HomeMy WebLinkAboutInspection - 316 GREAT POND ROAD 6/22/2015 Wolstromer, Bonnie
From: Cheetham, Kristine
Sent: Monday,June 22, 2015 12:52 PM
To: Wolstromer, Bonnie
Subject: FW: 316 Great Pond Road -Inspection report(Week of June 8, 2015)
fyi
From: Hughes, Jennifer
Sent: Monday, June 15, 2015 9:16 AM
To: Jack Sullivan; Gaffney, Heidi
Cc: Bill Karras; Cheetham, Kristine
Subject: RE: 316 Great Pond Road - Inspection report (Week of June 8, 2015)
Jack,
How far along the side lot do you propose to remove the erosion controls? I would suggest only to the back corner of
the house due to the on-going work in the back yard. Does that sound reasonable?
Because portions of the site are not stabilized, monitoring can be reduced to storm event of%"or more only.
Jennifer A. Hughes
Conservation Administrator
Town of North Andover
1600 Osgood Street,Suite 2035
North Andover,MA 01845
Phone 978.688.9530
Fax 978.688.9542
Email
Web www.TownofNorthAndover.com "
From: Jack Sullivan
Sent: Friday, June 12, 2015 4:04 PM
To: Gaffney, Heidi; Hughes, Jennifer
Cc: Bill Karras
Subject: Re: 316 Great Pond Road - Inspection report (Week of June 8, 2015)
My last email did not include the site photos with the report....please find report/photos in the attached
pdf
Jack �
1
From: "Jack Sullivan"
To: "Heidi Gaffney" _ om
Cc: "Bill Karras"
Sent: Friday, June 12, 2015 3:36:07 PM
Subject: Re: 316 Great Pond Road - Inspection report (Week of June 8, 2015)
Jennifer & Heidi,
Attached is weekly report...please read...there are two items which the owner is hoping you will agree
to:
1) Remove erosion control in front and side yard
2) Suspend monitoring until his contractor can show up in approximately 4 weeks...no work will take
place over the four weeks.
Thanks
Jack Sullivan
From: "Jack Sullivan'
To: "Heidi Gaffne
Cc: "Bill Karras" <
Sent: Friday, June 5, 2015 11:54:50 AM
Subject: Re: 316 Great Pond Road - Inspection report (Week of June 1, 2015)
Weekly inspection report attached.
Jack
From: "Jack Sullivan" R
To: "Heidi Gaffney' ,
Cc: "Bill Karras"
Sent: Friday, May 29, 2015 4:01:17 PM
Subject: Re: 316 Great Pond Road - Inspection report (Week of May 25)
Jennifer & Heidi,
Work is back underway at 316 GPR...weekly inspection report attached. In preparing for the paver
patio area there is a small stockpile area near the rear of the lot that will be removed.
Have a good weekend.
Jack
From: "Jack Sullivan"
To: "Heidi Gaffney"
Cc: "Matthew Egge" , "Bill Karras"
2
Sent: Wednesday, November 19, 2014 11:00:53 AM
Subject: Re: 316 Great Pond Road - Inspection report (Week of Nov 17)
Jennifer/Heidi,
Weekly inspection report attached. Owner is hoping to hay mulch down between almost completed
stone retaining wall and established lawn area next week. If he has it done he is hoping to suspend
inspections till Spring 2015. 1 will have him email you once the hay mulch is in place so you can
make a site visit & determination. There will be no additional site walk once wall is finished/backfilled.
Jack
From: "Jack Sullivan"
To: "Gaffney, Heidi"
Cc: "Matthew Egge" Bill K
Sent: Thursday, October 30, 2014 12:42:20 PM
Subject: Re: 316 Great Pond Road - Inspection report (Week of Oct 27)
Jennifer/Heidi,
Attached is inspection report. See you Nov. 5 at the hearing.
Jack
From: "Jack Sullivan" M. III' op
To: "Gaffney, Heidi" <
Cc: "Matthew Egge" UNIM, "Bill Karras"
Sent: Friday, October 24, 2014 4:35:38 PM
Subject: Re: 316 Great Pond Road - Inspection report (Week of Oct 20)
Inspection report for week of Oct, 20 attached.
Jack
From: "Jack Sullivan"
To: "Gaffney, Heidi" iL
Cc: "Matthew Egge" Illm- ml—"Bill Karras" <
Sent: Monday, October 20, 2014 9:31:13 AM
Subject: Re: 316 Great Pond Road - Inspection report (Week of Oct 13)
Attached is inspection report for last week. I will be out this week to complete an interim as-built plan.
Jack
From: "Jack Sullivan"
To: "Gaffney, Heidi" .166aw—f* i rcom
Cc: "Matthew Egge"
3
Sent: Sunday, October 12, 2014 8:49:56 AM
Subject: Re: 316 Great Pond Road - Inspection report (Week of Oct 6)
Jennifer, Heidi, Matt,
Attached is weekly inspection report for 316 GPR.
Jack Sullivan
978-352-7871
— 1 $ 'i ._fir. , , ..z t+1•.a < 'g
P
t
4
Wolstromer, Bonnie
From: Cheetham, Kristine
Sent: Monday,June 22, 2015 12:52 PM
To: Wolstromer, Bonnie
Subject: FW: 316 Great Pond Road -Inspection report (Week of June 8, 2015)
fyi
From: Jack [mailto:jacksul153 @comcast.net]
Sent: Monday, June 15, 2015 9:48 AM
To: Hughes, Jennifer x
Cc: Gaffney, Heidi; Bill Karras; Cheetham, Kristine
Subject: Re: 316 Great Pond Road - Inspection report (Week of June 8, 2015)
That sounds reasonable to me.
Thank you
Jack
Sent from my Whone
On Jun 15, 2015, at 9:15 AM, Hughes, Jennifer wrote:
Jack,
How far along the side lot do you propose to remove the erosion controls? I would suggest only to the
back corner of the house due to the on-going work in the back yard. Does thatsound reasonable?
Because portions of the site are not stabilized, monitoring can be reduced to storm event of%Z" or more
only.
Jennifer A.Hughes
Conservation Administrator
Town of North Andover
1600 Osgood Street,Suite 2035
North Andover,MA 01845
Phone 978.688.9530
Fax 978.688.9542
Email
Web
<image001.Jpg>
From: Jack Sulliva
Sent: Friday, June 12, 2015 4:04 PM
To: Gaffney, Heidi; Hughes, Jennifer
Cc: Bill Karras
Subject: Re: 316 Great Pond Road - Inspection report(Week of June 8, 2015)
1
My last email did not include the site photos with the report....please find report/photos
in the attached pdf
Jack
............
From: "Jack Sullivan"
To: "Heidi Gaffney" * -- -- - Om demahow>
Cc: "Bill Karras"
Sent: Friday, June 12, 2015 3:36:07 PM
Subject: Re: 316 Great Pond Road - Inspection report (Week of June 8, 2015)
Jennifer & Heidi,
Attached is weekly report—please read...there are two items which the owner is hoping
you will agree to:
1) Remove erosion control in front and side yard
2) Suspend monitoring until his contractor can show up in approximately 4 weeks...no
work will take place over the four weeks.
Thanks
Jack Sullivan
From: "Jack Sullivan"—lopwr"=
To: "Heidi Gaffney"
Cc: "Bill Karras" <.� Fff
Sent: Friday, June 5, 2015 11:54:50 AM
Subject: Re: 316 Great Pond Road - Inspection report (Week of June 1, 2015)
Weekly inspection report attached.
Jack
From: "Jack Sullivan"
To: "Heidi Gaffney"
Cc: "Bill Karras"
Sent: Friday, May 29, 2015 4:01:17 PM
Subject: Re: 316 Great Pond Road - Inspection report (Week of May 25)
Jennifer & Heidi,
Work is back underway at 316 GPR...weekly inspection report attached. In preparing
for the paver patio area there is a small stockpile area near the rear of the lot that will be
removed.
2
Have a good weekend.
Jack
-------------------------
From: "Jack Sullivan"
To: "Heidi Gaffney"
Cc: "Matthew Egge" Bill Karras"
Sent: Wednesday, November 19, 2014 11:00:53 AM
Subject: Re: 316 Great Pond Road - Inspection report (Week of Nov 17)
Jennifer/Heidi,
Weekly inspection report attached. Owner is hoping to hay mulch down between
almost completed stone retaining wall and established lawn area next week. If he has it
done he is hoping to suspend inspections till Spring 2015. 1 will have him email you
once the hay mulch is in place so you can make a site visit & determination. There will
be no additional site walk once wall is finished/backfilled.
Jack
From: "Jack Sullivan"
To: "Gaffney, Heidi"
Cc: "Matthew Egge" -129199A
0 -- _g
�=�Bill Karras"
Sent: Thursday, October 30, 2014 12:42:20 PM
Subject: Re: 316 Great Pond Road - Inspection report (Week of Oct 27)
Jennifer/Heidi,
Attached is inspection report. See you Nov. 5 at the hearing.
Jack
From: "Jack Sullivan"
To: "Gaffney, Heidi"
CC: "Matthew Egge" Wiw-i abwalksyol a i i is a "Bill Karras
Sent: Friday, October 24, 2014 4:35:38 PM
Subject: Re: 316 Great Pond Road - Inspection report (Week of Oct 20)
Inspection report for week of Oct. 20 attached.
Jack
3
From: "Jack Sullivan"
To: "Gaffney, Heidi"
Cc: "Matthew Egg "Bill Karras"
AW
Sent: Monday, October 20, 2014 9:31:13 AM
Subject: Re: 316 Great Pond Road - Inspection report (Week of Oct 13)
Attached is inspection report for last week. I will be out this week to complete an interim
as-built plan.
Jack
From: "Jack Sullivan"
To: "Gaffney, Heidi" mot :eo . ,
Cc: "Matthew Egge" < "Bill Karras"
Sent: Sunday, October 12, 2014 8:49:56 AM
Subject: Re: 316 Great Pond Road - Inspection report (Week of Oct 6)
Jennifer, Heidi, Matt, "
Attached is weekly inspection report for 316 GPR.
Jack Sullivan
978-352-7871
All email messages and attached content sent from and to this email account are public
records unless qualified as an exemption under the Massachusetts'Public Records Law:
Visit us online at www.townofnorthandover.com
Social Networks
twitter.com/north andover
www.facebook.com/northandoverma
4
Sullivan Engineering Group, LLC
Civil Engineers&Land Development Consultants
SWIMMING POOL MAINTENANCE REQUIREMENTS
316 GREAT POND ROAD
NORTH ANDOVER, MA 01845
i
April 24,2014
CR USHED STONE INFILTRATON TRENCH
The crushed stone infiltration trench along the pool patio edge shall be inspected every six(6)months and
after major storms. Debris shall be removed and the top layer of crushed stone shall be inspected for
sedimentation. Areas found to be clogged shall be removed and replaced to a depth necessary to assure proper
functioning of the trench.
STORAGE OF CHEMICALS
Pool chemicals shall be stored either inside the pool shed or the basement of the dwelling structure to ensure
containment of any spill or drips.
POOL DRAIND0WN
At the time of pool closure for the season or anytime the pool needs to be drained the water shall not be
discharged onsite. The owner shall engage a water hauling company to pump the water and truck the water
away. Final disposal of the water by the water hauling company shall be in accordance with all federal and
state regulations.
i