HomeMy WebLinkAboutMiscellaneous - 550 BOXFORD STREET 12/28/2015 i
rPr.t Commonwealth of Massachusetts Map-Block-Lot
BOARD OF HEALTH - ---Permit No------------
*
t
(North Andover BHP-2015-0363
FEE
$250.00
DISPOSAL WORKS CONSTRUCTION PERMIT
Permission is hereby granted Jesse T. Warren
to(Construct)an Individual Sewage Disposal System.
at No 550 BOXFORD STREET
-----------------------------------------------------------4 ------ ----------------------------- ---- ------
as shown on the application for Disposal Works Construction Permit No. BHP-2015-036 Dated August 27,2015
u1� ----------------
Issued O--Aug-27-2015 Z
�� : .. Application for Septic Disposal System --
• TODAY'S DATIt
Construction Permit — TOWN OF
NORTH ANDOVER 01$45 $ 250.00'-_'-0""1i Repair
$125.00 Component
Important: Application Is hereby made fora permit to:
When tilling out onstruct a new on-site sewage disposal system*
forms on the
computer,use ❑ Repair or replace an existing on-site sewage disposal system*
only the tab key
to move your F-1 Repair or replace an existing system component—What?
cursor-do not
use the return A. Facility Information
key. 60,1 J30XX 'ems _. 4- L04 9- --
Address or Lot#
rya
City/Town
r87�° 2.-*TYPE OF SEPTIC SYSTEM*:
➢ El �Pump Gravity(choose one)
***If pump system, attach copy of electrical ermittoy pp
application"*
9 conventional system i e and stone s stem
�-
➢ ❑ Pressure D or istribution f S.AGSa(NoLD-Box)ttach a copy of your certification to mstalh1h,i, typeosystem.)
➢ ❑ Pressure Dosed(D Box Present)S.A.S. ,
y ❑ Does the system require an effluent filter? Yes No
If yes, does plan specify make and model of filter? YES =(no further info. needed)
NO=(installer must specify brand of filter before DWC issuance)
What is the Make? What is the Model?
2. Owner Information
L.L
Name
0
Address(if different from above).
tl
City/Town State P�.,„
Y ) b
Email address Telephon6 Number
3. Installer Information
na In J y /y n \( (mot{
Name Name of Company
103 Rd
Address
r"S\0
City/Town State Zip Code
— � c� i
Telephone Number(Cell Phone#if possible please)
4. Designer Information ,r�/
Name Name off Company
_
p Y
Address
City/Town State Zip Code
Telephone Number(Best#to Reach)
Application for Disposal System Construction Permit•Page 1 of 2
� pplication for Septic Disposal System _
Construction Permit — TOWN OF TODAY'S DATE
ANDOVER,NORTH 01845 $25 00 -Component
PAGE 2 OF 2
A. Facility Information continued....
5. Type of Building: [Residential Dwelling or ❑Commercial
B. Agreement
The undersigned agrees to ensure the construction and maintenance of the afore-described
on-site sewage disposal system in accordance with the provisions of Title 5 of the
Environmental Code, as well as the Local Subsurface Disposal Regulations for the Town of
North Ando r. I understand that until a final Certificate of Compiian a has been issued by
this Board v Health, the installed system is not approved.
171 y,
Name Date
Application Approved By: (Board of Health Representative)
Name Date
Application Disapproved for the following reasons:
For Office Use Only:
1. Fee Attached.? Yes No
Z. ProjectManager Obligation Form Attaciteda Yes No
3. Pump Sys tem? If so,Attach copy of Electrical Permit Yes No
Applicant received copy of
"Electrical Inspection Notes for Septic Systems" Yes No
Handout?
4. Reviewed approval letter, all paperwork received? Yes No
Missing:
5. Foundation As-Built.,(new construction only): Yes No
(Same scale as approved plan)
6. Floor Plans?(new construction only): Yes No
Application for Disposal System Construction Permit•Page 2 of 2
SEPTIC SYSTEM INSTALLER PROJECT MANAGEMENT OBLIGATIONS
As the North Andover licensed installer for the construction for the septic system for the property at:
611&�Z- 41
(Add of ress septic systcni) s by
For plan
(Engineer)
Relative to the application of
(Installer's natne) And dated
( )riginal clate
Dated ? )
(I oday's clare) With revisions dated 2�`L"cl
(Last revised date)
I understand the following obligations for management of this project:
1. As the installer,I am obligated to obtain all permits and Board of Health approved plans prior to
performing any work on a site. I must have the approved plans and the permit on site when any work is
being done.
2. As the installer,I must call for any and all inspections. If homeowner, contractor,project manager,or any
other person not associated with my company schedules an inspection and the system is not ready,then
item three shall be applicable.
3. As the installer,I am required to have the necessary work completed prior to the applicable inspections as
indicated below. I understand that requesting an inspection,without completion of the items in accordance
with Tide 5 and the Board of Health Regulations may result in a$50.00 fine being levied against me and/or
my co=any.
a. Bottom of Bed—Generally, this is the first (1'� inspection unless there is a retaining-wall,which
should be done first. The installer must request the inspection but does not have to be present.
b. Final Construction Inspection—Engineer must first do their inspection for elevations, ties, etc.
As-built of verbal OK(or e-mail to: lieilthdet)t(i4),townoftiortliaiidoN,er.c()n-i) from the engineer must
be submitted to the Board of Health,after which- installer calls for an inspection time. Installer must
be present for this inspection. With a pump system, all electrical work must be ready and able to
cause pump to work and alarm to function.
c. Final Grade—Installer must request inspection when all grading is complete. Installer does not
have to be on-site.
4. As the installer, I understand that only I may perform the work (other than simple excavation)and I am required
to complete the installation of the system identified in the attached application for installation. I further
understand that work done by others unlicensed to install septic systems in North Andover can constitute
reasons for denial of the system and/or revocation or suspension of my license to operate in the Town of
North Andover, significant fines to all persons involved are also I?ossible.
5. As the installer,I understand that I must be on-site during the performance of the following construction
steps:
a. Determination that the proper elevation of the excavation has been reached.
b. Inspection of the sand and stone to be used.
c. Final inspection by Board of Health staff or consultant.
d. Installation of tank, D-Box, pipes, stone, vent,pump chamber, retaining wall and other
components.
6. As the installer,I understand that I am solely responsible for the installation of the system as per the
al?12roved 121ans. No instructions by the homeowner, general contractor, or any other persons shall absolve
me of this obligation.
Undersigned Licensed Septic Installer: (Today's Date)
(Name-- Print _ (Nance 7,,Signea)_