HomeMy WebLinkAboutMiscellaneous - 68 INNIS STREET k ,
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance 242-1554
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
A. Project Information
Important:
When filling out 1. This Certificate of Compliance is issued to:
fors on the
computer,use John E.Tocio, Jr.
only the tab key Name
to move your 68 Innis Street
cursor-do not Address
the return Melling Atldre
key. North
North Andover MA 01845
ey�IC�I Cdyrrown State Zip Cade
m 2. This Certificate of Compliance is issued for work regulated by a final Order of
Conditions issued to:
John E. Tocio, Jr.
Name
May 10 2012 242-1554
Dated DEP File Number
3. The project site is located at:
68 Innis Street North Andover
Street Address Cityrrown
Map 98D Parcel 36
Assessors MaWPlal Number Parceblot Number
the final Order of Condition was recorded at the Registry of Deeds for:
Property Owner gt dilferenp
Essex North 113 361
County Book Page
Certificate
4. A site inspection was made in the presence of the applicant, or the applicant's agent,
on:
10/24/12
Date
wprrn0b c•m.IY WPAFOM Be,Cenifi W&Cm Ija—Ppa 1 a13
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance 242-1664
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provid d by DEP
B. Certification
Check all that apply:
® Complete Certification: It is hereby certified that the work regulated by the
above-referenced Order of Conditions has been satisfactorily completed.
❑ Partial Certification: It is hereby certified that only the following portions of work
regulated by the above-referenced Order of Conditions have been satisfactorily
completed.The Project areas or work subject to this partial certification that have
been completed and are released from this Order are:
❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the
above-referenced Order of Conditions never commenced. The Order of
Conditions has lapsed and is therefore no longer valid. No future work subject to
regulation under the Wetlands Protection Act may commence without filing a new
Notice of Intent and receiving a new Order of Conditions.
® Ongoing Conditions:The following conditions of the Order shall continue:
(Include any conditions contained in the Final Order, such as maintenance or
monitoring, that should continue for a longer Period).
Condition Numbers:
69
C. Authorization
Issued by:
North Andover /0/3 SAX
Conservation Commission Date of Issuance
This Certificate must be signed by a majority of the Conservation Commission and a
copy sent to the applicant and appropriate DEP Regional Office(See
http�ttwww mass.nov/deolaboutlmolon/findvour.htm).
Signatures: Lam—
l� !✓_
"eGmBE.Em•rev.1 MM9 WPA Form 69,C tfi'ale of Complianw•Peg"of
O
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number.
WPA Form 8B — Certificate of Compliance 242-1554
Massachusetts Wetlands Protection Act lvi c. 131, §40 Provided by DEP
D. Recording Confirmation
The applicant is responsible for ensuring that this Certificate of Compliance is recorded in
the Registry of Deeds or the Land Court for the district in which the land is located.
Detach on dotted line and submit to the Conservation Commission.
To: .---------------------.-.-.---------------.-.-------.-.-.-.'.---.---------------.-.-.-.__--__---.
North Andover
Conservation Commission
Please be advised that the Certificate of Compliance for the project at:
68 Innis Street 242-1554
Project Location DEP Fib Number
Has been recorded at the Registry of Deeds of:
Essex North
County
for:
John E. Tocio Jr.
Property Owner
and has been noted in the chain of title of the affected property on:
Date Book Page
If recorded land, the instrument number which identifies this transaction is:
If registered land, the document number which identifies this transaction is:
Document Number --
Signature of Applicant
aWlrmBn_Eac•m.112112 MA Fen 9e,Cvfle 0C ima-Pan 3M3
0 Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection-Wetlands MassDEP File#:242-1554
WPA Form 5-Order of Conditions eDEP Transaction#:469415
Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 C1ty/Town:NORTHANDOVFR
A. General Information
1.Conservation Commission NORTHANDOVER
2.Issuance a. r DDC b.F Amrnded DOC
3.Applicant Details
&First Name JOHN&SUSAN b.Last Name TOCIO
c Orgynarbon
d MaBingAddress 68 INNIS STREET
a CSty/rown NORTH ANDOVER f.Sime MA g.Zip Code 01845
4.Property Owner
a FiMName JOHN&SUSAN b.Last Name TOCIO
c.Organimfion
d Mailing Address 68 INNIS STREET
C.City/fo vn NORTH ANDOVER f State MA g.Zip Code 01845
5.Project Location
&Street Address 68 INNIS STREET
b.Cdy/fo— NORTHANDOVER c.Zip Code 01845
d.Assessors Map hc#98D e.Parcel/l.ot# 36
£Latitude 42.66452N 8Lon8recle 71.11291W
6.Property recorded at the Registry of Deed for:
a County b.Certificate c.Book d.Page
NORTHERNESSEX 113 361
?.Dates
a.Date NOI Filed:4202012 b.Date Public Hearing Closed:5/92012 c Date Oflssmoce: 5/102012
8.Final Approved Plans and Other Documents
a.Plan Title: b.Plan Prepared by: c.Plan Signed/Stamped by: d.Revised Final Date: e.Scale:
PROPOSED PLOT WAYPOINT
PLAN 68 INNIS SURVEYING DAVIDALVES 4/30/12 1"=10'
STREET SERVICES
B. Findings
].Findings pursuant to the Massachusetts Wetlands Protection Act
Page 1 of 10 a ELECTRONIC COPY
0 Massachusetts Department of Environmental Protection Provided by M—DEP:
Bureau of Resource Protection-Wetlands M=DEPFdc#:242-1554
WPA Form 5-Order of Conditions cDEP Twnssction 0:469415
Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 C4y/fovm:NORTH ANDOVER
Cubic Feet Flood Storage
e.cabicfed fcubtcfea g.cubic fest h.cubic fed
8.rIsolated Land Subject to Flooding
asquorefeet b.squaw fed
Cubic Fed Flood Storage
c,cubic fed dcubic fed acubicfeet f.cubic fed
9.r River@nnt Area
e.total sq.feet b.total sq.feet
Sgft within l00fl
c.square feet dsgaaw feet e.square feet (squaw fed
Sq R between 100.200 It
g sgtmre fed h.square feet i.square fed j.squaw fest
Comtel Resource Area Impacts:
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
10.1--Designated Pmt Areas hOti esizeundal.and Urderthe Ocean,below
11.r land Under the Ocean
a squaw feet b.square feet
c.cly dredged d.cly dredged
12.r BariaBeaches Indicate sbe under Coastal Beaches andlor Coastal Do sasbelow
13.r Coastal Beaches
a squaw feet b.squaw feet c.ctynoudslunent d dy nomishman
14.r Coastal Dunes
asquawfcd b.square feet c.etynattishment d ctyroto(.shoant
15.r Coastal Banka
allnemfeet b.linear foot
16.r Rocky Intertidal Shores
a squaw ted b.squaw feet
17.r Salt Marshes
a7-square feet b.squaw fed c.squaw feet d.square fest
18.F Land Under SaltPonds
a squ—fk b.squaw fed
a cly dredged d c/y dredged
19.r land Containing Shellfish
a squaw feet b.square feet c.square fat d.square fed
Page 3 of 10•ELECTRONIC COPY
Massachusetts Department of Environmental Protection Provided byMassDEP.
Bureau of Resource Protection-Wetlands MMDEPFfle#242-1554
WPA Form 5-Order of Conditions eDEP Transaction#:469415
Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 City/Pown:NORTH ANDOVER
the Final Order shall also be acted in the Registry's Grantor Index under the name ofthe owner ofthe land upon which the
proposed work is to be done.In the case of the registered land,the Final Order shall also be noted an the Land Coad
Cerfificate of7ife of the owner of the land upon which the proposed work is done.The recording inforrration shall be submitted
to the Conservation Commission on the form mthe end of this Order,which than most be stamped by the Registry ofDeedq
prior to the commeneemera of work.
10. A sign shall be displayed at the she not less then two square feet or more than 0uee square feet in size bearing the words,
"Massachusetts Department of Environmental Protection"
[or'MaesDEP"]
File Number:"242-1554"
11. Where the Department of Environmental Protection is requested to issue a Superseding Order,the Conservation Commission
shall be aparty to all agency proceedings and hearings before Mass DEP.
12. Open completion ofthe work described herein,the applicant shall submit a Request for Certificate of Compliance(WPA Farm
SA)to the Conssarvation Commission
13. The work shall conform to the plans and special conditions referenced in this order.
14. Any change to the plans identified in Condition#13 above shall require the applicant to inquire of(he Conservation Commission
in writing whetlur the change is signifrcmrt enough to require the filing of a new Notice of hdent.
15. The Agar or members ofthe Conservation Commission and the Department of Environmental Protection shall have the right to
raver and inspect the area subject to this Order al reasonable hours to evaluate compliance with the rondi inns stated in this
Order,and may require the submittal of my data deemed necessary by the Conservation Commission or Department for that
evaluation.
16. This Order of Conditions shall apply to any successor in interest or successor in central of the property subject lo rids Order and
to any counselor or other person performing work conditioned by this Order.
17. Prior m the start ofwork,and if the project involves work adjacent to a Bordering Vegetated Wetland,the boundary ofthe
wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging.Once in place,thewedand
boundary markers shall be maintained until a Cenificare of Compliance has been issued by the Conservation Conavissim.
IS. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetationor
other means.At no time shall sedimervs be deposited in a wetland or water body.During construction,the applicant or his/her
designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed.The applicant
shall immediately control any erosion problems that occur sa the site and shall also immediately notify the Causation
Commission,which reserves the right to require additional erosion and/or damage prevention controls it may deem nceessary.
Sedimentation barriers shall serve as the limit ofworkunlessmother limit ofwork line has hem approved by this Order.
NOTICE OF STORMWATER CONTROL AND MAINTENANCE REQUIREMENTS
19. Thework associated with this Order(the"Project")fall) r isnot(2)r subject to the Massachuseas Stormwater Standards.
lithe work is subject to Stamwater Standards,then the project is subjectto the following omdiam;
a) All work,including site preparation,land disdnbarae,construction and redevelopment shall be implemented in accordance
with the construction period pollution prevention and erosion and sedimentation control plan and if applicable,the
Stormwater Pollution Prevention Plan required by the National Pollutant Discharge Elimination System Carry motion General
Permit as required by SlonnweterStandard S.Construction period erosion,sedlmentatim and pollution control measures and
best management practices(BMPs)shall remain in place until the site is fully stabilized
b) Nostormwatermnoffmay be discharged to the post-construction stom intr BMPs unless and unfil a Registered
Professional Fngmeapovides aartificmio,that i.all construction period BMPshave been removed or will be removed by
a data attain specified in the Certification For any construction period BMPs intended to be converted to post ou scion
operation for stormwater attenuation,recharge,snd/ortreatnent the conversion is allowed by the MassDEP Stormwater
Handbook BMP specifications and that the BMP has been properly cleaned orprepared for post censauction operation,
includ ing removal of all construction period sedimenthapperl in Wet and cadet central sunsums;U.ta-built final construction
BMP plans are included,signed and stamped by a Registered Professional Engineer,cert&Angthe site is fully stabilized;
my illicit discharges to the stormwater management system have been removed,as per the requirements ofStamwater
Page 5 of 10'ELECTRONIC COPY
0 Massachusetts Department of Environmental Protection Provided by MamDEP:
Bureau of ResourceProtection-Wetlands MwseDEP EP Trm9acti24&1554
WPA Form 5-Order of Conditions eDEP Trarisaclion p:469415
Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 C7ty/fmvnNORTH ANDOVER
Page 7 of 10•ELECTRONIC COPY
0 Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection-Wetlands MasiDEP File#:242-1554
WPA Form 5-Order of Conditions eDEP Transection#:469415
Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 City/fown:NORTH ANDOVER
E. Signatures
This Order is valid for three year;from the date ofissuance,unless otherwise specified
pmsuanHo General Condition 04.Ifthis is an Amended Order of Conditions,the Amended LDeteofOnginel Order
Order expires on the same daze as the original Order ofCondifiom r
Please indicate the numberofinembers who will sign this form.This Order must be signed by 2Number of Signers
a majority ofthe Conservation Commission.
The Order must be mailed by certified mail(return receipt requested)or hand delivered to the applicant A copy also most be mailed
or hand delivered athe same time to the appropriate Department ofEnvironmemnl Protection Regional Office,if not filing
electronically,and the property owner,ifdifferartfran applicant
Signatures:
Lr-"-d delivery on fCe5'certified mail,return receipt requested,on
Date Date
F. Appeals
The applicant,the owner,any person aggrieved by this Order,any owner of land abutting the land subject to this Order,or any ten
residents ofthe city or town in which such land is located,are hereby notified oftheir right to request the appropriate MassDEP
Regional Office to issue a Superseding Order of Conditions.The request mus[be made by certified mail or hard delivery tothe
Department,with the appropriate filing fee and a completed Request forDepamnemal Action Fee Tnucsnriral Form,as provided in
310 CMR 10.030 within ten business days from the date of issuance of this Order.A copy of the request shall az the same time be
sent by certified mail or hand delivery to the Conservation Commission and to the applicant,if he/she is not the appellant
Any appellants seeking to appeal the Depamnem's Superseding Order associated with this appeal will be required in demonstrate prim
participation in the review ofdds project Previous participation in the permit presiding means the submission ofwriaen information to
the Conservation Commission prim in the close of the public hearing,requesting a Superseding Order,or providing written information
to the Deparment prior to issuance of Superseding Order.
The request shall sure clearly and concisely the objections to the Order which is being appealed and how the Order does not
contribute to the protection ofthe interests identified in the Massachusetts Wetlands Protection Ace(M.G.L.c.131,§40),and is
inconsistent with the wetlands regulations(3 10 CMR 10.00).To the extent that the Order is based on a municipal ordinance or bylaw,
and not on the Massachusetts Wetlands Protection Act or regulations,the Department has an appellatejwisdiction.
Page 9 of 10•ELECTRONIC COPY
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection-Wetlands MacsDEP File#:242-1554
WPA Form 5-Order of Conditions eDEP Transaction 4:465415
Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 C1ry/I'ooni NORTH ANDOVER
G. Recording Information
This Order ofConditions most be recorded in the Registry of Deeds or the Lad Court for the district in which the land is located,
within the chain offide of the afiaxedproperty.N the case Of recorded land,the Final Oder shall also be noted in the Registry's
Gramm Index-and"the name ofthe owna ofthe load subject to the Order.In the cam of registered hand,this Order shall also be
noted on the Land Court Certificate of Tide of the owner of the land subject 0the Order of Conditions The recording information on
this page shall be submitted to the Conservation Commission listed below.
NORTH ANDOVER
Corturvatian Communion
Detach on dotted line,have stamped by the Registry of Deeds and mbm@ to the Conservation Commission.
.........................................................................................................................................................................................................
To:
NORTH ANDOVER
Conservation Conunission
Please be advised that the Omer of Conditions for the Project at:
68 INNIS STREET 242-1554
Project Location MassDEPFile Number
Has been recorded at the Registry of Deeds of.
Canty Book Ease
far.
Property owner JOHN&SUSANTOCIO
and has been noted in the chain of title of the affected property in:
Book page
In accordance with the Order of Conditions issued a an,
Date
Ifrecorded lard,the instrument nwnberidermlying this transaction is:
Instrument Number
If registered land,the document number idaititying this trensaction is:
Dm summa Number
Sigamae ofApphca t or..armo�o
Page 10 of 10"ELECTRONIC COPY
DEP FILE#242-1554
Therefore,the North Andover Conservation Commission(hereafter the"NACC")hereby
finds that the following conditions are necessary,in accordance with the Performance
Standards set forth in the State Regulations,the local Bylaw and Regulations,to protect
those interests noted above. The NACC orders that all work shall be performed in
accordance with said conditions and with the Notice of Intent referenced below. To the
extent that the following conditions modify or differ from the plans specifications or other
proposals submitted with the Notice of Intent.the conditions shall control.
GENERAL CONDITIONS
20. The proposed work includes:remove an existing deck and construct a 19-foot by 14-
foot addition and 6-foot by 12-foot deck with stairs. New footings for the addition will
be installed in the same location as existing footings. An existing shed in the 50-foot
No-Build Zone will be removed. All work is within 100 feet of a Bordering Vegetated
Wetland (BV W).
21.The work shall conform to the following(except as noted in the remainder of this
document where revisions may be required):
Notice of Intent filed by: John and Susan Tocio (Owners)
68 Innis Street
North Andover, MA 01845
Filed: April 13,2012
Site Plans prepared by: Waypoint Surveying Services
Titled:Proposed Plot Plan
68 Innis Street
Dated: March 14,2012
Last Revised:4/30/12
Signed and Stamped by David Alves, PLS
Other Record Documents: Additional Information for 68 Innis Street
22. The tern"Applicant' as used in this Order of Conditions shall refer to the owner,any
successor in interest or successor in control of the property referenced in the Notice of
Intent,supporting documents and this Order of Conditions. The NACC shall be
notified in writing within 30 days of all transfers of title of any portion of property that
takes place prior to the issuance of a Certificate of Compliance.
23.The conditions of this decision shall apply to,and be binding upon,the applicant,
owner,its employees and all successors and assigns in interest or control. These
obligations shall be expressed in covenants in all deeds to succeeding owners of
portions of the property.
242-1554,68 Innis Street 1 NACC 5/102012
DEP PILE#242-1554
33.The NACC agrees with the applicant's delineation of the wetland resource areas on
the site as shown on the plans dated referenced herein.
34. The NACC finds that the intensive use of the upland areas and buffer zone proposed
on this site will cause further alteration of the wetland resource areas. In order to
prevent any alteration of wetland resource areas a twenty five foot(25') No-
Disturbance Zone and a fifty foot 50') No-Construction Zone shall be established from
the edge of the adjacent wetland resource except for areas shown as previously
developed as shown on the herein referenced plan. The Conservation Administrator
and/or other agents of the NACC do not have the authority to waive these setbacks as
established under the local bylaw. No disturbance of existing grade,soils or
vegetation is permitted in the No-Disturbance zone. (See Section 3.4 &Appendix F of the
local Regulations).
35. As mitigation for deck expansion in the 50-foot No-Build Zone the applicant proposes
to move an existing 7 x 7 foot shed outside of the 50-foot No-Build Zone. The project
results in a decrease of 48 square feet of impervious area in the No-Build Zone.
36. This document shall be included in all construction contracts,subcontracts,and
specifications dealing with the work proposed and shall supersede any conflicting
contract requirements. The applicant shall assure that all contractors,subcontractors,
and other personnel performing the permitting work are fully aware of the permits
terms and conditions. Thereafter,the contractor will be held jointly liable for any
violation of this Order resulting from failure to comply with its conditions.
37.The owners of the project and their successors in title agree that the Order does not in
itself impose upon the Town any responsibility to maintain the proposed drainage
system and that said Town shall not be liable for any damage in the event of failure.
By acceptance of this Order, the owners agree to indemnify,and hold harmless to the
Town and its residents for any damage attributable to alterations undertaken on this
property pursuant to the Order. Issuance of these Conditions does not in any way
imply or certify that the site or downstream areas will not be subject to flooding, storm
damage or any other form of water damage.
PRIOR TO CONSTRUCTION
38. No work shall be undertaken until all administrative appeal periods from this Order
have elapsed or,if such an appeal has been filed, until all proceedings before the
Department or Court have been completed.
39. This Order shall be recorded by the applicant at the Registry of Deeds immediately
after the expiration of all appeal periods. No work shall be undertaken until the Final
Order has been recorded in the Registry of Deeds or the Land Court for the district in
242-1554,68 Imis Street 3 NACC 5/102012
DEP PILE#242-1554
conditions on portions of this project to mitigate any impacts which could result from
site erosion,or any noticeable degradation of surface water quality discharging from
the site. For example,installation of erosion control measures may be required in
areas not shown on the plan(s)referenced in this Order of Conditions. Should such
installation be required by the NACC,they shall be installed within 48 hours of the
Commissions request.
46.The applicant shall have on hand at the start of any soil disturbance,removal or
stockpiling,a minimum of 5 hay bales and sufficient stakes for staking these bales(or
an equivalent amount of silt fence, I hay bale to equal 3 feet of fence). Said bales shall
be used only for the control of emergency erosion problems and shall not be used for
the normal control of erosion.
47. A check payable to the Town of North Andover shall be provided in the amount of
$500 which shall be in all respects satisfactory to Town Counsel,Town Treasurer,and
the NACC,and shall be posted with the North Andover Town Treasurer through the
NACC before commencement of work. Said deposit of money shall be conditioned on
the completion of all conditions hereof,shall be signed by a party or parties
satisfactory to the NACC,and Town Counsel,and shall be released after completion of
the project,provided that provisions,satisfactory to the NACC,have been made for
performance of any conditions which are of continuing nature. The applicant may
propose a monetary release schedule keyed to completion of specific portions of the
project for the NACC's review and approval. This condition is issued under the
authority of the local ByLaw.
48.The applicant shall be responsible for placing signs on each parcel,where there is
more than one(1)lot,designating the applicable lot number as depicted on the plans
approved and referenced herein.
49. Prior to construction,the applicant shall permanently mark the fence with two (2)
signs spaced evenly incorporating the following text., "Protected Wetland Resource
Area" and the associated rules(1 round and 1 square). This will designate their
sensitivity and assure no further inadvertent encroachment into the wetland. These
permanent markers are subject to review and approval by the NACC. The applicant
shall instruct all agents to explain these markers to buyers/lessees/landscapers and all
persons taking over the property from the applicant. These markers shall remain
posted and be replaced as necessary in perpetuity. Markers are available from the
Conservation Department($2 round and$3 square).
50.The applicant and/or the legal owner of that portion of land upon which these Orders
of Conditions have been placed shall provide to the NACC prior to transferring,or
assigning any portion of said land to another party, subject to said Orders of
Conditions,the"Compliance Certification Form Affidavit" attached via"Appendix
A" signed under the pains and penalties of perjury,stating that said applicant and/or
owner has read these Orders of Conditions and is in compliance with each and every
242-1554,68 Innis Street 5 NACC 5/102012
DEP PILE N 242-1554
lath,paper,cardboard,pipe,tires,ashes,refrigerators,motor vehicles or parts on any
of the foregoing.
56. All exposed soil finish grade surfaces shall be immediately landscaped and stabilized,
or loamed,seeded and mulched,with a layer of mulch hay. All disturbed areas must
be graded,loamed and seeded prior to November Pt of each year.Outside of the
growing season,exposed soil finish grade surfaces shall be stabilized with a layer of
mulch hay or other stabilization method(as directed by the Conservation Department)
until climate conditions allow for seeding. During construction,any area of exposed
soils that will be left idle for more than 30 days shall be stabilized with a layer of
mulch hay or other means as directed by the NACC.
57. No re-grading in the buffer zone shall have a slope steeper than 2:1 (horizontal:
vertical). Slopes of steeper grade shall be rip-rapped to provide permanent
stabilization.
58. There shall be no stockpiling of soil or other materials within 100-feet of any resource
area.Stockpile locations shall conform to the approved plan.
59. Washings from concrete trucks,or surplus concrete,shall not be directed to,any
drainage system, or wetland resource area. If truck washing is necessary an area shall
be designated and approved by the Conservation Department.
60. All waste generated by,or associated with,the construction activity shall be contained
within the limit of work,and away from any wetland resource area. There shall be no
burying of spent construction materials or disposal of waste on the site by any other
means. The applicant shall maintain dumpsters (or other suitable means)at the site
for the storage and removal of such spent construction materials off-site. However,no
trash dumpsters will be allowed within 50' of areas subject to protection under the Act
or local ByLaw.
61. Accepted engineering and construction standards and procedures shall be followed in
the completion of the project.
62. During and after work on this project,there shall be no discharge or spillage of fuel,or
other pollutants into any wetland resource area. If there is a spill or discharge of any
pollutant during any phase of construction the NACC shall be notified by the
applicant within one(1)business day. No construction vehicles are to be stored within
100 feet of wetland resource areas,and no vehicle refueling,equipment lubrication,or
maintenance is to be done within 100 feet of a resource area.
AFPER CONSTRUCTION
242-1554,68 Innis Street 7 NACC 5/102012
DEP FILE#242-1554
➢ "As-Built" post-development elevations and grades of all filled or altered
wetland resource areas including the encompassing buffer zone which is
regulated as a resource area under the local Wetland Protection Bylaw.
D Distances from structures to wetland resource areas. Structures include(but
are not limited to)septic systems,additions,fences,sheds,stone walls,
pools,retaining walls, subsurface utilities and decks.
➢ A line showing the limit of work and the extent of existing erosion control
devices. "Work" includes any disturbance of soils or vegetation.
69. The following special conditions shall survive the issuance of a Certificate of
Compliance(COC)for this project:
➢ 25' No-Disturbance Zone and a 50' No-Construction Zone shall be
established from the edge of adjacent wetland resource areas on lot except in
those locations approved under DEP#242-1554. Future work within 100'of
existing wetland resource areas will require a separate filing with the NACC
(See Section 3.4 of the Regulations for performance standards within these
zones). The Conservation Administrator and/or other agents of the NACC
do not have the authority to waive these setbacks as established under the
local ByLaw;
➢ Resource Area Markers (Condition#49)
➢ Discharge or spillage of pollutants(Condition#62);
➢ Prohibition of underground fuels(Condition#63);
➢ Limitations on the use of fertilizers,herbicides, and pesticides (Conditions
#64);
➢ Prohibition of dumping of leaves, grass clippings, brush, or other debris
(Condition#65);
242-1554,68 Innis Street 9 NACC 5/102012