Upon completion ofthe work described herein the applicant shall submit a Request forCenificate ofCompliance(WPAForm SA)m the Conservation Commission, 13. The work shell condom to the plans and special conditions referenced in this order. 14. Any chazWas,the plans identified in Condition#13 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing alfa new Notice of Intent 15. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to and analmspad the area subject m this Order az reasonable hours m evaluate compliance with the conditions stated in this ho. omay require the submittal ofany,data deemed necessary by the Conservation N Commission or for at evaluati 16. This Order of Conditions shall apply many successor in interest or successor in control of the property subject 0 Us Order and many convector m other person performing work conditioned by this Order. 17. Prior to the start ofwork,and if the project involves work adjacent to a Bordering Vegetated Wetland,the boundary of the wetland in the vicinity of the proposed work area shall bema lred by wooden stakes or flagging.Once in place,the wetland boundary markers shall be maintained until a Certificate of Compliance hes been issued by die Cana z ofis n Commission, 18. All sedimentation barriers shall bemaintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means.At no time shall sediment be deposited in a wetland or water body.During construction,the applicant or his her designee shell inspect the erosion controls on a daily basis and shall remove and mula+ed sediments as needed.The applicant shall immediately control any erosion problems the occur as the site and shalt also immediately notify the Conservation Canmission,which reserves the right m require additional erosion and/or damage prevention controls it may deem necessary. Sedimentation barriers shall serve as the limit ofwork unless another Writ of work line has been approved by this Order. NOTICE OF STORMWATER CONTROL AND MAINTENANCE REQUIREMENTS 19. The work associated with this Order(the"Project")is(1) o isnot(2)o sobjeato the Mossach ardta Stormwater,Smndards. If the work is subjca on Smrmweer Standards,then the project is subject m the following conditions; a) All work,including site preparation,land disturbance,construction and redevelopment,shall be implemented in accordance with the construction period pulludon prevention and erosion and sedimentation control plan and,If applicable,the Stormwater Pollution Prevention Plan required by the National Pollutant Discharge Elimination System Construction General Permit as required by Smmnwater SmtMard S.Construction period erosion,sedimentation and pollution cement measures and best mamegementpmgied,(BMPs)shall remain in place until the site is fully stabilized. by No eonnwerex many may be discharged as the past-WHotruction stormwmer BMP,unless and mail a Registered Professional Engineer pmvides a Certification the:i.all construction period BMPs have been removed or will be removed by a date certain specified in the Certification.For my construction period BMPs intended m be converted to post construction operation far slormwedsonametion,recharge,and/or treahnent,the conversion is allowed by Ore MassDEP Semmwmer Handbook BMP specifications and that the BMP has been properly cleaned or prepared for post construction operation, including removal of all consmxtiom period sediment tapped in eld and outlet control structures;ii.es-built final construction BMP plans are included,signed and stamped by a Registered Professional Engineer,certifying the she is fully stabilized;id, any illicit discharges m the summoner management system have been removed,as per the requirements of Smnnwmer Page 5 of 10•ELECTRONIC COPY Massachusetts Department of Environmental Protection Provided by M,,DEP: Bureau of Resource Protection- Wetlands MassDEP File#:242-1609 WPA Form 5-Order of Conditions eDEP Tmnsaefiom#:605592 L3 Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 Ciry/Pown:NORTH ANDOVER Standard 10;r` all post-cotrnuction rimmwster BMPs are installed in accordance with the plans(including a0 planting Plans)approved by the issuing authority,and have been inspected to ensure that they are not damaged and that they are in proper woddng condition;v.any vegetation associated with post-conshtretion BMPs is suilably established to withstand erosion- c) The landowner is responsible for BMP namdenartseuntil the issuing authority is notified that another party has legally assumed responsibility for RMP maintenance.Prior m requesting a Certificate of Compliance,or Partial Certificate of Compliance,the responsible parry(defined in General Condition 19(e))shall execute and submit to the issuing authority an Operation aM Maintenance Compliance Statement("O&MStatemaa')for the SmrmwaterBMpt idenoin Inng hepadyresperatioefor implementing the smrmwaterRAP Operation and Maidenance Plan("O&M Plan")and certifying the following:i.)the O&M Plan is complete and will be implanrnted upon receiptofthe Certififate of Compliance,and ii.)the future responsible parties shall be notified in writing oftheh ongoing legal=Portability an operate and maintain the ammrwetamanagement BMP,and implement the Stonnwe er Potation Prevadon Plan. d) Pon-construction pollution prevention and source,corme)shall be implemented an accordance with the long-term pollution Preventionplansectionoftheapproved Smrmwaz Repmtand,ifapplicable,the Smorma erPollution Prevention Plan required by the National PollumntDischarge D minim System Multi-Sector General Permit e) Uden and wet another Party accepts responsibility,the landowner,or owner Many drainage easement,assumes responsibility far maintaining each END.To ov«cmne this presumption,the landowner of the property most submit to the issuing authority a legally binding agreement ofrecand,acceptable to the issuing authority,evidencing tu[anotherrntity has accepted responsibility for maintaining the BMP,and that the pnryosedresponsible pmy,ady evdlncheated as number as PuNosed re implementing the requirements requirement 19(t)througlh 19(k)with respect to that BMP.Any failure ofthe ar Proposed responsible party m implement the requirzments ofCondiduns 19(t)tivough 19(k)with respect to that BMP shall be a violation ofthe Order of Conditions or Certificate oi-complanum In the case ofstormwater BMPs Out are serving more than one lot,the legally binding agreement shall also identify the lots Out will be serviced by the stmmwa xDMps.A plan and easement deed that grant,the responsible Party access m perform the required operation and maintenance must be submitted almg with the legally binding agreemeut. f) The responsible party shall operate and maintain all stormwmer BMPs in accordance with the design plans,the O&M Plao, and the requirements of the Massachusetts Smmnwater Handbook g) The responsible party shall: 1.Maintain an operation and maintenance log fa the hat three,(3)consecutive calendar years ofinspections,repairs, maintenance and/or replacement ofthe amma"a tes management system or any Pmt therent and disposal(for disposal 0te log shall indicate the type ofmaterial and the disposal location); 2.Make the maintenance log available to MassDFP and the Conservation Commission("Commission")upon request;and 3.Allow members and agents ofthe MassDEP and the Corrmtission m enter and inspect the site an evaluate and ensure that the responsible Party is in compliance with the requireme s fo each BMP established in the O&M Plan approved by the issuing audionity. h) All sediment orother contaminants removed from stomhwater BMPs shall be disposed ofin aceordance with all applicable fedual,state,and local laws and regulations. Illicit discharges to the smrmwater management system as defined in 310 CMR 10.04 are prohibited. j) The smrmwakr management system approved in the Order ofCoMitlons shall not be chaa rdi W. the prior written approval ofthe issuing amhoriry. k) Areas designated as qualifying pervious areas far the purpose ofthe Low Impact Site Design Credit(as defined in the MassDEP Smnawater Handbook,Volume 3,Chapter 1,Low Impact Development Site Design Credits)shall not be altered without the prior written approval of the issuing authority. 9 Access for maintenance,repair,and/or replacement ofBMPs shall not be withheld.Any fencing constructed around srmmwater BMP,shall include access gates and shall be at least six inches above grade to allow for wildlife passage. Special Conditions: SEE ATTACHED, Page 6 of 10•ELECTRONIC COPY LOMassachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection-Wetlands MessDEP File#:242-1609 WPA Form 5-Order of Conditions cDEP Transactioe#:605592 Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 City/Town:NORTH ANDOVER Page 7 of 10•ELECTRONIC COPY 1 . . 0 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection-Wetlands MassDEP File#:242.1609 WPA Form 5 -Order of Conditions eDEP Tomocdon#:605592 Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 CnyTuwn:NORTH ANDOVER A Findings Under Municipal Wetlands Bylaw Or Ordinance L Is a municipal wetlands bylaw or ordinance applicable?� Yes ❑ No 2. -Ue COMeNatiOn C m' io h ck one that applies) a 0 DENIES the proposed work which cannot be conditionedm meet the standards set forth m ammicipal ordinance or bylaw specifically: I.Mmicipal Ordinancem Bylaw 2.Citation Therefore,work on this project may not go forward unless and until a revised Notice oflatem is submitted which provides measures which are adequate to meet these Standards and a final Order or Conditions is issued.Which are necessary to comply with a municipal ordinance or bylaw: b. D APPROVES the proposed work,subject b the following additional conditions NORTH ANDOVER I.Municipal Ordinance or Bylaw WETLANDS PROTECTION 2.Citation CHAPTER 178 BYLAW 3. The Commission orders thatall work shall be performed in accordance with the following conditions and withthe Notice of hr[ent referenced above.Ta the egentthat the following conditions modify or differ from the plans,specifications,w other Proposals submitted with the Notice of Intent,the conditions shall control. The special conditions relating to municipal ordinance or bylaw are as follows: SEE ATTACHED. Page 8 of 10•ELECTRONIC COPY 0Massachusetts Department of Environmental Protection Provided by MamDEP: Bureau of Resource Protection-Wetlands MassDEP File 4:242-1609 WPA Form 5-Order of Conditions eDEP Trmisactioo 4:605592 Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 Clty/rown:NORTHANDOVER E. Signatures This Orderis valid for am years from the data of issuance,unless otherwise specified - �j — pursmnttoGeneral Condition 44.ifthis is an Amended Order of Conditions,the Amended 1. ate of Original Order Order expires on the same date as the original Order ofConditia n. Please indicate the number of members who will sign[Otis forth.This Order most be signed by — a majority of the Conservation Commission. 2.Number of Signers The Order most be mailed by certified mail moron receipt requested)or hand delivered to the applicant.A copy also must be mailed Or hand delivered a the same time to the appropriate DepartnemofEnvironmental Protection Regional Office,if not filing electronically,and the property owner,ift ifferent from applicant Signatures: X by hand delivery on Oby certified mail,return receipt requested,on Date Date F. Appeals The applicant,the owner,any person aggrieved by this Order,any owner of land abutting the land subject to this Order,or any ten residents of the city or town in which such land is located,are hereby notified of their right to request the appropriate MassDEP Regional Office to issue a Superseding Order of Conditions.The request must be made by certified mail m hand delivery to the Depamnent with the appropriate filing fee and a completed Request for Departmental Action Fee Transmittal Form,as provided in 310 CMR 10.03(7)within ten business days from the date of issuance of this Order.A copy of the request shall ar the same time be sent by certified mail mhand delivery to the Conservation Commission and to the applicant,ifhe/she is not the appellant. Any appellants seeking to appeal the Departments Superseding Order associated with this appeal will be required to demonstrate prior participation in the review of this project Previous participation in the permitprocttding means the submission of writhe information to the Conservation Commission print to the close of the public hearing requesting a Superseding Order,or to the Department prior to issuance of a Superseding Order. p ding whiten information The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute m the protection ofthe interests identified in the Massachusetts Wetlands Protection Act(M.G.L,a 131,§40),and is inconsistent:with the wetlands regulations(3 10 CMR 10.00).To the extent the the Order is based on amunicipal ordinarrce or bylaw, and not on the Massachusetts Wetlands Protection Ad or regulations,the Department has no appellatejurisdicton. Page 9 of 10•ELECTRONIC COPY 1 - . 0 Massachusetts Department of Environmental Protection Provided by MassDFP: Bureau of Resource Protection-Wetlands MassDEP File#:242-1609 WPA Form 5-Order of Conditions eDEP Transaction#:605592 Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 City/rownNORTHANDOVER G. Recording Information Itis OrderofConditions must be recorded in the Registry ofDeeds or the Land Court for the dildd in which the land is located, wi0tin die chain oftitle ofthe affected Property,In the case ofrecorded land the Final Ordershall also be noted in the Regisbys Grantor Index underthe name ofahe owrrer ofthe land subject w the Order.N the case ofregistemd land,this Order sbell also be noted on the Lard Court Cerlificate ofTide ofthe owner ofthe land subject io the Order ofConditions.The recording information on dtis page shall be submioed tothe Conservation Corrunission listed below. NORTH ANDOVER Conservation Commission Detach on doaW line,have stamped by the Registry of Deeds and submit to the Coreenomm Commission. To: ................................................................................................................................................................................................... NORTH ANDOVER Conservation Commission Please be advised that the Order ofCondidons for the Project at: 59 BANNAN DRIVE 242-1609 Project Location MassDEP File Number Has been recoMW at the Registry of Deeds of. Com Book Page f¢ Property Owner THOMAS&SANDRABLACKSHAW said has been noted in the chain oftide ofthe affected property in: Book Page In azmrda s.with the Order of Conditions issued on: Date Ifremded lend,the instrument number identifying this tmnsacam is: Instrument Number Ifregistered lord the docmment number idmtifymgthis barisacdm is: Document Number Sigunsre ofApplicanl aw.u�rzo�o Page 10 of 10*ELECTRONIC COPY DEP FILE#242 - 1609 Therefore, the North Andover Conservation Commission(hereafter the"NACC")hereby finds that the following conditions are necessary, in accordance with the Performance Standards set forth in the State Regulations, the local ByLaw and Regulations, to protect those interests noted above. The NACC orders that all work shall be performed in accordance with said conditions and with the Notice of Intent referenced below. To the extent that the following conditions modify or differ from the plans specifications or other proposals submitted with the Notice of Intent, the conditions shall control. GENERAL CONDITIONS 20. The proposed work includes: removal of an existing deck and replacement with a 2 story addition on a frost wall foundation with a 6'x 20' deck on the second level and a 3' x 8' stone patio on the lower level. The project will require the original septic tank to be replaced 10' off of the new foundation. The distribution box will also be replaced and the perforated field lateral pipes will either be replaced or re-pitched. The closest point of new construction is more than 60'from the wetland resource area. A shed in the No-Build Zone will be removed and a new shed will be constructed outside of the 50' No-Build Zone in a location to be approved by the Conservation Department. 21. The work shall conform to the following(except as noted in the remainder of this document where revisions may be required): Property Owner/ Applicant: Thomas 6r Sandra Blackshaw 59 Barman Drive North Andover,MA 0845 Notice of Intent: Received October 11,2013 Revised Project Narrative: Received October 21,2013 Site Plans prepared by: Pennon Associates Inc. Title: Sewer Disposal System Plan Dated: 10/09/13 Last Revised: 10/21/13 Signed and Stamped by: Benjamin Osgood,Jr.,P.E. Wetland Delineation by: Wetland Consulting Services Delineated:October 2,2013 22. The term"Applicant" as used in this Order of Conditions shall refer to the owner,any successor in interest or successor in control of the property referenced in the Notice of Intent,supporting documents and this Order of Conditions. The NACC shall be notified in writing within 30 days of all transfers of title of any portion of property that takes place prior to the issuance of a Certificate of Compliance. 242-1609,59 Benner Drive DOC ] NACC ID24/2013 DEP FILE 9 242- 1609 23. The conditions of this decision shall apply to,and be binding upon the applicant, owner,its employees and all successors and assigns in interest or control. These obligations shall be expressed in covenants in all deeds to succeeding owners of portions of the property. 24. Failure to comply with all conditions stated herein,and with all related statutes and other regulatory measures,shall be deemed cause to revoke or modify this Order. 25. This Order does not grant any property rights or any exclusive privileges;it does not authorize any injury to private property or invasion of property rights. However,the NACC,agent of the NACC or the Department of Environmental Protection(DEP) reserves the right to enter and inspect the property at all reasonable times until a Certificate of Compliance is issued,to evaluate compliance with this Order of Conditions, the Act(310 CMR 10.00),the North Andover Wetland ByLaw and Regulations,and may require any information,measurements,photographs, observations, and/or materials,or may require the submittal of any data or information deemed necessary by the NACC for that evaluation. Further,work shall be halted on the site if the NACC,agent or DEP determines that any of the work is not in compliance with this Order of Conditions. Work shall not resume until the NACC is satisfied that the work will comply and has so notified the applicant in writing. 26. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal,state or local statutes,ordinances,by-laws or regulations. 27. The work authorized hereunder shall be completed within three years from the date of this order. 28.This Order may be extended by the issuing authority for one but not more than two periods of up to one year each upon application to the issuing authority at least thin days (30) prior to the expiration date of the Order (Refer to Section 8.3 of the North Andover Wetland Regulations). 29. The NACC reserves the right to amend this Order of Conditions after a legally advertised public hearing if plans or circumstances are changed or if new conditions or information so warrant. 30. Where the Department of Environmental Protection(DEP) is requested to make a determination and to issue a Superseding Order,the Conservation Commission shall be a party to all agency proceedings and hearings before the Department. 31. Any future project which proposes a wetland crossing in order to access certain portions of the property will not be qualified as a limited project roadway under 310 CMR 10.53(e). 242-1609,59 Berman Drive OOC 2 NACC 10/24/2013 DEP FILE#242 -1609 32. The following wetland resource areas are affected by the proposed work: Buffer Zone to Bordering Vegetated Wetland(BV W). These resource areas are significant to the interests of the Act and Town ByLaw as noted above and therein. The applicant has not attempted to overcome the presumption of significance of these resource areas to the identified interests. 33. The NACC agrees with the applicant's on-site buffer zones as shown on the plans dated and referenced herein. 34. The NACC finds that the intensive use of the upland areas and buffer zone proposed on this site will cause further alteration of the wetland resource areas. In order to prevent any alteration of wetland resource areas a twenty five foot(25' No- Disturbance Zone and a Fifty foot(50')No-Build Zone shall be established from the edge of the adjacent wetland resource areas except as shown on the herein referenced plan(lawn area in the 25' No-Disturbance Zone). The Conservation Administrator and/or other agents of the NACC do not have the authority to waive these setbacks as established under the local bylaw. No disturbance of existing grade,soils or vegetation is permitted in the No-Disturbance zone. (See Section 3.4 &Appendix F of the local Regulations). 35. This document shall be included in all construction contracts,subcontracts,and specifications dealing with the work proposed and shall supersede any conflicting contract requirements. The applicant shall assure that all contractors,subcontractors, and other personnel performing the permitting work are fully aware of the perm is terms and conditions. Thereafter,the contractor will be held jointly liable for any violation of this Order resulting from failure to comply with its conditions. 36. Issuance of these Conditions does not in any way imply or certify that the site or downstream areas will not be subject to flooding,storm damage or any other form of water damage. PRIOR TO CONSTRUCTION 37. No work shall be undertaken until all administrative appeal periods from this Order have elapsed or,if such an appeal has been filed, until all proceedings before the Department or Court have been completed. 38. This Order shall be recorded by the applicant at the Registry of Deeds immediately after the expiration of all appeal periods. No work shall be undertaken until the Final Order has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located,within the chain of title of the affected property. hl the case of recorded land,the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, the Final Order shall also be noted on the Land Court 242-1609,59 Barman Drive OOC 3 NACC 10/242013 DEP FD:,E#242 -1609 Certificate of Title of the owner of the land upon which the proposed work is to be done.The recording information shall be submitted to the North Andover Conservation Commission on the form at the end of this Order prior to commencement of the work. Any Order not recorded by the applicant before work commences may be recorded by the NACC at the applicant's expense. 39. A sign shall be displayed at the site not less than two square feet or more than three square feet in size bearing the words"Massachusetts DEP,File Number 242-1609." 40. Any changes in the submitted plans caused by the applicant,another Board's decision or resulting from this Order of Conditions must be submitted to the NACC for approval prior to implementation. If the NACC finds said changes to be significant, the NACC will call for another public hearing(at the expense of the applicant).Willun 21 days of the close of said public hearing the NACC will issue an amended or new Order of Conditions. Any errors found in the plans or information submitted by the applicant shall be considered as changes. No work shall begin on a project until written approval has been granted by the NACC. 41. It is the responsibility of the applicant,owner, and/or successor(s) to ensure that all conditions of this Order of Conditions are complied with. The project engineer and contractors are to be provided with a copy of this Order of Conditions and referenced documents before commencement of construction. 42. Prior to any work commencing on-site,the applicant shall submit to the NACC for approval,a detailed and dated sequence of construction, including installation of sedimentation/erosion control devices,excavation, construction and revegetation/stabilization. 43. Wetland flagging shall be checked prior to start of construction and shall be re- established where missing. All wetland flagging shall remain visible and enumerated per the approved plan(s)throughout the life of the project and until a Certificate of Compliance is issued so that erosion control measures can be properly placed and wetland impacts can be monitored. The proposed limit of work shall be shall be clearly marked with erosion controls or temporary fencing and shall be confirmed by the NACC. Such barriers shall be checked and replaced as necessary and shall be maintained until all construction is complete. Workers should be informed that no use of machinery, storage of machinery or materials,stockpiling of soil, or construction activity is to occur beyond this line at any time. 44. A staked filter sock will be placed between all construction areas and wetlands. The erosion control barrier will be properly installed and placed as shown on the plans approved and referenced herein and shall be inspected and approved by the NACC or its agent prior to the start of construction and shall remain intact until all disturbed areas have been permanently stabilized to prevent erosion. All erosion prevention and sedimentation protection measures found necessary during construction shall be 242-1609,59 By Drive OOC 4 NACC 1024/2013 DEP FELE#242 - 1609 implemented at the direction of the NACC or its agent. The NACC reserves the right to impose additional conditions on portions of this project to mitigate any impacts which could result from site erosion, or any noticeable degradation of surface water quality discharging from the site. For example,installation of erosion control measures may be required in areas not shown on the plan(s) referenced in this Order of Conditions. Should such installation be required by the NACC, they shall be installed within 48 hours of the Commission's request. 45. The applicant shall have on hand at the start of any soil disturbance,removal or stockpiling,a minimum of 20 extra feet of filter sock. Extra erosion controls shall be used only for the control of emergency erosion problems and shall not be used for the normal control of erosion. 46. A check payable to the Town of North Andover shall be provided in the amount of $1,000 which shall be in all respects satisfactory to Town Counsel,Town Treasurer, and the NACC,and shall be posted with the North Andover Town Treasurer through the NACC before commencement of work. Said deposit of money shall be conditioned on the completion of all conditions hereof, shall be signed by a party or parties satisfactory to the NACC, and Town Counsel,and shall be released after completion of the project, provided that provisions,satisfactory to the NACC,have been made for performance of any conditions which are of continuing nature. The applicant may propose a monetary release schedule keyed to completion of specific portions of the project for the NACC's review and approval. This condition is issued under the authority of the local ByLaw. 47.The applicant shall designate a Wetland Scientist(or other environmental professional as approved by the NACC or its agent) as an "Erosion Control Monitor" to oversee any emergency placement of controls and regular inspection or replacement of sedimentation control devices. The name and phone number of the erosion control monitor must be provided to the NACC in the event that this person has to be contacted, due to an emergency at the site,during any 24-hour period,including weekends. Proof of the retained monitor must be submitted to the Conservation Department on letterhead by the retained consulting firm. This person shall be given the authority to stop construction for erosion control purposes and the Environmental Professional will immediately notify the Conservation agent of any matter that requires attention by the Commission or the agent. The erosion control monitor will be required to inspect all such devices and oversee cleaning and the proper disposal of waste products. Cleaning shall include removal of any entrapped silt. 48. At least once during each week in which construction activities occurs on-site and for as long thereafter as ground remains unstabilized, the applicant shall submit a written report from the"Erosion Control Monitor" to the NACC certifying that,to the best of his/her knowledge and belief based on a careful site inspection, all work is being performed in compliance with this Order of Conditions and that approved setbacks are being adhered to. The erosion control monitor must visually inspect all 242-1609,59 Barman Drive DOC 5 NACC 10/242013 DEP FILE#242- 1609 sedimentation/erosion control measures and assume responsibility for their maintenance on a weekly basis and that they are functioning as intended. In addition, all wetland resource areas must be visually inspected for siltation, turbidity,and/or other water quality impacts. The Erosion Control Monitor shall be on site during and/or following a major storm event of 1" inch of rain or greater(24 hour event) to ensure that soils remain stable,and erosion controls are adequate and secure 49. Prior to construction, the applicant shall permanently mark the existing stone wall/treeline with signs spaced every 30 feet incorporating the following text., "Protected Wetland Resource Area" and the associated rules (3 rounds for every 1 square). This will designate their sensitivity and assure no further inadvertent encroachment into the wetland. These permanent markers are subject to review and approval by the NACC. The applicant shall instruct all agents to explain these markers to buyers/lessees/landscapers and all persons taking over the property from the applicant. These markers shall remain posted and be replaced as necessary in perpetuity. Markers are available from the Conservation Department($2 round and $3 square). 50. The applicant and/or the legal owner of that portion of land upon which these Orders of Conditions have been placed shall provide to the NACC prior to transferring,or assigning any portion of said land to another party,subject to said Orders of Conditions,the"Compliance Certification Form Affidavit" attached via"Appendix A" signed under the pains and penalties of perjury,stating that said applicant and/or owner has read these Orders of Conditions and is in compliance with each and every condition. This document shall apply to each of the conditions referenced herein and shall be provided to the Conservation Department at least five (5) business days prior to the closing of said land transaction. 51. Once these above mentioned pre-construction requirements are complete,the applicant shall contact the Conservation Office prior to site preparation or construction and shall arrange an on-site conference with an NACC representative,the contractor,wetland scientist and the applicant to ensure that all of the Conditions of this Order are understood. This Order shall be included in all construction contracts, subcontracts, and specifications dealing with the work proposed and shall supersede any conflicting contract requirements. The applicant shall assure that all contractors, subcontractors and other personnel performing the perniitted work are fully aware of the permiCs terms and conditions. Thereafter,the contractor will be held jointly liable for any violation of this Order of Conditions resulting from failure to comply with its conditions. The applicant or contractor shall notify the NACC in writing of the identity of the on-site construction supervisor hired to coordinate construction and to ensure compliance with this Order. A reasonable period of time shall be provided as notice of the pre-construction meeting(e.g. 72 hours). 242-1609,59 Barman Drive DOC 6 NACC 10/2412013 DEP FILE#242- 1609 STORMWATER MANAGEMENT CONDITIONS 52. There shall be no changes in post development conditions that alter the post development watershed boundaries as currently depicted in the Notice of Intent and approved by this Order of Conditions, unless specifically approved in writing by the Commission. 53. Water quality in down gradient BV W's shall not differ significantly following completion of the project from the pre-development conditions. There shall be no sedimentation into wetlands or water bodies from discharge pipes or surface runoff leaving the site. DURING CONSTRUCTION 54. Upon beginning work, the applicant shall submit written progress reports weekly(as part of the erosion control monitoring report Condition#48 above)detailing what work has been done in or near resource areas, and what work is anticipated to be done over the next period. This will update the construction sequence. 55. De-watering activities are not anticipated as part of the proposed project.No discharge of water is allowed directly into an area subject to jurisdiction of the Wetlands Protection Act and/or the North Andover Wetland Bylaw. If emergency de- watering requirements arise,the applicant shall submit a contingency plan to the Commission for approval,which provides for the pumped water to be contained in a settling basin,to reduce turbidity prior to discharge toward a resource area. 56. Any fill used in connection with this project shall be clean fill, containing no trash, refuse,rubbish or debris,including but not limited to lumber,bricks,plaster,wire, lath,paper,cardboard,pipe,tires,ashes,refrigerators,motor vehicles or parts on any of the foregoing. 57. All exposed soil finish grade surfaces shall be immediately landscaped and stabilized, or loamed,seeded and mulched,with a layer of mulch hay. All disturbed areas must be graded,loamed and seeded prior to November 1a1 of each year. Outside of the growing season,exposed soil finish grade surfaces shall be stabilized with a layer of mulch hay until climate conditions allow for seeding. During construction,any area of exposed soils that will be left idle for more than 30 days shall be stabilized with a layer of mulch hay or other means approved by the NACC. 58. No re-grading in the buffer zone shall have a slope steeper than 2:1 (horizontal: vertical). Slopes of steeper grade shall be rip-rapped to provide permanent stabilization. 242-1609,59 Banner Drive DOC 7 NACC 10/24/2013 DEP FILE#242- 1609 59. There shall be no stockpiling of soil or other materials within one hundred (50)feet of any resource area. Stockpiled material shall be stored in the area identified on the approved plan referenced herein. Excess material shall be disposed of properly in accordance with state and local law. 60. The existing driveway will serve as construction access for the project.This area shall be swept daily to remove sediment deposited by construction vehicles accessing then site. 61. Washings from concrete trucks, or surplus concrete,shall not be directed to,any drainage system, or wetland resource area. If truck washing is required a location for such activity shall be approved by the Conservation Department. 62. All waste generated by,or associated with, the construction activity shall be contained within the limit of work,and away from any wetland resource area. There shall be no burying of spent construction materials or disposal of waste on the site by any other means. The applicant shall maintain dumpsters (or other suitable means)at the site for the storage and removal of such spent construction materials off-site. However,no trash dumpsters will be allowed within 50' of areas subject to protection under the Act or local ByLaw. 63. Accepted engineering and construction standards and procedures shall be followed in the completion of the project. 64. During and after work on this project,there shall be no discharge or spillage of fuel,or other pollutants into any wetland resource area. If there is a spill or discharge of any pollutant during any phase of construction the NACC shall be notified by the applicant within one (1)business day. No construction vehicles are to be stored within 100 feet of wetland resource areas, and no vehicle refueling,equipment lubrication, or maintenance is to be done within 100 feet of a resource area. AFTER CONSTRUCTION 65. No underground storage of fuel oils shall be allowed on any lot within one-hundred (100)feet of any wetland resource area. This condition shall survive this Order of Conditions and shall run with the title of the property. This condition is issued under the authority of the Town's Wetland protection ByLaw. 66. Fertilizers utilized for landscaping and lawn care shall be slow release,low-nitrogen types(<5%),and shall not be used within 25 feet of a resource area. Pesticides and herbicides shall not be used within 100 feet of a wetland resource area. This condition shall survive this Order of Conditions and shall run with the title of the property. This condition is issued under the authority of the Towns Wetland Protection ByLaw and shall remain in perpetuity. 242-1609,59 Barmen Drive OOC 7i NACC IOYL4@013 DEP FILE 9 242 - 1609 67. There shall be no dumping of leaves, grass clippings, brush,or other debris into a wetland resource area or beyond the limits of clearing. This condition shall remain in perpetuity. 68. Upon completion of construction and grading, all disturbed areas located outside resource areas shall be stabilized permanently against erosion. This shall be done by loaming and seeding according to NRCS standards. Stabilization will be considered complete once full vegetative cover has been achieved. 69. Upon approved site stabilization by Conservation staff,the erosion controls shall be removed and properly disposed of and all exposed unvegetated areas shall be seeded. 70. Upon completion of the project the applicant shall submit the following to the Conservation Commission as part of a request for a Certificate of Compliance: a. WPA Form 8A-"Request for a Certificate of Compliance." b. A letter from the applicant requesting a Certificate of Compliance. c. The name and address of the current landowner. d. Signed statements from the individual property owners shall be submitted with the request for a Certificate of Compliance indicating that they read and understood the recorded Order of Conditions prior to purchasing their property. e. The name and address of the individual/trust or corporation to whom the compliance is to be granted. f. The street address and assessor's map/parcel number for the project. g. The DEP file number. h. A written statement from a Registered Professional Civil Engineer (and/or Registered Professional Land Surveyor) of the Commonwealth certifying that the work has been conducted as shown on the plan(s)and documents referenced above,and as conditioned by the Commission. i. An"As-Built" plan prepared and signed and stamped by a Registered Professional Civil Engineer(and/or Registered Professional Land Surveyor) of the Commonwealth,for the public record. This plan will include: ➢ "As-Built" post-development elevations of all drainage&stormwater management structures constructed within 100 feet of any wetland resource area. NOTE: If portions of the stormwater systems exist partially within the Buffer Zone than the entire structure must be depicted to accurately verify compliance. ➢ "As-Built" post-development elevations and grades of all filled or altered wetland resource areas including the encompassing buffer zone which is regulated as a resource area under the local Wetland Protection Bylaw. 242-1609,59 Banner Drive OOC 9 NACC 10/212013 DEP FILE#242 - 1609 ➢ Distances from structures to wetland resource areas. Structures include(but are not limited to)septic systems,additions,fences,sheds, stone walls, pools, retaining walls, subsurface utilities and decks. ➢ A line showing the limit of work and the extent of existing erosion control devices. "Work" includes Any disturbance of soils or vegetation. ➢ Location of all subsurface utilities entering the property. 71. The following special conditions shall survive the issuance of a Certificate of Compliance(COC)for this project: 25' No-Disturbance Zone and a 50' No-Construction Zone shall be established from the edge of adjacent wetland resource areas as approved under DEP#242-1609. Future work within 100' of existing wetland resource areas will require a separate filing with the NACC The Conservation Administrator and/or other agents of the NACC do not have the authority to waive these setbacks as established under the local ByLaw; ➢ Resource Area Markers(Condition#49); ➢ Discharge or spillage of pollutants(Condition#64); ➢ Prohibition of underground fuels(Condition#65); ➢ Limitations on the use of fertilizers,herbicides and pesticides(Condition #66); ➢ Prohibition of dumping of leaves, grass clippings, brush, or other debris (Condition#67). 242-1609,59 Barman Drive OOC 10 NACC 10/24/2013 DEP FILE#242- 1609 APPENDD(A-AFFIDAVIT I' on oath do hereby depose and state: (authorized agent applicant and/or current owner) (PLEASE CHECK AT LEAST ONE BLOCK) 1._ I am the of (position with applicant) (applicant name or company name) the applicant upon whom Order of Conditions have been placed upon by (DEP orNACC number) the North Andover Conservation Commission. &/or 2.— I am the of (position with owner) (owner name) the owner upon whose land Order of Conditions have been placed up by (DEP or NACC number) the North Andover Conservation Commission. & 3. I hereby affirm and acknowledge that I have received said Order of Conditions and have read the same and understand each (DEP File#) and every condition which has been set forth in said Order of Conditions. & 4. thereby affirm and acknowledge that on this day of 19_ with any and al I inspected said property together l improvements which have been made to the same and hereby certify that each and every condition set forth in Order of Conditions are presently in compliance. (DEP File#) & S. I hereby affirm and acknowledge that this document will be relied upon by the North Andover Conservation Commission as well as any potential buyers of said property which is subject to said Order of Conditions (DEP File#) Signed under the pains and penalties of perjury this_day of 19_ (Signature-authorized agent of applicant or owner) 242-1609,59 Berman Drive OOC I1 NACC 10/2A@013