HomeMy WebLinkAboutMiscellaneous - 151 BOXFORD STREET Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 8B - Certificate of Compliance 242-1562
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
A. Project Information
Important:
When filling out 1. This Certificate of Compliance is issued to:
forms on the
computer,use Jeff&Alyson Kutz
only the tab key Name
to move your 151 Boxford Street
cursor-do not Mailing Address
use the return
key. North Andover MA 01845
City/Town State Zip Code
taVrIt_: 2. This Certificate of Compliance is issued for work regulated by a final Order of
Conditions issued to:
- Name
&Alyson Kutz
�QA" Name
September 17, 2012 242-1562
Dated DEP File Number
3. The project site is located at:
151 Boxford Street North Andover
Street Address City/Town
Map 106A Parcel 257
Assessors Map/Plat Number Parcel/Lot Number
the final Order of Condition was recorded at the Registry of Deeds for:
Property Owner(if different)
Essex Northern 13169 282
County Book Page
Certificate
4. A site inspection was made in the presence of the applicant, or the applicant's agent,
on:
6/23/15
Date
wpafrm8b.doc•rev.5/29/14 WPA Form 8B,Certificate of Compliance•Page 1 of 3
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance 242-1562
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
B. Certification
Check all that apply:
® Complete Certification: It is hereby certified that the work regulated by the
above-referenced Order of Conditions has been satisfactorily completed.
❑ Partial Certification: It is hereby certified that only the following portions of work
regulated by the above-referenced Order of Conditions have been satisfactorily
completed. The project areas or work subject to this partial certification that have
been completed and are released from this Order are:
❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the
above-referenced Order of Conditions never commenced. The Order of
Conditions has lapsed and is therefore no longer valid. No future work subject to
regulation under the Wetlands Protection Act may commence without filing a new
Notice of Intent and receiving a new Order of Conditions.
® Ongoing Conditions: The following conditions of the Order shall continue:
(Include any conditions contained in the Final Order, such as maintenance or
monitoring that should continue for a longer period).
Condition Numbers:
69
C. Authorization
Issued by:
North Andover /O
Conservation Commission Dat of Is ance
This Certificate must be signed by a majority of the Conservation Commission and a
copy sent to the applicant and appropriate DEP Regional Office(See
http://www•mass.gov/eea/agencies/massdep/about/contact nd-the-massdep-
regional-office-for-your-city-or-town•html).
Signatur.
1#71 ie4
wpafrm8b.doc•rev.5/29/14 WPA Form 8B,Certificate of Compliance•Page 2 of 3
•
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 8B - Certificate of Compliance 242-1562
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
D. Recording Confirmation
The applicant is responsible for ensuring that this Certificate of Compliance is recorded in
the Registry of Deeds or the Land Court for the district in which the land is located.
Detach on dotted line and submit to the Conservation Commission.
To:
North Andover
Conservation Commission
Please be advised that the Certificate of Compliance for the project at:
151 Boxford Street 242-1562
Project Location DEP File Number
Has been recorded at the Registry of Deeds of:
Essex Northern
County
for:
Jeff&Alyson Kutz
Property Owner
and has been noted in the chain of title of the affected property on:
Date Book Page
If recorded land, the instrument number which identifies this transaction is:
If registered land, the document number which identifies this transaction is:
Document Number
Signature of Applicant
wpafrm8b.doc•rev.5/29/14 WPA Form 8B,Certificate of Compliance•Page 3 of 3
MIMI
t
Massachusetts Department of Environmental Protection Provided by MassDEP: 1
Bureau of Resource Protection-Wetlands MassDEP File#:242-1562
WPA Form 5-Order of Conditions eDEP Transaction#:500158
Massachusetts Wetlands Protection Act M.G.L.c. 131, §40 Cityrfown:NORTH ANDOVER
i
I
r
A. General Information
1.Conservation Commission NORTH ANDOVER
2. Issuance a. F OOC b.r Amended OOC
3.Applicant Details
a.First Name JEFF&ALYSON b.Last Name KUTZ
c.Organization
d.Mailing Address 151 BOXFORD STREET
e.City/Town NORTH ANDOVER f State MA g.Zip Code 01845
4. Property Owner
a.First Name JEFF&ALYSON b.Last Name KUTZ
c.Organization
d.Mailing Address 151 BOXFORD STREET
e.City/Town NORTH ANDOVER f.State MA g.Zip Code 01845
5.Project Location
a.Street Address 151 BOXFORD STREET —
b.City/Town NORTH ANDOVER c.Zip Code 01845
d.Assessors Map/Plat# 106A e.Parcel/Lot# 257
f.Latitude 42.66467N g.Longitude 71.06475W
6.Property recorded at the Registry of Deed for:
a.County b.Certificate c.Book d.Page
NORTHERN ESSEX 6199 199
7.Dates
a.Date NOI Filed: 7/31/2012 b.Date Public Hearing Closed: 9/12/2012 c.Date Of Issuance: 9/17/2012
8.Final Approved Plans and Other Documents
a.Plan Title: b.Plan Prepared by: c.Plan Signed/Stamped by: d.Revised Final Date: e.Scale:
151 BOXFORD SULLIVAN
STREET,PLOT ENGINEERING JOHN D.SULLIVAN III,P.E.
PLAN OF LAND GROUP,LLC
&SCOTT L.GILES,PLS July 17,2012 1"=20'
B. Findings
1.Findings pursuant to the Massachusetts Wetlands Protection Act
Page 1 of 10 *ELECTRONIC COPY
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection- Wetlands MassDEP File#:242-1562
WPA Form 5-Order of Conditions eDEP Transaction#:500158
i Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 City/Town:NORTH ANDOVER
Following the review of the the above-referenced Notice of Intent and based on the information provided in this application and
s
presented at the public hearing,this Commission fords that the areas in which work is proposed is significant to the following interests of
the Wetlands Protection Act
n
Check all that apply:
a. F Public Water Supply b. r Land Containing Shellfish c.F Prevention of Pollution r
d. F Private Water Supply e. r Fisheries f F Protection of Wildlife Habitat
g. F Ground Water Supply h. F Storm Damage Prevention i. F Flood Control
2.Commission hereby finds the project,as proposed,as
Approved subject to
a.F The following conditions which are necessary in accordance with the performance standards set forth in the wetlands regulations.
This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above,the following
General Conditions,and any other special conditions attached to this Order.To the extent that the following conditions modify or
differ from the plans,specifications,or other proposals submitted with the Notice of Intent,these conditions shall control.
Denied because:
b.r The proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations.Therefore,
work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are
adequate to protect interests of the Act,and a final Order of Conditions is issued.A description of the performance standards
which the proposed work cannot meet is attached to this Order.
c.r The information submitted by the applicant is not sufficient to describe the site,the work or the effect of the work on the interests I.
identified in the Wetlands Protection Act.Therefore,work on this project may not go forward unless and until a revised Notice of
Intent is submitted which provides sufficient information and includes measures which are adequate to protect the interests of the ,
Act,and a final Order of Conditions is issued.A description of the specific information which is lacking and why it is
necessary is attached to this Order as per 310 CMR 10.05(6)(c). r
3.F Buffer Zone Impacts:Shortest distance between limit of project disturbance and the wetland resource 52
area specified in 310CMR10.02(1)(a).
a.linear feet
Inland Resource Area Impacts:(For Approvals Only):
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
4. r Bank
z
a.linear feet b.linear feet c.linear feet d.linear feet
5.r Bordering Vegetated Wetland
a.square feet b.square feet c.square feet d.square feet
6. r Land under Waterbodies and Waterways
a.square feet b.square feet c.square feet d.square feet
e.c/y dredged f.dy dredged
7.r Bordering Land Subject to Flooding
a square feet b.square feet c.square feet d.square feet
Page 2 of 10*ELECTRONIC COPY
L/711 Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection-Wetlands MassDEP File#:242-1562
WPA Form 5-Order of Conditions eDEP Transaction#:500158
Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 City/Town:NORTH ANDOVER
t,
Cubic Feet Flood Storage
e.cubic feet f.cubic feet g.cubic feet h.cubic feet
8.r Isolated Land Subject to Flooding
a.square feet b.square feet
Cubic Feet Flood Storage
c.cubic feet d.cubic feet e.cubic feet f cubic feet
9.E Riverfront Area
a total sq.feet b.total sq.feet
Sq ft within 100 ft
c.square feet d.square feet e.square feet f square feet
Sq ft between 100-200 ft
g.square feet h.square feet i.square feet j.square feet
Coastal Resource Area Impacts:
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
10.r Designated Port Areas Indicate size under Land Under the Ocean,below
11.r Land Under the Ocean
a.square feet b.square feet
c.c/y dredged d.c/y dredged
12.r Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below
13.E Coastal Beaches
a.square feet b.square feet c.c/y nourishment d.c/y nourishment
14.r Coastal Dunes
a.square feet b.square feet c.c/y nourishment d.c/y nourishment
15.r Coastal Banks
a.linear feet b.linear feet
16.r Rocky Intertidal Shores
a.square feet b.square feet
17.r Salt Marshes
a.square feet b.square feet c.square feet d.square feet
18.r Land Under Salt Ponds
a.square feet b.square feet
c.c/y dredged d.c/y dredged
19.r Land Containing Shellfish
a.square feet b.square feet c.square feet d.square feet
Page 3 of 10*ELECTRONIC COPY
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection-Wetlands MassDEP File#:242-1562
WPA Form 5-Order of Conditions eDEP Transaction#:500158
Massachusetts Wetlands Protection Act M.G.L.c. 131, §40 City/Town:NORTH ANDOVER
Indicate size under Coastal Banks,inland Bank,Land Under the
20.r Fish Runs Ocean,and/or inland Land Under Waterbodies and Waterways,
above
c.c/y dredged d.c/y dredged
21.r Land Subject to Coastal Storm Flowage
a.square feet b.square feet
22.
r Restoration/Enhancement(For Approvals Only)
If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has been
entered in Section B.5.c&d or B.17.c&d above,please entered the additional amount here.
a.square feet of BVW b.square feet of Salt Marsh
23.
r Streams Crossing(s)
If the project involves Stream Crossings,please enter the number of new stream crossings/number of replacement stream crossings.
a.number of new stream crossings b.number of replacement stream crossings
C. General Conditions Under Massachusetts Wetlands Protection Act
The following conditions are only applicable to Approved projects
1. Failure to comply with all conditions stated herein,and with all related statutes and other regulatory measures,shall be deemed
cause to revoke or modify this Order.
2. The Order does not grant any property rights or any exclusive privileges;it does not authorize any injury to private property or
invasion of private rights.
3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal,
state,or local statutes,ordinances,bylaws,or regulations.
4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following
apply:
a.the work is a maintenance dredging project as provided for in the Act;or
b.the time for completion has been extended to a specified date more than three years,but less than five
years,from the date of issuance.If this Order is intended to be valid for more than three years,the
extension date and the special circumstances warranting the extended time period are set forth as a
special condition in this Order.
5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the
issuing authority at least 30 days prior to the expiration date of the Order.
6. If this Order constitutes an Amended Order of Conditions,this Amended Order of Conditions does not exceed the issuance
date of the original Final Order of Conditions.
7. Any fill used in connection with this project shall be clean fill.Any fill shall contain no trash,refuse,rubbish,or debris,including
but not limited to lumber,bricks,plaster,wire,lath,paper,cardboard,pipe,tires,ashes,refrigerators,motor vehicles,or parts of
any of the foregoing.
8. This Order is not fmal until all administrative appeal periods from this Order have elapsed,or if such an appeal has been taken,
until all proceedings before the Department have been completed.
9. No work shall be undertaken until the Order has become fmal and then has been recorded in the Registry of Deeds or the Land
Court for the district in which the land is located,within the chain of title of the affected property.In the case of recorded land,
Page 4 of 10*ELECTRONIC COPY
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection-Wetlands MassDEP File#:242-1562
WPA Form 5- rder of Conditions eDEP Transaction#:500158
Massachusetts Wetlands Protection Act M.G.L.c. 131, §40 Crty/Town:NORTH ANDOVER i.
the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the
proposed work is to be done.In the case of the registered land,the Final Order shall also be noted on the Land Court
Certificate of Title of the owner of the land upon which the proposed work is done.The recording information shall be submitted
to the Conservation Commission on the form at the end of this Order,which form must be stamped by the Registry of Deeds,
prior to the commencement of work..
10. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words,
"Massachusetts Department of Environmental Protection"
[or'MassDEP"] t'
File Number:"242-1562"
11. Where the Department of Environmental Protection is requested to issue a Superseding Order,the Conservation Commission
shall be a party to all agency proceedings and hearings before Mass DEP.
12. Upon completion of the work described herein,the applicant shall submit a Request for Certificate of Compliance(WPA Form
8A)to the Conservation Commission.
13. The work shall conform to the plans and special conditions referenced in this order.
14. Any change to the plans identified in Condition#13 above shall require the applicant to inquire of the Conservation Commission 1,
in writing whether the change is significant enough to require the filing of a new Notice of Intent.
15. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to
enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this
Order,and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that
evaluation.
16. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and ,
to any contractor or other person performing work conditioned by this Order.
17. Prior to the start of work,and if the project involves work adjacent to a Bordering Vegetated Wetland,the boundary of the
wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging.Once in place,the wetland
boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission.
18. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or r,
other means.At no time shall sediments be deposited in a wetland or water body.During construction,the applicant or his/her
designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed.The applicant
shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation
Commission,which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary.
Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order.
NOTICE OF STORMWATER CONTROL AND MAINTENANCE REQUIREMENTS
19. The work associated with this Order(the"Project")is(1) r is not(2)F subject to the Massachusetts Stormwater Standards.
If the work is subject to Stormwater Standards,then the project is subject to the following conditions;
a) All work,including site preparation,land disturbance,construction and redevelopment,shall be implemented in accordance
with the construction period pollution prevention and erosion and sedimentation control plan and,if applicable,the
Stormwater Pollution Prevention Plan required by the National Pollutant Discharge Elimination System Construction General
Permit as required by Stormwater Standard 8.Construction period erosion,sedimentation and pollution control measures and
best management practices(BMPs)shall remain in place until the site is fully stabilized.
b) No stormwater runoff may be discharged to the post-construction stormwater BMPs unless and until a Registered
Professional Engineer provides a Certification that:i.all construction period BMPs have been removed or will be removed by
a date certain specified in the Certification.For any construction period BMPs intended to be converted to post construction
operation for stormwater attenuation,recharge,and/or treatment,the conversion is allowed by the MassDEP Stormwater
Handbook BMP specifications and that the BMP has been properly cleaned or prepared for post construction operation,
including removal of all construction period sediment trapped in inlet and outlet control structures;ii..as-built fmal construction
BMP plans are included,signed and stamped by a Registered Professional Engineer,certifying the site is fully stabilized;iii.
any illicit discharges to the stormwater management system have been removed,as per the requirements of Stormwater
Page 5 of 10*ELECTRONIC COPY
i
i
:
0 f
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection-Wetlands MassDEP File#:242-1562
WPA Form 5-Order of Conditions eDEP Transaction#:500158
Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 City/Town:NORTH ANDOVER
(
Standard 10;iv. all post-construction stormwater BMPs are installed in accordance with the plans(including all planting t
plans)approved by the issuing authority,and have been inspected to ensure that they are not damaged and that they are in
proper working condition;v.any vegetation associated with post-construction BMPs is suitably established to withstand
erosion.
Y
c) The landowner is responsible for BMP maintenance until the issuing authority is notified that another party has legally assumed
responsibility for BMP maintenance.Prior to requesting a Certificate of Compliance,or Partial Certificate of Compliance,the
responsible party(defined in General Condition 19(e))shall execute and submit to the issuing authority an Operation and I
Maintenance Compliance Statement("O&M Statement")for the Stormwater BMPs identifying the party responsible for I:
implementing the stormwater BMP Operation and Maintenance Plan("O&M Plan")and certifying the following:i.)the O&M
Plan is complete and will be implemented upon receipt of the Certificate of Compliance,and ii.)the future responsible parties i.
shall be notified in writing of their ongoing legal responsibility to operate and maintain the stormwater management BMPs and
implement the Stormwater Pollution Prevention Plan. 1
d) Post-construction pollution prevention and source control shall be implemented in accordance with the long-term pollution
prevention plan section of the approved Stormwater Report and,if applicable,the Stormwater Pollution Prevention Plan #"
i
required by the National Pollutant Discharge Elimination System Multi-Sector General Permit.
e) Unless and until another party accepts responsibility,the landowner,or owner of any drainage easement,assumes
responsibility for maintaining each BMP.To overcome this presumption,the landowner of the property must submit to the
t
issuing authority a legally bindin g agreement eement of record,acceptable to the issuing authority,evidencin that another entity has
accepted responsibility for maintaining the BMP,and that the proposed responsible party shall be treated as a permittee for
purposes of implementing the requirements of Conditions 19(f)through 19(k)with respect to that BMP.Any failure of the
proposed responsible party to implement the requirements of Conditions 19(f)through 19(k)with respect to that BMP shall s
be a violation of the Order of Conditions or Certificate of Compliance.In the case of stormwater BMPs that are serving more
than one lot,the legally binding agreement shall also identify the lots that will be serviced by the stormwater BMPs.A plan and
easement deed that grants the responsible party access to perform the required operation and maintenance must be submitted F;
along with the legally binding agreement
f) The responsible party shall operate and maintain all stormwater BMPs in accordance with the design plans,the O&M Plan,
and the requirements of the Massachusetts Stormwater Handbook.
g) The responsible party shall:
1.Maintain an operation and maintenance log for the last three(3)consecutive calendar years of inspections,repairs,
maintenance and/or replacement of the stormwater management system or any part thereof,and disposal(for disposal the
log shall indicate the type of material and the disposal location);
2.Make the maintenance log available to MassDEP and the Conservation Commission("Commission")upon request;and i
3.Allow members and agents of the MassDEP and the Commission to enter and inspect the site to evaluate and ensure
that the responsible party is in compliance with the requirements for each BMP established in the O&M Plan approved by
the issuing authority. ''
h) All sediment or other contaminants removed from stormwater BMPs shall be disposed of in accordance with all applicable
federal,state,and local laws and regulations.
i) Illicit discharges to the stormwater management system as defined in 310 CMR 10.04 are prohibited.
j) The stormwater management system approved in the Order of Conditions shall not be changed without the prior written
approval of the issuing authority.
k) Areas designated as qualifying pervious areas for the purpose of the Low Impact Site Design Credit(as defined in the
MassDEP Stormwater Handbook,Volume 3,Chapter 1,Low Impact Development Site Design Credits)shall not be altered
without the prior written approval of the issuing authority.
I) Access for maintenance,repair,and/or replacement of BMPs shall not be withheld.Any fencing constructed around
stormwater BMPs shall include access gates and shall be at least six inches above grade to allow for wildlife passage.
Special Conditions:
SEE ATTACHED.
Page 6 of 10*ELECTRONIC COPY
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection-Wetlands
MassDEP File#:242-1562
WPA Form 5-Order of Conditions eDEP Transaction#:500158
Massachusetts Wetlands Protection Act M.G.L.c. 131, §40
City/Town:NORTH ANDOVER
1
t
[[k
SkS
5€,
jL
F`-
z3
5-.
}
Page 7 of 10 *ELECTRONIC COPY
1
i
I
t
I
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection-Wetlands MassDEP File#:242-1562 -
, WPA Form 5-Order of Conditions eDEP Transaction#:500158
Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 City/Town:NORTHANDOVER
,
D. Findings Under Municipal Wetlands Bylaw or Ordinance
1. Is a municipal wetlands bylaw or ordinance applicable?F Yes I— No 7;
2. The Conservation Commission hereby(check one that applies):
a. I— DENIES the proposed work which cannot be conditioned to
meet the standards set forth in a municipal ordinance or bylaw i`
specifically:
s
1.Municipal Ordinance or Bylaw 2.Citation 3`
Therefore,work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides t.
measures which are adequate to meet these standards,and a final Order or Conditions is issued.Which are necessary to
comply with a municipal ordinance or bylaw: i
b.
F APPROVES the proposed work,subject to the following
additional conditions.
1.Municipal Ordinance or Bylaw NORTH ANDOVER
p y WETLANDS BYLAW 2.Citation CHAPTER 178 {
3. The Commission orders that all work shall be performed in accordance with the following conditions and with the Notice of
Intent referenced above.To the extent that the following conditions modify or differ from the plans,specifications,or other
proposals submitted with the Notice of Intent,the conditions shall control.
The special conditions relating to municipal ordinance or bylaw are as follows:
SEE ATTACHED.
g
r'
Page 8 of 10*ELECTRONIC COPY
1
f
t
1
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection-W MassDEP File#:242-1562
WPA Form 5- Order of Conditions etlands eDEP Transaction#:500158
Citylfown:NORTH ANDOVER F
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 t
i
s
E. Signatures
This Order is valid for three years from the date of issuance,unless otherwise specified ei 17 - (2
pursuant to General Condition#4.If this is an Amended Order of Conditions,the Amended 1.Date of Original Order
Order expires on the same date as the original Order of Conditions.
Please indicate the number of members who will sign this form.This Order must be signed by
a majority of the Conservation Commission. 2.Number o Signers
The Order must be mailed by certified mail(return receipt requested)or hand delivered to the applicant.A copy also must be mailed ,'
or hand delivered at the same time to the appropriate Department of Environmental Protection Regional Office,if not filing
electronically,and the property owner,if different from applicant.
a
Signatures:
i
(
ti/ii_tio
7., .._,.... -- Finfir
,:'
I— by hand delivery on 17 by ified mail,return receipt requested,on
`3 / 7//
Date Date
F. Appeals
The applicant,the owner,any person aggrieved by this Order,any owner of land abutting the land subject to this Order,or any ten
residents of the city or town in which such land is located,are hereby notified of their right to request the appropriate MassDEP
Regional Office to issue a Superseding Order of Conditions.The request must be made by certified mail or hand delivery to the
Department,with the appropriate filing fee and a completed Request for Departmental Action Fee Transmittal Form,as provided in s
310 CMR 10.03(7)within ten business days from the date of issuance of this Order.A copy of the request shall at the same time be ,
sent by certified mail or hand delivery to the Conservation Commission and to the applicant,if he/she is not the appellant k
z
Any appellants seeking to appeal the Department's Superseding Order associated with this appeal will be required to demonstrate prior
participation in the review of this project.Previous participation in the permit proceeding means the submission of written information to
the Conservation Commission prior to the close of the public hearing,requesting a Superseding Order,or providing written information &'
to the Department prior to issuance of a Superseding Order.
The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not
contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act(M.G.L.c. 131,§40),and is
inconsistent with the wetlands regulations(310 CMR 10.00).To the extent that the Order is based on a municipal ordinance or bylaw,
and not on the Massachusetts Wetlands Protection Act or regulations,the Department has no appellate jurisdiction.
Page 9 of 10 * ELECTRONIC COPY
•
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Pon Wet MassDEP File#:242-1562
WPA Form 5 Oder rotecti of Co-ndifilands ons eDEP Transaction#:500158
Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 City/Town:NORTH ANDOVER
(}4(}
G. Recording Information
This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located,
within the chain of title of the affected roe In the case of recorded land,the Final Order shall also be noted in the Registry's l°
property.rtY•
Grantor Index under the name of the owner of the land subject to the Order.In the case of registered land,this Order shall also be
noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions.The recording information on
this page shall be submitted to the Conservation Commission listed below.
NORTH ANDOVER
Conservation Commission x'
Detach on dotted line,have stamped by the Registry of Deeds and submit to the Conservation Commission.
To:
NORTH ANDOVER
Conservation Commission
Please be advised that the Order of Conditions for the Project at:
151 BOXFORD STREET
242-1562
Project Location
MassDEP File Number
Has been recorded at the Registry of Deeds of:
County Book Page 3:
for:
Property Owner JEFF&ALYSONKUTZ
and has been noted in the chain of title of the affected property in:
Book Page
In accordance with the Order of Conditions issued on:
Date
If recorded land,the instrument number identifying this transaction is:
Instrument Number
If registered land,the document number identifying this transaction is:
Document Number
Signature of Applicant Rev 4/1/2010
Page 10 of 10 *ELECTRONIC COPY
F1
3
DEP FILE#242-1562
Therefore, the North Andover Conservation Commission (hereafter the "NACC") hereby
finds that the following conditions are necessary, in accordance with the Performance
Standards set forth in the State Regulations, the local ByLaw and Regulations, to protect
those interests noted above. The NACC orders that all work shall be performed in
accordance with said conditions and with the Notice of Intent referenced below. To the
extent that the following conditions modify or differ from the plans, specifications or other
proposals submitted with the Notice of Intent, the conditions shall control.
GENERAL CONDITIONS
20. The proposed work includes: construction of a 30-foot x 31-foot addition and farmer's
porch. An existing deck will be expanded to include an approximately 22-foot by 16-
foot paver patio (set in stone). Work is within 100-feet of Bordering Vegetated
Wetland (BVW).
21. The work shall conform to the following (except as noted in the remainder of this '
document where revisions may be required):
Applicant/Property Owner: Jeff&Alyson Kutz
151 Boxford Street
North Andover, MA 01845
Filed: August 7,2012
Applicant's Representative: John Sullivan, P.E.
Sullivan Engineering Group, LLC
22 Mount Vernon Road
Boxford, MA 01921
Site Plans prepared by: Sullivan Engineering Group, LLC
Titled: 151 Boxford Street, Plot Plan of Land
Dated:July 17,2012
Last Revised:
Signed and Stamped by John D. Sullivan III, P.E. and
Scott L. Giles, PLS
22. The term"Applicant" as used in this Order of Conditions shall refer to the owner, any
successor in interest or successor in control of the property referenced in the Notice of
Intent, supporting documents and this Order of Conditions. The NACC shall be
notified in writing within 30 days of all transfers of title of any portion of property that
takes place prior to the issuance of a Certificate of Compliance.
23. The conditions of this decision shall apply to, and be binding upon,the applicant,
owner,its employees and all successors and assigns in interest or control. These
242-1562, 151 Boxford Street 1 NACC 9/17/2012
DEP FILE#242-1562
interests of the Act and Town ByLaw as noted above and therein. The applicant has
not attempted to overcome the presumption of significance of this resource area to the
identified interests. 1
i
t
33. The NACC agrees with the applicant's delineation of the wetland resource areas and
associated buffer zones on the site as shown on the plans dated referenced herein.
i
34. The NACC finds that the intensive use of the upland areas and buffer zone proposed
on this site will cause further alteration of the wetland resource areas. In order to
prevent any alteration of wetland resource areas a twenty five foot(25') No-
Disturbance Zone and a fifty foot(50') No-Construction Zone shall be established from
the edge of the adjacent wetland resource as shown on the herein referenced plan. The
Conservation Administrator and/or other agents of the NACC do not have the
authority to waive these setbacks as established under the local bylaw. No
disturbance of existing grade, soils or vegetation is permitted in the No-Disturbance 1
zone. (See Section 3.4 &Appendix F of the local Regulations).
35. This document shall be included in all construction contracts, subcontracts, and
specifications dealing with the work proposed and shall supersede any conflicting
contract requirements. The applicant shall assure that all contractors, subcontractors,
and other personnel performing the permitting work are fully aware of the permits
terms and conditions. Thereafter, the contractor will be held jointly liable for any
violation of this Order resulting from failure to comply with its conditions.
36. The owners of the project and their successors in title agree that the Order does not in
itself impose upon the Town any responsibility to maintain the proposed drainage
system and that said Town shall not be liable for any damage in the event of failure.
By acceptance of this Order, the owners agree to indemnify and hold harmless to the
Town and its residents for any damage attributable to alterations undertaken on this
property pursuant to the Order. Issuance of these Conditions does not in any way `'
imply or certify that the site or downstream areas will not be subject to flooding,storm
damage or any other form of water damage.
PRIOR TO CONSTRUCTION
37. No work shall be undertaken until all administrative appeal periods from this Order
have elapsed or, if such an appeal has been filed, until all proceedings before the
Department or Court have been completed. ti`
{
38. This Order shall be recorded by the applicant at the Registry of Deeds immediately
after the expiration of all appeal periods. No work shall be undertaken until the Final
Order has been recorded in the Registry of Deeds or the Land Court for the district in
which the land is located, within the chain of title of the affected property. In the case
of recorded land, the Final Order shall also be noted in the Registry's Grantor Index
is
242-1562, 151 Boxford Street 3 NACC 9/17/2012
7
DEP FILE#242-1562
prior to the start of construction and shall remain intact until all disturbed areas have
been permanently stabilized to prevent erosion. All erosion prevention and
sedimentation protection measures found necessary during construction shall be
implemented at the direction of the NACC or its agent. The NACC reserves the right
to impose additional conditions on portions of this project to mitigate any impacts
which could result from site erosion, or any noticeable degradation of surface water
quality discharging from the site. For example, installation of erosion control
measures may be required in areas not shown on the plan(s) referenced in this Order
of Conditions. Should such installation be required by the NACC,they shall be
installed within 48 hours of the Commission's request. h'
45. The applicant shall have on hand at the start of any soil disturbance,removal or
stockpiling, a minimum of 10 hay bales and sufficient stakes for staking these bales (or
an equivalent amount of silt fence,1 hay bale to equal 3 feet of fence). Said bales shall
be used only for the control of emergency erosion problems and shall not be used for
the normal control of erosion.
46. A check payable to the Town of North Andover shall be provided in the amount of
zr
$1,000 which shall be in all respects satisfactory to Town Counsel, Town Treasurer,
and the NACC, and shall be posted with the North Andover Town Treasurer through
the NACC before commencement of work. Said deposit of money shall be #'
conditioned on the completion of all conditions hereof, shall be signed by a party or
parties satisfactory to the NACC, and Town Counsel, and shall be released after
completion of the project, provided that provisions, satisfactory to the NACC,have
been made for performance of any conditions which are of continuing nature. The
applicant may propose a monetary release schedule keyed to completion of specific
portions of the project for the NACC's review and approval. This condition is issued
under the authority of the local ByLaw.
47. The applicant shall designate a Wetland Scientist(or other environmental professional
as approved by the NACC or its agent) as an"Erosion Control Monitor" to oversee
any emergency placement of controls and regular inspection or replacement of
sedimentation control devices. The name and phone number of the erosion control
monitor must be provided to the NACC in the event that this person has to be
contacted, due to an emergency at the site, during any 24-hour period, including
weekends. Proof of the retained monitor must be submitted to the Conservation
Department on letterhead by the retained consulting firm. This person shall be given
the authority to stop construction for erosion control purposes. The Environmental
Professional will immediately notify the Conservation agent of any matter that
requires attention by the Commission or the agent. The erosion control monitor will
be required to inspect all such devices and oversee cleaning and the proper disposal of
waste products. Cleaning shall include removal of any entrapped silt.
48. At least once during each week in which construction activities occurs on-site and for
as long thereafter as ground remains unstabilized,the applicant shall submit a written
242-1562, 151 Boxford Street 5 NACC 9/17/2012
'`r
S
DEP FILE#242-1562 ,i,,i'
ensure compliance with this Order. A reasonable period of time shall be provided as
notice of the pre-construction meeting(e.g. 72 hours).
STORMWATER MANAGEMENT CONDITIONS
52. Water quality in down gradient BVW's shall not differ significantly following
completion of the project from the pre-development conditions. There shall be no
sedimentation into wetlands or water bodies from discharge pipes or surface runoff
leaving the site.
DURING CONSTRUCTION
53. Upon beginning work,the applicant shall submit written progress reports every
month detailing what work has been done in or near resource areas, and what work is
anticipated to be done over the next period. This will update the construction
sequence.
54. De-watering activities are not anticipated during construction. If emergency de-
watering requirements arise, the applicant shall submit a contingency plan to the
Commission for approval, which provides for the pumped water to be contained in a
settling basin, to reduce turbidity prior to discharge into a resource area.
k
55. Any fill used in connection with this project shall be clean fill, containing no trash,
refuse,rubbish or debris, including but not limited to lumber,bricks,plaster,wire, ['
lath, paper, cardboard,pipe,tires, ashes, refrigerators, motor vehicles or parts on any
of the foregoing.
56. All exposed soil finish grade surfaces shall be immediately landscaped and stabilized,
or loamed, seeded and mulched,with a layer of mulch hay. All disturbed areas must
be graded,loamed and seeded prior to November 1St of each year. Outside of the x
growing season, exposed soil finish grade surfaces shall be stabilized with a layer of
mulch hay or other stabilization method (as directed by the Conservation Department) ri'
until climate conditions allow for seeding. During construction, any area of exposed
soils that will be left idle for more than 30 days shall be stabilized with a layer of y`
mulch hay or other means as directed by the NACC.
57. No re-grading in the buffer zone shall have a slope steeper than 2:1 (horizontal:
vertical). Slopes of steeper grade shall be rip-rapped to provide permanent
stabilization.
58. There shall be no stockpiling of soil or other materials within 50-feet of any resource
area.
k
f
242-1562, 151 Boxford Street 7 NACC 9/17/2012
4
z.
DEP FILE#242-1562
d'
1
67. Upon approved site stabilization by Conservation staff, the erosion controls shall be ,
removed and properly disposed of and all exposed unvegetated areas shall be seeded.
68. Upon completion of the project the applicant shall submit the following to the
Conservation Commission as part of a request for a Certificate of Compliance:
a. WPA Form 8A- "Request for a Certificate of Compliance."
b. A letter from the applicant requesting a Certificate of Compliance. p
c. The name and address of the current landowner.
d. Signed statements from the individual property owners shall be submitted with
the request for a Certificate of Compliance indicating that they read and
understood the recorded Order of Conditions prior to purchasing their property.
e. The name and address of the individual/trust or corporation to whom the
compliance is to be granted.
f. The street address and assessor's map/parcel number for the project.
g. The DEP file number.
h. A written statement from a Registered Professional Civil Engineer (and/or ,
Registered Professional Land Surveyor) of the Commonwealth certifying that the x
work has been conducted as shown on the plan(s) and documents referenced ''
above, and as conditioned by the Commission. �'
i. An"As-Built" plan will not be required provided that all work is constructed as &'
shown on the Plan of Record referenced herein. Should deviations be made they
shall be shown on the Plan of Record and certified by the installer. Should
deviations be significant an as-built plan may be required and shall include the i
following:
'y
> "As-Built" post-development elevations and grades of all filled or altered
wetland resource areas including the encompassing buffer zone which is
regulated as a resource area under the local Wetland Protection Bylaw.
i
D Distances from structures to wetland resource areas. Structures include (but
are not limited to) septic systems, additions,fences, sheds, stone walls,
pools, retaining walls, subsurface utilities and decks.
r
i
D A line showing the limit of work and the extent of existing erosion control
devices. "Work" includes any disturbance of soils or vegetation.
B:;
69. The following special conditions shall survive the issuance of a Certificate of
Compliance (COC) for this project:
> The 25-foot No-Disturbance Zone and a 50' No-Construction Zone shall be
established from the edge of adjacent wetland resource areas on lot except in
those locations approved under DEP# 242-1562. Future work within 100' of
existing wetland resource areas will require a separate filing with the NACC
(See Section 3.4 of the Regulations for performance standards within these
242-1562, 151 Boxford Street 9 NACC 9/17/2012
DEP FILE#242-1562
APPENDIX A-AFFIDAVIT
to
on oath do hereby depose and state:
(authorized agent applicant and/or current owner)
(PLEASE CHECK AT LEAST ONE BLOCK)
1. I am the of
(position with applicant) (applicant name or company name)
the applicant upon whom Order of Conditions
have been placed upon by (DEP or NACC number)
the North Andover Conservation Commission.
&/or
2. Iamthe of
(position with owner) (owner name)
the owner upon whose land Order of Conditions
have been placed up by (DEP or NACC number)
the North Andover Conservation Commission.
&
3. I hereby affirm and acknowledge that I have received said Order of Conditions
and have read the same and understand each
(DEP File#) and every condition which has been set forth
in said Order of Conditions.
4. I hereby affirm and acknowledge that on this day of 19
I inspected said property together with any and all improvements which have
been made to the same and hereby certify that each and every condition set
forth in Order of Conditions are presently in compliance. F;
(DEP File#)
5. I hereby affirm and acknowledge that this document will be relied upon by the
North Andover Conservation Commission as well as any potential buyers of
said property which is subject to said Order of Conditions
(DEP File#)
Signed under the pains and penalties of perjury this day of 19 .
(Signature-authorized agent of applicant or owner)
242-1562, 151 Boxford Street 11 NACC 9/17/2012