Loading...
HomeMy WebLinkAboutMiscellaneous - 303 BERRY STREET 1/4/2016 (3) i i North Andover Health Department Community Development Division August 15, 2013 Tom Perry 303 Berry Street North Andover, MA 01845 Re: Subsurface Sewage Disposal System Plan for 303 Berry Street, Map 106D, Lot 49 Dear Mr. Perry: The proposed wastewater system design plan for the above site dated July 22, 2013 with a final revision dated August 13, 2013, received on August 14, 2013 has been approved. The design has been approved for use in the construction of a new upgraded onsite septic system, designed for a 4-bedroom(maximum 9- room) home. This plan is good for 3-years from the date of approval. During this time, a licensed septic system installer must obtain a permit and complete this work, and a Certificate of Compliance be endorsed by the installer, designer and the Town of North Andover or the plan approval will be voided. This approval is also subject to the following conditions: I. The owner will record the required Deed Notice prior to Construction. Additionally, the owner will provide written certification to the Board of Health to comply with Section II(18) for alternative systems. 2. Prior to the issuance of the Disposal Works Installers Permit, the applicant must submit a foundation as-built at the same scale as the approved plan. The overlay will ensure the new foundation and new system meet the minimum distance requirements. 3. If site conditions are found in the field to be different from those indicated on the design plan and/or soil evaluation, the originally issued Disposal System Construction Permit is void, installation shall stop, and the applicant shall reapply for a new Disposal Systems Construction Permit (3 10 CMR 15.020(1)). Page 1 of 2 North.Andover Health Department, 1 600 Osgood Street, Suite 2035 North Andover, MA 01.845 Phone: 978.688.9540 Fax: 978.688.8476 303 Berry Street August 15, 2013 4. It is the responsibility of the applicant and/or the applicant's septic system designer, septic system installer or other representative to ensure that all other state and municipal requirements are met. These may include review by the Conservation Commission, Zoning Board, Planning Board, Building Inspector, Plumbing Inspector and/or Electrical Inspector. The issuance of a Disposal System Construction Permit shall not construe and/or imply compliance with any of the aforementioned requirements. Please feel free to contact the office with any questions you may have, We look forward to working with you to obtain a wastewater treatment and dispersal system which will be in compliance with all regulations and assure protection of public health and the environment of North Andover. SincpAely, $�,S/an Y,Sa REHS/RS Public 14eaI t4hirector Encl. N Andover Installer's list cc: Jack Sullivan, PE File Page 2 of 2 North Andover Health Department, 1600 Osgood Street, Building 20, Suite 2-36, North Andover, MA 01 845 Phone: 978.688.9540 Fax: 97 .688.8476 Sullivan Engineering Group, LLC Civil Engineers Land Development Consultants i August 14, 2013 Town of North Andover Health Dept. c/o Susan Sawyer 1600 Osgood Street, Suite 2035 North Andover,MA 01845 `. ' 1 2013 � G Re: Revised Septic Plans 303 Berry Street Ms. Sawyer; Enclosed are three (3) sets of the revised Septic Plans for the above referenced property The following changes/revisions were made based on the review letter; 1) A scaled profile of the system has been added to Sheet 2 2) Percolation testing area has been added to Sheetl. 3) The location of the water line from the well to the house is shown on Sheet 1 4) Depths of the inlet/outlet tees are shown on Sheet 2. 5) There is no proposed septic effluent filter for the existing septic tank. The note has been removed from the plan regarding the effluent filter. 6) The bottom of the Septic Tank elevation(92.58') is ABOVE the seasonal groundwater table (90.93')....no buoyance calculation required. 7) The proposed septic tank has been noted to be `Watertight" on Sheet 2 8) On the system profile on Sheet 2 the first 2 feet out of Dbox noted to be level 9) A note has been added to the plan on Sheet 1 requiring the finished grade over the D-box to be at Elevation 97.04' which is the required 9 inches. 10) A percolation rate of 15 MPI was used 11)A swale is shown along the property line since the proposed grading is within 5 feet 12) The 2:1 slope is only in areas with the HDPE barrier is being used. With a HDPE barrier you can grade out at 2:1 beyond the barrier 13) The depth and layers of the Horizon A and Horizon B removal for the system installation has been labeled on Sheet 2. 14)The area between the infiltrators has been changed to Title 5 sand instead of crushed stone 15) I contacted Infiltrator Systems, Inc and at this time there is no required training for DESIGN of systems. Installers are still required to be certified. 16)The owner will record the required Deed Notice prior to Construction. Additionally,the owner will provide written certification to the Board of Health to comply with Section 11(18) for alternative systems. 22 Mount Vernon Road — Boxford,Massachusetts 01921 — (978)352-7871-Phone — 978 352-7871 -Fax I 17)A best feasible upgrade plan showing a conventional system design has been shown on Sheet 1. The calculations in sizing the conventional system are shown on Sheet 2. If you sh)uldha e any questions or comments please feel free to contact me. I Very TrJack Sul 22 Mount Vernon Road — Boxford,Massachusetts 01921 — (978)352-7871-Phone 978 352-7871 -Fax Blackburn, Lisa From: Sawyer, Susan Sent Wednesday,August 14, 20l] IO:lOAK4 To: tpeny@shawmut.com Cc; Elizabeth (eperryl3l@verizon.net);Jack Sullivan; Blackburn, Lisa; Grant, Michele Subject: RE: 303 Berry St Septic review Hi Tom, Jack and |just spoke. | believe we are on the same page as far asthe review. He is working on those changes. � I will be ready with the approval letter so it will be ready to go, as soon as he submits the changes and I can check over them. The approval letter will be sent to you and the building dept and we will be able to sign the Form u at that time. For expedience, the letter will be sent via email. Thank you Susan | \ From: Sawyer, Susan � Sent: Friday, August 09, 2013 11:44 AM To: 'Jack Sullivan' Cc: Elizabeth ; 'tperry@shawmuLcom' Subject: RE: 3O3 Berry St - Septic review Jack, I was wrong, my reviewer has found a newer document from DEP dated June 6, 2013 that requires the items listed in the review. | had not heard of these changes. Sn the related few items on the review stand aswritten. As for the perc rate; I wouldn't generally round down, however I would do so in this specific case as it is such a slight amount above, but Would require a large increase. I appreciate your cooperation with these new rules that we have to comply with. Let's talk on Monday. |wou|d like to move forward as soon as possible. Susan From: lack Sullivan Sent: Fhday, August 09, 2013 12:05 AM To: Sawyer, Susan Subject: Re: 303 Berry St' Septic review Hi Susan, I received comments back OD303 Berry and the majority Ofth8CO0rOeOtG@[8fiO8...I@rD confused OO |TerUG 15-17 stating that this 2O alternative system...I @Dl proposing infiltrators which is allowed for 1 general and remedial use...I dont believe this is an alternative system requiring the deed notice, training notice, etc...am I missing something?? Otherwise I can easily address all the other issues...the only other thing was the 16 MPI percolation...the 3 inch drop was in 46 minutes...which adjusts to 15.33 MPI...I rounded down to 15 MPI which is somewhat standard-it looks like the inspector rounded up to 16 MPI...I am not trying to split hairs but typically it would be round down to 15 MPI..thoughts? From: "Jack Sullivan" <iacksu1153@)comcast.net> To: "Susan Sawyer" <ssawyerptownofnorthandover.com> Sent: Tuesday, July 30, 2013 8:24:15 AM Subject: Re: Septic Design Engineers Great...thank Susan..enjoy the rest of your summer .......... From: "Susan Sawyer" <ssawyer AL townofnorthandover.coi-n> j _ To: "Jack Sullivan" <LacksuII53 comcastnet> Sent: Tuesday, July 30, 2013 7:59:59 AM Subject: RE: Septic Design Engineers Lisa must have gotten the same call.The updated list has been sent to be posted...and you are on it. From: Jack Sullivan [mailto:iacksuli[53 comcast.net] Sent: Monday, July 29, 2013 3:18 PM To: Sawyer, Susan Subject: re: Septic Design Engineers Hi Susan, I just had a long term client call and ask if I could prepare a septic plan in North Andover...I said of course...he said I was not on the list of engineers the Town provided.....if I am not on the list could you please look to add my information below... Thank you!! Sullivan Engineering Group, LLC Jack Sullivan 22 Mount Vernon Road 2 Blackburn, Lisa From: Isaac Rowe <irowe@miUhverconsulting.cum> / Sent: Monday, August US, 201] 2:S3PK4 _ To: Blackburn, Lisa; 'Dan Ottenheimer'; 'Pam Lally' Cc: Sawyer, Susen; irowe@miUriveroonsu|ting.com Subject: RE: 303 Berry St. Attachments: 303 Berry St - Soil testing results 6-18 l3.POF; 303 Berry St Disapproval letter 85-I3.doc Susan/Lisa, Attached is the disapproval letter for the above referenced property. A number edits required. Most notably the newer standards for using Infiltrator Chambers. Ahavv major points are: - Deed notice ie required (Remedial sites only) - System owner acknowledgement - Best feasible upgrade plan We can discuss |n more detail ifneeded. Let me know if you have any questions. Thanks, Isaac M. Rowe, R.S. Project Manager / | M8yU @ver Comswffiwg � 6 Sargent Street � � 1