Loading...
HomeMy WebLinkAboutPlanning Permit # 6/25/1996 ASS William F. Weld Paul Cellucci Jamess crerarysiotes Keconmmis oner HIGHU�I Governor Lieutenant Govemor Permit No.; 496-0308 PERMIT - NORTH ANDOVER subject to all the terms, conditions, and restrictions printed or `written below, and on the reverse sidee1e Ted NCO permission enter uponrthe granted to john Ferreira/North Andover Street far the purpose of State Highway known a$ Route 125 ed on site drainage systems to the connecting existing and prop state Drainage System on the northerly side of the roadway as eanuar indicated on plane submitted, dated y The Grantee shall forward all copies of correspondence espect to the approval of between the Departments and Parties with r intended discharge location of drainage flow from the subject site to the MRD District Four Environmental Engineer. WORK HOURS: 9 : 00 A.M. tbru 3:00 P.M. Monday thru Friday Provisions shall be made for the ct safety t and period. Protection of Pedestrian Traffic during the constr The work will be performed as per plans on file at the Massachusetts Highway Department District Four Permits Office. The Grantee shat l notify the District permits of work Engineer at (6,3.7) 648-6100, two (2) days prior to the star The Grantee shall make contact with ofortyte g t Specialist III via Pager Telephone Number #617-644-3604 , prior to start of work. No work shall be authorized without said notification. Massachusetts Highway Department-District 4 .519 Appleton St., Arlington, MA 02174 - (617) 648-6100 1t3 THU 15.52 FAX zoo3 The Grantee shall notify Dig-Safe at 1-800-322-4844 at least 72 hours prior to the start of work for the purpose of identifying the location of underground utilities. Dig-Bate # 960502226 A copy of this permit must be on the job site at all times for inspection. Failure to have this permit available will result in suspension of the rights granted by this permit. All work shall be in compliance with the current edition of the "Massachusetts Department. of Public works Standard Specifications for Highways and Bridges"! No work will be performed on the day before or',the day after a- long- week-end which involves a holiday on any ;highway, roadway : or property under the control of the Massachusetts Highway Department or in areas where the work would adverse impact the normal flog of traffic on the State Highway System-. hc�ur�. + h : District Highway Director or his Represe This permit is issued with the stipulation -that it may be modified or revoked at any time at the discretion of the District Four Highway Director or his representative without rendering said Department or the Commonwealth of Massachusetts liable in any way. Uniformed Police officers shall be in attendance ate all times while work is being':. done under this permit. All personnel who are working on the traveled way or breakdown lanes shall wear safety vests and hard hats. The furnishing and erecting of all traffic safety devices shall; be the responsibility of the Grantee. Cones and non-reflecting; warning devices shall not be left in operating position on the highway when the daytime operations have ceased. if it becomes necessary for this Department to remove any construction warning devices or their appurtenances from the project due to negligence by the Grantee all costs for this work will be charged to the Grantee. Flashing arrow boards will be used at all times when operations occupy the roadway and shall be available for use at all times. Necessary signs, barriers, cones, etc. shall conform with the current Manual on Uniform Traffic Control. Devices. Free flow of traffic shall be maintained at all times. j6 THU, 15:52 FAX 004 i r ' Two way traffic shall be maintained at all times. when in the opinion of the Engineer, this operation constitutes a hazard to traffic in any area, the Grantee may be required to suspend operations during certain hours and to remove his equipment from the roadway. Care must be taken not to interfere with underground structures that exist in the area. The Grantee will be responsible for any damage caused by his operation to curbing, structures, roadway, etc. . The Grantee shall be responsible for any "settlement'which may occur as a result of the work done under this permit. The Grantee shall be responsible for any ponding of water which may develop within the State Highway Layout, caused by this work. y water jetting of the trench area is prohibited. When a snow or ice condition exists during the progress of this work, the Grantee shall keep the highway well sanded to a point not less than two hundred (200) feet beyond the limits of the barriers and signs. No work shall be authorized during snow, sleet, or ice storms and subsequent snow removal operations., No bituminous concrete shall be installed between November 15th and April 15th. The Highway surface shall be kept clean of debris at all times and shall .be thoroughly cleaned at the completion of this permit. At the completion of this permit, I all disturbed areas shall be restored to a condition equal or similar to that which existed prior ; to the work. Whenever trenches are cut in the travelled way the surface shall be cut in straight lines using a concrete saw or other accepted methods equipped to cut the full surfacing and including the reinforcing steel on concrete roadways. The excavation shall only be between these lines. The cutting operation shall not be done with a backhoe, gradall or any type of ripping equipment. The trench shall be backfilled with Controlled Density Fill (CDF) . it must be batched at a concrete plant, is flowable, requires no vibrating, and the finished product must be excavatable without the use of power tools. See the attached sketch for additional requirements. 11J6 THU 15: 55 FAX .�. �..� Z005 f f The material shall flow under and' around the pipe or conduit, providing uniform support without leaving voids. Flowable mortar shall be discharged from the mixer by a reasonable means into the trench area to be filled. Filling operations shall . proceed simultaneously on both sides of pipe or conduit so that the two fills are kept at approximately the same elevation at all times. An external load shall be applied to the pipe or conduit, sufficient to hold it in place before filling. A permanent patch shall then be placed consisting of 1 1/2" of binder and 1 1/2" of top (class I, Bituminous Concrete Pavement - Type I-1) to meet the existing pavement-surface grad: After the work has been completed the Grantee shall use the Infra- Red Method. as a surface treatment a minimum of one (1) foot beyond the limitsof the trench. The contractor, •when opening his trenc" bituminous- material or_,-- concrete surface, shall either use a jack-Hammer or saw to insure the., l..east. ,amount,.i damage;.,to,,.thq_ road- . k, of the trench somewhat' parallel i - - - r ��, ,� •'Yt N4�ai ..r.'. A 5•. a.., p1 ♦;, e' .r'IT: ... '',. If it becomes necessary to open the roadway surface in a larger area than specified in this permit then the Grantee shall apply for an additional permit to cover this project. All utility companies -whose services are located within or adjacent to the proposed installation areas shall be notified in writing ;of the proposed installation at least '48 hours prior to the start of any excavation in said areas. This is independent of the required dig safe notification. It' shall. 'be the responsibility of the Grantee to contact the District Highway Director regarding the field location of any underground traffic control devices on this project. If the Grantee elects to use steel plates to protect the excavations, they shall be of sufficient thickness to resist bending, vibration, etc. under traffic loads and shall be anchored securely to prevent movement. If these conditions are not met the Grantee will be required to back fill and pave the excavations daily. No trench shall be left open overnight. Steel sheeting, shoring or bracing shall be driven or placed for all depths over 5 feet. At the discretion of the state Engineer said sheeting shall be left in place and cut off two (2) feet below the surface. 06 THU 15:59 FAX `R. .. _ A �006 r If the sidewalk area is disturbed, it shall be restored, full width, in kind a minimum of five feet beyond any disturbed area as follows. After the subgrade has been prepared, a foundation of gravel shall . be placed upon it. After being mechanically compacted thoroughly, the foundation shall be at least 8 inches in thickness and parallel to the proposed surface of the walk. The concrete sidewalk shall be placed in alternate slabs 30 feet in length (if applicable) . The slabs shall be separated by transverse preformed expansion joint •filler 1/2 inch in thickness (shall conform to AASHTO-M153) . Preformed expansion joint filler. shall be placed adjacent to or around existing structures also. , On the foundation as specified above, the concrete (Air-Entrained 4000 psi, 3/4" 610) shall be placed in such quantity that after being thoroughly consolidated in place it shall be 4 inches in depth. At driveways, the sidewalk shad-,T- 6i 6. inches. iii ••depth•. - The b,itumi.,r�ous co.ncretf.•p ,a p;sur.fa . to a depth after rolling of :2 1/2 iriche be !'1 1/-4 inches `in' thidness* ahc# its'".su= "- 1 1/4 inches below the parallel to the proposed grade of the finished surface. The top course shall be 1 1/4 inches in thickness after rolling. It shall be the responsibility of the Grantee td replace all pavement markings which have been disturbed'by this permit. These pavement markings shall be restored within ten (10) days after this work is performed or as deemed necessary by the District Highway Engineer. Any bound marked MHB shall not be removed or disturbed. If it becomes necessary to remove and reset any highway bounds then the Grantee shall .hire a Registered Professional Land Surveyor to perform this work. It shall be the responsibility of this land surveyor to submit to this office a statement in writing and a plan containing his stamp and signature showing that said work has been performed. The Grantee shall indemnify and save harmless the Commonwealth and its Highway Department against all suits, claims or liability of every name and nature arising at any time out of or in consequence of the acts of the Grantee 'in the performance of the work covered by this permit and or failure to comply with terms and conditions of the permit whether by themselves or their employees or subcontractors. C GR.'11 l I.V,V L L0 V to Lotour y/ APPLICANT'S REPRESENTATIVE: John Ferreira TELEPHONE NUMBER: 5'08--975-2574 (SEE OTHER SIDE FOR ADDITIONAL CONDITIONS) No work shall be done under this permit until the Grantee shall have communicated with and received instructions from the District Highway Director of the Massachusetts Highway Department at 519 Appleton Street, Arlington, Ma. 02174 . This permit shall be void unless the work herein contemplated shall have been completed before June 25, 1997. Dated at Arlington this 25th day of June',' -1996. , Massachusetts Highway Department, • i - y 4! „ .well,', .1N'1 . C,,yd ?,. r• . , ynl., i,_. •r. , r�-.<:� .i�i'i;�Y,r a-,r. i` -'.:' � ;...t. I - D-mi�9II,*?+i1h District Highway Director WJD S