Loading...
HomeMy WebLinkAboutMiscellaneous - 100 BRIDLE PATH NORTIr C:I'C'E D �0�4 "0 Town of North Andover 3 a ° °c `"- Office of the Planning Department 2010 HAY 2 I PH I: 4E4 � , ,,4,* Community Development and Services Division °'�Ai!°�fP �J , Et< 1600 Osgood Street NORM r.l u s.icHUS sati1,ki , North Andover, Massachusetts 01845 MA S S A f`;!'-;',:.`';; I I NOTICE OF DECISION Watershed Special Permit- Waiver Date of Decision: May 18,2010 t Application of: Brendan Salach 100 Bridle Path North Andover, MA 01845 Premises Affected: 100 Bridle Path., North Andover, MA 01845, Map 104.C, Parcel 72, within the R-1 zoning district. $ HISTORY AND BACKGROUND On May 18, 2010, the applicant requested a waiver of the Watershed Protection District Special i Permit, in accordance with the North Andover Zoning Bylaw section 4.136.8, so as to allow the 1 construction of a two-tiered deck, with the following dimensions: 15 X 16 sq. ft. and 8 X 7 sq. ft. (total 296 sq.ft.) with stairs, at the rear of the dwelling unit. The deck will replace an existing deck of 214 sq. ft. and will be built in the same location as the existing deck. The net increase of , square footage is 82 sq. ft. The new deck will be built using sonatubes and will be located outside of the 50 ft. buffer from a delineated wetland resource area within the Non-Disturbance buffer zone of the Watershed Protection District. The applicant applied for and received an Order of Conditions from the Conservation Commission on May 19, 2010 for a Small Project. The Commission also approved the wetlands delineation performed by the applicant's wetlands scientist. 1 DECISION 1' After a Planning Board meeting on the above date, and upon a motion by R. Rowen and a 2nd by M. Walsh, a vote was taken with regard to a waiver of the Watershed Special Permit. The vote it was unanimous in favor of the waiver. FINDING OF FACT The Planning Board has made its decision based on the following findings: • The porch will be located adjacent to the existing deck, using a hand-dug concrete 1 sonotube foundation, which will located outside of the 50 ft buffer of the delineated wetland area. • The deck will be built according to the revised engineered plan dated May 19, 2010, produced by Merrimack Engineering, titled Plan of Land in North Andover, Prepared for t. Brendan Salach, dated May 19, 2010. • The plan has been approved by the Town of North Andover Conservation Commission. CONDITIONS The applicant has agreed to have the Town Planner perform a minimum of two inspections of the site during the construction process Proper erosion control will be constructed and will remain throughout the project. n - N h Andover Planning Board J hn Simons, Chairman Courtney LaVolpicelo Tim Seibert Michael Walsh Richard Rowen R gYg, 4¢' fl f 1 p{p. 2 ■ $ORrh CrII/E0 3?e„ 4,6 Town of North Anda .fir " r '" Office of the Planning Deiartme t ,.. * Community Development and Services Div? A, 5 il, ,4reo t1y S1' 1600 Osgood Street .I-, :,; 3 North Andover, Massachusett L 1 _ 'Z NOTICE OF DECISION Watershed Special Permit -Waiver t Date of Decision: May 18,2010 1 i Application of: Brendan Salach ti 100 Bridle Path t North Andover, MA 01845 x i t Premises Affected: 100 Bridle Path., North Andover, MA 01845, Map 104.C, Parcel 72, within the R-1 zoning district. k 5• HISTORY AND BACKGROUND On May 18, 2010, the applicant requested a waiver of the Watershed Protection District Special Permit, in accordance with the North Andover Zoning Bylaw section 4.136.8, so as to allow the construction of a two-tiered deck, with the following dimensions: 14 X 17 sq. ft. and 8 X 7 sq. ft. (total 294 sq.ft.) with stairs, at the rear of the dwelling unit. The deck will replace an existing deck of 214 sq. ft. and will be built in the same location as the existing deck. The net increase of square footage is 82 sq. ft. The new deck will be built using sonatubes and will be located I' outside of the 50 ft. buffer from a delineated wetland resource area within the Non-Disturbance buffer zone of the Watershed Protection District. f The applicant applied for and received an Order of Conditions from the Conservation C i. ommission on May 19, 2010 for a Small Project. The Commission also approved the wetlands delineation performed by the applicant's wetlands scientist. i' DECISION After a Planning Board meeting on the above date, and upon a motion by R. Rowen and a 2nd by F M. Walsh, a vote was taken with regard to a waiver of the Watershed Special Permit. The vote was unanimous in favor of the waiver. { FINDING OF FACT The Planning Board has made its decision based on the following findings: t • The porch will be located adjacent to the existing deck, using a hand-dug concrete tt sonotube foundation, which will located outside of the 50 ft buffer of the delineated wetland area. • The deck will be built according to the revised engineered plan dated May 19, 2010, f produced by Merrimack Engineering, titled Plan of Land in North Andover, Prepared for Brendan Salach, dated May 19, 2010. t tit i 4 IN • The plan has been approved by the Town of North Andover Conservation Commission. CONDITIONS The applicant has agreed to have the Town Planner perform a minimum of two inspections of the site during the construction process Proper erosion control will be constructed and will remain throughout the project. f/66/1 rth Andover anning Board John Simons, Chairman Courtney LaVolpicelo Tim Seibert Michael Walsh Richard Rowen a I e'- 2