HomeMy WebLinkAboutCorrespondence - 500 GREAT POND ROAD 10/26/2015 The m
M6rin-Cameron
October 26, 2015
Planning Board
1600 Osgood Street
North Andover, MA 01845
Re: Watershed Special Permit—Tennis Court Reconstruction
500 Great Pond Road
Assessors Map 62, Parcel 12
Owner/Applicant: North Andover Country Club
Dear Board Members:
In accordance with Special Condition 4 of the Watershed Special Permit issued on December 6,
2011, find enclosed an As-Built Site Conditions plan for the above-referenced project.
All work has been satisfactorily completed in accordance with the approved plans and the
Watershed Special Permit with the following exceptions:
• The tennis court area was constructed approximately 4"—6" higher than proposed. This
was done to account for a brick edge along the perimeter of the courts. Only the grades
within the tennis court area were raised. This should not have any adverse impact to the
resource areas around the courts since the infiltration trench was installed within the
court area (see below).
• The infiltration trench was moved to the inside of the tennis court area.This revision was
administratively approved by the Chair and Vice Chair of the Conservation Commission
in September 2013.
• The gravel access road and gravel parking area were re-surfaced with gravel. It is our
understanding that this work was discussed with the Conservation office prior to the
work being performed. The as-built gravel parking area is slightly smaller than what
previously existed.
• One tree was taken down at the rear of the tennis court area; it is our understanding that
this work was discussed with the Conservation office prior to the work being performed.
• A perimeter drain was installed in the north east corner of the tennis court area. It is our
understanding the contractor building the courts installed the drain to intercept runoff
that was coming from the hill to the north east. The perimeter drain discharges to
CIVIL ENGINEERS @ LAND SURVEYORS o ENVIRONMENTAL CONSULTANTS ® LAND USE PLANNERS
447 Boston Street(U.S. Route 1) Topsfield, MA 01983 978.887.8586 FAX 978.887.3480
Providing Professional Services Since 1978
www.morincameron.com
Planning Board October 26, 2015 Page 2
daylight to the north of the tennis courts via a 4" ADS pipe (see plan). The rate and amount of
water coming from this drain should not result in any erosion at the outlet.
The deviations above should not have any adverse impacts on the resource areas. The North
Andover Conservation Commission has issued a Certificate of Compliance for the project (please
find copy attached).
At this time we ask that the Board release the performance bond for this project to the
owner/applicant North Andover Country Club.
If you should have any questions regarding this matter please do not hesitate to contact our
office.
Sincerely,
THE MORIN-CAMERON GROUP, INC.
Mov
John M. Morin, PE
Principal
JMM/kmm
Attachment
cc: North Andover Country Club
F:\KATHYM\North Andover Country Club 3006\NAPB Wastershed SP Tennis Courts\NAPB Bond Rel Ltr.doc
v�
s
[Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance 242-1534
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
AD Project Information
Important:
When filling out 1. This Certificate of Compliance is issued to:
forms on the
computer,use North Andover Country Club
only the tab key Name
to move your c/o The Morin-Cameron Group, Inc., 447 Boston Street
cursor-do not
use the return Mailing Address
key. Topsfield MA 01983
CityfTown State Zip Code
2. This Certificate of Compliance is issued for work regulated by a final Order of
Conditions issued to:
North Andover Country Club
Name
November 16,2011 242-1534
Dated DEP File Number
3. The project site is located at:
500 Great Pond Road North Andover
Street Address City/Town
Map 63 Parcel 12
Assessors Map/Plat Number Parcel/Lot Number
the final Order of Condition was recorded at the Registry of Deeds for:
Property Owner(if different)
Essex Northern 12772 288
County Book Page
Certificate
4. A site inspection was made in the presence of the applicant, or the applicant's agent,
on:
July 8 2014
Date
wpafrm8b.doc•rev.12/23/09 VJPA Form 8B,Certificate of Compliance•Page 1 of 3
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number:
A Form 8B — Certificate of Compliance 242-1534
LLI Massachusetts Wetlands Protection Act M.G.L. c. 131, X40 Provided by DEP
B. Certification
Check all that apply:
® Complete Certification: It is hereby certified that the work regulated by the
above-referenced Order of Conditions has been satisfactorily completed.
❑ Partial Certification: It is hereby certified that only the following portions of work
regulated by the above-referenced Order of Conditions have been satisfactorily
completed.The project areas or work subject to this partial certification that have
been completed and are released from this Order are:
❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the
above-referenced Order of Conditions never commenced. The Order of
Conditions has lapsed and is therefore no longer valid. No future work subject to
regulation under the Wetlands Protection Act may commence without filing a new
Notice of Intent and receiving a new Order of Conditions.
® Ongoing Conditions:The following conditions of the Order shall continue:
(include any conditions contained in the Final Order, such as maintenance or
monitoring, that should continue for a longer period).
Condition Numbers:
73
C. Authorization
Issued by: !
North Andover I
Conservation Commission Date of Is ance
This Certificate must be signed by a majority of the Conservation Commission and a
copy sent to the applicant and appropriate DEP Regional Office(See
http://www.mass.gov/dep/about/region/findyour.htm).
Signatures:
wpafrm8b.doc•rev.12/23/09 WPA Form 8B,Certificate of Compliance•Page 2 of 3
ILIMassachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number:
PA Form 8B ® Certificate of Compliance 242-1534
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
D. Recording Confirmation
The applicant is responsible for ensuring that this Certificate of Compliance is recorded in
the Registry of Deeds or the Land Court for the district in which the land is located.
Detach on dotted line and submit to the Conservation Commission.
To:--------------------------------------------------------------------------------------------------
North Andover
Conservation Commission
Please be advised that the Certificate of Compliance for the project at:
500 Great Pond Road 242-1534
Project Location DEP File Number
Has been recorded at the Registry of Deeds of:
Essex Northern
County
for:
North Andover Country Club
Property Owner
and has been noted in the chain of title of the affected property on:
Date Book Page
If recorded land, the instrument number which identifies this transaction is:
If registered land,the document number which identifies this transaction is:
Do ument Number
Signature of Applicant
wpafrm8b.doc•rev.12/23/09 WPA Form 8B,Certificate of Compliance-Page 3 of 3
i r I
O 0 peOU uod
� Q E p �}ea
➢o =�
ID
a o Q
rvx
i
I
I
I
I
q � I
X_
i
i I el
R P�tl Rmd V3� .
JI
Ali
_ a
x U
i