HomeMy WebLinkAboutInspection - 316 GREAT POND ROAD 6/22/2015 Wolstromer, Bonnie From: Cheetham, Kristine Sent: Monday,June 22, 2015 12:52 PM To: Wolstromer, Bonnie Subject: FW: 316 Great Pond Road -Inspection report(Week of June 8, 2015) fyi From: Hughes, Jennifer Sent: Monday, June 15, 2015 9:16 AM To: Jack Sullivan; Gaffney, Heidi Cc: Bill Karras; Cheetham, Kristine Subject: RE: 316 Great Pond Road - Inspection report (Week of June 8, 2015) Jack, How far along the side lot do you propose to remove the erosion controls? I would suggest only to the back corner of the house due to the on-going work in the back yard. Does that sound reasonable? Because portions of the site are not stabilized, monitoring can be reduced to storm event of%"or more only. Jennifer A. Hughes Conservation Administrator Town of North Andover 1600 Osgood Street,Suite 2035 North Andover,MA 01845 Phone 978.688.9530 Fax 978.688.9542 Email Web www.TownofNorthAndover.com " From: Jack Sullivan Sent: Friday, June 12, 2015 4:04 PM To: Gaffney, Heidi; Hughes, Jennifer Cc: Bill Karras Subject: Re: 316 Great Pond Road - Inspection report (Week of June 8, 2015) My last email did not include the site photos with the report....please find report/photos in the attached pdf Jack � 1 From: "Jack Sullivan" To: "Heidi Gaffney" _ om Cc: "Bill Karras" Sent: Friday, June 12, 2015 3:36:07 PM Subject: Re: 316 Great Pond Road - Inspection report (Week of June 8, 2015) Jennifer & Heidi, Attached is weekly report...please read...there are two items which the owner is hoping you will agree to: 1) Remove erosion control in front and side yard 2) Suspend monitoring until his contractor can show up in approximately 4 weeks...no work will take place over the four weeks. Thanks Jack Sullivan From: "Jack Sullivan' To: "Heidi Gaffne Cc: "Bill Karras" < Sent: Friday, June 5, 2015 11:54:50 AM Subject: Re: 316 Great Pond Road - Inspection report (Week of June 1, 2015) Weekly inspection report attached. Jack From: "Jack Sullivan" R To: "Heidi Gaffney' , Cc: "Bill Karras" Sent: Friday, May 29, 2015 4:01:17 PM Subject: Re: 316 Great Pond Road - Inspection report (Week of May 25) Jennifer & Heidi, Work is back underway at 316 GPR...weekly inspection report attached. In preparing for the paver patio area there is a small stockpile area near the rear of the lot that will be removed. Have a good weekend. Jack From: "Jack Sullivan" To: "Heidi Gaffney" Cc: "Matthew Egge" , "Bill Karras" 2 Sent: Wednesday, November 19, 2014 11:00:53 AM Subject: Re: 316 Great Pond Road - Inspection report (Week of Nov 17) Jennifer/Heidi, Weekly inspection report attached. Owner is hoping to hay mulch down between almost completed stone retaining wall and established lawn area next week. If he has it done he is hoping to suspend inspections till Spring 2015. 1 will have him email you once the hay mulch is in place so you can make a site visit & determination. There will be no additional site walk once wall is finished/backfilled. Jack From: "Jack Sullivan" To: "Gaffney, Heidi" Cc: "Matthew Egge" Bill K Sent: Thursday, October 30, 2014 12:42:20 PM Subject: Re: 316 Great Pond Road - Inspection report (Week of Oct 27) Jennifer/Heidi, Attached is inspection report. See you Nov. 5 at the hearing. Jack From: "Jack Sullivan" M. III' op To: "Gaffney, Heidi" < Cc: "Matthew Egge" UNIM, "Bill Karras" Sent: Friday, October 24, 2014 4:35:38 PM Subject: Re: 316 Great Pond Road - Inspection report (Week of Oct 20) Inspection report for week of Oct, 20 attached. Jack From: "Jack Sullivan" To: "Gaffney, Heidi" iL Cc: "Matthew Egge" Illm- ml—"Bill Karras" < Sent: Monday, October 20, 2014 9:31:13 AM Subject: Re: 316 Great Pond Road - Inspection report (Week of Oct 13) Attached is inspection report for last week. I will be out this week to complete an interim as-built plan. Jack From: "Jack Sullivan" To: "Gaffney, Heidi" .166aw—f* i rcom Cc: "Matthew Egge" 3 Sent: Sunday, October 12, 2014 8:49:56 AM Subject: Re: 316 Great Pond Road - Inspection report (Week of Oct 6) Jennifer, Heidi, Matt, Attached is weekly inspection report for 316 GPR. Jack Sullivan 978-352-7871 — 1 $ 'i ._fir. , , ..z t+1•.a < 'g P t 4 Wolstromer, Bonnie From: Cheetham, Kristine Sent: Monday,June 22, 2015 12:52 PM To: Wolstromer, Bonnie Subject: FW: 316 Great Pond Road -Inspection report (Week of June 8, 2015) fyi From: Jack [mailto:jacksul153 @comcast.net] Sent: Monday, June 15, 2015 9:48 AM To: Hughes, Jennifer x Cc: Gaffney, Heidi; Bill Karras; Cheetham, Kristine Subject: Re: 316 Great Pond Road - Inspection report (Week of June 8, 2015) That sounds reasonable to me. Thank you Jack Sent from my Whone On Jun 15, 2015, at 9:15 AM, Hughes, Jennifer wrote: Jack, How far along the side lot do you propose to remove the erosion controls? I would suggest only to the back corner of the house due to the on-going work in the back yard. Does thatsound reasonable? Because portions of the site are not stabilized, monitoring can be reduced to storm event of%Z" or more only. Jennifer A.Hughes Conservation Administrator Town of North Andover 1600 Osgood Street,Suite 2035 North Andover,MA 01845 Phone 978.688.9530 Fax 978.688.9542 Email Web <image001.Jpg> From: Jack Sulliva Sent: Friday, June 12, 2015 4:04 PM To: Gaffney, Heidi; Hughes, Jennifer Cc: Bill Karras Subject: Re: 316 Great Pond Road - Inspection report(Week of June 8, 2015) 1 My last email did not include the site photos with the report....please find report/photos in the attached pdf Jack ............ From: "Jack Sullivan" To: "Heidi Gaffney" * -- -- - Om demahow> Cc: "Bill Karras" Sent: Friday, June 12, 2015 3:36:07 PM Subject: Re: 316 Great Pond Road - Inspection report (Week of June 8, 2015) Jennifer & Heidi, Attached is weekly report—please read...there are two items which the owner is hoping you will agree to: 1) Remove erosion control in front and side yard 2) Suspend monitoring until his contractor can show up in approximately 4 weeks...no work will take place over the four weeks. Thanks Jack Sullivan From: "Jack Sullivan"—lopwr"= To: "Heidi Gaffney" Cc: "Bill Karras" <.� Fff Sent: Friday, June 5, 2015 11:54:50 AM Subject: Re: 316 Great Pond Road - Inspection report (Week of June 1, 2015) Weekly inspection report attached. Jack From: "Jack Sullivan" To: "Heidi Gaffney" Cc: "Bill Karras" Sent: Friday, May 29, 2015 4:01:17 PM Subject: Re: 316 Great Pond Road - Inspection report (Week of May 25) Jennifer & Heidi, Work is back underway at 316 GPR...weekly inspection report attached. In preparing for the paver patio area there is a small stockpile area near the rear of the lot that will be removed. 2 Have a good weekend. Jack ------------------------- From: "Jack Sullivan" To: "Heidi Gaffney" Cc: "Matthew Egge" Bill Karras" Sent: Wednesday, November 19, 2014 11:00:53 AM Subject: Re: 316 Great Pond Road - Inspection report (Week of Nov 17) Jennifer/Heidi, Weekly inspection report attached. Owner is hoping to hay mulch down between almost completed stone retaining wall and established lawn area next week. If he has it done he is hoping to suspend inspections till Spring 2015. 1 will have him email you once the hay mulch is in place so you can make a site visit & determination. There will be no additional site walk once wall is finished/backfilled. Jack From: "Jack Sullivan" To: "Gaffney, Heidi" Cc: "Matthew Egge" -129199A 0 -- _g �=�Bill Karras" Sent: Thursday, October 30, 2014 12:42:20 PM Subject: Re: 316 Great Pond Road - Inspection report (Week of Oct 27) Jennifer/Heidi, Attached is inspection report. See you Nov. 5 at the hearing. Jack From: "Jack Sullivan" To: "Gaffney, Heidi" CC: "Matthew Egge" Wiw-i abwalksyol a i i is a "Bill Karras Sent: Friday, October 24, 2014 4:35:38 PM Subject: Re: 316 Great Pond Road - Inspection report (Week of Oct 20) Inspection report for week of Oct. 20 attached. Jack 3 From: "Jack Sullivan" To: "Gaffney, Heidi" Cc: "Matthew Egg "Bill Karras" AW Sent: Monday, October 20, 2014 9:31:13 AM Subject: Re: 316 Great Pond Road - Inspection report (Week of Oct 13) Attached is inspection report for last week. I will be out this week to complete an interim as-built plan. Jack From: "Jack Sullivan" To: "Gaffney, Heidi" mot :eo . , Cc: "Matthew Egge" < "Bill Karras" Sent: Sunday, October 12, 2014 8:49:56 AM Subject: Re: 316 Great Pond Road - Inspection report (Week of Oct 6) Jennifer, Heidi, Matt, " Attached is weekly inspection report for 316 GPR. Jack Sullivan 978-352-7871 All email messages and attached content sent from and to this email account are public records unless qualified as an exemption under the Massachusetts'Public Records Law: Visit us online at www.townofnorthandover.com Social Networks twitter.com/north andover www.facebook.com/northandoverma 4 Sullivan Engineering Group, LLC Civil Engineers&Land Development Consultants SWIMMING POOL MAINTENANCE REQUIREMENTS 316 GREAT POND ROAD NORTH ANDOVER, MA 01845 i April 24,2014 CR USHED STONE INFILTRATON TRENCH The crushed stone infiltration trench along the pool patio edge shall be inspected every six(6)months and after major storms. Debris shall be removed and the top layer of crushed stone shall be inspected for sedimentation. Areas found to be clogged shall be removed and replaced to a depth necessary to assure proper functioning of the trench. STORAGE OF CHEMICALS Pool chemicals shall be stored either inside the pool shed or the basement of the dwelling structure to ensure containment of any spill or drips. POOL DRAIND0WN At the time of pool closure for the season or anytime the pool needs to be drained the water shall not be discharged onsite. The owner shall engage a water hauling company to pump the water and truck the water away. Final disposal of the water by the water hauling company shall be in accordance with all federal and state regulations. i 22 Mount Vernon Road Boxford,Massachusetts 01921 (978)352-7871-Phone 978352-7871 -Fax i i