Loading...
HomeMy WebLinkAboutMiscellaneous - 80 LACONIA CIRCLE Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands DEP File Number. WPA Form 8B — Certificate of Compliance 242-1495 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Pr Ad dby DEP A. Project Information Important: When filling out 1. This Certificate of Compliance is issued to: corms to,u compuse Dale &Tiffany Jenkins onlythetabk ony the tab key Name to move your 80 Laconia Circle cursor-do not Address the return Melling Adtlre key. North Andover MA 01845 Cityrrovm State Zip Code r 2. This Cerfifirate of Compliance is issued for work regulated by a final Order of Conditions issued to: Dale&Tiffany Jenkins m Name December 2 2010 242-1495 Dated DEP Fib Number 3. The project site is located at: 80 Laconia Circle North Andover Street Address cayrrovm Map 105D Parcel 156 Assessors Map/Plat Number ParwVLot Number the final Order of Condition was recorded at the Registry of Deeds for. Property Owner(ff different) Essex North 12445 305 County Book Page CertlBcate 4. A site inspection was made in the presence of the applicant, or the applicant's agent, on: 11/28/12 Date wpelrm9e aoc.rev.13r1NH VVPA Form e9.cennimre or Correa -Page 1 W9 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands DEP File Number: WPA Form 8B — Certificate of Compliance 242-1495 Massachusetts Wetlands Protection Act M.G.L. C. 131, §40 provided by DEP B. Certification Check all that apply: ® Complete Certification: It is hereby certified that the work regulated by the above-referenced Order of Conditions has been satisfactorily completed. ❑ Partial Certification: It is hereby certified that only the following portions of work regulated by the above-referenced Order of Conditions have been satisfactorily completed.The project areas or work subject to this pallial certification that have been completed and are released from this Order are: ❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the above-referenced Order of Conditions never commenced.The Order of Conditions has lapsed and is therefore no longer valid. No future work subject to regulation under the Wetlands Protection Act may commence without filing a new Notice of Intent and receiving a new Order of Conditions. ® Ongoing Conditions:The following conditions of the Order shall continue: (Include any conditions contained in the Final Order, such as maintenance or monitoring, that should continue for a longer period). Condition Numbers: 76 C. Authorization Issued by: North Andover '�y Conservation Commission Da of Issuancs This Certificate must be signed by a majority of the Conservation Commission and a copy sent to the applicant and appropriate DEP Regional Office(See htt ://www.mass. ov/de / boutire ig n/find o r.htm . Signatures: rptln,eu.6x.m.1Y1&W VflNFwmea.Gtiflub dGa„p0en-e.PeW 2MB Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands DEP Fib Number: WPA Form 8B — Certificate of Compliance 242-1495 Massachusetts Wetlands Protection Act M.G.L. C. 131, §40 provloeo by DEP D. Recording Confirrnation The applicant is responsible for ensuring that this Certificate of Compliance is recorded in the Registry of Deeds or the Land Court for the district in which the land is located. Detach on dotted line and submit to the Conservation Commission. To:------- --------- ._ --- __.___._._._.__._._._.--------------- ._._._.---_._._._.-.-._._._.-._._. North Andover Conaervabon Commission Please be advised that the Certificate of Compliance for the project at: 80 Laconia Circle 242-1495 Project Location DEP File Number Has been recorded at the Registry of Deeds of: Essex North County for: Dale&Tiffany Jenkins Property Owner and has been noted in the chain of title of the affected property on: Dale Book Page If recorded land, the instrument number which identifies this transaction is: If registered land, the document number which identifies this transaction is: Document Number Signature of Applicant 122erp WPA Form 8e,Cad fifate dCmpue,Me.Pegs 3 ora Y a�,N•• CONSERVATION DEPARTMENT Community Development Division MODIFICATION TO ORDER OF CONDITIONS 80 Laconia Circle,North Andover At the May 23,2012 public hearing the North Andover Conservation Commission(NACC)voted to issue a minor modification to DEP File #242-1495.The Modification shall conform to the plans and documents referenced below. Applicant: Dale&Tiffany Jenkins 80 Laconia Circle North Andover,MA Record Plans: Sketch Plan,sketched on a copy of a portion of the record plan Prepared by:The Neve-Morin Group,Inc. 447 Boston Street,US Route I Topsfield,MA 01983 Other Record Documents: E-mail from John M. Morin,P.E. dated May 16,2012 Re:Jenkins—80 Laconia Circle Appmved Modifications: • Proposed pool location is shifted to the south east and is approximately 79 s.f. larger. • Increase in pool patio area within 100-foot buffer zone of 260 s.f. 1600 Osgood=-t,Building m,Suite 2-36,Nonh.lndover,Massachwetu 01845 Phone 978.688.9530 Fax 978.688.9542 Web:http://w .tounofnord=dover.co /PWs/NAndoverMLl Consetvatim/index ppORT1r x r ,SSACHUS� CONSERVATION DEPARTMENT Community Development Division Modification to Order of Conditions The NORTH ANDOVER CONSERVATION COMMISSION agreed to accept Applicant: T)aLp + 7i��stu en�:nc R6 L.9conla Cit r_1I o. AJ a+h .9"ypg., ma n t a 06 as a Modification to the Order of Conditions issued in File 242-7005 datedj� and recorded in Book laand page 365 Issued Ay N RTH OVER CONSERVATION COMMISSION: art ��z this aJ fh of 9oldg before me personally appeared Louis Napoli tome day month/yr known to be the person described in and who executed the forgoing instrument and acknowledged that he/she executed the same as his/her free act and deed. 2*9 Notary Public s DONNA M.WEDGE pornwlHeuc �� p]NIlGIy1f EVMIJ41e66Er16 ply Cxmn Erpiies JWy 15,2016 1600 Osgood Street,North Andover,Massachusetts 01845 Phone 978.688.9530 fox 978.688.9542 Web www.townofnorthandover.com Massachusetts Department of Environmental Protection PmAdedby MassDEP: Bureau oorm5Resource rder oProtection-Wetlands MassDEPFdek:242-1495 LO WPA Form 5-Order of Conditions - eDEP Trmsac0on p:349778 Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 City/rown:NORTH ANDOVER A. General Information 1.Conservation Commission NORTH ANDOVER 2.Issuance a C7 DOC b.f' Amended DOC 3.Applicant Details a FirstNamc DALE&.TIFFANY b.last Name JENKINS c.Organvanon C/O THE NEVE-MORIN GROUP d Mailing Address 447BOSTONSTAEET e.City/Town TOPSEIELD f.State MA g.Zip Code 01983 4.Property Owner a First Name DALE&TIFFANY b.Last Name JENKINS c Orgrabation d.MailingAddress 80 LACONIA CIRCLE a CSty rT NORTH ANDOVER £State MA g.Zip Code 01845 5.Project Location a Street Address 801ACONIACIRCLE b.Chyarran NORTHANDOVER c.Zip Code 01845 d.Assessors Map/Plat f 105D c.ParcetLoO 156 E Iartde 42.64354N gLongmde 71.0486W 6.Property recorded at the Registry of Deed for: a.County b.Certificate c.Book d.Page NORTHERN ESSEX 10682 157 7.Dates a Date NOI Filed:8/302010 b.Data Public Hearing Closed: 11/152010 c.Date Oflwuaace: 12/1/2010 8.Final Approved Plans and Other Documents a Plan Title: b.Plan Prepared by: c.Plan Signed/Stamped by: d.Revised Final Date: e.Scale: PROPOSE SITE THENEVE-MORIN DEVELOPMENT GROUP,INC JOHN M.MORIN 11/02/2010 F" 20' PLAN B. Findings 1.Findings pursuant to the Massachusetts Wetlands Protection Act Page 1 of 10•ELECTRONIC COPY Massachusetts Department of Environmental Protection Provided by MassDEP. Bureau of Resource Protection-Wetlands MawDEPFile#:242-1495 WPA Form 5-Order of Conditions eDEP Traa a sva#:349778 Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 Cityfrown:NORTH ANDOVER Cubic Fort Flood Storage c.cubic feet f.abicfeet g.cubic fee[ IL cubic feet 8.F7 Isolated land Subject to Flooding a square feet b.square feet Cubic Feet Flood Storage c.cubic feet d.cubic fort e,cubic feet fcubic fed 9.❑Riveniont Area a total sq.feet b.total sq.feet Sq ft within 100 It c.square feet d.square fat e.square fort f.squarefee Sq ft between 100.200 ft g.square feet h.square feet i.square feet j.square fat Coastal Resource Area Impacts: Resource Area Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement 10.r Designated Pon Areas Indicate sire under LandUndathe Ocean,below I1.r LandUndcrthe Oc= a square fed b.square fat c.sty dredged d dy dredged 12,r Barrier Benches Indicate size under Coastal Beaches and/or Coastal Dunes below 13.r Coastal Beaches a square fee[ b.square feel a oty rwunshmart d o/ noudslmtan 14.❑Coastal Dunes a square fed b.square feet a dy nourishment d dymurishment 15.F7 Coastal Banks alinearfed bAinearfed 16.F Rocky hadfidal Shores a square feet b.square feet 17.r Salt Marshes a square feet b.squaw fed c.square feet d square fat 18.❑ Land Under Salt Ponds asquarcfcd b.square feet c.dy dredged d dy dredged 19.F Lard CavainingShell ish a square fed b.square feet c.square fee[ d.square fat Page 3 of 10•ELECTRONIC COPY 0 Massachusetts Department of Environmental Protection Provided by Mas;DEP: Bureau ofResourcerce Protection-Wetlands MasaeDEP mosac#:242-1495 WPA Form 5-Order of Conditions eDEPTrvsaction#:349778 Massachusetts Wetlands Protection Act M.G.L.C. 131,§40 City/fown:NORTHANDOVHR the Final Ordershall also be noted in We Registry's Gramm Inde cunderthe name of the owner of the land upon which the proposed work is to be done.N the case of the registered land,the Final Order shall also be noted on the Land Court Certificate of Tide of the owner of the land upon which the proposed work is done,The recording information shall be submitted to the ConservatimCommission on the form at the end of Us Order,which form most be stamped by the Registry of Deeds, prior W the commemmmentofwe&. 10. A sign shall be displayed I the site not less than two square feet or more than Use square feet in size hearing the words, °Massachusetts Department ofEmnaomnentallhokction' [or'MassDEP"j File Number.7A2-1495" ll. Where the Department of Environmental Protection is requested to issue a Superseding Order,the Conservation Commission shell be aparty W all agency proceedings and hearings before Mass DEP. 12. Upon completion of the work described herein,the applicant shall submit a Request for Certificate ofCurpliance(WPAForm SA)W the Cooservvation Commission. 13. The work shall conform to the plans and special conditions referenced in Nis order. 14. Any change to the plans identified in Condition#13 above shall requirethe apPEamthe inquire of the Conservation Commission in writing whether the change is sippificamenough W require the Ming of a newNctim of Intent 15. The Agent or members of the Conservation Commission and de Department ofEnvimrmrertal Proteaian shall have the tight an ederand inspat the area subject W this Order at reasonable hours W evaluate compliance with the conditions stated in this Order,and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation 16. This Order ofCondmons shall apply to any successor in interest or successor in control of the property subject to this Order and to any contras tar or other person performing work conditioned by this Order. 17. Prior W the start ofwork,and if the project involves work adjacent a Bordering Vegetated Wetland,the boundary of the wedand in the vicinity of the proposed work area shall be marked by wooden stakes or Flagging.Once in place,the wedand boundary markers shall be maintained until a Certificate of Compliance has been Issued by the Conservation Commission, 18. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabifved with vegetation or other means.At no time shall sediments be deposited in awedand or water body.During construction,the applicant or hisber designee shall inspect the erosion controls on adaily basis and shall remove accumulated sediments as needed The applicant M immediately,control any erosion problems for occur at the site and shall also immediately notify the Conservation Commission,which reserves the night W require additional amnion and/or damage prevention controls it may deem necessary. Sedimrnfetionbariers shall serve as the limit of work unless another Emit of work line has been approved by this Order. NOTICE OF STORMWATER CONTROL AND MAIJTENANCE REQUIREMENTS 19. The work associated with thisOrderphe"Project")is(1) 1`7 isnot(2)r+l subjedw the Massachusetts SWrmwater Standards. IfUrework is subject W SWnnwmar Standards,then the project is subjectto the following conditions; a) All wore,including site prepemfion,land disturbance,construction andncdevelopncra,shall be implemented in accordance with the construction period pollution prevention and mosionand sedimentation control plan and,ifappUcable,the S Wmnwater Pollution Preverroon Plan required by tine National Pollutant Discharge Elimination System Construction General Permit asrequmnd by Stonnwater Smrdsrd 8.Construction period emsioq sedimmmdon and pollution control measures and best management practices(BMPs)shell coram in place until the site is fidly stabilized. b) No surmwacer nmoffmay be discharged to the post-construdion stomrwater BMPs undess and=61 a Registered Professional Engineer provides a Certification that:i.all construction period BMPs have been removed or will be removed by a date certain specified in the Certification For any construction period BMPs intended to be converted W post construction operation for umm ger,attenuation,recharge,and/or manned,the conversion is allowed by the MasA)EP Stonnwaser Handbook BMP specifications and that the BMP has been properly cleaned orprepared for post construction operation, including removal ofall consWctionperiod sediment trapped in inlet and outletcontml grammes;A.as-built final construction BW plans are included,signed and stumped by a Registered Professional Engineer,certifying the site is fully stabilized;HL any illicit discharges W the sWrmwatamanagement system have beenremmed,as per the requirements of Stormwamr Page 5 of 10•ELECTRONIC COPY U Massachusetts Department of Environmental Protection Provided byMassDEP: Bureau of Resource Protection-Wetlands MassDEP File#:242-1495 WPA Form 5-Order of Conditions. eDEP Trao=tim#:349778 Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 Cityfrown:NORTH ANDOVER Page 7 of 10• ELECTRONIC COPY DEP FILE#242- 1495 Therefore,the North Andover Conservation Commission(hereafter the"NACC")hereby finds that the following conditions are necessary,in accordance with the Performance Standards set forth in the State Regulations,the local ByLaw and Regulations,to protect those interests noted above. The NACC orders that all work shall be performed in accordance with said conditions and with the Notice of Intent referenced below. To the extent that the following conditions modify or differ from the plans,specifications or other ro osals submitted with the Notice of Intent,the conditions shall control. GENERAL CONDITIONS 20.The proposed work includes: construction of garage/pool house(approx. 20' x 24'), deck (approx. 8'x20'),pool and patio within the 100-foot Buffer Zone to Bordering Vegetated Wetland(BV W). Additional work includes relocation of an existing shed,removal of 276 s.f. of driveway with associated restoration,installation of 1.5' wide driveway pavers, removal of an existing timber retaining wall with appurtenant site work and grading within 100 feet of a bordering vegetated wetland. 21.The work shall conform to the following: Applicant&Property Owner: Dale&Tiffany Jenkins 80 Laconia Circle North Andover,MA 01845 Notice of Intent Prepared by: John M. Morin The Neve-Morin Group,Inc. 447 Old Boston Road Topsfield,MA 01983 Received on: August 27,2010 Site Plans prepared by: The Neve-Morin Group,Inc. Titled:Proposed Site Development Plan Designed for Dale&Tiffany Jenkins Dated: August 25,2010 Revised:10/12/10&11/2/10 Stamped by:John M. Morin,P.E. Other Record Documents: Letters from: The Neve Morin Group,Inc. RE: 80 Laconia Circle,DEP File No. 242-1495 Dated October 12,2010&November 2,2010 Letter from Division of Fisheries &Wildlife RE: NHESP File No.: 10-28614 Dated:September 24,2010 242-1495,60 Laconia Circle OOC.dw I NACC 122/2010 DEP FILE#242 - 1495 22.The term"Applicant" as used in this Order of Conditions shall refer to the owner,any successor in interest or successor in control of the property referenced in the Notice of Intent, supporting documents and this Order of Conditions. The NACC shall be notified in writing within 30 days of all transfers of title of any portion of property that takes place prior to the issuance of a Certificate of Compliance. 23. The conditions of this decision shall apply to,and be binding upon,the applicant, owner, its employees and all successors and assigns in interest or control. These obligations shall be expressed in covenants in all deeds to succeeding owners of portions of the property. 24. Failure to comply with all conditions stated herein,and with all related statutes and other regulatory measures,shall be deemed cause to revoke or modify this Order. 25.This Order does not grant any property rights or any exclusive privileges;it does not authorize any injury to private property or invasion of property rights. However, the NACC,agent of the NACC or the Department of Environmental Protection(DEP) reserves the right to enter and inspect the property at all reasonable times until a Certificate of Compliance is issued,to evaluate compliance with this Order of Conditions, the Act(310 CMR 10.00),the North Andover Wetland ByLaw and Regulations,and may require any information,measurements,photographs,observations,and/or materials, or may require the submittal of any data or information deemed necessary by the NACC for that evaluation. Further,work shall be halted on the site if the NACC,agent or DEP determines that any of the work is not in compliance with this Order of Conditions. Work shall not resume until the NACC is satisfied that the work will comply and has so notified the applicant in writing. 26.This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state or local statutes, ordinances,by-laws or regulations. 27.The work authorized hereunder shall be completed within three years from the date of this order. 28.This Order may be extended by the issuing authority for one but not more than two periods of up to one year each upon application to the issuing authority at least this days(30) urior to the expiration date of the Order (Refer to Section 8.3 (p.37)of the North Andover Wetland Regulations). 29. The NACC reserves the right to amend this Order of Conditions after a legally advertised public hearing if plans or circumstances are changed or if new conditions or information so warrant. 30.Where the Department of Environmental Protection (DEP)is requested to make a determination and to issue a Superseding Order,the Conservation Commission shall be a party to all agency proceedings and hearings before the Department. 242-1495,80 Laconia Cinic OOC.doc 2 NACC 17/7/2010 DEP FILE#242- 1495 31. Any future project which proposes a wetland crossing in order to access certain portions of the property will not be qualified as a limited project roadway under 310 CMR 10.53(e). 32. The following wetland resource area is affected by the proposed work: Buffer Zone to Bordering Vegetated Wetland (BV W). This resource area is significant to the interests of the Act and Town ByLaw as noted above and therein The applicant has not attempted to overcome the presumption of significance of these resource areas to the identified interests. 33. The NACC inspected and confirmed wetland flags 100 through 116 and 200 through 210 as shown on the revised plan dated and referenced herein. The wetland was delineated by The Neve-Morin Group,Inc. on June 24, 2010. 34.The NACC finds that the intensive use of the upland areas and buffer zone proposed on this site will cause further alteration of the wetland resource areas. In order to prevent any alteration of wetland resource areas a twenty five foot(25') No-Disturbance Zone and a fifty foot(50') No-Construction Zone shall be established from the edge of the adjacent wetland resource area except as follows:Waiver of the 25' No-Disturbance Zone and 50' No-Construction Zone granted for installation of 1.5'wide driveway pavers. The Conservation Administrator and/or other agents of the NACC do not have the authority to waive these setbacks as established under the local bylaw. No disturbance of existing grade,sods or vegetation is permitted in the No-Disturbance Zone except as noted herein. 35.The NACC finds the applicant's proposal for removal of 276 sq. ft. of driveway pavement adjacent to wetland flags 102 and 103 to be adequate mitigation for disturbance of the 25- foot No-Disturbance Zone. The applicant shall provide the Conservation Department with a planting plan consisting of native shrubs prior to the start of construction. The restoration area shall undergo one year of growth to ensure survival prior to the issuance of a Certificate of Compliance. The area shall be maintained as No-Disturbance Zone in perpetuity. 36. This document shall be included in all construction contracts,subcontracts,and specifications dealing with the work proposed and shall supersede any conflicting contract requirements. The applicant shall assure that all contractors, subcontractors,and other personnel performing the permitting work are fully aware of the permits terms and conditions. Thereafter,the contractor will be held jointly liable for any violation of this Order resulting from failure to comply with its conditions. 37. Issuance of these Conditions does not in any way imply or certify that the site or downstream areas will not be subject to flooding,storm damage or any other form of water damage. PRIOR TO CONSTRUCTION 242-1495,80 Laconia circle 00CAoc 3 NACC 12/1/1010 DEP FILE#242 - 1495 38. No work shall be undertaken until all administrative appeal periods from this Order have elapsed or,if such an appeal has been filed,until all proceedings before the Department or Court have been completed. 39. This Order shall be recorded by the applicant at the Registry of Deeds immediately after the expiration of all appeal periods. No work shall be undertaken until the Final Order has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located,within the chain of title of the affected property. In the case of recorded land,the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land,the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is to be done. The recording information shall be submitted to the North Andover Conservation Commission on the form at the end of this Order prior to commencement of the work. Any Order not recorded by the applicant before work commences may be recorded by the NACC at the applicant's expense. 40. A sign shall be displayed at the site not less than two square feet or more than three square feet in size bearing the words "Massachusetts DRP,File Number 242-1495" 41. Any changes in the submitted plans caused by the applicant,another Board's decision or resulting from this Order of Conditions must be submitted to the NACC for approval prior to implementation. If the NACC finds said changes to be significant,the NACC will call for another public hearing(at the expense of the applicant).Within 21 days of the close of said public hearing the NACC will issue an amended or new Order of Conditions. Any errors found in the plans or information submitted by the applicant shall be considered as changes. No work shall begin on a project until written approval has been granted by the NACC. 42. It is the responsibility of the applicant, owner,and/or successor(s)to ensure that all with. The project engineer and conditions of this Order of Conditions are compliedp of contractors are to be provided with a copy of this Order of Conditions and referenced documents before commencement of construction. 43.Prior to any work commencing on-site,the applicant shall submit to the NACC for approval,a detailed sequence of construction,including the construction of restoration areas,installation of sedimentation/erosion control devices and re-vegetation to be completed before other work begins on-site. Approval of the phasing plan is required prior to construction. 44. Wetland flagging shall be checked prior to start of construction and shall be re-established where missing. All wetland flagging shall remain visible and enumerated per the approved plan(s)throughout the life of the project and until a Certificate of Compliance is issued so that erosion control measures can be properly placed and wetland impacts can 242-1495,80 Laconia Cycle OOC.doc 4 NACC 12/2/2010 DEP FILE#242- 1495 be monitored. The proposed limit of work shall be shall be clearly marked with erosion controls or temporary fencing and shall be confirmed by the NACC. Such barriers shall be checked and replaced as necessary and shall be maintained until all construction is complete. Workers should be informed that no use of machinery,storage of machinery or materials,stockpiling of soil,or construction activity is to occur beyond this line at any time. 45. Erosion controls shall be placed between all construction areas and wetlands. The erosion control barrier will be properly installed and placed as shown on the plans approved and referenced herein and shall be inspected and approved by the NACC or its agent prior to the start of construction and shall remain intact until all disturbed areas have been permanently stabilized to prevent erosion. All erosion prevention and sedimentation protection measures found necessary during construction shall be implemented at the direction of the NACC or its agent. The NACC reserves the right to impose additional conditions on portions of this project to mitigate any impacts which could result from site erosion,or any noticeable degradation of surface water quality discharging from the site. For example,installation of erosion control measures may be required in areas not shown on the plan(s)referenced in this Order of Conditions. Should such installation be required by the NACC,they shall be installed within 48 hours of the Commission's request. 46.The applicant shall have on hand at the start of any soil disturbance,removal or stockpiling,a minimum of 20 hay bales and sufficient stakes for staking these bales (or an equivalent amount of silt fence,1 hay bale to equal 3 feet of fence). Said bales shall be used only for the control of emergency erosion problems and shall not be used for the normal control of erosion. 47. A check payable to the Town of North Andover shall be provided in the amount of$3,000 which shall be in all respects satisfactory to Town Counsel,Town Treasurer,and the NACC, and shall be posted with the North Andover Town Treasurer through the NACC before commencement of work. Said deposit of money shall be conditioned on the completion of all conditions hereof,shall be signed by a party or parties satisfactory to the NACC,and Town Counsel,and shall be released after completion of the project,provided that provisions,satisfactory to the NACC,have been made for performance of any conditions which are of continuing nature. The applicant may propose a monetary release schedule keyed to completion of specific portions of the project for the NACC's review and approval. This condition is issued under the authority of the local ByLaw. 48. The applicant shall designate a Wetland Scientist(or other environmental professional as approved by the NACC or its agent)as an"Erosion Control Monitor' to oversee any emergency placement of controls and regular inspection or replacement of sedimentation control devices. The name and phone number of the erosion control monitor must be provided to the NACC in the event that this person has to be contacted,due to an emergency at the site,during any 24-hour period, including weekends. The Environmental Professional will immediately notify the Conservation agent of any matter 242-1495,80 Laconia Circle 00C.doc 5 NACC 12/2/2010 DEP FILE#242 - 1495 that requires attention by the Commission or the agent. The erosion control monitor will be required to inspect all such devices and oversee cleaning and the proper disposal of waste products. Cleaning shall include removal of any entrapped silt. 49. At least once during each week in which construction activities occurs on-site and for as long thereafter as ground remains unstabilized,the applicant shall submit a written report from the"Erosion Control Monitor' to the NACC certifying that,to the best of his/her knowledge and belief based on a careful site inspection,all work is being performed in compliance with this Order of Conditions and that approved setbacks are being adhered to. The erosion control monitor must visually inspect all sedimentation/erosion control measures and assume responsibility for their maintenance on a weekly basis and that they are functioning as intended. In addition, all wetland resource areas must be visually inspected for siltation,turbidity, and/or other water quality impacts. The Erosion Control Monitor shall be on site during and/or following a major storm event of 1" inch of rain or greater (24 hour event) to ensure that soils remain stable,and erosion controls are adequate and secure. 50. Prior to construction,the applicant shall permanently mark the edge of the"25-foot No- Disturbance Zone" with a minimum of eight(8)wetland markers spaced evenly every 25 feet incorporating the following text: "Protected Wetland Resource Area' and the associated rules (1 square sign for every 3 round). This will designate their sensitivity and assure no further inadvertent encroachment into the wetland. These permanent markers are subject to review and approval by the NACC. The applicant shall instruct all agents to explain these markers to buyers/lessees/landscapers and all persons taking over the property from the applicant. The markers shall remain posted and be replaced as necessary in perpetuity. Markers may be obtained from the Conservation Department ($2/round and$3/square). 51. Prior to the commencement of any work on site the applicant/contractor shall stake the garage/foundation comers and the limits of the pool. These measurements will be verified in the field during the pre-construction meeting. 52. The applicant and/or the legal owner of that portion of land upon which these Orders of Conditions have been placed shall provide to the NACC prior to transferring,or assigning any portion of said land to another party,subject to said Orders of Conditions, the"Compliance Certification Form Affidavit' attached via"Appendix A" signed under the pains and penalties of perjury,stating that said applicant and/or owner has read these Orders of Conditions and is in compliance with each and every condition. This document shall apply to each of the conditions referenced herein and shall be provided to the Conservation Department at least five (5)business days prior to the closing of said land transaction. 53. Once these above mentioned pre-construction requirements are complete,the applicant shall contact the Conservation Office prior to site preparation or construction and shall arrange an on-site conference with an NACC representative,the contractor,wetland 242-1495,80 Le nia Circle OOC.dac 6 NACC 17!2/2010 DEP FILE 9 242 - 1495 scientist and the applicant to ensure that all of the Conditions of this Order are understood. This Order shall be included in all construction contracts,subcontracts, and specifications dealing with the work proposed and shall supersede any conflicting contract requirements. The applicant shall assure that all contractors, subcontractors and other personnel perforating the permitted work are fully aware of the permit's terms and conditions. Thereafter, the contractor will be held jointly liable for any violation of this Order of Conditions resulting from failure to comply with its conditions. The applicant or contractor shall notify the NACC in writing of the identity of the on-site construction supervisor hired to coordinate construction and to ensure compliance with this Order. A reasonable period of time shall be provided as notice of the pre-construction meeting(e.g. 72 hours). 54. Following the pre-construction meeting and prior to the start of work,the applicant shall conduct test pits in the area of the pool to determine conditions for excavation(i.e. location of boulders/ledge). Findings shall be reported to the Conservation Department for final decisions on necessary erosion controls and construction access. STORMWATER MANAGEMENT CONDITIONS 55. There shall be no increase in the post development discharges from the storm drainage system or any other changes in post development conditions that alter the post development watershed boundaries as currently depicted in the Notice of Intent and approved by this Order of Conditions,unless specifically approved in writing by the Commission. 56. Water quality in down gradient BV W's shall not differ significantly following completion of the project from the pre-development conditions. There shall be no sedimentation into wetlands or water bodies from discharge pipes or surface runoff leaving the site. DURING CONSTRUCTION 57. Upon beginning work,the applicant shall submit written monthly progress detailing what work has been done in or near resource areas,and what work is anticipated to be done over the next period.This will update the construction sequence. 58. Accepted engineering and construction standards and procedures shall be followed in the completion of the project. 59.The contractor will take all steps necessary to control dust onsite so that adverse effects on adjacent resource areas and/ or habitat do not occur. 60. The existing driveway and front lawn shall serve as the construction access for the project. The driveway shall be swept daily to remove sediment deposited by 242-1495,80 Laconia Circle 00C.doc 7 NACC 12/2/2010 DEP FILE#242- 1495 construction vehicles accessing the site. If necessary, a crushed stone construction entrance shall be installed to minimize soil / material tracking onto Laconia Circle. All construction vehicles must access the site through the construction entrance. This entrance shall be reinforced as necessary. 61. Erosion control devices shall be inspected regularly;any entrapped silt shall be removed to an area outside of the buffer zone and wetland resource areas;silt fence and hay bales shall be replaced as necessary.The areas of construction shall remain in stable condition at the close of each construction day. All erosion controls shall be in place throughout the duration of any construction on site or unless authorized by the Conservation personnel. 62. Approved de-watering activities shall be supervised and witnessed by the designated erosion control monitor. This designee must be on-site at all times while dewatering is occurring. De-watering activities shall be conducted as shown on the approved plans and shall be monitored daily by the erosion control monitor to ensure that sediment laden water is appropriately settled prior to discharge toward the wetland resource areas. No discharge of water is allowed directly into an area subject to jurisdiction of the Wetlands Protection Act. If emergency de-watering requirements arise,the applicant shall submit a contingency plan to the NACC or its administrator for approval,which provides for the pumped water to be contained in a settling basin,to reduce turbidity prior to discharge into a resource area. 63. Any fill used in connection with this project shall be clean fill,containing no trash, refuse,rubbish or debris,including but not limited to lumber,bricks,plaster,wire, lath,paper,cardboard,pipe,tires, ashes, refrigerators,motor vehicles or parts on any of the foregoing. 64. All exposed soil finish grade surfaces shall be immediately landscaped and stabilized, or loamed,seeded and mulched,with a layer of mulch hay. All disturbed areas must be graded,loamed and seeded prior to November V of each year. Outside of the growing season, exposed soil finish grade surfaces shall be stabilized with a layer of mulch hay or other stabilizing material as approved by the Conservation Department until climate conditions allow for seeding. During construction, any area of exposed soils that will be left idle for more than 30 days shall be stabilized with a layer of mulch hay or other means approved by the NACC. 65. No re-grading in the buffer zone shall have a slope steeper than 2:1 (horizontal: vertical). Slopes of steeper grade shall be rip-rapped to provide permanent stabilization. 66. Construction equipment/vehicles shall not be staged overnight within 50 feet of a wetland resource area. 242-1495,60 Laconia Circle 00C.doc 8 NACC 12t2f2010 DEP PILE#242- 1495 67.There shall be no stockpiling of soil or other materials within 100 feet of any resource area. Per the applicant,materials will be trucked on and off site daily. 68.Washings from concrete trucks, or surplus concrete, shall not be directed to,any drainage system,or wetland resource area. If concrete truck washing is required an area for this activity shall be designated and approved by the Conservation Department. 69. All waste generated by, or associated with, the construction activity shall be contained within the limit of work,and away from any wetland resource area. There shall be no burying of spent construction materials or disposal of waste on the site by any other means. The applicant shall maintain dumpsters(or other suitable means)at the site for the storage and removal of such spent construction materials off-site. However,no trash dumpsters will be allowed within 50' of areas subject to protection under the Act or local ByLaw. 70. During and after work on this project,there shall be no discharge or spillage of fuel,or other pollutants into any wetland resource area. If there is a spill or discharge of any pollutant during any phase of construction the NACC shall be notified by the applicant within one(1)business day. No construction vehicles are to be stored within 100 feet of wetland resource areas,and no vehicle refueling,equipment lubrication,or maintenance is to be done within 100 feet of a resource area. AFTER CONSTRUCTION 71. No underground storage of fuel oils shall be allowed on any lot within one-hundred (100)feet of any wetland resource area. This condition shall survive this Order of Conditions and shall run with the title of the property. This condition is issued under the authority of the Towns Wetland protection ByLaw. 72. Fertilizers utilized for landscaping and lawn care shall be slow release,low-nitrogen types (< 5%), and shall not be used within 25 feet of a resource area. Pesticides and herbicides shall not be used within 100 feet of a wetland resource area.This condition shall survive this Order of Conditions and shall run with the title of the property. This condition is issued under the authority of the Towns Wetland Protection ByLaw and shall remain in perpetuity. 73. Upon completion of construction and grading,all disturbed areas located outside resource areas shall be stabilized permanently against erosion. This shall be done by loaming and seeding according to NRCS standards. Stabilization will be considered complete once full vegetative cover has been achieved. 74. Upon approved site stabilization by Conservation staff,the erosion controls shall be removed and properly disposed of and all exposed unvegetated areas shall be seeded. 242-1495,80 Laconia Circle OOC.doc 9 NACC 12/2/2010 DEP FILE#242- 1495 75. Upon completion of the project the applicant shall submit the following to the Conservation Commission as part of a request for a Certificate of Compliance: a. WPA Form 8A-"Request for a Certificate of Compliance." b. A letter from the applicant requesting a Certificate of Compliance. c. The name and address of the current landowner. d. Signed statements from the individual property owners shall be submitted with the request for a Certificate of Compliance indicating that they read and understood the recorded Order of Conditions prior to purchasing their property. e. The name and address of the individual/trust or corporation to whom the compliance is to be granted. f. The street address and assessor's map/parcel number for the project. g. The DEP file number. h. A written statement from a Registered Professional Civil Engineer(and/or Registered Professional Land Surveyor)of the Commonwealth certifying that the work has been conducted as shown on the plan(s)and documents referenced above,and as conditioned by the Commission. i. An"As-Built' plan prepared and signed and stamped by a Registered Professional Civil Engineer(and/or Registered Professional Land Surveyor) of the Commonwealth,for the public record. This plan will include: ➢ "As-Built" post-development elevations of all drainage&stonnwater management structures constructed within 100 feet of any wetland resource area. NOTE: If portions of the stormwater systems exist partially within the Buffer Zone than the entire structure must be depicted to accurately verify compliance. ➢ "As-Built" post-development elevations and grades of all filled or altered wetland resource areas including the encompassing buffer zone which is regulated as a resource area under the local Wetland Protection Bylaw. ➢ Distances from structures to wetland resource areas. Structures include(but are not limited to)septic systems,additions,fences,sheds,stone walls, pools,retaining walls,subsurface utilities and decks. ➢ A line showing the limit of work and the extent of existing erosion control devices. "Work" includes ilk disturbance of soils or vegetation. ➢ Location of all subsurface utilities entering the property. 76.The following special conditions shall survive the issuance of a Certificate of Compliance (COC)for this project: ➢ 25' No-Disturbance Zone and a 50' No-Construction Zone shall be established from the edge of adjacent wetland resource areas as approved 242-1495,80 Laconia Circle OOC.doc 10 NACC 12/28010 DEP FILE#242- 1495 under DEP#242-1495. Future work within 100' of existing wetland resource areas will require a separate filing with the NACC (refer to Section 3.4 (page 15)of the Regulations for performance standards within these zones)The Conservation Administrator and/or other agents of the NACC do not have the authority to waive these setbacks as established under the local Bylaw; ➢ Resource Area Markers (Condition#50); Discharge or spillage of pollutants (Condition#70); ➢ Prohibition of underground fuels (Condition#71); ➢ Limitations on the use of fertilizers,herbicides,and pesticides (Conditions #72). 242-1495,80 Laconia Circle OOC.dac 11 NACC 1227010 LOMassachusetts Department of Environmental Protection PmvldedbyMassDEP: Bureau of Resource Protection-Wetlands Ma r;DEP File#:242-1495 WPA Form 5-Order of Conditions eDEP Transaction#:349778 Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 Cnty/r.NORTHANDOVER E. Signatures �I This Order is valid for three years from the date ofissvP' ance,malas aherwise specified U pursmm[N General Condition#4.Ifthis is an Amended OrderofConditions,tlu AmeMd1 1.Date ofOriginal Order ON,expires an the same date as the original Order of Conditions. Please indicate the numberofinembers who will sign this four.This Order must be signed by 4 amajorityofthe Conservation,Cruisaission. 2.NumbceofSiguers The Order most be mailed by comfiedmail(rehrm receiptrequated)or hand delivered to the applicant A copy also most be mailed or hard delivered a the sometime to the appropriate Department of Environmental Protection Regional Other,Your filing electr,nicdly,and the property owner,if different fnan applicant Signatures: C by Land delivery on Toby certified mail,return receipt requested,on JI'D Data Date F. Appeals The applicant,the owner,anyperson aggrievedby this Order,any ownerof land abutting the landsubjectto this Order,or any ten residents of the city ce Neu in which such land is located,aro hereby notified of their right to request the appropriate MassDEP Regional O6iceto issue a Superseding Order ofConditions.The request most be made by certified=it or hand delivery to the Department with the appropriate filing fee and a completed Request fir Departmental Action Fee Transmittal Foran,as provided in 310 CMR 10.03(7)within ten business days fi,n the date of issuance of this Order.A copy ofthe request shall at the same time be sent by certified=1 or band delivery in the Conservation Commission mission and to the applicant,if he/she is not the appellant Any appellants seeking N appeal the Departments Superseding Order associated with this appeal will be required to demonstrate price participation in the review of this project Previous participation in the permit proceeding means the submission ofwrittm infomstim N the Conservation Commission prior N the close of the public hearing requesting a Superseding Order,or providing written information to the Department prior N issuance of Superseding Order. The request shill stat,clearly and concisely the objections N the Order which is being appealed and how the Order does not contribute N the protection of the interests identified in the Massachusefta Wetlands Protection Ad(M.G.L.c.131,§40),and is inconsistent with the wetlands regulations(3 10 CMR 10.00).To the extent that the Order is based ma a municipal o&MM,bylaw, and not on the Massachusetts Wetlands Protection Act or regulations,the Department has no appellate jurisdiction. Page 9 of 10•ELECTRONIC COPY DEP FILE H 242- 1495 APPENDIX A-AFFIDAVIT I, on oath do hereby depose and state: (authorized agent applicant and/or current owner) (PLEASE CHECK AT LEAST ONE BLOCK) 1._ I am the of (position with applicant) (applicant name or company name) the applicant upon whom Order of Conditions have been placed upon by (DEP"NACC number) the North Andover Conservation Commission. Wor 2_ I am the of (position with owner) (owner name) the owner upon whose land Order of Conditions have been placed up by (DEP or NACC number) the North Andover Conservation Commission. A 3. I hereby affirm and acknowledge that I have received said Order of Conditions and have read the same and understand each (DEP File N) and every condition which has been set forth in said Order of Conditions. 4. I hereby affirm and acknowledge that on this day of 19_ I inspected said property together with any and all improvements which have been made to the same and hereby certify that each and every condition set forth in Order of Conditions are presently in compliance. (DEP File#) 5. 1 hereby affirm and acknowledge that this document will be relied upon by the North Andover Conservation Commission as well as any potential buyers of said property which is subject to said Order of Conditions (DEP File ff) Signed under the pains and penalties of perjury this day of 19_. (Signature-authorized agent of applicant or owner) 242-1495,80 Laconia Mete OOC.doc 12 NACC 122@010