HomeMy WebLinkAboutCorrespondence - 980 OSGOOD STREET 3/21/1995 TOWN OF NORTH ANDOVER, MASSACHUSET-i-s
DIVISION OF PUBLIC WORKS
394 OSGOOD STREET, 01845
GEORGE F'ERNA Telephone(508)685-0950
DIRECTOR Fax(50 3)665-057 3
� rac��roy
f
March 21, 1995
I
Mr. Richard Nardella Ch. III
Planning Board
120 Main Street
North Andover, Ma 01845
A BOA
l
Re: 980 Osgood Street
Dear Mr. Nardella,
The Division of Public Works has reviewed the revised site
plan of 980 Osgood Street dated March 20, 1995 drawn for John
Ferreira by Merrimack Engineering Services. We have the following
comments:
1 . The proposed drainage improvements shown on the 3/20/95
potential
the ate
plan are adequate measures to mitigate p
adverse impact of the site to Lake Cochichewick. The new
drainage captures the majority of the site storm water
runoff and diverts the flow to existing drainage which is
not tributary to the Lake.
2 . The proposed sewer design is acceptable, however it may
be advantages to install a gravity sewer connection from
the existing building to the new sewer pumping station.
i
3 . The water service for the new building should be
connected to the 12 inch water main on Osgood Street.
Very tr yours'
J. William Hmurciak, P.E.
Assist. Director
Division of Public Works
cc: Merrimack Engineering