Loading...
HomeMy WebLinkAboutCorrespondence - 980 OSGOOD STREET 3/21/1995 TOWN OF NORTH ANDOVER, MASSACHUSET-i-s DIVISION OF PUBLIC WORKS 394 OSGOOD STREET, 01845 GEORGE F'ERNA Telephone(508)685-0950 DIRECTOR Fax(50 3)665-057 3 � rac��roy f March 21, 1995 I Mr. Richard Nardella Ch. III Planning Board 120 Main Street North Andover, Ma 01845 A BOA l Re: 980 Osgood Street Dear Mr. Nardella, The Division of Public Works has reviewed the revised site plan of 980 Osgood Street dated March 20, 1995 drawn for John Ferreira by Merrimack Engineering Services. We have the following comments: 1 . The proposed drainage improvements shown on the 3/20/95 potential the ate plan are adequate measures to mitigate p adverse impact of the site to Lake Cochichewick. The new drainage captures the majority of the site storm water runoff and diverts the flow to existing drainage which is not tributary to the Lake. 2 . The proposed sewer design is acceptable, however it may be advantages to install a gravity sewer connection from the existing building to the new sewer pumping station. i 3 . The water service for the new building should be connected to the 12 inch water main on Osgood Street. Very tr yours' J. William Hmurciak, P.E. Assist. Director Division of Public Works cc: Merrimack Engineering