Loading...
HomeMy WebLinkAboutConsultant Review - 41 MARBLERIDGE ROAD 10/18/2001 MERRIMACK ENGINEERING SERVICES, INC. PROFESSIONAL ENGINEERS ® LAND SURVEYORS ® PLANNERS 66 PARK STREET•ANDOVER,MASSACHUSETTS 01870•TEL(978)47r 3555.373-S721 •FAX(978)475-1448•E-MAIL:m rrenpfool.com October 2,2001 plantung Department Town of North Andover 27 Charles Street North Andover,MA 01845 Attn: Heidi Gffxn,Town Planner RE: 41 Marbleridge Road Town Map#37C Town Lot#12 Stephen Iannsn Jr. Dear Ms.Giffin: Regarding the above mferenced project,we offer the following written response to comments: In a letter dated 9-27-01 from Heidi Griffin,Town Planner to the Planning Board, 1. Specific measures have been incorporated in the pool design to prevent degradation ofthe water quality&quantity emering the lake. The pool will be equipped with disposable non- backwash filter cartridges. Each October,the pool water level will have to be lowered approximately 6 inches,a zero chlorine level can be achieved before this operation is performed. Additionally,an area for pool pumping has been designated to maximize wetland separation,placed rip-rap in this area will prevent any soil erosion. Structural engineering design plena will be presented to the town as required,The site plan has also beery revised to require that the silt-fam be band-dug as requested. In a letter dated 9-27-01 from VHB to the Planning Board: 1. (4.136.4.c.ii.2)Wetlands Preservation,Environmental Consultants,flagged the designated wetland area shown on the plan. As discussed with the North Andover Conservation Commission,the wetland boundary will be Held verified with their agent prior to issuance of a bulling permit. 11. (4.136.4.e.iii)No significaut degradation of the water quality or quantity will occur tom the proposed work. Additionally,the existing Conservation Reatriction and will be in effect to further protect the resource areas. III. (4.136.4.c.vi)No increase of nitrogen in groundwater will o=ur from the proposed project IV. (4.136A.c.vi)Since no increase of downgradiertt concentrations of nitrogen,phosphorous,o other relevant chemicals will result from this project. A waiver is requested from this item. V. (4.136.4.8)The only increase in impervious area will be the construction of a 4-foot apron around the perimeter. Due to the saub vegetation at the back oftht lot,and the distance of the proposed pool to the resource area,a natural vegetative barrier exists to facilitate removal and infiltration of surface water, VI. The owner has agreed to secure within the dwelling,all chemicals required for the main�&peration of the pool. VII. No restriction exists that prohibits the construction ofthe proposed stone walls within the 20 sewer ea>reme nt VW- The desip and ooh of the retaim"wails will adhaz to aft state and local r'equhvimads. If you have any questions or continents,please do not heitate to call. Vary truly your NfERRMACK ENGINPEMG SERVICES Anthony Donato P.E. Project Engineer MERRIMACK ENGINEERING SERVICES.INC. 66 PARK STREET ANDOVER.MASSACHUSETTS 01810 OCT.10.2001 7:41AM VHB NO. 1rr P.2. TOWN OF NORTH ANDOVER PLANNING BOARD ENGINEERING REVIEW OF SITE PLAN/SPECIAL PERMIT FOR CONFORMA.NCE WITH THE TOWN OF NORTH ANDOVER ZONING BYLAW& STANDARD.ENGMERING PRACTICE Site Plan'Title: Platt of baud VHB No.: 06716.47 Location: 41 Marbleridge Road Owaer&Applicant: Stephen Lannan 41 Marbleridge Road,North Andover,MA 01852 Applicant's Engineer:Merrimack Engineering Services 66 Park Street,Andover,MA 01810 Plan late: 8-22.01 Review Date:9-27-01 Second Review Date: 1019101 The Applicant submitted revised plans and documents to VHB for review on October 8,2001. The revised Watershed Special permit plan submission was reviewed for conformance to the appropriate sections of the 1972 Town of North Andover Zoning Bylaw amended on December 11,2000 and standard engineering practice. The Applicant submitted the following information for VHB's review: Revised Plan of Land(1 sheet)dated 10-02-01 Written Response to Comments dated 10-02-0I The revised plan submission includes a swimming pool,retaining wall and related facilities. The following comments are in response to revised plans and documents submitted to VIM: I(4.136.4.c.ii.2.) Original VHB comment has been satisfied regarding designated wetlands. II(4.136.4.c.iii.) Original VHB comment has been satisfied. III(4.136.4.c.vi.)Original VHB comment has been satisfied. IV(4.136.4.c.vii.)The applicant has requested a waiver from calculating down gradient concentrations of relevant chemicals. VHB recommends that the waiver be granted. V(4.136.4.8.) Original VHB comment has been satisfied regarding recharge of runoff onsite. VI(4.136.4.h.) Original VHB comment has been satisfied regarding chemicals associated with the operation of the pool. VII(Sewer Easement)Original VHB comment has been satisfied. - 1 - 1tMDwadm1U67161doclProgrcy iopons16916.d7rMcw repontdoc OCT.1 0.2001 7:42AM VHB NO.177 P.3 I I VIII(Retaining Wall)Design)Original VHB comment has been satisfied. It appears that all of VHB's comments have been adequately addressed (including requests for waivers)and VWS concerns in this matter have been satisfied. No further engineering review is required at this time. If you have any questions or co erns, a call at your convenience. Reviewed by: Date: 10/09/01 Michele Mochnoc Higgins .E Senior Project Engineer— way&Municipal Engineering UMawatrleCO67T68oceProgren RCpans16716rs�revlCw ropon2 d- v 2 a