Loading...
HomeMy WebLinkAboutMiscellaneous - 171 BRENTWOOD CIRCLE i • i E Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: 242-1569 WPA Form 8B ertifiate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP A. Project Information Important: When filling out 1. This Certificate of Compliance is issued to: forms on the computer, use Rose Sandoval ! only the tab key Name t to move your 171 Brentwood Circle cursor-do not use the return Mailing Address Is key. North Andover MA 01845 City/Town State Zip Code o (j 2. This Certificate of Compliance is issued for work regulated by a final Order of Conditions issued to: MI Rose Sandoval Name November 15, 2012 242-1569 Dated DEP File Number 3. The project site is located at: 171 Brentwood Circle North Andover Street Address City/Town Map 64 Parcel 42 Assessors Map/Plat Number Parcel/Lot Number the final Order of Condition was recorded at the Registry of Deeds for: ' Rose Sandoval Property Owner(if different) Essex Northern 13254 313 County Book Page Certificate 4. A site inspection was made in the presence of the applicant, or the applicant's agent, on: 1/13/15 Date i wpafrm8b.doc•rev.5/29/14 WPA Form 8B,Certificate of Compliance•Page 1 of 3 1 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands DEP File Number: WPA Form 8B — Certificate of Compliance 242-1569 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP B. Certification Check all that apply: ® Complete Certification: It is hereby certified that the work regulated by the above-referenced Order of Conditions has been satisfactorily completed. ❑ Partial Certification: It is hereby certified that only the following portions of work regulated by the above-referenced Order of Conditions have been satisfactorily completed.The project areas or work subject to this partial certification that have been completed and are released from this Order are: ❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the above-referenced Order of Conditions never commenced. The Order of Conditions has lapsed and is therefore no longer valid. No future work subject to regulation under the Wetlands Protection Act may commence without filing a new Notice of Intent and receiving a new Order of Conditions. Ongoing Conditions: The following conditions of the Order shall continue: (Include any conditions contained in the Final Order, such as maintenance or monitoring that should continue for a longer period). Condition Numbers: 72 C. Authorization Issued by: North Andover I t 4 I Conservation Commission Da e of I uance This Certificate must be signed by a majority of the Conservation Commission and a copy sent to the applicant and appropriate DEP Regional Office (See http://www.mass.gov/eea/agencies/massdep/about/contacts/find-the-massdep- regional-office-for-your-city-or-town.html). Sittnatures: )4. wpafrm8b.doc•rev.5/29/14 WPA Form 8B,Certificate of Compliance•Page 2 of 3 { Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands DEP File Number: WPA Form 8B — Certificate of Compliance 242-1569 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP D. Recording Confirmation The applicant is responsible for ensuring that this Certificate of Compliance is recorded in the Registry of Deeds or the Land Court for the district in which the land is located. Detach on dotted line and submit to the Conservation Commission. To: North Andover Conservation Commission Please be advised that the Certificate of Compliance for the project at: 171 Brentwood Circle 242-1569 Project Location DEP File Number Has been recorded at the Registry of Deeds of Essex Northern County for: Rose Sandoval Property Owner and has been noted in the chain of title of the affected property on: Date Book Page If recorded land, the instrument number which identifies this transaction is: If registered land, the document number which identifies this transaction is: Document Number Signature of Applicant wpafrm8b.doc•rev.5/29/14 WPA Form 8B,Certificate of Compliance•Page 3 of 3 2 , 1 • RECEIVED TI "!" ''' Sr'.:,—r °t<•�•° �`�" Town of North Andover 2012 NOV 2 I APB IC 32 Office of the Planning Department TiO'itiii 0i: •I 6> _ ,a• * Community Development and Services Divis' S H ANDOVER SACMUStt 1600 Osgood Street MASSACHUSETTS North Andover,Massachusetts 01845 NOTICE OF DECISION This is to certify that twenty(20)days have elapsed from date of decision,filed without filing Daof te art 5V. Any appeal shall be filed Date NOV� d/3 within (20) days after the redehaw date of filing this notice in the office of the Town Clerk. Date: November 20,2012 Date of Hearings: October 16 2012, November 20, 2012, Date of Decision: November 20, 2012 Petition of Rose Sandoval,171 Brentwood Circle,North Andover,MA 01845 1 Premises Affected: 171 Brentwood Circle,North Andover,Massachusetts,01845. Assessor's Map 64,Parcel 42 and located in the Residential 1 Zoning District. 4 Referring to the above petition for a Watershed Special Permit from the requirements of the North Andover Zoning Bylaw, Sections 4.136.3.c.ii.6& 10.3. i So as to allow the installation of an inground swimming pool, a concrete deck and patio and associated grading and utilities within 100 feet of a wetland in the Non-Disturbance Zone and the Non-Discharge Zone of the Watershed Protection District. I After a Public Hearing given on the above date, the Planning Board voted to APPROVE a Watershed Special Permit for the Watershed Protection District,based upon the following conditions: i ii/7140\ _/ arming Board j ohn Simons i f Richard Rowen Michael Colantoni 3 Lynne Rudnicki Lora Mc Sherry 1 Dave Kellogg A True Copy, Town Clerk ` gi 171 Brentwood Circle Map 64 Lot 42 Watershed Special Permit—Construction of Inground Pool&Patio November 20,2012 The public hearing on the above referenced application was opened on October 16, 2012 closed by the North Andover Planning Board on November 20,2012. On November 20, 2012, upon a motion made by D. Kellogg and seconded by R. Rowen to GRANT a Watershed Special Permit for the installation of an inground swimming pool, a concrete deck and patio and associated grading and utilities within 100 feet of a wetland in the Non-Disturbance Zone and the Non-Discharge Zone of the Watershed Protection District under the requirements of Section 4.136.3.c.ii.6 & 10.3 of the North Andover Zoning Bylaw. This Special Permit was requested by Rose Sandoval, 171 Brentwood Circle, North Andover, MA 01845 on September 26, 2012. The applicant submitted a complete application, which was noticed and reviewed in accordance with Section 10.52 of the Town of North Andover Zoning Bylaw and MGL Chapter 40A, Section 9. The motion to approve was subject to the FINDINGS OF FACTS and SPECIAL CONDITIONS set forth in this decision. The Planning Board vote was unanimous. A special permit issued by the special permit granting authority requires a vote of at least four members of a five-member board. The applicant is hereby notified that should the applicant disagree with this decision, the applicant has the right, under MGL Chapter 40A, Section 17, to appeal to this decision within twenty days after the date this decision has been filed with the Town Clerk. In accordance with 4.136 the Planning Board makes the finding that the intent of the Bylaw, as well as its specific criteria are met. This decision specifically stated by the Planning Board makes the following FINDINGS OF FACT: 1) That as a result of the proposed construction in conjunction with other uses nearby,there will not be any significant degradation of the quality or quantity of water in or entering Lake Cochichewick. The project is located within an extremely environmental sensitive area and in close proximity to Lake Cochichewick. The final design reflects extensive discussions between the Town and applicant to ensure the continued protection of Lake Cochichewick and the safety and welfare of the residents of North Andover. a) The construction has been reviewed by Town Staff and the Town's consulting engineer, Lisa Eggleston,and with the application of the erosion control measures and modifications to the drainage and stormwater management designs, the consultant concluded that there will not be significant degradation to the quality or quantity of water in or entering Lake Cochichewick. The site drainage system and storm water management design are designed in accordance with the Town Bylaw requirements and Best Engineering and Management Practices. The plan has been reviewed by the outside consulting engineer, Lisa Eggleston, as evidenced by a letters dated October 16, 2012 and October 24, 2012 and email correspondence from Norse Environmental Services dated October 23 2012. Further, adequate safeguards have been provided to mitigate pollutants from entering Lake Cochichewick through the installation/implementation of the following Best Management Practices relative to an inground pool and pool deck: i) The new project will create approximately 2,100 sq. ft. of new impervious area that will include the pool and the pool deck. All stormwater runoff will be routed to an infiltration trench that surrounds the pool and the pool deck and the trench has the capacity to store and infiltrate all stormwater runoff. ii) Best Management Practices (BMP) will be followed with regard to maintenance of the pool, as stated in the document titled"Swimming Pool Maintenance Requirements, 171 Brentwood Circle, North Andover, MA, dated October 19, 2012, provided by JM Associates, North 2 171 Brentwood Circle Map 64 Lot 42 Watershed Special Permit—Construction of Inground Pool&Patio November 20,2012 Reading, MA."These BMPs includes maintenance of the infiltration trench, proper storage of chemicals and de-chlorination of the pool water before discharge. Discharge of pool water into the town's stormwater management is strictly forbidden. The "Best Management Practice"document referenced here will be noted in the deed. iii) The limit of work has been marked on the plan to be as close to the proposed construction as possible.No new lawn areas will be created. iv) Fertilizers are limited to those which are either organic or slow-release nitrogen and phosphorous-free. This restriction will be noted on the deed. b) The existing lot complies with the current Zoning Bylaw with regard to frontage and acreage. The lot was created before 1994 and is not subject to the Conservation Zone, as described in section 4.136.2.Table 1. c) The existing structure is connected to the Town sewer and water systems. 2) There is no reasonable alternative location outside the General, Non-Disturbance, and the Non- Discharge Zones for any discharge, structure or activity. 3) In addition, in accordance with Section 10.31 of the North Andover Zoning Bylaw, the Planning Board makes the following FINDINGS OF FACT: a) The specific site is an appropriate location for the proposed use as all feasible storm water and erosion controls have been placed on the site; b) The use will not adversely affect the neighborhood as the lot is located in a Residential 1 Zoning District; c) There will be no nuisance or serious hazard to vehicles or pedestrians; d) Adequate and appropriate facilities are provided for the proper operation of the proposed use; e) The Planning Board also makes a specific finding that the use is in harmony with the general purpose and intent of the North Andover Zoning Bylaw. Upon reaching the above findings,the Planning Board approves this Special Permit based upon the following SPECIAL CONDITIONS: 1)Permit Definitions: a) The"Locus"refers to the 57,800 sq. ft. parcel of land with frontage on Brentwood Circle as shown on Assessors Map 64, Parcel 42, and also known as 171 Brentwood Circle,North Andover,Massachusetts. b) The"Plans"refer to the plans prepared by JM Associates, 325 Main Street,North Reading,MA 01864, entitled Proposed Swimming Pool 171 Brentwood Circle North Andover, MA 01845. c) The"Project"or"171 Brentwood Circle"refers to installation of an inground swimming pool,a concrete deck and patio and associated grading and utilities within 100 feet of a wetland in the Non-Disturbance Zone and the Non-Discharge Zone of the Watershed Protection District d) The"Applicant"refers to Rose Sandoval,the applicant for the Watershed Special Permit. The"Project Owner"refers to the person or entity holding the fee interest to the title to the Locus from time to time,which can include but is not limited to the applicant, developer,and owner. 3 4 171 Brentwood Circle Map 64 Lot 42 • Watershed Special Permit—Construction of Inground Pool&Patio November 20,2012 2) The Town Planner shall approve any changes made to these plans. Any changes deemed substantial by the Town Planner would require a public hearing and modification by the Planning Board. 3) Prior to the endorsement of the Plan a) The applicant shall incorporate the following conditions as a deed restriction and a copy of the recorded deed shall be submitted to the Town Planner and included in the file. i) Fertilizers are limited to those which are either organic or slow-release nitrogen and phosphorous-free. b) The applicant will provide copies of all Decisions, Notification and Orders of Conditions from the North Andover Conservation Commission. 4) Prior to the start of construction or the issuance of a building permit: a) A performance guarantee bond of four thousand dollars ($4,000.00) made out to the Town of North Andover must be posted to insure that the construction, erosion control, measures, and ■ performance of any other condition contained herein will take place in accordance with the plans and the conditions of this decision and to ensure that the as-built plans will be submitted. b) The applicant shall designate an independent Environmental Monitor who shall be chosen in consultation with the Planning Department and Conservation Department staff The Monitor shall submit weekly reports during the entire duration of the project and must be available upon four (4) hours notice to inspect the site with the Planning Board staff. The Planning Staff may reduce the frequency of reports upon review of such a request from the applicant. c) All erosion control measures as shown on the plan must be in place and reviewed by the Town Planner and Conservation Department. d) A pre-construction meeting must be held with the developer,their construction employees, Planning Department and Conservation Department (and other applicable departments) to discuss scheduling of inspections to be conducted on the project and the construction schedule. e) No new landscape or lawn areas are to be created. Fertilizers are limited to those which are either organic or slow-release nitrogen and phosphorous-free. 5) Prior to release of the Performance Bond: a) The applicant shall submit an as-built plan stamped by a Registered Professional Engineer in Massachusetts that shows all construction, including storm water mitigation trenches and other pertinent site features. This as-built plan shall be submitted to the Town Planner for approval and must be provided in paper form as well as in SDF (Standard Digital File) format. The applicant must also submit a letter from the architect and engineer of the project stating that the building, landscaping, lighting and site layout substantially comply with the plans referenced at the end of this decision as endorsed by the Planning Board. This as-built plan shall be submitted to the Town Planner for approval. b) The Planning Board must by a majority vote make a finding that the site is in conformance with the approved plan. > 4 171 Brentwood Circle Map 64 Lot 42 Watershed Special Permit—Construction of Inground Pool&Patio November 20,2012 5) No open burning shall be done except as is permitted during burning season under the Fire Department regulations. 6) The Contractor shall contact Dig Safe at least 72 hours prior to commencing excavation. 7) The provisions of this conditional approval shall apply to and be binding upon the applicant, it's employees and all successors and assigns in interest or control. 8) This Special Permit approval shall be deemed to have lapsed November 20, 2014(two years from the date of issuance) exclusive of the time required to pursue or await determination of any appeals, unless substantial use or construction has commenced within said two-year period. Substantial use or construction will be determined by a majority vote of the Planning Board. 9) This decision must be filed with the North Essex Registry of Deeds. The following information is included as part of this decision: Plan titled: "Proposed Swimming Pool 171 Brentwood Circle North Andover,MA 01845 Prepared for: Rose Sandoval 171 Brentwood Circle North Andover,MA 01845 Prepared by: JM Associates 325 Main Street North Reading,MA 01864 Scale: 1"=40' Date: September 25,2012,revised, October 11, 2012 and October 22, 2012. Sheets: 1 Plan Titles: Swimming Pool Maintenance Requirements Prepared for: Rose Sandoval Prepared by: JM Associates Date: October 19,2012 cc: Director of Public Works Building Inspector Conservation Administrator Planning Board Police Chief Fire Chief Applicant Engineer File 5 • Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau MassDEP File#:242-1569 WPA Form of 5 Resource-Order Protection of Conditions eDEP Transaction#:515360 ` Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 City/Town:NORTH ANDOVER A. General Information 1.Conservation Commission NORTH ANDOVER 2. Issuance a. r OOC b.E Amended OOC 3.Applicant Details a.First Name ROSE b.Last Name SANDOVAL c.Organization d.Mailing Address 171 BRENTWOOD CIRCLE e.City/Town NORTH ANDOVER f.State MA g.Zip Code 01845 4.Property Owner a.First Name ROSE b.Last Name SANDOVAL c.Organization d.Mailing Address 171 BRENTWOOD CIRCLE e.City/Town NORTH ANDOVER f.State MA g.Zip Code 01845 5.Project Location a.Street Address 171 BRENTWOOD CIRCLE b.City/Town NORTH ANDOVER c.Zip Code 01845 d.Assessors Map/P1at# 64 e.Parcel/Lot# 42 f.Latitude 42.69044N g.Longitude 71.0833W 6.Property recorded at the Registry of Deed for: a.County b.Certificate c.Book d.Page NORTHERN ESSEX 12606 178 7.Dates a.Date NOI Filed: 9/17/2012 b.Date Public Hearing Closed: 11/14/2012 c.Date Of Issuance: 11/15/2012 8.Final Approved Plans and Other Documents a.Plan Title: b.Plan Prepared by: c.Plan Signed/Stamped by: d.Revised Final Date: e.Scale: PROPOSED M ASSOCIATES JOHN F.MCQUILKIN JR. 10-22-12 1"=40' SWIMMING POOL P.E. B. Findings 1.Findings pursuant to the Massachusetts Wetlands Protection Act Page 1 of 10*ELECTRONIC COPY , p i 1 I Massachusetts Department of Environmental Protection Provided by MassDEP: ~ Bureau of Resource Protection-Wetlands MassDEP File#:242-1569 WPA Form 5-Order of Conditions eDEP Transaction#:515360 3 (' Massachusetts Wetlands Protection Act M.G.L.c. 131, §40 City/Town:NORTH ANDOVER 1 Following the review of the the above-referenced Notice of Intent and based on the information provided in this application and presented at the public hearing,this Commission finds that the areas in which work is proposed is significant to the following interests of ! the Wetlands Protection Act. Check all that apply: i i a. F Public Water Supply b. r Land Containing Shellfish c.F Prevention of Pollution d. F Private Water Supply e. r Fisheries f. F Protection of Wildlife Habitat g. F Ground Water Supply h. F Storm Damage Prevention i. F Flood Control E § 2.Commission hereby finds the project,as proposed,is: Approved subject to: a.F The following conditions which are necessary in accordance with the performance standards set forth in the wetlands regulations. This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above,the following General Conditions,and any other special conditions attached to this Order.To the extent that the following conditions modify or differ from the plans,specifications,or other proposals submitted with the Notice of Intent,these conditions shall control. Denied because: b.r The proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations.Therefore, work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are adequate to protect interests of the Act,and a final Order of Conditions is issued.A description of the performance standards which the proposed work cannot meet is attached to this Order. c.r The information submitted by the applicant is not sufficient to describe the site,the work or the effect of the work on the interests identified in the Wetlands Protection Act.Therefore,work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information and includes measures which are adequate to protect the interests of the l Act,and a fmal Order of Conditions is issued.A description of the specific information which is lacking and why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c). 1 F 3.F Buffer Zone Impacts:Shortest distance between limit of project disturbance and the wetland resource 50 area specified in 310CMR10.02(1)(a). a.linear feet 4 i. t Inland Resource Area Impacts:(For Approvals Only): l Resource Area Proposed Permitted Proposed Permitted k Alteration Alteration Replacement Replacement 4. r Bank a.linear feet b.linear feet c.linear feet d.linear feet 5.r Bordering Vegetated Wetland i a.square feet b.square feet c.square feet d.square feet 6. r Land under Waterbodies and Waterways is a.square feet b.square feet c.square feet d.square feet P." , e.c/y dredged f.c/y dredged 7.r Bordering Land Subject to Flooding 1' a.square feet b.square feet c.square feet d.square feet i Page 2 of 10*ELECTRONIC COPY t r i Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection-Wetlands MassDEP File#:242-1569 WPA Form 5-Order of Conditions eDEP Transaction#:515360 ILIPNyi .:1 Massachusetts Wetlands Protection Act M.G.L.c. 131, §40 City/Town:NORTH ANDOVER Cubic Feet Flood Storage e.cubic feet f.cubic feet g.cubic feet h.cubic feet 8.r Isolated Land Subject to Flooding a.square feet b.square feet Cubic Feet Flood Storage c.cubic feet d.cubic feet e.cubic feet f.cubic feet 9.r Riverfront Area a.total sq.feet b.total sq.feet Sq ft within 100 ft c.square feet d.square feet e.square feet f.square feet Sq ft between 100-200 ft g.square feet h.square feet i.square feet j.square feet Coastal Resource Area Impacts: Resource Area Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement 10.r Designated Port Areas Indicate size under Land Under the Ocean,below 11.r Land Under the Ocean a.square feet b.square feet c.c/y dredged d.c/y dredged 12.r Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below 13.r Coastal Beaches a.square feet b.square feet c.c/y nourishment d.c/y nourishment 14.r Coastal Dunes a.square feet b.square feet c.c/y nourishment d.c/y nourishment 15.r Coastal Banks a linear feet b.linear feet 16.r Rocky Intertidal Shores a.square feet b.square feet 17.r Salt Marshes a.square feet b.square feet c.square feet d.square feet 18.r Land Under Salt Ponds a.square feet b.square feet c.c/y dredged d.c/y dredged 19.E Land Containing Shellfish a square feet b.square feet c.square feet d.square feet Page 3 of 10 *ELECTRONIC COPY 3f tl A Massachusetts Department of Environmental Protection Provided by MassDEP: r- Bureau of Resource Protection-Wlands MassDEP File#:242-1569 WPA Form 5 -Order of Condetitions eDEP Transaction#:515360 City/I'own:NORTH ANDOVER Massachusetts Wetlands Protection Act M.G.L.c. 131, §40 Indicate size under Coastal Banks,inland Bank,Land Under the 20.I—Fish Runs Ocean,and/or inland Land Under Waterbodies and Waterways, above c.c/y dredged d.c/y dredged 21.I—Land Subject to Coastal Storm Flowage a.square feet b.square feet 22. r Restoration/Enhancement(For Approvals Only) If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has been entered in Section B.5.c&d or B.17.c&d above,please entered the additional amount here. a.square feet of BVW b.square feet of Salt Marsh 23. I—Streams Crossing(s) If the project involves Stream Crossings,please enter the number of new stream crossings/number of replacement stream crossings. a.number of new stream crossings b.number of replacement stream crossings C. General Conditions Under Massachusetts Wetlands Protection Act The following conditions are only applicable to Approved projects 1. Failure to comply with all conditions stated herein,and with all related statutes and other regulatory measures,shall be deemed cause to revoke or modify this Order. 2. The Order does not grant any property rights or any exclusive privileges;it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state,or local statutes,ordinances,bylaws,or regulations. 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: a.the work is a maintenance dredging project as provided for in the Act;or b.the time for completion has been extended to a specified date more than three years,but less than five years,from the date of issuance.If this Order is intended to be valid for more than three years,the extension date and the special circumstances warranting the extended time period are set forth as a special condition in this Order. 5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6. If this Order constitutes an Amended Order of Conditions,this Amended Order of Conditions does not exceed the issuance date of the original Final Order of Conditions. 7. Any fill used in connection with this project shall be clean fill.Any fill shall contain no trash,refuse,rubbish,or debris,including xt but not limited to lumber,bricks,plaster,wire,lath,paper,cardboard,pipe,tires,ashes,refrigerators,motor vehicles,or parts of any of the foregoing. 8. This Order is not fmal until all administrative appeal periods from this Order have elapsed,or if such an appeal has been taken, until all proceedings before the Department have been completed. 9. No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located,within the chain of title of the affected property.In the case of recorded land, Page 4 of 10 *ELECTRONIC COPY I i j 1 1 N 0 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection-Wetlands MassDEP File#:242-1569 1 WPA Form 5-Order of Conditions eDEP Transaction#:515360 Massachusetts Wetlands Protection Act M.G.L.c. 131, §40 CitylTown:NORTH ANDOVER 1 1 the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done.In the case of the registered land,the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done.The recording information shall be submitted to the Conservation Commission on the form at the end of this Order,which form must be stamped by the Registry of Deeds, , prior to the commencement of work.. I 10. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection" l [or'MassDEP"] ' File Number:"242-1569" ;k 11. Where the Department of Environmental Protection is requested to issue a Superseding Order,the Conservation Commission shall be a party to all agency proceedings and hearings before Mass DEP. 12. Upon completion of the work described herein,the applicant shall submit a Request for Certificate of Compliance(WPA Form 8A)to the Conservation Commission. 13. The work shall conform to the plans and special conditions referenced in this order. s 14. Any change to the plans identified in Condition#13 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing of a new Notice of Intent. 1 15. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order,and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. t T 16. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any contractor or other person performing work conditioned by this Order. 17. Prior to the start of work,and if the project involves work adjacent to a Bordering Vegetated Wetland,the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging.Once in place,the wetland boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. P 18. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means.At no time shall sediments be deposited in a wetland or water body.During construction,the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed.The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation Commission,which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary. ( Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. r� NOTICE OF STORMWATER CONTROL AND MAINTENANCE REQUIREMENTS 19. The work associated with this Order(the"Project")is(1) 1- is not(2)F subject to the Massachusetts Stormwater Standards. If the work is subject to Stormwater Standards,then the project is subject to the following conditions; Fi , a) All work,including site preparation,land disturbance,construction and redevelopment,shall be implemented in accordance with the construction period pollution prevention and erosion and sedimentation control plan and,if applicable,the Stormwater Pollution Prevention Plan required by the National Pollutant Discharge Elimination System Construction General Permit as required by Stormwater Standard 8.Construction period erosion,sedimentation and pollution control measures and best management practices(BMPs)shall remain in place until the site is fully stabilized. i b) No stormwater runoff may be discharged to the post-construction stomiwater BMPs unless and until a Registered Professional Engineer provides a Certification that:i. all construction period BMPs have been removed or will be removed by v a date certain specified in the Certification.For any construction period BMPs intended to be converted to post construction operation for stormwater attenuation,recharge,and/or treatment,the conversion is allowed by the MassDEP Stormwater Handbook BMP specifications and that the BMP has been properly cleaned or prepared for post construction operation, including removal of all construction period sediment trapped in inlet and outlet control structures;ii..as-built final construction i' BMP plans are included,signed and stamped by a Registered Professional Engineer,certifying the site is fully stabilized;iii. any illicit discharges to the stormwater management system have been removed,as per the requirements of Stormwater t' Page 5 of 10*ELECTRONIC COPY Provided by MassDEP: 1,71 Massachusetts Department of Environmental Protection Bureau of Resource Protection-Wetlands MassDEP File#:242-1569 WPA Form 5-Order of Conditions eDEP Transaction#:515360 Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 Cityfl own:NORTH ANDOVER Standard 10;iv. all post-construction stormwater BMPs are installed in accordance with the plans(including all planting plans)approved by the issuing authority,and have been inspected to ensure that they are not damaged and that they are in proper working condition;v. any vegetation associated with post-construction BMPs is suitably established to withstand erosion. c) The landowner is responsible for BMP maintenance until the issuing authority is notified that another party has legally assumed responsibility for BMP maintenance.Prior to requesting a Certificate of Compliance,or Partial Certificate of Compliance,the responsible party(defined in General Condition 19(e))shall execute and submit to the issuing authority an Operation and Maintenance Compliance Statement("O&M Statement")for the Stormwater BMPs identifying the party responsible for implementing the stormwater BMP Operation and Maintenance Plan("O&M Plan")and certifying the following:i.)the O&M Plan is complete and will be implemented upon receipt of the Certificate of Compliance,and ii.)the future responsible parties shall be notified in writing of their ongoing legal responsibility to operate and maintain the stormwater management BMPs and implement the Stormwater Pollution Prevention Plan. d) Post-construction pollution prevention and source control shall be implemented in accordance with the long-term pollution prevention plan section of the approved Stormwater Report and,if applicable,the Stormwater Pollution Prevention Plan required by the National Pollutant Discharge Elimination System Multi-Sector General Permit. e) Unless and until another party accepts responsibility,the landowner,or owner of any drainage easement,assumes responsibility for maintaining each BMP.To overcome this presumption,the landowner of the property must submit to the issuing authority a legally binding agreement of record,acceptable to the issuing authority,evidencing that another entity has accepted responsibility for maintaining the BMP,and that the proposed responsible party shall be treated as a permittee for purposes of implementing the requirements of Conditions 19(f)through 19(k)with respect to that BMP.Any failure of the proposed responsible party to implement the requirements of Conditions 19(f)through 19(k)with respect to that BMP shall be a violation of the Order of Conditions or Certificate of Compliance.In the case of stonnwater BMPs that are serving more than one lot,the legally binding agreement shall also identify the lots that will be serviced by the stormwater BMPs.A plan and easement deed that grants the responsible party access to perform the required operation and maintenance must be submitted along with the legally binding agreement. f) The responsible party shall operate and maintain all stormwater BMPs in accordance with the design plans,the O&M Plan, and the requirements of the Massachusetts Stormwater Handbook. g) The responsible party shall: 1.Maintain an operation and maintenance log for the last three(3)consecutive calendar years of inspections,repairs, maintenance and/or replacement of the stonnwater management system or any part thereof,and disposal(for disposal the log shall indicate the type of material and the disposal location); 2.Make the maintenance log available to MassDEP and the Conservation Commission("Commission")upon request;and 3.Allow members and agents of the MassDEP and the Commission to enter and inspect the site to evaluate and ensure that the responsible party is in compliance with the requirements for each BMP established in the O&M Plan approved by the issuing authority. h) All sediment or other contaminants removed from stormwater BMPs shall be disposed of in accordance with all applicable federal,state,and local laws and regulations. ) Illicit discharges to the stormwater management system as defined in 310 CMR 10.04 are prohibited. j) The stormwater management system approved in the Order of Conditions shall not be changed without the prior written approval of the issuing authority. k) Areas designated as qualifying pervious areas for the purpose of the Low Impact Site Design Credit(as defined in the MassDEP Stormwater Handbook,Volume 3,Chapter 1,Low Impact Development Site Design Credits)shall not be altered without the prior written approval of the issuing authority. I) Access for maintenance,repair,and/or replacement of BMPs shall not be withheld.Any fencing constructed around stormwater BMPs shall include access gates and shall be at least six inches above grade to allow for wildlife passage. Special Conditions: SEE ATTACHED. Page 6 of 10 *ELECTRONIC COPY , ti Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection-Wetlands MassDEP File#:242-1569 WPA Form 5-Order of Conditions eDEP Transaction#:515360 Massachusetts Wetlands Protection Act M.G.L.c. 131, §40 CityfFown:NORTH ANDOVER } 1 Page 7 of 10*ELECTRONIC COPY 3 i J. t k I i i Massachusetts Department of Environmental Protection Provided by MassDEP: II l — Bureau of Resource Protection-Wetlands MassDEP File#:242-1569 eDEP Transaction#:515360 j i WPA Form:Tetlan Order of onditions i 2 City/Town:NORTH ANDOVER Massachusetts ds Protection Act MGL.c. 131,§40 1 D. Findings Under Municipal Wetlands Bylaw or Ordinance j I " 1. Is a municipal wetlands bylaw or ordinance applicable?F Yes r No 1 2. The Conservation Commission hereby(check one that applies): s a. IT DENIES the proposed work which cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw I specifically: 1.Municipal Ordinance or Bylaw 2.Citation 1 Therefore,work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards,and a final Order or Conditions is issued.Which are necessary to comply with a municipal ordinance or bylaw: 1 1 b. F APPROVES the proposed work,subject to the following additional conditions. NORTH ANDOVER '' 1.Municipal Ordinance or Bylaw WETLANDS PROTECTION 2.Citation CHAPTER 178 BYLAW o 3. The Commission orders that all work shall be performed in accordance with the following conditions and with the Notice of Intent referenced above.To the extent that the following conditions modify or differ from the plans,specifications,or other i proposals submitted with the Notice of Intent,the conditions shall control. t The special conditions relating to municipal ordinance or bylaw are as follows: SEE ATTACHED. 1 t 4 it. 1 F fi Z R 4 i 1 i t f Page 8 of 10*ELECTRONIC COPY t , I { I, j 1 1 I y a , 1 1 I i 0 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection-Wetlands MassDEP File#:242-1569 i eDEP Transaction#:515360 WPA Form 5-Order of Conditions Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 Ci y1fown:NORTH ANDOVER 1 f E. Signatures c This Order is valid for three years from the date of issuance,unless otherwise specified I I -I S "- f pursuant to General Condition#4.If this is an Amended Order of Conditions,the Amended 1.Date of Ori final Order Order expires on the same date as the original Order of Conditions. Please indicate the number of members who will sign this form.This Order must be signed by i a majority of the Conservation Commission. 2.Number of Signers The Order must be mailed by certified mail(return receipt requested)or hand delivered to the applicant.A copy also must be mailed or hand delivered at the same time to the appropriate Department of Environmental Protection Regional Office,if not filing electronically,and the property owner,if different from applicant l Signatures: i // A.�_ / �1 _AO '� /% illO A/ / / e / .9,),-Q- E by hand delivery on 14y certified mail,return receipt requested,on //// .s./'0- Date Date F. Appeals The applicant,the owner,any person aggrieved by this Order,any owner of land abutting the land subject to this Order,or any ten residents of the city or town in which such land is located,are hereby notified of their right to request the appropriate MassDEP Regional Office to issue a Superseding Order of Conditions.The request must be made by certified mail or hand delivery to the Department,with the appropriate filing fee and a completed Request for Departmental Action Fee Transmittal Form,as provided in 310 CMR 10.03(7)within ten business days from the date of issuance of this Order.A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant,if he/she is not the appellant. s Any appellants seeking to appeal the Department's Superseding Order associated with this appeal will be required to demonstrate prior participation in the review of this project.Previous participation in the permit proceeding means the submission of written information to the Conservation Commission prior to the close of the public hearing,requesting a Superseding Order,or providing written information to the Department prior to issuance of a Superseding Order. The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act(M.G.L.c. 131,§40),and is inconsistent with the wetlands regulations(310 CMR 10.00).To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations,the Department has no appellate jurisdiction. Page 9 of 10*ELECTRONIC COPY Y 3 4 1 l' 1 i i 0 Massachusetts Department of Environmental Protection Provided by MassDEP: j Bureau of Resource Protection-Wetlands MassDEP File#:242-1569 ' WPA Form 5 -Order of Conditions eDEP Transaction#:515360 Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 City/Town:NORTH ANDOVER 1 1 G. Recording Information 1 This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property.In the case of recorded land,the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order.In the case of registered land,this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions.The recording information on j this page shall be submitted to the Conservation Commission listed below. 1 q NORTH ANDOVER I i Conservation Commission Detach on dotted line,have stamped by the Registry of Deeds and submit to the Conservation Commission. To: NORTH ANDOVER 1 Conservation Commission , Please be advised that the Order of Conditions for the Project at: i 171 BRENTWOOD CIRCLE 242-1569 , Project Location MassDEP File Number Has been recorded at the Registry of Deeds of: 1 County Book Page for. 1 Property Owner ROSE SANDOVAL and has been noted in the chain of title of the affected property in: t Book Page In accordance with the Order of Conditions issued on: I Date F 1 If recorded land,the instrument number identifying this transaction is: i Instrument Number If registered land,the document number identifying this transaction is: Document Number 1 r i'.' Signature of Applicant Rev.4/1/2010 t• €. Page 10 of 10*ELECTRONIC COPY I 1 i i. • • DEP FILE#242 - 1569 Therefore,the North Andover Conservation Commission(hereafter the "NACC")hereby finds that the following conditions are necessary, in accordance with the Performance Standards set forth in the State Regulations,the local ByLaw and Regulations,to protect those interests noted above. The NACC orders that all work shall be performed in accordance with said conditions and with the Notice of Intent referenced below. To the extent that the following conditions modify or differ from the plans, specifications or other proposals submitted with the Notice of Intent,the conditions shall control. GENERAL CONDITIONS Ed 20. The proposed work includes: The construction of an in-ground pool with cartridge style (non-backwashing)filter,concrete deck/patio,chain link fence,utilities with appurtenant site work and grading,portions of which are within 100 feet of a Bordering Vegetated Wetland (BVW) and ephemeral pool/ephemeral pool habitat. After the fact approval of an existing patio and retaining wall (constructed without a filing by a prior owner) are included in this proposal. 21. The work shall conform to the following (except as noted in the remainder of this document where revisions may be required): F Notice of Intent filed by Steven Eriksen Norse Environmental 92 Middlesex Road,Unit 4 Tyngsboro, MA 01879 Property Owner: Rose Sandoval 171 Brentwood Circle North Andover, MA 01845 Site Plans prepared by JM Associates 325 Main Street North Reading, MA 01864 Title: Proposed Swimming Pool,171 Brentwood Circle, North Andover, MA 01845 Dated: September 25,2012 Last Revised: 10/22/12 Signed and Stamped by John F. McQuilkin,Jr., P.E. Wetland Delineation by Norse Environmental March 2012 Other Record Documents: Swimming Pool Maintenance Requirements Prepared by JM Associates Date: October 19, 2012 242-1569, 171 Brentwood Circle OOC 1 NACC 11/15/2012 I I 1 DEP FILE#242- 1569 I 30.Where the Department of Environmental Protection(DEP) is requested to make a determination and to issue a Superseding Order,the Conservation Commission shall be a party to all agency proceedings and hearings before the Department. 31. Any future project which proposes a wetland crossing in order to access certain portions of the property will not be qualified as a limited project roadway under 310 I CMR 10.53(e). 32. The following wetland resource areas are affected by the proposed work: Buffer Zone to Bordering Vegetated Wetland and Ephemeral Pool and Ephemeral Pool Habitat. These 1 resource areas are significant to the interests of the Act and Town Bylaw as noted above and therein. The applicant has not attempted to overcome the presumption of I J significance of these resource areas to the identified interests. 1 33. The NACC agrees with the applicant' s delineation of the wetland resource areas and the associated buffer zone on the site as shown on the plans dated and referenced f herein. inds that the intensive use of the upland areas and buffer zone proposed on 34. The NACC f P this site will cause further alteration of the wetland resource areas. In order to prevent any alteration of wetland resource areas a fifty foot (50') No-Disturbance Zone and a seventy-five foot (75') No-Construction Zone shall be established from the edge of the adjacent wetland resource area except for existing structures shown on the herein referenced plan. The Conservation Administrator and/or other agents of the NACC do not have the authority to waive these setbacks as established under the local bylaw. No u disturbance of existing grade, soils or vegetation is permitted in the No-Disturbance zone. (See Section 3.4 &Appendix F of the local Regulations). 35. This document shall be included in all construction contracts,subcontracts, and 3 specifications dealing with the work proposed and shall supersede any conflicting contract requirements. The applicant shall assure that all contractors, subcontractors, 1 and other personnel performing the permitting work are fully aware of the permits = terms and conditions. Thereafter, the contractor will be held jointly liable for any violation of this Order resulting from failure to comply with its conditions. f 36. Issuance of these Conditions does not in any way imply or certify that the site or downstream areas will not be subject to flooding, storm damage or any other form of water damage. E PRIOR TO CONSTRUCTION 37. No work shall be undertaken until all administrative appeal periods from this Order have elapsed or,if such an appeal has been filed,until all proceedings before the Department or Court have been completed. i 1 242-1569,171 Brentwood Circle 00C 3 NACC 11/15/2012 i 1 DEP FILE#242 - 1569 1 1 , of machinery,storage of machinery or materials, stockpiling of soil, or construction activity is to occur beyond this line at any time 1 44. Staked and trenched silt fence shall be placed between all construction areas and 1 1 wetlands. The erosion control barrier will be properly installed and placed as shown on the plans approved and referenced herein and shall be inspected and approved by the 1 NACC or its agent prior to the start of construction and shall remain intact until all i disturbed areas have been permanently stabilized to prevent erosion. All erosion 1 1 prevention and sedimentation protection measures found necessary during i construction shall be implemented at the direction of the NACC or its agent The NACC reserves the right to impose additional conditions on portions of this project to I mitigate any impacts which could result from site erosion, or any noticeable degradation of surface water quality discharging from the site For example, 1 installation of erosion control measures may be required in areas not shown on the 1 t plan(s) referenced in this Order of Conditions. Should such installation be required by I the NACC, they shall be installed within 48 hours of the Commission' s request. i 45. The applicant shall have on hand at the start of any soil disturbance,removal or i I stockpiling, a minimum of 25' of additional silt fence and stakes for staking. Extra 1 erosion controls shall be used only for the control of emergency erosion problems and I shall not be used for the normal control of erosion. t t i i 46. A check payable to the Town of North Andover shall be provided in the amount of r i $1,500 which shall be in all respects satisfactory to Town Counsel,Town Treasurer, and 1 the NACC, and shall be posted with the North Andover Town Treasurer through the i NACC before commencement of work. Said deposit of money shall be conditioned on i the completion of all conditions hereof,shall be signed by a party or parties satisfactory i i to the NACC,and Town Counsel, and shall be released after completion of the project, i provided that provisions, satisfactory to the NACC, have been made for performance of I any conditions which are of continuing nature. The applicant may propose a monetary I release schedule keyed to completion of specific portions of the project for the NACC' s f review and approval. This condition is issued under the authority of the local By Law. 1 z 1 47. The applicant shall designate a Wetland Scientist (or other environmental professional i as approved by the NACC or its agent) as an"Erosion Control Monitor" to oversee any t i emergency placement of controls and regular inspection or replacement of sedimentation control devices. The name and phone number of the erosion control i monitor must be provided to the NACC in the event that this person has to be k k contacted, due to an emergency at the site, during any 24-hour period,including ! E weekends. Proof of the retained monitor must be submitted to the Conservation t Department on letterhead by the retained consulting firm. This person shall be given , c the authority to stop construction for erosion control purposes and the Environmental I Professional will immediately notify the Conservation agent of any matter that requires i attention by the Commission or the agent. The erosion control monitor will be required 1 t i g 242-1569, 171 Brentwood Circle 00C 5 NACC 11/15/2012 t DEPFILE#242 - 1569 terms and conditions. Thereafter, the contractor will be held jointly liable for any violation of this Order of Conditions resulting from failure to comply with its conditions. The applicant or contractor shall notify the NACC in writing of the identity of the on-site construction supervisor hired to coordinate construction and to ensure compliance with this Order. A reasonable period of time shall be provided as notice of the pre-construction meeting(e.g. 72 hours). STORMWATER MANAGEMENT CONDITIONS 52. There shall be no changes in post development conditions that alter the post development watershed boundaries as currently depicted in the Notice of Intent and approved by this Order of Conditions,unless specifically approved in writing by the Commission. 53. Water quality in down gradient BVW' s shall not differ significantly following completion of the project from the pre-development conditions. There shall be no sedimentation into wetlands or water bodies from discharge pipes or surface runoff leaving the site. DURING CONSTRUCTION 54. Upon beginning work,the applicant shall submit written progress reports weekly (as part of the erosion control monitoring report Condition#48 above) detailing what work has been done in or near resource areas, and what work is anticipated to be done over the next period. This will update the construction sequence. 55. De-watering activities are not anticipated as part of the proposed project. If emergency de-watering requirements arise,the applicant shall submit a contingency plan to the Commission for approval,which provides for the pumped water to be contained in a settling basin,to reduce turbidity prior to discharge into a resource area. 56. Any fill used in connection with this project shall be clean fill,containing no trash, refuse, rubbish or debris,including but not limited to lumber,bricks,plaster,wire,lath, paper, cardboard,pipe,tires, ashes, refrigerators,motor vehicles or parts on any of the foregoing. 57. All exposed soil finish grade surfaces shall be immediately landscaped and stabilized, or loamed, seeded and mulched,with a layer of mulch hay. All disturbed areas must be graded,loamed and seeded prior to November 1st of each year. Outside of the growing season,exposed soil finish grade surfaces shall be stabilized with a layer of mulch hay until climate conditions allow for seeding. During construction, any area of exposed soils that will be left idle for more than 30 days shall be stabilized with a layer of mulch hay or other means approved by the NACC. 242-1569, 171 Brentwood Circle OOC 7 NACC 11/15/2012 j 1 DEP FILE#242 - 1569 1 herbicides shall not be used within 100 feet of a wetland resource area This condition = shall survive this Order of Conditions and shall run with the title of the property. This i condition is issued under the authority of the Town' s Wetland Protection ByLaw and shall remain in perpetuity. 67. No backwashing is associated with the installed cartridge filtration. Draining of pool 3 water is not permitted directly into an area subject to jurisdiction of the Wetlands Protection Act and/or the North Andover Wetland Bylaw. Pool maintenance shall be done in accordance with the Swimming Pool Maintenance Requirements referenced in the Record Documents herein. This condition shall survive the issuance of a Certificate 1 of Compliance. 4 68. There shall be no dumping of leaves, grass clippings,brush, or other debris into a wetland resource areas or the 50-foot No-Disturb Zone. This condition shall remain in i perpetuity. 1 69. Upon completion of construction and grading, all disturbed areas located outside p resource areas shall be stabilized permanently against erosion. This shall be done by 'mining and seeding according to NRCS standards. Stabilization will be considered complete once full vegetative cover has been achieved. 70. Upon approved site stabilization by Conservation staff, the erosion controls shall be removed and properly disposed of and all exposed unvegetated areas shall be seeded. i 71. Upon completion of the project the applicant shall submit the following to the Conservation Commission as part of a request for a Certificate of Compliance: , a. WPA Form 8A- "Request for a Certificate of Compliance." b. A letter from the applicant requesting a Certificate of Compliance. c. The name and address of the current landowner. d. Signed statements from the individual property owners shall be submitted with the request for a Certificate of Compliance indicating that they read and understood the recorded Order of Conditions prior to purchasing their property. e. The name and address of the individual/trust or corporation to whom the compliance is to be granted. f. The street address and assessor' s map/parcel number for the project. g. The DEP file number. h. A written statement from a Registered Professional Civil Engineer (and/or Registered Professional Land Surveyor) of the Commonwealth certifying that the work has been conducted as shown on the plan(s) and documents referenced above, and as conditioned by the Commission. i. An"As-Built" plan prepared and signed and stamped by a Registered Professional Civil Engineer (and/or Registered Professional Land Surveyor) of the Commonwealth,for the public record. This plan will include: { i I 2424569, 171 Brentwood Circle OOC 9 NACC 11/15/2012 DEP FILE#242 - 1569 APPENDIX A-AFFIDAVIT on oath do hereby depose and state: (authorized agent applicant and/or current owner) (PLEASE CHECK AT LEAST ONE BLOCK) 1. Iamthe of (position with applicant) (applicant name or company name) the applicant upon whom Order of Conditions have been placed upon by (DEP or NACC number) the North Andover Conservation Commission. &/or 2. I am the of (position with owner) (owner name) the owner upon whose land Order of Conditions have been placed up by (DEP or NACC number) the North Andover Conservation Commission. 3. I hereby affirm and acknowledge that I have received said Order of Conditions and have read the same and understand each (DEP File#) and every condition which has been set forth in said Order of Conditions. ( & 4. I hereby affirm and acknowledge that on this day of 19 I inspected said property together with any and all improvements which have . been made to the same and hereby certify that each and every condition set forth in Order of Conditions are presently in compliance. (DEP File#) & && 5. I hereby affirm and acknowledge that this document will be relied upon by the North Andover Conservation Commission as well as any potential buyers of said property which is subject to said Order of Conditions (DEP File#) Signed under the pains and penalties of perjury this day of 19 (Signature-authorized agent of applicant or owner) 242-1569, 171 Brentwood Circle OOC 11 NACC 11/15/2012 Print Form 0`,�Y,eo ,,6'.40 ? :° RECEIVED 1:17.::::,,:,::.4�®,6 % TO'WH CLERK'S OFFICE 1 x ;t ' '' 2012 SEP 26 AM 10: I I 9 ,...j. 4` PLANNING DEPARTMENT NORTH ANDOVER g Community Development Division MASSACHUSETTS S s ecial Permit — Watershed Permit A s 1 lication Please type or print clearly. 1. Petitioner: Norse Environmental Services-Steven Eriksen i' Petitioner's Address: 92 Middlesex Road - Unit 4, Tyngsboro, Ma 01879 Telephone number: (978)649-9932 2.Owners of the Land: Rose Sandoval Address: 171 Brentwood Circle Number of years of ownership: (1)year t 3.Year lot was created: 1963 f 4. Is the lot currently on septic or sewer? I If on sewer,please provide date the sewer connection was completed: Sewer-connected on September 15, 1995. i 5. Description of Proposed Project: The petitioner is proposing to install an inground swimming pool, concrete deck/patio, chain link fence, associated grading and utilities within 100 ft of a Bordering Vegetated Wetland. i. t 6.Description of Premises: Existing single family dwelling, driveway and patio. t ) 7.Address of Property Being Affected: 171 Brentwood Circle Zoning District: R1- t Assessors Map: Map 64 Lot#: Lot 42 Registry of Deeds: Book#: 12606 Page#: 178 i 8. Existing Lot: (- Lot Area(Sq.Ft): 57,800 s.f. Building Height: 30 ft+/-(2 Stories) Street Frontage: 155 ft Side Setbacks: 27 ft Front Setback:83 ft Rear Setback:211 ft P Floor Area Ratio: N/A Lot Coverage: N/A F P 9.Proposed Lot(if applicable): Lot Area(Sq. Ft): Building Height: Street Frontage: Side Setbacks: Page 1 of 2 r 1600 Osgood Street,North Andover,Bldg.20,Suite 2-36 Planning Dept.,Massachusetts 01845 Phone 978.688.9535 Fax 978.688.9542 Web www.townofnorthandover.com Edited 8/6/07 1 t i i . 1 Front Setback: Rear Setback: Floor Area Ratio: Lot Coverage: t 10. Required Lot(as required by Zoning Bylaw): Lot Area(Sq. Ft): 87,120 s.f. Building Height: 35 ft Street Frontage: 175 ft Side Setbacks: 30 ft Front Setback: 30 ft Rear Setback: 30 ft I Floor Area Ratio: N/A Lot Coverage: N/A 1 11. Existing Building(if applicable): Ground Floor(Sq.Ft.): 2080 s.f. #of Floors: 2 Floors Total Sq. Ft.: 6130 s.f. Height: 30 ft+/- Use: Single Family Dwelling Type of Construction: Colonial t 12. Proposed Building: Ground Floor(Sq.Ft.): #of Floors: Total Sq. Ft. Height: Use Type of Construction: 1 13.Has there been a previous application for a Special Permit from the Planning Board on these premises? unkown If so,when and for what type of construction? 14.Section of Zoning Bylaw that Special Permit Is Being Requested 4.136 Watershed Protection Division I 15. Petitioner and Landowner signature(s): Every application for a Special Permit shall be made on this form, which is the official form of the Planning Board. Every application shall be filed with the Town Clerk's office. It shall be the responsibility of the petitioner to furnish all supporting documentation with this application. The dated copy of this application received by the Town Clerk or Planning Office does not absolve the applicant from this responsibility. The petitioner shall be responsible for all expenses for filing and legal notification. Failure to comply with application requirements, as cited herein and in the Planning Board Rules and Re!. . io`. may result in a dismissal by the Planning Board of this application as incomplete. ( . Petitioner's Signature: __, Print or type name here Steven Eriksen Owner's Signature: t/ is P Print or type name here: Rose P. Sandoval 16. Please list title of plans and documents you will be attaching to this application. ( t i Proposed Swimming Pool- 171 Brentwood Circle-Prepared By JM Associates dated 9/25/12 t f' f Page2of2 1 1600 Osgood Street,North Andover,BIdg.20,Suite 2-36 Planning Dept.,Massachusetts 01845 Phone 978.688.9535 Fax 978.688.9542 Web www.townofnorthandover.com Edited 8/6/07 r 1 t t t . t Abutter to Abutter ( ) Building Dept. ( ) Conservation ( X ) Zoning ( ) r, Town of North Andover t Abutters Listing t For Site Plan Review ti REQUIREMENT: MGL 40A,Section 11 states in part"Parties in Interest as used in this chapter shall mean the petitioner, abutters,owners of land directly oppositeon any public or private way,and abutters to abutters within t three hundred(300)feet of the property line of the petitioner as they appear on the most recent applicable f tax list,not withstanding that the land of any such owner is located in another city or town,the planning board of the city or town,and the planning board of every abutting city or town." i Subject Property: t MAP PARCEL's Name Address 64 3 8 42 Rose Sandoval 171 Brentwood Circle,North Andover,MA 01845 i hi4°'3 '-''''Pct(---�r .I Abutters Properties i Map Parcel's Name Address ( 64 2 Connie Yee 137 Brentwood Circle,North Andover,MA 01845 64 6 North Andover Country Club P.O.Box 99,North Andover,MA 01845 r' 64 9 Town of North Andover 120 Main Street,North Andover,MA 01845 t 64 37 Alden Lincoln 135 Brentwood Circle,North Andover,MA 01845 r; 64 38 David Fournier 15 Timber Lane,North Andover,MA 01845 64 39 30 Timber Lane Realty Trust 30 Timber Lane,North Andover,MA 01845 t . 64 40 William Duffy,Jr. 22 Timber Lane,North Andover,MA 01845 £, 64 41 Edward Brown 6 Timber Lane,North Andover,MA 01845 t, 64 43 Robert Kohalimi 191 Brentwood Circle,North Andover,MA 01845 t. 64 44 Timothy Galvin 205 Brentwood Circle,North Andover,MA 01845 64 45 Lazzaro Modigliani 217 Brentwood Circle,North Andover,MA 01845 64 54 Barbara Cataudella 200 Brentwood Circle,North Andover,MA 01845 t' 64 55 Robert Peterson 178 Brentwood Circle,North Andover,MA 01845 64 56 Daniel Carroll 150 Brentwood Circle,North Andover,MA 01845 t 64 57 Barbara James 132 Brentwood Circle,North Andover,MA 01845 64 72 David Kealler 257 Bridle Path,North Andover,MA 01845 t't 64 74 Denise Grasso 245 Bridle Path,North Andover,MA 01845 i t i'. t This certifies that the names appearing on the i records Hof the Assess/�� • e as of ' Certified by: I T%'ate 9®20/2— . t. / F 1 r, i f I 4 t ti; JM ASSOCIATES Civil Engineers-Land Surveyors-GPS 325 Main St. North Reading, Ma. 01864 t Tel. 978-664-6668 Fax 978-664-8155 l° www.imassociateseng.corn I i Sept. 25, 2012 1' I Infiltration Calculations t t Prepared For Rose Sandoval v 171 Brentwood Circle North Andover, Ma 01845 I t SOIL TYPE a Charleton Hydrologic Group B 8.7% Sutton Hydrologic Group B 91.3% I' i INFILTRATION VOLUME REQUIRED Vr C soils require .35 inches X impervious area 1 Total additional impervious area=pool deck and pool = 1,780 SF Vr=( .35 inches/ 12 inches per foot) X 1,780 SF = 51.9 cubic feet required(cf) INFILTRATION VOLUME PROVIDED Vp Volume of trench= 1.5' X 1' X 132' = 198 cf r v Porosity of stone=35% • Volume of voids =Vp = 198 X .35 = 69.3 cubic feet provided 1', t 69.3 cf >51.9 cf OK o■OF ss JOHN F. N . WOMAN Jr. v cMl cci� NO.31262 Q 1 Ap pF�FGISTE�`0��41 FSSIONAI. j f° i s i ))) NORSE ENVIRONMENTAL SERVICES, INC. „;,iii:'irti 11' 92 Middlesex Road, Unit 4 Tyngsboro, MA 01879 TEL. (978) 649-9932 • FAX(978) 649-7582 Website: www.norseenvironmental.com September 26, 2012 North Andover Planning Board 1600 Osgood Street, Bldg 20, Suite 2-36 North Andover, Ma 01845 Re: Watershed Special Permit Application 1 171 Brentwood Circle North Andover, Ma 01845 , Planning Board Members: t E tr The following written summary is prepared on behalf of the owner/applicant, Rose Sandoval, in support of constructing an inground swimming pool, patio, waterfall, chain link fence, landscaping, grading and utilities within 100 foot"Non-Disturbance" Zone as defined under the Watershed District Bylaw. The property is located within the General Zone of the Watershed Protection District and the lot was created in 1963. i The following items as outlined in the Watershed Special Permit requirements are listed i below(responses to required items are in italic); 1. Encouraging the most appropriate use of land: t; This site is zoned residential with an existing single family dwelling. The proposal is for an accessory to the single family dwelling. 2. Preventing overcrowding of land: The proposed swimming pool construction has a footprint area that will only i;' cover 3.1%of the lot area. 3. Conserving the value of land and buildings: k The swimming pool is proposed within an existing area of lawn. The proponent is proposing to remove (5) trees for the installation of the swimming pool. Every effort has been made to conserve the value of the land. F; 4. Lessening congestion of traffic: This project will not impact traffic congestion since this is a single family dwelling accessory use project. e 5. Preventing undue concentration of population: k This project is a single family dwelling accessory use which is consistent with surrounding properties and as such will not have a measurable impact on population. f 1 z i 4 5: 1 6. Providing adequate light and air: There will be no adverse impact to current background air and light levels. 1 P Sry' g 7. Reducing the hazards from fire and other danger: There will be no increase in hazard levels from fire or other dangers. The proposed swimming pool structure will meet Building Code requirements. 8. Assisting in the economical provisions of transportation, water, sewerage, schools, parks, and other public facilities: 1? This project will not impact the above noted public facilities and/or utilities. There will not be a negative impact to the economics of any public utility. 9. Controlling the use of bodies of water, including watercourses: This project does not directly abut Lake Cochichewick and will not have a negative impact on present uses of the Lake or tributaries thereto. t. 10. Reducing the probability of losses resulting from floods: This property is not located within a designated Flood Plain as shown as the I latest FIRM maps. The proposed swimming pool construction will utilize drainage mitigation to collect & recharge stormwater runoff back to the groundwater table. There will be no increase of stormwater runoff from this site There will be no increase in flooding probability due to the installation of the swimming pool. 11. Reserving and increasing the amenities of the Town: This project will increase the amenities of the Town through an improvement to the property and additional tax revenue due to the new construction assessment. I The Planning Board, in reviewing this application, will note that all threshold r requirements for granting the Special Permit are met and/or exceeded. Further written documentation is provided below (responses to required items are in >" italics) n 1. Written certification by a Registered Professional Engineer, or other scientist educated in and possessing extensive experience in the science of hydrology and hydrogeology, stating that there will not be any significant degradation of the quality or quantity or water in or entering Lake Cochichewick. I 1) No pesticides,fungicides, chemicals, or non-organic fertilizers will be used in lawn care or maintenance. 2) Siltation controls are proposed at the limit of work during construction and until the site is final stabilized by landscaped means to protect the lake and surrounding properties from any potential runoff impacts. L 3) Stormwater mitigation has been provided to account for all impervious areas. Runoff associated with impervious surface will be conveyed to an infiltration trench that surrounds the perimeter of proposed swimming pool. f. t 2 1' 4) The proposed swimming pool will not increase the nitrogen levels over the existing background levels at the property. 5) This site does not directly abut the lake. The existing natural wooded buffer will be maintained except for the removal of(5) trees for the construction and installation of the swimming pool. 6) Carefully planning went into the pool location to limit site grading changes and to match the existing topography. By limiting the grading changes onsite, existing drainage watercourses will continue to function as in the undeveloped state. 2. Proof that there is no reasonable alternative location outside the Non-Disturbance and/or Non-Discharge Buffer Zones, whichever is applicable, for any discharge, structure, or activity, associated with the proposed use to occur. The petitioner cannot site the proposed swimming pool outside the "Non- Disturbance and/or Non-Discharge Buffer Zone. The pool maybe able to shift to the east by approximately 10 ft however the pool will still encroach within portions of the No Disturbance and/or Non-Discharge Buffer Zone. Approximately %2 of the proposed work is located within the Non-Disturbance Zone. 3. Evidence of approval by Mass DEP of any industrial waste water treatment or disposal system or any waste water treatment of system 15,000 GPD capacity. This item does not apply to this site 4. Evidence that all on-site operations including, but not limited to, construction, water disposal, fertilizer applications, and septic systems will not create concentrations of Nitrogen in groundwater, greater than the federal limit at the downgradient property boundary. The on-site operations including, but not limited to, construction, water disposal, fertilizer applications, and septic systems will not create concentrations of Nitrogen in groundwater, greater than the federal limit at the downgradient property boundary. The proposed swimming pool will be designed with a cartridge filter and therefore a backwash is not required as it is a closed system. A deed restriction only allowing organic or slow-release nitrogen,phosphorus free product for fertilizer use will insure that background nitrogen levels in the groundwater table will not be increased 5. Projections of downgradient concentrations of nitrogen,phosphorus, and other relevant chemicals at property boundaries and other locations deemed pertinent by the SPGA. 3 F r There will be no downgradient concentration of the above referenced chemicals as outlined in the response to Item 4 above. rt If you should have any questions or require additional information please feel free to contact me. Very Truly'Yours;1 7. Steven Eriksen Cc: Rose Scandoval i r r i i r t 1 I i I 1 1 t 4 dCi COQ Ofd 4 R A N @t]0' A L I NORSE ENVIRONMENTAL SERVICES, INC. )��,, n 90l Middlesex Road, Suite sr y Tyngsboro,Mass. 01879 DATE 7 I996 I/ I JOB NO TEL. (978)649-9932 • FAX(978)649-7582 ATTENTIOIr ��/ C'e / W �/e, RE JJ TO /�O. An d o,�e,e nl � ic low) Ado r) cS toe 14-&4-e rs h e d Spec i s l P11t IVd. P-nd eye e L1 O/&11s 7 / �re� �Ltlooc3� ��C/c°_ / i Co dde ✓e,, M,9 0 ONS WE ARE SENDING YOU ❑Attached ❑ Under separate cover via the following items: ❑ Shop drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of letter ❑ Change order ❑ COPIES DATE NO. DESCRIPTION / Norse )e c da.kd 9=09 1,-/�, Wa-�rshed Pei-mil- , ph'64 hdi-7 r, h l-Pecs 1,/,c7 7'A-4 Aas e6J 4 ,S Icvi a Ili")s fpm() r THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval ❑ For your use ❑ Approved as noted ❑ Submit copies for distrubution — ❑ As requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ El BIDS DUE 19 ❑ PRINTS RETURNED AFTER LOAN TO US if REMARKS g COPY TO SIGNED: