NOTICE OF DECISION(INSUBSTANTIAL CHANGE)
SITE PLAN REVIEW
Date: November 21,2013
Petition of Town of North Andover
120 Main St.
North Andover,MA 01845
Premises Affected: School Administration Building
566 Main St.
North Andover,MA 01845
HISTORY AND BACKGROUND
On October 4,2013,the Town of North Andover tiled an Application for a Site Plan Review
Special Permit with the Planning Board pursuant to Section 8.3, 10.3, 10.31 and 18 of the Town of North
Andover Zoning Bylaws. On November 19,2013,the Planning Board unanimously voted to grant the
Applicant a Site Plan Review Special Permit approving the Project.
On November 21, 2013, the applicant requested that Condition 6.D, which states that "The
applicant has agreed to provide a commemorative display, inside the building, to acknowledge the fact
that the site was formerly used as the town's high school, known as Johnson High School" be removed
from the Decision. The applicant will consult with the town's Historic Commission at the completion of
the project to determine how to commemorate the fact that the site was once occupied by the Johnson
High School.
FINDINGS OF FACT
The proposed change is deemed insubstantial and not materially different than the approved Decision,
dated November 19,2013,Site Plan Review Special Permit for 566 Main St, School Administration
Building.
CONDITIONS
The Town Planner's finding of no substantial change is conditioned on the following:
• This Decision shall be recorded with the Registry of Deeds and evidence of recording is
to be provided to the Planning Department.
Town of North Andover
Planning Department
1�
By:
J th M.Tymon
Iwn Planner
f NORTH ,
3 c
" , ^n,� , rp
# se .: ai.�r� 21 Pr: 1: 57
1/ °nano .P`,t9
,SSACHU`aet
PLANNING DEPARTMENT
Community Development Division
1600 Osgood Street
North Andover,Massachusetts,01845
NOTICE OF DECISION
SITE PLAN REVIEW
Date: November 19,2013
Date of Public Hearing: November 5,2013,
November 19,2013
Date of Decision:November 19, 2013
Petition of. Town of North Andover
120 Main St.
North Andover,MA 01845
Premises Affected: School Administration Building
566 Main St.
North Andover,MA 01845
Referring to the above petition for Site Plan Review, according to the requirements of the North Andover
Zoning Bylaw,Sections 8.3, 10.3,and 10.31 and MGL C.40A,Sec.9
So as to allow the construction of a 7,380 sq.ft.school office building on existing town-owned properly,with
34 parking spaces, associated stormwater drainage, a driveway and landscaping in the Residential 4 Zoning
District.
After a public hearing given on the above date,and upon a motion by D.Kellogg and 2nd by M.Colantoni to
APPROVE the Site Plan Review Special Permit as amended and based upon the following conditions. Vote
was 4—0 in favor of the application.
half of the Nor dover Planning Board
chard Rowen
Michael Colantoni
Dave Kellogg
Lora McSherry
1
_ Town of North Andover
Site Plan Special Permit—School Administration Building
The Plannipg Board herein APPROVES the construction of a 7,380 sq. R. school office building on existing
town-owned property,with 34 parking spaces, associated stormwater drainage, a driveway and landscaping
in the Residential 4 Zoning District.This Special Permit was requested by the Town of North Andover. The
application was filed with the Planning Board on October 4, 2013. The public hearing on the above
referenced application was opened on November 5, 2013, and closed by the North Andover Planning Board
on November 19,2013. The applicant submitted a complete application,which was noticed and reviewed in
accordance with Section 8.3, 10.3,and 10.31 of the Town of North Andover Zoning Bylaw and MGL C.40A,
Sec.9.
The Planning Board makes the following findings as required by the North Andover Zoning Bylaws
Section 8.3 and 10.3:
FINDINGS OF FACT:
1) The specific site is an appropriate location for the project as it consists of the construction of a 7, 380
sq. ft. office building on the site of the town's former police station, in the vicinity of other School
Department facilities, including the Middle School the Pre-K School and the Kittredge School. The
project will also include 34 parking spaces, associated stormwater drainage improvements, a
driveway and landscaping;
2) The use as developed will not adversely affect the neighborhood as the building and the driveway
have been situated in a location that will have the least amount of visual impact on the neighborhood
as possible. Existing landscaping will be maintained on the northern side of the building and
landscaping will be added along the proposed retaining wall that is to be built along Osgood St;
3) There will be no nuisance or serious hazard to vehicles or pedestrians. There will be one driveway to
provide access to Main St, facilitating access among all adjacent existing school buildings and the
new office building and two curb cuts on Osgood St. will be eliminated. The new use as an office
building will create less traffic than the prior use as a police station.
4) Adequate and appropriate facilities will be provided for the proper operation of the proposed use.
The building is currently serviced by town water and sewer. The Division of Public Works has
reviewed the application,utilities,and drainage and deemed them to be adequate;
5) Stormwater management improvements include the construction of a grassed drainage swale to be
located on the northern side of the building. A deep sump catch basin will be installed in low the
point of the parking lot, with drainage piped to the beginning of the swale, through a flared end
section with a rip-rap outlet.The plans were reviewed and deemed adequate by the town's stormwater
consultant,Lisa Eggleston. (see memo dated November 4,2013);
6) An erosion control and maintenance plan will be been submitted to insure proper erosion control
during construction.
Finally the Planning Board finds that this project generally complies with the Town of North Andover
Zoning Bylaw requirements as listed in Section 8.3.5, but requires conditions in order to be fully in
compliance. The Planning Board hereby grants an approval to the applicant provided the following
conditions are met:
SPECIAL CONDITIONS:
1) Permit Definitions:
2
Town of North Andover
Site Plan Special Permit—School Administration Building
�111I'he "Plans" refer to the plans entitled "Site Development Plans School Department Office
Building 566 Main Street North Andover, Massachusetts", dated October 3, 2013 and revised to
November 4, 2013, consisting of 10 Sheets, prepared by Sullivan Engineering Group, LLC , 22
Mount Vernon Road, Boxford, Ma 01921, Kang Associates, 339 Boston Post Road, Sudbury,
MA 01776,and DeVellis Zrein Inc.,P.O. Box 307,Foxborough,MA 02035..
B) The "Project" refers to the construction of a 7, 380 sq. ft. school office building on existing town-
owned property, with 34 parking spaces, associated stormwater drainage, a driveway and
landscaping in the Residential 4 Zoning District.
C) The"Applicant"refers to the Town of North Andover,the applicants for the Special Permit.
D) The`Project Owner"refers to the person or entity holding the fee interest to the tide to the Locus
from time to time,which can include but is not limited to the applicant,developer,and owner.
2) PRIOR TO THE START OF SITE WORK OR CONSTRUCTION
A) A detailed construction schedule shall be submitted to the Planning Staff for the purpose of
tracking the construction and informing the public of anticipated activities on the site.
B) A new site plan must be provided with the details for stormwater structures as outlined in the email
from L.Eggleston,dated November 12,2013
C) The applicant shall designate a Construction Monitor who shall be chosen in consultation with the
Planning Department staff. The Construction Monitor shall submit weekly reports during the
entire duration of the project and must be available upon four (4) hour notice to inspect the site
with the Planning Board staff.
D) An Erosion and Sediment Control Plan must be submitted for review by the Town Planner All
applicable erosion control measures must be in place and reviewed and approved by the Planning
Department.
E) If required,the contractor shall provide a Construction SWPPP (Storm Water Pollution Prevention
Plan)for review by the Planning Department.
F) Construction fencing must be placed along the limit of clearing and grading as shown on the plan.
The Planning Department must be contacted prim to any cutting and or clearing on site.
G) A pre-construction meeting must be held with the construction monitor, the applicant, thein
construction employees, Planning Department and other applicable departments to discuss
scheduling of inspections to be conducted on the project and the construction schedule.
H) The applicant shall provide the Planning Board with copies of permits, plans and decisions
received from all North Andover Land-Use Boards.
3
Town of North Andover
Site Plan Special Permit—School Administration Building
3) PRIOR TO THE ISSUANCE OF A BUILDING PEANUT
r A) The applicant must submit architectural elevations for the planned building. These elevations
must include details of the landscaping to be installed in front of the retaining wall on the Osgood
St.side. These plans are to be reviewed by the Planning Board.
B) Three (3) copies of the signed, recorded plans and Notice of Decision must be delivered to the
Planning Department.
4) DURING CONSTRUCTION
A) Dust mitigation must be performed weekly, or more frequently as directed by the Town Planner,
throughout the construction process.
B) Any stockpiling of materials (dirt, wood, construction material, etc.) must be shown on a plan and
reviewed and approved by the Planning Staff. Any approved piles must remain covered at all times
and fenced off to minimize any dust problems that may occur with adjacent properties.
C) It shall be the responsibility of the applicant to assure that no erosion from the construction site shall
occur which will cause deposition of soil or sediment upon adjacent properties or public ways,
except as normally ancillary to off-site sewer or other off-site construction. Off-site erosion will be
a basis for the Planning Board making a finding that the project is not in compliance with the plan;
provided, however, that the Planning Board shall give the developer written notice of any such
finding and ten days to cure said condition.
6) PRIOR TO CERTIFICATE OF OCCUPANCY
A) The applicant must submit a letter from the architect and engineer of the project stating that the
building, lighting and site layout substantially comply with the plans referenced at the end of this
decision as endorsed by the Planning Board.
B) The Planning Staff shall review the site. Any screening as may be reasonably required by the
Planning Staff will be added at the Project Owner's expense.
C) A final as-built plan showing final topography,the location of all on-site utilities, structures,curb
cuts,parking spaces and drainage facilities must be submitted to the Planning Department.
D) The applicant has agreed to provide a commemorative display, inside the building, to
acknowledge the fact that the site was formerly used as the town's high school,known as Johnson
High School.
7)GENERAL CONDITIONS
A) The contractor shall contact Dig Safe at least 72 hours prior to commencing any excavation.
4
Town of North Andover
Site Plan Special Permit—School Administration Building
B) GV, Telephone, Cable and Electric utilities shall be installed underground as specified by the
respective utility companies.
C) The hours for construction shall be limited to between 7:00 a.m. and 5:00 p.m. Monday through
Friday and between 8:00 a.m.and 5:00 p.m. on Saturday.
D) No open burning shall be done except as is permitted during burning season under the Fire
Department regulations.
E) No underground fuel storage shall be installed except as may be allowed by Town Regulations.
F) The provisions of this conditional approval shall apply to and be binding upon the applicant, its
employees and all successors and assigns in interest or control.
G) Any action by a Town Board, Commission, or Department,which requires changes in the plan or
design of the building, as presented to the Planning Board, may be subject to modification by the
Planning Board.
H) Any revisions shall be submitted to the Town Planner for review. If these revisions are deemed
substantial,the developer must submit revised plans to the Planning Board for approval.
1) The following information shall be deemed part of the decision:
Plan tided: Site Development Plans School Department Office Building 566 Main Street
North Andover,Massachusetts
Prepared for: Town of North Andover
North Andover, MA 01845
Prepared by: Sullivan Engineering Group,Inc.
22 Mount Vernon Road
Boxford,Ma 01921
Kang Associates
336 Boston Post Road
Sudbury,Me 01776
DeVellis Zrein,hrc.
P.O.Box 307
Foxborough,Me 02035
Scale: I,,=20'
Date: October 3,2013,revised to November 4,2013
Sheets: 10
cc: Town Departments
Applicant
Engineer
Abutters
Assessor
5
NORTH
=06ssieo 'c ANO
O F
L—CIV ED
t r 1
• s 9 i
KOY 21 P:1 1: 57
- - �,SSACH�S
PLANNING DEPARTMENT
Community Development Division
1600 Osgood Street
North Andover,Massachusetts,01845
NOTICE OF DECISION
STPE PLAN REVIEW
Date: November 19,2013
Date of Public Hearing: November 5,2013,
November 19,2013
Date of Decision:November 19,2013
Petition of Town of North Andover
120 Main St.
North Andover,MA 01845
Premises Affmted: School Administration Building
566 Main St.
North Andover,MA 01845
Referring to the above petition for Site Plan Review, according to the requirements of the North Andover
Zoning Bylaw,Sections 8.3, 10.3,and 10.31 and MGL C.40A,Sec.9
So as to allow the construction of a 7,380 sq.ft.school office building on existing townowned property,with
34 parking spaces,associated stormwater drainage, a driveway and landscaping in the Residential 4 Zoning
District. -
After a public hearing given on the above date,and upon a motion by D.Kellogg and 2nd by M.Cohndoni to
APPROVE the Site Plan Review Special Permit as amended and based upon the following conditions.Vote
was 4—0 in favor of the application.
half of the Nord)(Andover Planning Board
chard Rowen
Michael Colamoni
Dave Kellogg
Lora McSherry
1
Town of North Andover
Site Plan Special Permit—School Administration Building
lifffhe "Plans" refer to the plans entitled "Site Development Plans School Department Office
Building 566 Main Street North Andover,Massachusetts", dated October 3, 2013 and revised to
November 4, 2013, consisting of 10 Sheets, prepared by Sullivan Engineering Group, LLC , 22
Mount Vernon Road, Boxford, Ma 01921, Kang Associates, 339 Boston Post Road, Sudbury,
MA 01776,and DeVellis Zrein Inc,P.O.Box 307,Foxborough,MA 02035..
B) The "Project"refers to the construction of a 7, 380 sq. tt. school office building on existing town-
owned property, with 34 parking spaces, associated stormwater drainage, a driveway and
landscaping in the Residential 4 Zoning District.
C) The"Applicant"refers to the Town of North Andover,the applicants for the Special Permit.
D) The"Project Owner"refers to the person or entity holding the fee interest to the title to the Locus
from time to time,which can include but is not limited to the applicant,developer,and owner.
2) PRIOR TO THE START OF SITE WORK OR CONSTRUCTION
A) A detailed construction schedule shall be submitted to the Planning Staff for the purpose of
tracking the construction and informing the public of anticipated activities on the site.
B) A new site plan must be provided with the details for stormwater structures as outlined in the email
from L.Eggleston,dated November 12,2013
C) The applicant shall designate a Construction Monitor who shall be chosen in consultation with the
Planning Department staff. The Construction Monitor shall submit weekly reports during the
entire duration of the project and must be available upon four(4) hour notice to inspect the site
with the Planning Board staff.
D) An Erosion and Sediment Control Plan must be submitted for review by the Town Planner All
applicable erosion control measures must be in place and reviewed and approved by the Planning
Department.
E) If required, the contractor shall provide a Construction SWPPP(Storm Water Pollution Prevention
Plan)for review by the Planning Department.
F) Construction fencing must be placed along the limit of clearing and grading as shown on the plan.
The Planning Department must be contacted prim to any cutting and or clearing on site.
G) A pre-construction meeting must be held with the construction monitor, the applicant, their
construction employees, Planning Department and other applicable departments to discuss
scheduling of inspections to be conducted on the project and the construction schedule.
H) The applicant shall provide the Planning Board with copies of permits, plans and decisions
received from all North Andover Land-Use Boards.
3
Town of North Andover
Site Plan Special Permit-School Administration Building
B) Gas, Telephone, Cable and Electric utilities shall be installed underground as specified by the
respective utility companies.
C) The hours for construction shall be limited to between 7:00 a.m. and 5:00 p.m. Monday through
Friday and between 8:00 a.m.and 5:00 p.m.on Saturday.
D) No open bunting shall be done except m is permitted during burning season under the Fire
Department regulations.
E) No underground fuel storage shall be installed except m may be allowed by Town Regulations.
F) The provisions of this conditional approval shall apply to and be binding upon the applicant its
employees and all successors and assigns in interest or control.
G) Any action by a Town Board, Commission,or Department which requires changes in the plan or
design of the building,as presented to the Planning Board,may be subject to modification by the
Planning Board.
H) Any revisions shall be submitted to the Town Planner for review. If these revisions are deemed
substantial,the developer must submit revised plans to the Planning Bomd for approval.
I) The following information shall be deemed part of the decision:
Plan titled: Site Development Plans School Department Office Building 566 Main Street
North Andover,Massachusetts
Prepared for: Town of North Andover
North Andover,MA 01845
Prepared by: Sullivan Engineering Group,Inc.
22 Mourn Vernon Road
Boxford,Ma 01921
Kang Associates
336 Boston Post Road
Sudbury,Ma 01776
DeVellis Zrein,Inc.
P.O.Box 307
Foxborough,Ma 02035
Scale: 1"=20'
Date: October 3,2013,revised to November 4,2013
Sheets: 10
cc: Town Departments
Applicant
Engineer
Abutters
Assessor
5
ui poniN�0 T
._ r
2013 OCT -4 AV. 10: 07
�'TS�1CM15�
PLANNING DEPARTMENT
Community Development Division
Special Permit- Site Plan Review Application
Please type or print clearly.
1.Petitioner: Ravmo d Santilli As istant Town Manager
Petitioner's Address: 120 Main Street North Andover MA 01845
Telephone number: 978-688-9516
2.Ovmers of the Land: Town of North Andover
Address: 120 Main Street, North Andover KA 01845
Number of years of ownership:
3.Year lot was created:
4.Description of Proposed Project:
Construction of a modern tate-of-the-art School Department
administration building, with 34 parking spaces, and associated
grading, stormwater onanigmenetlandscapingand utilities
5.Description of Premises:
6.Address of Property Being Affected: 566 Main Street North Andover MA 01845
Zoning District: R4
Assessors Map: 58B Lot#: 37
Registry of Deeds:Book#: Page#:
7.Existing Lot:
Lot Area(Sq.Ft): 68,190 SF Building Height:
Street Frontage: 908 ft Side Setbacks:
Front Setback: Rear Setback:
Floor Area Ratio: Lot Coverage:
8.Proposed Lot(if applicable):
Lot Area(Sq.Ft): Building Height:
Street Frontage: Side Setbacks:
Front Setback: Rear Setback:
Floor Area Ratio: Lot Coverage:
Page 4 of 6
1600 Osgood Streel,North Andover,81dg.10,Suite 7-36 Planning Dept.,Massachusetts 01845
Phone 978.688.9535 Fox 978.688.9541 Web www.lownpinorlhandower.com
9.Required Lot(as required by Zoning Bylaw):
Lot Area(Sq.Ft): 43,560 SF Building Height: 35 ft
Street Frontage: 150 ft Side Setbacks: 25 ft
Front Setback: 30 ft Rear Setback: 30 ft
Floor Area Ratio: N/A Lot Coverage: 20%
10.Existing Building(if applicable):
Ground Floor(Sq.Ft.): #of Floors:
Total Sq.Ft.: Height:
Use: Type of Construction:
11.Proposed Building:
Ground Floor(Sq.Ft.): 7,380 SF #of Floors: 1
Total Sq.Ft. 7,380 SF Height: 24 ft to ridge
Use: offices Type of Construction: wood frame w/brick veneer
12.Has there been a previous application for a Special Permit from the Planning Board on these premises?
no If so,when and for what type of construction?
13.Section of Zoning Bylaw that Special Permit Is Being
Requested
14.Petitioner and Landowner signaturefs):
Every application for a Spacial Permit shall be made on this form,which is the official form of the Planning Board. Every
application shall be filed with the Town Clerk's office. It shall be the responsibility of the petitioner to furnish all supporting
documentation with this application.The dated copy of this application received by the Town Clerk or Planning Office does
not absolve the applicant from this responsibility. The petitioner shall be responsible for all expenses for fling and legal
notification. Failure to comply with application requirements, as cited herein and in the Planning Board Rules and
Regulations may result in a dis-missal by the
/Planning Board of
this application as incomplete.
Petitioner's Signature:
r
Print or type name here: Ra and ti ri As scant Town Manager
Owner's Signature: a
Print or type name here: Andrew W. Maylor, Town Manager
15.Please list title of plans and documents you will be attaching to this application.
Cover Sheet C-5 Site Details
Existing Conditions Plan of Land Photometrics Plan
C-1 Layout and Materials Plan Al Floor and Roof Plane
C-2 Grading and Utility. Plan A2 Building Elevations and Sections
C-3 Planting Plan 'hydroCAD calculations'
C-4 Site Details
Page 5 of 6
1600 Osgood Street,North Andover,BIdg.20,Suite 1-36 Planning Dept.,Massachusetts 01845
Phone 978.688.9535 Fax 978.688.9542 Web www.townofnarthandever.com