Loading...
HomeMy WebLinkAboutCorrespondence - 858 GREAT POND ROAD 5/12/2011 Sullivan Engineering Group, LLC Civil Engineers&Land Development Consultants May 12, 2011 Town of North Andover Conservation Commission c/o Jennifer Hughes 1600 Osgood Street North Andover, MA 01845 Re: 858 Great Pond Road, North Andover Construction Update Ms.Hughes; On behalf of the owner,David&Gay Tracy, I am submitting this letter to inform you that the Tracy's intend to demolish the existing dwelling structure entirely, and then rebuild their new house utilizing the existing foundation. During the public hearing process for the Notice of Intent,the intention was to gut the existing dwelling and construct a second story. After the Order of Conditions was issued,the various builders bidding on the project ALL felt that the existing structure should be razed. Please note that this modification does not affect ANY of the design features on the approved Site Plan. The construction access points are the same, the erosion control location is the same, and there is no change to the approved building footprint. The site grading and drainage mitigation for this project remain the same. The only excavation activity will be for the foundation for the approved addition off of the rear of the house and for the construction of the third garage bay(approved). If you should have any questions or require additional information please feel free to contact me. Very Truly Yours, Jack Sullivan, P.E. Cc: David&Gay Tracy, Owners 22 Mount Vernon Road — Boxford,Massachusetts 01921 — (978)352-7871-Phone — 978352-7871 -Fax Annecrest Building Corporation P. O.Bog 290 Boxford,MA 01921 Date: May 23, 2011 To:North Andover Conservation Commission Re: Orders of Condition DEP File No. 242-1509 For David and Gay Tracy 858 Great Pond Road North Andover, MA 01845 In accordance with the above Order of Conditions please be advised of the following: The On-site Construction Supervisor and Contractor: Bill Constantine Annecrest Building Corporation 81 Herrick Road Boxford,MA 01921 Tel# 978-887-4991 The Erosion Control Monitor: Jack Sullivan,P.E. Sullivan Engineering Group,LLC 22 Mount Vernon Road Boxford,MA 01929 Tel# 978-352-7871 The following are dates for the sequence of construction: June 1, 2011---------------- -Demolition of main house down to first floor deck June 8, 2011---------------- -Excavation work for new partial foundations June 13, 2011----------------Foundation installations June 21,2011----------------Foundation backfilling Sept 8,2011------------------Roof drains and drywell tank installations Oct 4,2011-------------------Re-vegetation and final stabilization Oct 28,2011------------------Final paving LR� f Vim"446'24 Bill Constantine,President