HomeMy WebLinkAbout642 CHICKERING ROAD Massachusetts Department of Environmental Protection Provided by MassOEP:
Bureau of Resource Protection -Wetlands 242-1471
�\ WPA Form 5 — Order of Conditions MessgEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eoE Transaction#
North Andover
Clty/Toan
A. General Information
Important: North Andover
When filling 1. From: Conservation commission
out forms
on the z.This issuance is for
computer, (check one): a.®Order of Conditions b.ElAmended Order of Conditions
use only the '
tab key to 3. To: Applicant:
move your
cursor-do James Barrett
not use the a. First Name b.Last Name
return key. Environmental Pools, Inc.
Q organvabon
184-R Riverneck Road
d.Mailing Address
Chelmsford MA 01824
e.City/roan L State g.Zip Code
4. Property Owner(if different from applicant):
a.First Name b.Last Name
Brookside Homeowners
c.Organization
642 Chickering Road
d.Mailing Address
North Andover MA 01845
e.Cityrroan f.suite g.LP Code
5. Project Location:
0 East Water Street North Andover
a.Street Address b.Cayrrovm
83 Parcel 5
C.Assessors MaplPlat Number d.ParceIA of Number
Latitude and Longitude, if known: 42d4l'm57's 7109'm52"s
d.Latitude e.Longitude
warn«i,is.aoo ,...osvec+o
vew+alz
Massachusetts Department of Environmental Protection Providetl by ManDER
Bureau of Resource Protection -Wetlands 242-1471
WPA Form 5 - Order of Conditions MassDEP-File 0
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEPTrensadion#
North Andover
Cityrrown
B. Findings (cont.)
Denied because:
b. ❑ the proposed work cannot be conditioned to meet the performance standards set forth
in the wetland regulations. Therefore, work on this project may not go forward unless and
until a new Notice of Intent is submitted which provides measures which are adequate to
protect the interests of the Act, and a final Order of Conditions is issued. A description of
the performance standards which the proposed work cannot meet is attached to this
Order.
c. ❑ the information submitted by the applicant is not sufficient to describe the site, the
work, or the effect of the work on the interests identified in the Wetlands Protection Act
Therefore, work on this project may not go forward unless and until a revised Notice of
Intent is submitted which provides sufficient information and includes measures which are
adequate to protect the Ad's interests, and a final Order of Conditions is issued. A
description of the specific information which is lacking and why it is necessary is
attached to this Order as per 310 CMR 10.05(6)(c).
3. ❑ Buffer Zone Impacts: Shortest distance between limit of project
dist,irbance and the wetland resource area specified in 310 CMR 10.02(1)(a) a.limer feet
Inland Resource Area Impacts: Check all that apply below. (For Approvals Only)
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
a. ❑ Bank a.limarfeet b.linearfeet c.linearfeet d.linearfeet
5. ❑ Bordering
Vegetated Wetland e.square feet b.square feet c square feet d.square feet
6. ❑ Land Under
Waterbodies and a.square feet b.square feet c.square Leet tl.square feet
Waterways
e.ory dredged f.Ny dredged
7. ® Bordering Land 0 0 0 0
Subject to Flooding a.square feet b.square feat c.Square Not d.square feet
Cubic Feet Flood Storage e.orbic feet f.orbic feet
g.cubic feet h.cubic feet
s. ❑ Isolated Land
Subject to Flooding e.square feet b.square feet
Cubic Feet Flood Storage c.cubicfeet d.cubic feet e.cubic feet f.cubic feet
e. ® Riverfront Area 3,735
e rrom.,, rm D.total sq.feat
Sq It within 100 it 3,735 3735 in-kind pool
.-, d.square feet e.square feet solacement
Sq ft between 100- 0�� p 0 0
200 ft g.square feet h.squaw feet ye, 1.square feet
wmams eon ,..oazrmro p�3mt2
Massachusetts Department of Environmental Protection provided by ManDEP:
Bureau of Resource Protection - Wetlands 242-1471
WPA Form 5 - Order of Conditions MassDEP Re#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEPT,n ,fton#
North Andover
City?own
B. Findings (cont.)
•#22. If the
pmiied is for zz. ❑ Restoration/Enhancement':
Me purpose of
restoring
efflaa. uare feet of BVw
enhancing a T'4111 feet of ,it marsh
wetland
resource area zs. ❑ Stream Crossing(s):
in addition to
the square
footage that a.number of new stream crossings b.number of replaeemem sfmam crossings
has been C. General Conditions Under Massachusetts wetlands Protection Act
entered in
section B.5.c
(BWor
B,17.c(Sah The following conditions are only applicable to Approved projects.
Marsh)above, 1 Failure to comply with all conditions stated herein, and with all related statutes and other
please enter
the additional regulatory measures, shall be deemed cause to revoke or modify this Order.
amount here. 2. The Order does not grant any property rights or any exclusive privileges; it does not
authorize any injury to private property or invasion of private rights.
3. This Order does not relieve the penmittee or any other person of the necessity of complying
with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations.
4. The work authorized hereunder shall be completed within three years from the date of this
Order unless either of the following apply:
a, the work is a maintenance dredging project as provided for in the Act; or
b. the time for completion has been extended to a specified date more than three years,
but less than five years, from the date of issuance. If this Order is intended to be valid
for more than three years, the extension date and the special circumstances warranting
the extended time period are set forth as a special condition in this Order.
5. This Order may be extended by the issuing authority for one or more periods of up to three
years each upon application to the issuing authority at least 30 days prior to the expiration
date of the Order.
6. If this Order constitutes an Amended Order of Conditions, this Amended Order of
Conditions does not extend the issuance date of the original Final Order of Conditions and
the Order will expire on unless extended in writing by the Department.
7. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash,
refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath,
paper, cardboard, pipe,tires, ashes, refrigerators, motor vehicles, or parts of any of the
foregoing.
8. This Order is not final until all administrative appeal periods from this Order have elapsed,
or if such an appeal has been taken, until all proceedings before the Department have
been completed,
syera„s.aoc. rw.avumro
P•ae 5 m 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection -Wetlands 242-1471
�\ WPA Form 5 - Order of Conditions ManDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
North Andover
Ckyrro
C. General Conditions Under Massachusetts Wetlands Protection Act (cont.)
18. All sedimentation barriers shall be maintained in good repair until all disturbed areas have
been fully stabilized with vegetation or other means.At no time shall sediments be
deposited in a wetland or water body. During construction, the applicant or his/her
designee shall inspect the erosion controls on a daily basis and shall remove accumulated
sediments as needed. The applicant shall immediately control any erosion problems that
occur at the site and shall also immediately notify the Conservation Commission, which
reserves the right to require additional erosion and/or damage prevention controls it may
deem necessary. Sedimentation barriers shall serve as the limit of work unless another
limit of work line has been approved by this Order.
NOTICE OF STORMWATER CONTROL AND MAINTENANCE REQUIREMENTS
19. The work associated with this Order (the "Project') is (i)❑ is not(2)®subject to the
Massachusetts Stormwater Standards. If the work is subject to the Stormwater
Standards, then the project is subject to the following conditions:
a) All work, including site preparation, land disturbance, construction and redevelopment,
shall be implemented in accordance with the construction period pollution prevention and
erosion and sedimentation control plan and, if applicable, the Stormwater Pollution
Prevention Plan required by the National Pollution Discharge Elimination System
Construction General Permit as required by Stormwater Condition 8. Construction period
erosion, sedimentation and pollution control measures and best management practices
(BMPs)shall remain in place until the she is fully stabilized.
b) No stormwater runoff maybe discharged to the post-construction stormwater BMPs
unless and until a Registered Professional Engineer provides a Certification that:
i. all construction period BMPs have been removed or will be removed by a date certain
specified in the Certification. For any construction period BMPs intended to be converted
to post construction operation for stormwater attenuation, recharge, and/or treatment, the
conversion is allowed by the MassDEP Stormwater Handbook BMP specifications and that
the BMP has been propedy cleaned or prepared for post construction operation, including
removal of all construction period sediment trapped in inlet and outlet control structures;
fl. as-built final construction BMP plans are included, signed and stamped by a Registered
Professional Engineer, certifying the site is fully stabilized;
iii. any illicit discharges to the stormwater management system have been removed, as per
the requirements of Stormwater Standard 10;
iv. all post-construction stormwater BMPs are installed in accordance with the plans
(including all planting plans)approved by the issuing authority, and have been inspected to
ensure that they are not damaged and that they are in proper working condition;
v. any vegetation associated with post-construction BMPs is suitably established to
withstand erosion.
avvmio
Peoerais
Massachusetts Department of Environmental Protection Prowled by MassDEP:
Bureau of Resource Protection -Wetlands 242-1471
WPA Form 5 — Order of Conditions MassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 aDEPTmnseclion#
North Andover
cftyrro
C. General Conditions Under Massachusetts Wetlands Protection Act(cont.)
g) The responsible party shall:
1. Maintain an operation and maintenance log for the last three(3)consecutive
calendar years of inspections, repairs, maintenance and/or replacement of the
stormwater management system or any part thereof, and disposal (for disposal the
log shall indicate the type of material and the disposal location);
2. Make the maintenance log available to MassDEP and the Conservabon
Commission ("Commission") upon request; and
3. Allow members and agents of the MassDEP and the Commission to enter and
inspect the site to evaluate and ensure that the responsible party is in compliance
with the requirements for each BMP established in the O&M Plan approved by the
issuing authority.
h) All sediment or other contaminants removed from stormwater BMPs shall be disposed
of in accordance with all applicable federal, state, and local laws and regulations.
I) Illicit discharges to the stormwater management system as defined in 310 CMR 10.04
are prohibited.
j) The stormwater management system approved in the Order of Conditions shall not be
changed without the prior written approval of the issuing authority.
k) Areas designated as qualifying pervious areas for the purpose of the Low Impact Site
Design Credit(as defined in the MassDEP Stonowater Handbook, Volume 3, Chapter 1,
Low Impact Development She Design Credits)shall not be altered without the prior written
approval of the issuing authority.
1) Access for maintenance, repair, and/or replacement of BMPs shall not be withheld.
Any fencing constructed around stormwater BMPs shall include access gates and shall be
at least six inches above grade to allow for wildlife passage.
Special Conditions(if you need more space for additional conditions, please attach a text
document):
See Attached
.wm,ms a« reg.oazzofo
Pge9d13
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 242-1471
A`\ WPA Form 5 - Order of Conditions MassDEP File if
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 ZEPTnnsaction#
North Andover
City/Town
E. Signatures
This Order is valid for three years,unless otherwise specified as a special
condition pursuant to General Conditions#4,from the date of issuance. t.Data of Issuance
Please indicate the number of members who will sign this form.
This Order must be signed by a majority of the Conservation Commission. 2.Number of signers
The Order must be mailed by certified mail(retum receipt requested)or hand delivered to the applicant.A
copy also must be mailed or hand delivered at the same time to the appropriate Department of
Environmental Protection Regional Office, if not filing electronically, and the property owner,If different
from applicant.
Signatu n
❑ by hand delivery on W by certified mail, return receipt
Dam rea //N ,in�/ C�
Date I
F. Appeals
The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the
land subject to this Order, or any ten residents of the city or town in which such land is located,
are hereby notified of their right to request the appropriate MassDEP Regional Office to issue a
Superseding Order of Conditions. The request must be made by certified mail or hand delivery
to the Department, with the appropriate filing fee and a completed Request of Departmental
Action Fee Transmittal Form, as provided in 310 CMR 10.03(7)within ten business days from
the date of issuance of this Order. A copy of the request shall at the same time be sent by
certified mail or hand delivery to the Conservation Commission and to the applicant, 9 he/she is
not the appellant.
Any appellants seeking to appeal the Department's Superseding Order associated with this appeal
will be required to demonstrate prior participation in the review of this project. Previous participation
in the permit proceeding means the submission of written information to the Conservation
Commission prior to the close of the public hearing, requesting a Superseding Order, or
providing written information to the Department prior to issuance of a Superseding Order.
The request shall state clearly and concisely the objections to the Order which is being
appealed and how the Omer does not contribute to the protection of the interests identified in
the Massachusetts Wetlands Protection Act(M.G.L. c. 131, §40), and is inconsistent with the
wetlands regulations(310 CMR 10.00).To the extent that the Order is based on a municipal
ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the
Department has no appellate jurisdiction.
wmom,s.doo. re..O.N.
P.�11112
LGr rML R 1.4L- 14/1
Therefore,the North Andover Conservation Commission(hereafter the"NACU) hereby
finds that the following conditions are necessary,in accordance with the Performance
Standards set forth in the State Regulations, the local ByLaw and Regulations,to protect
those interests noted above. The NACC orders that all work shall be performed in
accordance with said conditions and with the Notice of Intent referenced below. To the
extent that the following conditions modify or differ from the plans specifications or other
proposals submitted with the Notice of Intent the conditions shall control.
GENERAL CONDITIONS
19.The proposed work includes: Reconstruction of existing 3,735 s.f. in-ground pool with
associated concrete and porous paver decking,re-plumbing, and improvement of a
stormwater swale with appurtenant site work and grading within Riverfront Area and
Buffer Zone to Inland Bank.
20.The work shall conform to the following:
Applicant: Environmental Pools, Inc.
184-R Rivemeck Road
Chelmsford, MA 01824
Property Owner: Brookside Homeowners
642 Chickering Road
North Andover, MA 01845
Notice of Intent filed by: John Murphy
Merrimack Engineering Services, Inc.
66 Park Street
Andover,MA 01810
Dated: 3/17/10
Site Plans prepared by: Vladimir Nemchenok,P.E.
Merrimack Engineering Services,Inc.
66 Park Street
Andover,MA 01810
Titled: Site Plan land in North Andover,Massachusetts
Prepared for Environmental Pools, Inc.
Dated: March 16,2010
Revised: April 7,2010
21.The term"Applicant' as used in this Order of Conditions shall refer to the owner,any
successor in interest or successor in control of the property referenced in the Notice of
Intent,supporting documents and this Order of Conditions. The NACC shall be notified
242-1471,8rooWde P.idoc 1 NACC4/16/2010
31. The following wetland resource areas are affected by the proposed work: Buffer Zone to
Inland Bank and Riverfront Area. These resource areas are significant to the interests of
the Act and Town ByLaw as noted above and therein. The applicant has not attempted to
overcome the presumption of significance of this resource area to the identified interests.
32. The NACC agrees with the applicant's delineation of the wetland resource area (wetland
flags RFI -RF8 on the site as shown on the revised plans dated referenced herein.
33.The NACC finds that the intensive use of the upland areas and buffer zone proposed on
this site will cause further alteration of the wetland resource areas. In order to prevent
any alteration of wetland resource areas a twenty five foot(25') No-Disturbance Zone and
a fifty foot(50')No-Construction Zone shall be established from the edge of the adjacent
wetland resource area. The Conservation Administrator and/or other agents of the
NACC do not have the authority to waive these setbacks as established under the local
bylaw.
34. This document shall be included in all construction contracts,subcontracts,and
specifications dealing with the work proposed and shall supersede any conflicting
contract requirements. The applicant shall assure that all contractors, subcontractors,and
other personnel performing the permitting work are fully aware of the permits terms and
conditions. Thereafter, the contractor will be held jointly liable for any violation of this
Order resulting from failure to comply with its conditions.
35. The owners of the project andtheir successors in title agree that the Order does not in
itself impose upon the Town any responsibility to maintain the proposed drainage system
and that said Town shall not be liable for any damage in the event of failure. By
acceptance of this Order,the owners agree to indemnify and hold harmless to the Town
and its residents for any damage attributable to alterations undertaken on this property
pursuant to the Order. Issuance of these Conditions does not in any way imply or certify
that the site or downstream areas will not be subject to flooding,storm damage or any
other form of water damage.
PRIOR TO CONSTRUCTION
36. No work shall be undertaken until all administrative appeal periods from this Order have
elapsed or,if such an appeal has been filed, until all proceedings before the Department
or Court have been completed.
37. This Order shall be recorded by the applicant at the Registry of Deeds immediately after
the expiration of all appeal periods. No work shall be undertaken until the Final Order
has been recorded in the Registry of Deeds or the Land Court for the district in which the
land is located, within the chain of title of the affected property. In the case of recorded
land,the Final Order shall also be noted in the Registry's Grantor Index under the name
of the owner of the land upon which the proposed work is to be done. In the case of
242-1471,13rookside Pool.doc 3 NACC 4/162010
u- 1.1rc(*k- 14/1
intact until all disturbed areas have been permanently stabilized to prevent erosion.Silt
fence proposed along the existing pool fence shall be trenched and backed by either hay
bales or other erosion control product. All erosion prevention and sedimentation
protection measures found necessary during construction shall be implemented at the
direction of the NACC or its agent. The NACC reserves the right to impose additional
conditions on portions of this project to mitigate any impacts which could result from site
erosion, or any noticeable degradation of surface water quality discharging from the site.
For example, installation of erosion control measures may be required in areas not shown
on the plan(s) referenced in this Order of Conditions. Should such installation be
required by the NACC, they shall be installed within 48 hours of the Commission's
request.
44. The applicant shall have on hand at the start of any soil disturbance,removal or
stockpiling,a minimum of 10 hay bales and sufficient stakes for staking these bales (or an
equivalent amount of silt fence, 1 hay bale to equal 3 feet of fence). Said bales shall be
used only for the control of emergency erosion problems and shall not be used for the
normal control of erosion.
45. A check payable to the Town of North Andover shall be provided in the amount of$2,000
which shall be in all respects satisfactory to Town Counsel, Town Treasurer, and the
NACC,and shall be posted with the North Andover Town Treasurer through the NACC
before commencement of work. Said deposit of money shall be conditioned on the
completion of all conditions hereof, shall be signed by a party or parties satisfactory to the
NACC,and Town Counsel,and shall be released after completion of the project,provided
that provisions, satisfactory to the NACC,have been made for performance of any
conditions which are of continuing nature. The applicant may propose a monetary
release schedule keyed to completion of specific portions of the project for the NACC's
review and approval. This condition is issued under the authority of the local ByLaw.
46. The applicant shall designate a Wetland Scientist(or other environmental professional as
approved by the NACC or its agent) as an"Erosion Control Monitor' to oversee any
emergency placement of controls and regular inspection or replacement of sedimentation
control devices. The name and phone number of the erosion control monitor must be
provided to the NACC in the event that this person has to be contacted, due to an
emergency at the site,during any 24-hour period,including weekends. The
Environmental Professional will immediately notify the Conservation agent of any matter
that requires attention by the Commission or the agent. The erosion control monitor will
be required to inspect all such devices and oversee cleaning and the proper disposal of
waste products. Cleaning shall include removal of any entrapped silt.
47. At least once during each week in which construction activities occurs on-site and for as
long thereafter as ground remains unstabilized, the applicant shall submit a written
report from the "Erosion Control Monitor"to the NACC certifying that, to the best of
his/her knowledge and belief based on a careful site inspection, all work is being
performed in compliance with this Order of Conditions and that approved setbacks are
242-1471,B,00ksi&Pool.doc 5 NACC 4/16/2010
LGr r Zit1.9L - 14/1
50. There shall be no increase in the post development discharges from the storm drainage
system or any other changes in post development conditions that alter the post
development watershed boundaries as currently depicted in the Notice of Intent and
approved by this Order of Conditions, unless specifically approved in writing by the
Commission.
51. Water quality in down gradient BV W's shall not differ significantly following
completion of the project from the pre-development conditions. There shall be no
sedimentation into wetlands or water bodies from discharge pipes or surface runoff
leaving the site.
52.Pervious pavers shall be used in the reconstruction of the outer 24" of the pool deck.
This portion of the deck shall remain pervious in perpetuity.
53. The grass swale,to replace the existing asphalt swale,shall be maintained by the
property owner in perpetuity. Maintenance shall include regular mowing and debris
removal.
DURING CONSTRUCTION
54. Upon beginning work,the applicant shall submit written monthly progress reports
detailing what work has been done in or near resource areas,and what work is
anticipated to be done over the next period. This will update the construction
sequence.
55. Accepted engineering and construction standards and procedures shall be followed in
the completion of the project.
56. The pool filter shall be cartridge type with no back wash allowed. Pool supplies must
be stored inside a shed 25' or more away from delineated resource areas.
57. In lieu of a construction entrance,all construction vehicles shall access the site via the
existing parking area. The area shall be kept clean and/or swept daily during
construction. Catch basins in the work area shall be protected with silt sacks.
58. Erosion control devices shall be inspected regularly; any entrapped silt shall be
removed to an area outside of the buffer zone and wetland resource areas;silt fence
and hay bales shall be replaced as necessary. The areas of construction shall remain in
stable condition at the close of each construction day. All erosion controls shall be in
place throughout the duration of any construction on site or unless authorized by the
Conservation personnel.
59. Approved de-watering activities anticipated shall be supervised and witnessed by the
designated erosion control monitor. This designee must be on-site while work specific
242-1471,Brookside P.Ldm 7 NACC4/16@010
67. During and after work on this project, there shall be no discharge or spillage of fuel,or
Other pollutants into any wetland resource area. If there is a spill or discharge of any
pollutant during any phase of construction the NACC shall be notified by the
applicant within one (1) business day. No construction vehicles are to be stored within
100 feet of wetland resource areas,and no vehicle refueling, equipment lubrication,or
maintenance is to be done within 100 feet of a resource area.
AFTER CONSTRUCTION
68. No underground storage of fuel oils shall be allowed on any lot within one-hundred
(100)feet of any wetland resource area. This condition shall survive this Order of
Conditions and shall run with the title of the property. This condition is issued under
the authority of the Town's Wetland protection ByLaw.
69.Fertilizers utilized for landscaping and lawn care shall be slow release,low-nitrogen
types (<5%),and shall not be used within 25 feet of a resource area. Pesticides and
herbicides shall not be used within 100 feet of a wetland resource area. This condition
shall survive this Order of Conditions and shall run with the title of the property. This
condition is issued under the authority of the Town's Wetland Protection ByLaw and
shall remain in perpetuity.
70. Upon completion of construction and grading, all disturbed areas located outside
resource areas shall be stabilized permanently against erosion. This shall be done by
loaming and seeding according to NRCS standards. Stabilization will be considered
complete once full vegetative cover has been achieved.
71. Upon approved site stabilization by Conservation staff, the erosion controls shall be
removed and properly disposed of and all exposed unvegetated areas shall be seeded.
72. Upon completion of the project the applicant shall submit the following to the
Conservation Commission as part of a request for a Certificate of Compliance:
a. WPA Form 8A - "Request for a Certificate of Compliance."
b. A letter from the applicant requesting a Certificate of Compliance.
c. The name and address of the current landowner.
d. Signed statements from the individual property owners shall be submitted with
the request for a Certificate of Compliance indicating that they read and
understood the recorded Order of Conditions prior to purchasing their property.
e. The name and address of the individual/trust or corporation to whom the
compliance is to be granted.
f. The street address and assessor's map/parcel number for the project.
g. The DFS'file number.
h. A written statement from a Registered Professional Civil Engineer(and/or
Registered Professional Land Surveyor) of the Commonwealth certifying that the
242-1471.13roobide Pool.dac 9 NACC 4/162010
➢ Discharge or spillage of pollutants (Condition# 67);
➢ Prohibition of underground fuels (Condition#68);
➢ Limitations on the use of fertilizers,herbicides,and pesticides(Conditions
#69).
242-147I,Brookside Pool.doc lI
NACC 4/16/2010
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 86 — Certificate of Compliance
2-1471
Massachusetts Wetlands Protection Act M.G.L. c. 131, cc4�0 24v
Yb
r Provided ided by DEP
A. Project Information
Important:
When filling out 1. This Certificate of Compliance is issued to:
Poems on the
computer,use James Barrett
only the tab key Name
to move your 184-R Rivemeck Road
cursor-do not
use the return Mailing Address
key.
'��� Chelmsford MA 01824
I�
Cltyrrmn state Zip-c.&
m 2. This Certificate of Compliance is issued for work regulated by a final Order of
Conditions issued to:
James Barrett Environmental Pools
Name
April 16 2010 242-1471
Dated DEP File Number
3. The project site is located at:
642 Chickering Road North Andover
Street Address CM/rown
Map 83 Parcel 5
Asseswre Map/Plat Number Parcel/Lot Number
the final Order of Condition was recorded at the Registry of Deeds for:
Brookside Homeowers Association
Property Owner(ff different)
Essex North 12056 253
County Book
Page
Certificate
4. A site inspection was made in the presence of the applicant, or the applicant's agent,
on:
Date
� a� w I to
wpffimae a« rev.1v230e MA Fom,88,Can&fi Wor ComPlla«e•PWe1 a3
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number.
WPA Form 8B — Certificate of Compliance
471
Massachusetts Wetlands Protection Act M.G.L. c. 131, Pmkl
0 pdb
rovWeby DEP
B. Certification
Check all that apply:
® Complete Certification: It is hereby certified that the work regulated by the
above-referenced Order of Conditions has been satisfactorily completed.
❑ Partial Certification: It is hereby certified that only the following portions of work
regulated by the above-referenced Order of Conditions have been satisfactorily
completed.The project areas or work subject to this partial certification that have
been completed and are released from this Order are:
❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the
above-referenced Order of Conditions never commenced. The Order of
Conditions has lapsed and is therefore no longer valid. No future work subject to
regulation under the Wetlands Protection Act may commence without filing a new
Notice of Intent and receiving a new Order of Conditions.
® Ongoing Conditions: The following conditions of the Order shall continue:
(Include any conditions contained in the Final Order, such as maintenance or
monitoring, that should continue for a longer period).
Condition Numbers:
73
C. Authorization
Issued by:
North Andover /a2 /•7 ��,
Conseivabon commission Date of issuance
This Certificate must be signed by a majority of the Conservation Commission and a
copy sent to the applicant and appropriate DEP Regiona Office(See
hftp://www.mass.00vL/dep,—/�about/region/findvotir.html.
Signatures:
rrNnN'aee.m'II2iUY WPA Fw 88.CMlfimele W Compllaae-Pne 2 oto
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number.
WPA Form 8B — Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, 40 Fim id d-by by DEP
D. Recording Confirmation
The applicant is responsible for ensuring that this Certificate of Compliance is recorded in
the Registry of Deeds or the Land Court for the district in which the land is located.
Detach on dotted line and submit to the Conservation Commission.
To:.-------------
.---------------------------------............._._._._._._._._._._.------------- _.--
North Andover
Conservation Commission
Please be advised that the Certificate of Compliance for the project at:
642 Chickering Road 242.1471
Project Location DEP File Number
Has been recorded at the Registry of Deeds of.
Essex North
County
for:
Brookside Homeowers Association
Property owner
and has been noted in the chain of title of the affected property on:
Dela Book Page
If recorded land, the instrument number which identifies this transaction is:
If registered land, the document number which identifies this transaction is:
Document Number
Signature of Applioenl
.P&m8bd=•ray.1=ue wAF=8B,CWK& WCc iam Pep 3IN3