Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection-Wetlands MassDEP File#:242-1508
WPA Form 5-Order of Conditions eDEP Transaction#:374904
Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 City/Town:NORTH ANDOVER
A. General Information
1.Conservation Commission NORTH ANDOVER
2.Issuance a. F OOC b.r Amended OOC
3.Applicant Details
a.First Name MICHAEL b.Last Name MANOS
c.Organization
d.Mailing Address 279 BOXFORD STREET
e.City/Town NORTH ANDOVER f.State MA g.Zip Code 01845
4.Property Owner
a.First Name MICHAEL b.Last Name MANOS
c.Organization
d.Mailing Address 279 BOXFORD STREET
e.City/Town NORTH ANDOVER f.State MA g.Zip Code 01845
5.Project Location
a.Street Address 279 BOXFORD STREET
b.City/Town NORTH ANDOVER c.Zip Code 01845
d.Assessors Map/Plat# 106A e.Parcel/Lot# 258
f.Latitude 42.66541N g.Longitude 71.05913W
6.Property recorded at the Registry of Deed for:
a.County b.Certificate c.Book d.Page
NORTHERN ESSEX 5102 100
7.Dates
a Date NOI Filed:2/4/2011 b.Date Public Hearing Closed:4/13/2011 c.Date Of Issuance:4/14/2011
8.Final Approved Plans and Other Documents
a.Plan Title: b.Plan Prepared by: c.Plan Signed/Stamped by: d.Revised Final Date: e.Scale:
279 BOXFORD SULLIVAN JOHN D.SULLIVAN III,P.E
STREET,PLOT ENGINEERING &SCOTT L.GILES RPLS January 25,2011 1"=20'
PLAN OF LAND GROUP,LLC
B. Findings
1.Findings pursuant to the Massachusetts Wetlands Protection Act
Page 1 of 10* ELECTRONIC COPY
Massachusetts Department of Environmental Protection Provided by MassDEP:
- Bureau of Resource Protection-Wetlands MassDEP File#:242-1508
WPA Form 5-Order of Conditions eDEP Transaction#:374904
Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 City/Town:NORTHANDOVER
is
Cubic Feet Flood Storage
e.cubic feet f.cubic feet g.cubic feet h.cubic feet
8.IT Isolated Land Subject to Flooding
a.square feet b.square feet
Cubic Feet Flood Storage
c.cubic feet d.cubic feet e.cubic feet f.cubic feet
9.IT Riverfront Area
a.total sq.feet b.total sq.feet
Sq ft within 100 ft
c.square feet d.square feet e.square feet f square feet
Sq ft between 100-200 ft
g.square feet h.square feet i.square feet j.square feet
Coastal Resource Area Impacts:
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
10.IT Designated Port Areas Indicate size under Land Under the Ocean,below
11.IT Land Under the Ocean
a square feet b.square feet
c.c/y dredged d.c/y dredged
12.IT Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below
13.1—Coastal Beaches
a square feet b.square feet c.c/y nourishment d.c/y nourishment
14.IT Coastal Dunes
a.square feet b.square feet c.c/y nourishment d.ely nourishment
15.IT Coastal Banks
a linear feet b.linear feet
16.IT Rocky Intertidal Shores
a.square feet b.square feet
17.IT Salt Marshes
a square feet b.square feet c.square feet d.square feet
18.IT Land Under Salt Ponds
a.square feet b.square feet
c.c/y dredged d.c/y dredged
19.IT Land Containing Shellfish
a square feet b.square feet c.square feet d.square feet
Page 3 of 10*ELECTRONIC COPY
Massachusetts Department of Environmental Protection Provided by MassDEP:
- Bureau of Resource Protection-Wetlands MassDEP File#:242-1508
WPA Form 5-Order of Conditions eDEP Transaction#:374904
lMassachusetts Wetlands Protection Act M.G.L.c. 131,§40 City/Town:NORTH ANDOVER
the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the
proposed work is to be done.In the case of the registered land,the Final Order shall also be noted on the Land Court
Certificate of Title of the owner of the land upon which the proposed work is done.The recording information shall be submitted
to the Conservation Commission on the form at the end of this Order,which form must be stamped by the Registry of Deeds,
prior to the commencement of work..
10. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words,
"Massachusetts Department of Environmental Protection"
[or'MassDEP"]
File Number:"242-1508"
11. Where the Department of Environmental Protection is requested to issue a Superseding Order,the Conservation Commission
shall be a party to all agency proceedings and hearings before Mass DEP.
12. Upon completion of the work described herein,the applicant shall submit a Request for Certificate of Compliance(WPA Form
8A)to the Conservation Commission.
13. The work shall conform to the plans and special conditions referenced in this order.
14. Any change to the plans identified in Condition#13 above shall require the applicant to inquire of the Conservation Commission
in writing whether the change is significant enough to require the filing of a new Notice of Intent.
15. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to
enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this
Order,and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that
evaluation.
16. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and
to any contractor or other person performing work conditioned by this Order.
17. Prior to the start of work,and if the project involves work adjacent to a Bordering Vegetated Wetland,the boundary of the
wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging.Once in place,the wetland
boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission.
18. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or
other means.At no time shall sediments be deposited in a wetland or water body.During construction,the applicant or his/her
designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed.The applicant
shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation
Commission,which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary.
Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order.
NOTICE OF STORMWATER CONTROL AND MAINTENANCE REQUIREMENTS
19. The work associated with this Order(the"Project")is(1) 1- is not(2)F subject to the Massachusetts Stormwater Standards.
If the work is subject to Stormwater Standards,then the project is subject to the following conditions;
a) All work,including site preparation,land disturbance,construction and redevelopment,shall be implemented in accordance
with the construction period pollution prevention and erosion and sedimentation control plan and,if applicable,the
Stormwater Pollution Prevention Plan required by the National Pollutant Discharge Elimination System Construction General
Permit as required by Stormwater Standard 8.Construction period erosion,sedimentation and pollution control measures and
best management practices(BMPs)shall remain in place until the site is fully stabilized.
b) No stormwater runoff may be discharged to the post-construction stormwater BMPs unless and until a Registered
Professional Engineer provides a Certification that:i.all construction period BMPs have been removed or will be removed by
a date certain specified in the Certification.For any construction period BMPs intended to be converted to post construction
operation for stormwater attenuation,recharge,and/or treatment,the conversion is allowed by the MassDEP Stormwater
Handbook BMP specifications and that the BMP has been properly cleaned or prepared for post construction operation,
including removal of all construction period sediment trapped in inlet and outlet control structures;ii..as-built final construction
BMP plans are included,signed and stamped by a Registered Professional Engineer,certifying the site is fully stabilized;iii.
any illicit discharges to the stormwater management system have been removed,as per the requirements of Stormwater
Page 5 of 10* ELECTRONIC COPY
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection-Wetlands MassDEP File#:242-1508
WPA Form 5-Order of Conditions eDEP Transaction#:374904
Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 City/Town:NORTH ANDOVER
is
Page 7 of 10*ELECTRONIC COPY
. #gg
4
i
r;
LMassachusetts Department of Environmental Protection Provided by MassDEP:
1
Bureau of Resource Protection-Wetlands MassDEP File#:242-1508
WPA Form 5 -Order of Conditions eDEP Transaction#:374904
Massachusetts Wetlands Protection Act M.G.L.c. 131, §40 City/Town:NORTH ANDOVER
E. Signatures
This Order is valid for three years from the date of issuance,unless otherwise specified /a//z/Z9 07/pursuant to General Condition#4.If this is an Amended Order of Conditions,the Amended 1.D f Ori l Order f
Order expires on the same date as the original Order of Conditions. ,
Please indicate the number of members who will sign this form.This Order must be signed by
a majority of the Conservation Commission. 2.Num r of Signers
The Order must be mailed by certified mail(return receipt requested)or hand delivered to the applicant.A copy also must be mailed ,
or hand delivered at the same time to the appropriate Department of Environmental Protection Regional Office,if not filing
electronically,and the property owner,if different from applicant. i'.
Signatures: I maim
•
i ./AriatilkL4 IIIMP--- rw... ,
�
� -- Q di_ ; 1E
r by hand delivery on fay certified mail,return receipt requested,on '
v/I Vjj
Date Date
F. Appeals
The applicant,the owner,any person aggrieved by this Order,any owner of land abutting the land subject to this Order,or any ten
residents of the city or town in which such land is located,are hereby notified of their right to request the appropriate MassDEP
Regional Office to issue a Superseding Order of Conditions.The request must be made by certified mail or hand delivery to the
Department,with the appropriate filing fee and a completed Request for Departmental Action Fee Transmittal Form,as provided in
310 CMR 10.03(7)within ten business days from the date of issuance of this Order.A copy of the request shall at the same time be
sent by certified mail or hand delivery to the Conservation Commission and to the applicant,if he/she is not the appellant.
Any appellants seeking to appeal the Department's Superseding Order associated with this appeal will be required to demonstrate prior
participation in the review of this project.Previous participation in the permit proceeding means the submission of written information to
the Conservation Commission prior to the close of the public hearing,requesting a Superseding Order,or providing written information
to the Department prior to issuance of a Superseding Order.
The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not
contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act(M.G.L.c. 131,§40),and is
inconsistent with the wetlands regulations(310 CMR 10.00).To the extent that the Order is based on a municipal ordinance or bylaw,
and not on the Massachusetts Wetlands Protection Act or regulations,the Department has no appellate jurisdiction.
Page 9 of 10*ELECTRONIC COPY
3
fl
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection-Wetlands MassDEP File#:242-1508
WPA Form 5-Order of Conditions eDEP Transaction#:374904
1' Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 City/Town:NORTHANDOVER
G. Recording Information
This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located,
within the chain of title of the affected property.In the case of recorded land,the Final Order shall also be noted in the Registry's
Grantor Index under the name of the owner of the land subject to the Order.In the case of registered land,this Order shall also be
noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions.The recording information on
this page shall be submitted to the Conservation Commission listed below.
NORTH ANDOVER
Conservation Commission
Detach on dotted line,have stamped by the Registry of Deeds and submit to the Conservation Commission.
To:
NORTH ANDOVER
Conservation Commission
Please be advised that the Order of Conditions for the Project at:
279 BOXFORD STREET 242-1508
Project Location MassDEP File Number
Has been recorded at the Registry of Deeds of:
County Book Page
for:
Property Owner MICHAEL MANOS
and has been noted in the chain of title of the affected property in:
Book
Page
In accordance with the Order of Conditions issued on:
Date
If recorded land,the instrument number identifying this transaction is:
Instrument Number
If registered land,the document number identifying this transaction is:
Document Number
Signature of Applicant Rev 4Q/2010
Page 10 of 10*ELECTRONIC COPY
DEP FILE#242 - 1508
Therefore,the North Andover Conservation Commission(hereafter the "NACC") hereby
finds that the following conditions are necessary, in accordance with the Performance
Standards set forth in the State Regulations, the local ByLaw and Regulations, to protect
those interests noted above. The NACC orders that all work shall be performed in
accordance with said conditions and with the Notice of Intent referenced below. To the
extent that the following conditions modify or differ from the plans, specifications or other
proposals submitted with the Notice of Intent, the conditions shall control.
GENERAL CONDITIONS
20. The proposed work includes: construction of a 28' x 32' detached garage and grading
portions of which are within the 100' Buffer Zone to Bordering Vegetated Wetland
(BVW).
21. The work shall conform to the following:
Applicants: Michael Manos
279 Boxford Street
North Andover, MA 01845
Notice of Intent filed by: John Sullivan, P.E.
Sullivan Engineering Group, LLC
22 Mount Vernon Road
Boxford, MA 01929
Site Plans prepared by: Sullivan Engineering Group, LLC
Titled: #279 Boxford Street, Plot Plan of Land
Stamped By: John D. Sullivan III, P.E.
&Scott L. Giles Registered Professional Land
Surveyor
Date:January 25, 2011
22. The term"Applicant" as used in this Order of Conditions shall refer to the owner, any
successor in interest or successor in control of the property referenced in the Notice of
Intent, supporting documents and this Order of Conditions. The NACC shall be
notified in writing within 30 days of all transfers of title of any portion of property that
takes place prior to the issuance of a Certificate of Compliance.
23. The conditions of this decision shall apply to, and be binding upon, the applicant,
owner, its employees and all successors and assigns in interest or control. These
obligations shall be expressed in covenants in all deeds to succeeding owners of
portions of the property.
C:\Winword\OOC\boilerl.doc 1 NACC 4/14/2011
.
DEP FILE #242 - 1508
33. The NACC agrees with the applicant's delineation of the wetland resource areas on
the site as shown on the plans dated referenced herein.
34. The NACC finds that the intensive use of the upland areas and buffer zone proposed
on this site will cause further alteration of the wetland resource areas. In order to
prevent any alteration of wetland resource areas a twenty five foot (25') No-
Disturbance Zone and a fifty foot (50') No-Construction Zone shall be established from
the edge of the adjacent wetland resource area. The Conservation Administrator
and/or other agents of the NACC do not have the authority to waive these setbacks as
established under the local bylaw. No disturbance of existing grade, soils or
vegetation is permitted in the No-Disturbance zone.
35. This document shall be included in all construction contracts, subcontracts, and
specifications dealing with the work proposed and shall supersede any conflicting
contract requirements. The applicant shall assure that all contractors,subcontractors,
and other personnel performing the permitting work are fully aware of the permits
terms and conditions. Thereafter, the contractor will be held jointly liable for any
violation of this Order resulting from failure to comply with its conditions.
36. The owners of the project and their successors in title agree that the Order does not in
itself impose upon the Town any responsibility to maintain the proposed drainage
system and that said Town shall not be liable for any damage in the event of failure.
By acceptance of this Order,the owners agree to indemnify and hold harmless to the
Town and its residents for any damage attributable to alterations undertaken on this
property pursuant to the Order. Issuance of these Conditions does not in any way
imply or certify that the site or downstream areas will not be subject to flooding, storm a
damage or any other form of water damage. Maintenance of the drainage system, if
accepted by the Town as part of a public way,becomes the responsibility of the Town.
37. Issuance of these Conditions does not in any way imply or certify that the site or
downstream areas will not be subject to flooding, storm damage or any other form of
water damage.
PRIOR TO CONSTRUCTION
38. No work shall be undertaken until all administrative appeal periods from this Order
have elapsed or, if such an appeal has been filed, until all proceedings before the
Department or Court have been completed.
39. This Order shall be recorded by the applicant at the Registry of Deeds immediately
after the expiration of all appeal periods. No work shall be undertaken until the Final
Order has been recorded in the Registry of Deeds or the Land Court for the district in
which the land is located,within the chain of title of the affected property. In the case
of recorded land, the Final Order shall also be noted in the Registry's Grantor Index
C:\Winword\OOC\boilerl.doc 3 NACC 4/14/2011
DEP FILE #242 - 1508
approved by the NACC or its agent prior to the start of construction and shall remain
intact until all disturbed areas have been permanently stabilized to prevent erosion.
All erosion prevention and sedimentation protection measures found necessary
during construction shall be implemented at the direction of the NACC or its agent.
The NACC reserves the right to impose additional conditions on portions of this
project to mitigate any impacts which could result from site erosion, or any noticeable
degradation of surface water quality discharging from the site. For example,
installation of erosion control measures may be required in areas not shown on the
plan(s) referenced in this Order of Conditions. Should such installation be required by
the NACC, they shall be installed within 48 hours of the Commission's request.
46. The applicant shall have on hand at the start of any soil disturbance, removal or
stockpiling, a minimum of 8 hay bales and sufficient stakes for staking these bales (or
an equivalent amount of silt fence, 1 hay bale to equal 3 feet of fence). Said bales shall
be used only for the control of emergency erosion problems and shall not be used for
the normal control of erosion.
47. Prior to the commencement of any work on site, a Registered Land Surveyor (R.L.S.)
shall stake the corners of the garage. This will be confirmed during the pre-
construction meeting.
48. A check payable to the Town of North Andover shall be provided in the amount of
$1,500 which shall be in all respects satisfactory to Town Counsel, Town Treasurer,
and the NACC, and shall be posted with the North Andover Town Treasurer through
the NACC before commencement of work. Said deposit of money shall be
conditioned on the completion of all conditions hereof, shall be signed by a party or
parties satisfactory to the NACC, and Town Counsel, and shall be released after
completion of the project, provided that provisions, satisfactory to the NACC, have
been made for performance of any conditions which are of continuing nature. The
applicant may propose a monetary release schedule keyed to completion of specific
portions of the project for the NACC's review and approval. This condition is issued
under the authority of the local ByLaw.
49. The applicant shall designate a Wetland Scientist (or other environmental professional
as approved by the NACC or its agent) as an"Erosion Control Monitor" to oversee
any emergency placement of controls and regular inspection or replacement of
sedimentation control devices. The name and phone number of the erosion control
monitor must be provided to the NACC in the event that this person has to be
contacted, due to an emergency at the site, during any 24-hour period, including
weekends. Proof of the retained monitor must be submitted to the Conservation
Department on letterhead by the retained consulting firm. This person shall be given
the authority to stop construction for erosion control purposes (or) The Environmental
Professional will immediately notify the Conservation agent of any matter that
requires attention by the Commission or the agent. The erosion control monitor will
C:\Winword\OOC\boilerl.doc 5 NACC 4/14/2011
DEP FILE#242 — 1508
this Order are understood. This Order shall be included in all construction contracts,
subcontracts, and specifications dealing with the work proposed and shall supersede
any conflicting contract requirements. The applicant shall assure that all contractors,
subcontractors and other personnel performing the permitted work are fully aware of
the permit's terms and conditions. Thereafter, the contractor will be held jointly liable
for any violation of this Order of Conditions resulting from failure to comply with its
conditions. The applicant or contractor shall notify the NACC in writing of the
identity of the on-site construction supervisor hired to coordinate construction and to
ensure compliance with this Order. A reasonable period of time shall be provided as
notice of the pre-construction meeting (e.g. 72 hours).
STORMWATER MANAGEMENT CONDITIONS µ:
is
55. There shall be no increase in the post development discharges from the storm drainage
system or any other changes in post development conditions that alter the post
development watershed boundaries as currently depicted in the Notice of Intent and
approved by this Order of Conditions, unless specifically approved in writing by the
Commission.
56. Water quality in down gradient BVW's shall not differ significantly following
completion of the project from the pre-development conditions. There shall be no
sedimentation into wetlands or water bodies from discharge pipes or surface runoff
leaving the site.
DURING CONSTRUCTION
57. IMPORTANT: Immediately upon completion of the garage foundation, and prior to
further construction activities associated with the site, the applicant shall complete a
plan prepared by a Registered Professional Land Surveyor of the Commonwealth
(R.P.L.S.) which accurately depicts the foundation location and it's proximity to
wetland resource areas as approved under this Order of Conditions. Said plan shall
be submitted to the Conservation Administrator for approval. Failure to comply may
result in a stop work order for the site.
58. Upon beginning work, the applicant shall submit written progress reports every
month detailing what work has been done in or near resource areas, and what work is
anticipated to be done over the next period. This will update the construction
sequence.
59. Dewatering is not proposed during construction. No discharge of water is allowed
directly into an area subject to jurisdiction of the Wetlands Protection Act and/or the
North Andover Wetland Bylaw. If emergency de-watering requirements arise, the
C:\Winword\OOC\boilerl.doc 7 NACC 4/14/2011
DEP FILE#242 - 1508
pollutant during any phase of construction the NACC shall be notified by the
applicant within one (1) business day. No construction vehicles are to be stored within
100 feet of wetland resource areas, and no vehicle refueling, equipment lubrication, or
maintenance is to be done within 100 feet of a resource area.
AFTER CONSTRUCTION
69. No underground storage of fuel oils shall be allowed on any lot within one-hundred
(100) feet of any wetland resource area. This condition shall survive this Order of
Conditions and shall run with the title of the property. This condition is issued under
the authority of the Town's Wetland protection ByLaw.
70. Fertilizers utilized for landscaping and lawn care shall be slow release, low-nitrogen
types (< 5%), and shall not be used within 25 feet of a resource area. Pesticides and
herbicides shall not be used within 100 feet of a wetland resource area. This condition
shall survive this Order of Conditions and shall run with the title of the property. This
condition is issued under the authority of the Town's Wetland Protection ByLaw and
shall remain in perpetuity.
71. Upon completion of construction and grading, all disturbed areas located outside
resource areas shall be stabilized permanently against erosion. This shall be done by
loaming and seeding according to NRCS standards. Stabilization will be considered
complete once full vegetative cover has been achieved.
72. Upon approved site stabilization by Conservation staff, the erosion controls shall be
removed and properly disposed of and all exposed unvegetated areas shall be seeded.
73. Upon completion of the project the applicant shall submit the following to the
Conservation Commission as part of a request for a Certificate of Compliance:
a. WPA Form 8A- "Request for a Certificate of Compliance."
b. A letter from the applicant requesting a Certificate of Compliance.
c. The name and address of the current landowner.
d. Signed statements from the individual property owners shall be submitted with `?
the request for a Certificate of Compliance indicating that they read and
understood the recorded Order of Conditions prior to purchasing their property.
e. The name and address of the individual/trust or corporation to whom the
compliance is to be granted.
f. The street address and assessor's map/parcel number for the project.
g. The DEP file number.
h. A written statement from a Registered Professional Civil Engineer (and/or
Registered Professional Land Surveyor) of the Commonwealth certifying that the
work has been conducted as shown on the plan(s) and documents referenced
above, and as conditioned by the Commission.
{
C:\Winword\OOC\boilerl.doc 9 NACC 4/14/2011
DEP FILE#242 - 1508
APPENDIX A-AFFIDAVIT
on oath do hereby depose and state:
(authorized agent applicant and/or current owner)
(PLEASE CHECK AT LEAST ONE BLOCK)
1. I am the of
(position with applicant) (applicant name or company name)
the applicant upon whom Order of Conditions
have been laced upon b
p p by (DEP or NACC number)
the North Andover Conservation Commission.
&/or
2. Iamthe of
(position with owner) (owner name)
the owner upon whose land Order of Conditions
have been placed up by (DEP or NACC number)
the North Andover Conservation Commission.
3. I hereby affirm and acknowledge that I have received said Order of Conditions
and have read the same and understand each
(DEP File#) and every condition which has been set forth
in said Order of Conditions.
4. I hereby affirm and acknowledge that on this day of 19
I inspected said property together with any and all improvements which have
been made to the same and hereby certify that each and every condition set
forth in Order of Conditions are presently in compliance.
(DEP File#)
5. I hereby affirm and acknowledge that this document will be relied upon by the
North Andover Conservation Commission as well as any potential buyers of
said property which is subject to said Order of Conditions
(DEP File#)
Signed under the pains and penalties of perjury this day of 19 .
(Signature-authorized agent of applicant or owner)
C:\Winword\OOC\boilerl.doc 11 NACC 4/14/2011