Loading...
HomeMy WebLinkAboutGRANDSTAFF, KENNETH TOWN OF NOR11IANDOVER DIVISION OF .U' _, . WORKS �10YCE BRAQSHA�1 3,4 OS OOD STREET TOWN CLERK Ii NORTH ANDOVER, AS AC USETT S 01845-2Q09 NORTH ANDOVER J. ILLIAM H}tixJURCIAK, DIRECTOR, P.E. 1000 JUN 28 P 2. 0y J<:;mc s RomJr, � �,a�T14 Telephone (978) 6,85-09j0 I�f-8) 688T. Ju ne 28,2000 Mr. Kenneth Grandstaff,President Mesiti Development Corp. OP 231 Sutton Street, Suite 2F North Andover,MA 01845 RE: Conditional Operational Approval Boston Hill&Forest View Sewer Pumping Stations Dear Mr. Grandstaff: This letter grants CONDITIONAL operational approval to the Boston Hill and Forest View Sewer Pump Stations for 60 days.This"conditional operational approval"expires,ceases,and is void if the following conditions are not met or completed within 60 days of the date of this letter. CONDITIONS 1. Attachment labeled"A"is a condition of this approval,with particular reference to the last paragraph on the first page. Also, all the items listed under"Repair, alteration and additional still need to be done"they are as follows: A. Pump performance B. Pump Rooms C. Grounds D. Lighting E. Wet Wells F. Electronics and Data Transmission 2. A revised"As-Built"plan must be submitted for review by Guertin and Associates and Town personnel. A. Must be submitted within 30 days to allow time for proper review. B. If revisions and additional data are required this must be completed and resubmitted for review with sufficient time within the 60 days. C. A copy of the preliminary record drawing comment list is attached 3. Permanent easements must be provided to the Town of North Andover,Division of Public Works to access and repair both the Boston Hill and Forest View sewer pump stations. Mr. Kenneth Grandstaff Page 2 Rte 114 Sewer Pump Stations 06/28/00 0 CONDITIONS 3. Continued Also, your acceptance of this"Conditional Operational Approval"is also granting us full access to the aforesaid pump stations for this 60-day period, The easements must be delivered,within this 60-day period,and recorded at the Registry of Deeds,North Essex County and proof of said recording is delivered to the Division of Public Works. 4. The length of sewer pipe between NH 208+54 and 206+17.40 after review by Guertin and Associates is temporarily permitted to remain, based on the calculations submitted by Mark Gross,P.E. dated May 12, 2000. The personnel of the Town of North Andover will monitor this line. If unacceptable problems occur during the five-year maintenance period of Mesiti Development Corporation,this and any other work needed to correct the situation will be completed prior to the stations being accepted by the Town of North Andover. All of this work will be completed at the expense of Mesiti Development Corporation, or its successor in title. The Director of the Division of Public Works will be the sole authority to determine the acceptability of this line. The Director's decision is final and if work is required, and is not performed,band money will be utilized to complete this work. 5. The"Preventive Maintenance Contract"is unacceptable as written. Comments follow: A. AUTHORITIES Section,the first"C"If Roy's men refuse to enter the site,who will enter the site? B. AUTHORITIES Section,the second`B"who will do this work and who will pay? C. AUTHORITIES Section, the second"C"who will be refused access?The Town of North Andover personnel& other maintenance personnel cannot be denied access at any time and need keys to the buildings. D. AUTHORITIES Section,the second`W"this is UNACCEPTABLE the contract cannot be canceled without 45 day written notice delivered to the Division of Public Works by certified mail and the Mesiti Development corporation must have a new firm under a new contract within 21 days of any notice of termination of service. This new firm must be pre-approved by the DPW. E. SERVICES section B), 4 how will services and parts over$100.00 be provided for? F. NON-PROVIDED SERVICES who will provide these services and who will pay for them? G. FREQUENCY OF VISITS 1 per month is unacceptable. The stations must be visited once per week and Roy must submit copies of all reports to the Town of North Andover weekly. H. This contract is only for one year who will provide this service for the remaining 4 years and how will they be paid I. All purchasers of any property discharging into this sewer system shall be given a copy this document by Mesiti Development Corp., or its successors in title prior to conveyance. TOW O NI R-1-H ANDOVER FAVISION ()F PU 1311 381 OSGGG.D STREET NORTH ANDOVER, .MASS.ACH.USFTTS 01845-2909 _ Mr. Kenneth Grandstaff Page 3 Rte 114 Sewer Pump Stations 06/28/00 The Town of North Andover,Division of Public Works needs unlimited authority to accomplish whatever is necessary to insure the proper operation and maintenance of the two pumping stations. Any clause either written or omitted that could inhibit or limit this authority is unacceptable and void. All of these items must be addressed within the 60-day conditional operational period. A cash bond will be accepted in the amount of$25,000.00 and a paper bond of$100,000.00 for those items only which must extend out the 5-year maintenance period Mesiti is responsible. This bond is for the purpose of providing repairs,maintenance, utility services and any other service that may be required if Mesiti Development Corporation fails to provide them. All other items must be completed within the 60-day life of the"Conditional Operational Approval. It has been mentioned that Pulte Home Corporation may wish to bond or guarantee the work to be completed. This is acceptable to the Division and the details on how this will be done must be acceptable to the DPW and submitted prior to the 60-day approval expiring, All permits issued to Pulte and work done based on this 60 day conditional approval is done at the applicants risk. Sincerely, J. William Hmurciak, P.E. Director of Public Works JWH/JJr O CC: Attorney Thomas J. Urbelis,Town Counsel Terri Ackerman,Interim Town Manager William Scott,Dir.of Comm.Development Heidi Griffin,Town Planner James Rand,Jr.,Dir.of Engineering Enc. C:/Rte 114C o nct/C ondApp01 T O N� tit NOR 1 H t'.ND0)VE 38 ,. vSG00D STREET NORTH ANDOVER, MASSACHUSETTS 0184��2909 ri � it Boston Hill and Forest View Sewer Pump Stations On June 5a`, 2000 Inspection and operation of the Boston Hill and Forest View Sewer Pump Stations were conducted. On site were Dennis Bedrosian,Jerome Welch, Brian Ford and Youssef Issa from the North Andover Water/Sewer Dept. Also there was George Roy of George Roy Mechanical Services,Dick Pelletier and Moe Harpin of Mesiti Construction, Fred Wise of the Wise Company Inc, and Bill Stricht from Superior Concrete. Below are some of the conditions we created in order to determine this station readiness to operate. The pumps were operated at each station in auto mode,based on level control set points. The pumps were tested for alternation(order of operation). The backup level float control system was tested in manual mode for proper operation in the event of failure of the normal auto shutoff level control system. The main power was shut off while a pump was in operation (building power drop test) to determine if the Emergency Power Generator would operate and provide electricity needed to the building without straining power to machinery. The pumps and motors were felt for vibration. Fifteen-second time delays were adjusted to the electrical start components of the motors in order to reduce electrical demand and prevent potential damage to the pumps. It is my opinion that the Boston Hill and Forest View SPS's are suffic_, ienth capable of operation at this time. The pumps started, stopped and alternated properly in automatic and manual control. The Emergency power generators operated without problem and provided electricity to the pumps without major strain. The automatic and backup level control systems worked without failure. Regardless of who the owner of Boston Hill and Forest View SPS's are just prior to the time of transfer to the Town of North Andover, if any conditions mentioned on this report aren't completed then the owner will be responsible for completing them as well as any necessary repairs. This includes upgrading the station due to any unforeseen changes in development or construction such as additional residential, commercial or industrial properties that places a greater demand on these stations in comparison to what was originally designed. Repair, alteration and additional work still need to bbe,done The following work must be completed in good assurance to the Town of North Andover. It is my understanding from conversations with Moe Harpin that arrangements are presently being made for the continued troubleshooting and correction of the following. Pagel of 3 Boston Hill and Forest View Sewer Pump Stations Pump performance Pump hydraulic performance testing according to the Hydraulic Institute of Standards. Verify that each pump in the field can meet the certified curves based on manufacturers bench line testing. Insure efficiencies are met according to the Town of North Andover hydraulic requirements in respects to the subject areas. Each pump must be tested at least five points along the pump curve by a professionally, qualified person using test equipment or instruments which are newly calibrated and certified for such work. Along with these tests I require pump-motor vibration testing and analysis work to be performed by reputable professionals of that field of work. This must include temperature testing of the machinery in respects to their bearing area. The emergency power generator at Boston Hill took a little longer to fire up vs. Forest View. Pump Rooms Ventilation must be lowered closer to floor elevation Change all pump discharge psi gauges to the correct psi range Boston Hill#2 pump makes a squeak noise in flex coupling area. Forest Hill pumps 1 & 2 making knocking noise in pump impeller case due to either pre rotation or cavitations., Forest Hill ground water leaking through concrete wall next to pump#2. Grounds Ponding and poor drainage behind Forest View SPS Require fencing around stations. Li h�tin_g Replace fluorescent light fixtures in both stations(see submittal). Repair emergency light pack at Forest View. Install light fixtures above outside entrance doors at both stations. Wet Wells The Town of North Andover Water/Sewer Dept reserves the right to inspect the interior of the both wet wells prior to going in service for proper design and construction. All construction debris and foreign matter must be removed from the wet wells prior to going in service Install clear plastic shields over outside valves both stations(refer to Rodney Hunt Co). Wet well wash down 1 1/2 " water line, must core through wail and elbow this line to the outside. Wet well vent pipe is should be schedule 80 PVC not schedule 40. Wet well vent pipes need a support brackets. Page 2 of 3 fInMAY 2 11999 PREF 1VIA_ANCE CONTRACT AUTHORITIES: The signing of this contract provides George Roy Mechanical Services with the following authorities: A) Entrance to all locations owned by the customer and serviced by George Roy Mechanical Services as indicated below under"SITES." B) Performance of preventive maintenance including adjustments,changes,minor repairs,and the like to the customer's equipment. C) Refusal to enter any of the customers's sites which may present any unusual hazard to the company's personnel. The signing of this contract allows the customer the following authorities: A) Maintaining the status quo at any site. B) Rejection of any service work over and above preventive maintenance. C) Refusal of access to any site outside normal business hours. D) Termination of contract prior to completion upon written request of George Roy Mechanical Services. SITES: The following customer sites will be covered by this contract: A) 2 pump stations(North Andover,Route 114) Identified as Route 114/Palomino Drive and Route 1 I4/Boston Hill pumping stations Ree approved plans designed by Camp,Dresser,&MacKee(CDM) SERVICES: George Roy Mechanical Services will provide the following services as a function of this contract: A) Checklist to include: 1) pump(s)operation manual and automatic; 2) controls condition and operation; 3) wet-well inspection; 4) building/structure inspection;and 5) emergency generator or emergency pump inspection. B) Service to include: 1) oil and filter change on engine driven equipment; 2) packing changes on pump(s)—where applicable; 3) test with report on emergency generator and related apparatus;and 4) minor services including parts totaling no more than$100.00 over the term of this coytract. NON-PROVIDED SERVICES: Georg:.Roy Mechanical Services will not provide the following services as a function of this contract: A) Major overhaul—retrofitting existing equipment due to imminent or existing failure. B) Major service—services which require extended down time. C) Secondary services—bypass pumping,vacuum pumping,wet-well cleaning and the like. D) Cleaning,painting,and surface preparation for any coatings. E) Trucking—services to move equipment or materials on or off site. F) Emergency response.(see comments on Special Conditions) HOLD HARMLESS: The customer shall hold harmless George Roy Mechanical Services and any of its personnel from any and all liabilities arriving from any activities of the personnel providing services to the customer under the terms of this contract. George Roy Mechanical Services shall hold harmless the customer from any and all liabilities resulting from injuries and damages to the Company's personnel or equipment during the performance of the services of this contract at the customer's site. FREQUENCY OF VISITS: This contract allows for 1 visit(s)to each site(monthly or as required by manufacturer). COST AND PAYMENTS: Payment in the amount of$200.00 monthly($100.00 per site)shall be made to George Roy Mechanical Services upon completion of each visit. Terms are net 30 days with 2%interest per month for accounts over thirty days. COMMENTS OR SPECIAL PROVISIONS: (list as required) (1)Emergency Service/Response-$100.00 per hour for emergency calls from monitoring company and/or Town of North Andover. SIGNATURES: The customer agrees to allow George Roy Mechanical Services to provide preventive maintenance to the site(s) listed above for a period of one year,commencing from the date of signing this contract George Roy Mechanical Services agrees to provide the services as outlined above for the customer at the site(s) listed above and under the conditions and terms of this contract CUSTO '!n/ J DATE: • 2 f--q S' N S t GEORGE ROY MECHANICAL SERVICES: V [ 1' t L l May 15,2000 Mesiti Development Corporation 231 Sutton Street Suite 2F North Andover,MA 01845 Attn.: Dick Pelletier Project: Route 114 Force Main&Pumping Stations Subject: Pipe Slope Between MH 208+54 and MH 206+17.40 Dear Mr. Pelletier, As requested by Moe Harpin,Masterson Construction has had an engineering analysis completed to determine if the slope of the 8"diameter sewer pipe installed between MH 208+54 and MH 206+17.40 was sufficient. Based on the attached engineering calculations completed by MBF Design Consultants,Inc.the slope of 0.0036 ft/ft is sufficient to provide the required minimum of velocity of 2 to 3 feet per second. Please do not hesitate to contact me if you require any additional information. Very Truly Yours, J. Master n Construction Corporation Thomas Dion Project Manager CC: Moe Harpin-Mesiti File J. Masterson Construction Corporation P.O. Box 165• Hathorne,Massachusetts 01937 TEL: (978)774-8782• FAX: (978) 750-8046 WEB SITE: http://wwwmasterson-construction.com EMAIL: info@masterson-construction.com Established 1981 f , 1 RZ 103 Stiles Road-Suite One•Salem,New Hampshire 03079 MHF Design Consultants, Inc. TEL(603)893-0720•FAX(603)893-0733•E-MAIL mhf@xtdl.com May 12, 2000 Mr. Tom Dion J. Masterson Construction P.O.Box 165 Hathorne,Massachusetts 01937 Re: Sewer As-built Route 114 North Andover MIV#52697 Dear Mr.Dion: Per your request, this letter serves to address the issue regarding the as-built slope on a section of the sewer line constructed on Route 114 in the Town of North Andover,Massachusetts. Based on our as-built survey,the slope on this particular section of 8"sewer line was calculated to be 0.0036 8/$. Attached are calculations which determine the velocity in this pipe based on full flow conditions within this section of sewer pipe. A velocity of 2.58 fps was calculated based on full flow of this 8"pipe. This well within the range of 2 to 3 fps minimum velocity required for scouring under full flow conditions Should you have any questions,Please call me at your convenience. Since yours, SIG T S,INC. k Toss, Principal RECEIVED MAY 15 210 ENGINEERS PLANNERS SURVEYORS �I�I* ils i �ff��ll ,SHF Design Consultonts, Inc. cAtc. BY_� c n BY: -�DALM OF • _ ... `........:.................. ..............._..._.... _... __ _ ... _. - _....._.......... _. _ ..._.......... ... ... _ ... _.:. ... _.. ................... .... : 1 /• .. _ .. ................ ... ... ._. _.. .........:...................:.........:.........�..........................: ... .. ... .. ........ _ • I i... ..I... t : •� • � Ilii ..�y�+!► , ...... ... _... .f...__..:., ..�•_._...•.:. . ... _• At 40 _ .._ .._ . ;... _.. .... ... ......_ - -- - t_ -3•• .g,.. _ .. . ..._........._...... _, . _.. _ .: _.................. . .. . .. �:. ! . ! r(�R .. • _ ... .•. .» •._ .. . .. .. _ .. ... »...... - - ................ ..........._....:........€._.... _ _ __ - , • .. _._f.._...._..,_ « ..7_ ... .. _ y _. _ _..... •_•. ... _ _ � ..j ••_•..• : ._......................: ...i.._ I _.:...__:... .....«_....°_. _.___. ' _. ! : 1 t _. .......... .. ... ..• .. .. _.. ; i ... - .. - ........_...-r:.........:....:...:.... .• ............ .. .. _ ... «..«..«• ....:.•. _. .. ... 1 1 f TOWN OF NORTH ANDOVER RTE 114 SUBDIVISION REVIEW MESITI CORPORATION RECORD DRAWING REVIEW COMMENTS (Preliminary—For discussion) June 5,2000 1. Drawing No. 1 A. According to the drawings the new SMH 40+30.3 is higher than the SMH at Hillside Road. ?? B. There are no manhole ties on this drawing. (This is true of all drawings) C. There are no ties to the service connections.(#607&623) D. Note 3 says force main has 3.5'min. cover. Profile says 4 feet. E. Drawings should be stamped and signed. F. Drawing title should show stationing on that drawing. 2. Drawing No. 2 A. Detail sheets need to be attached. (What does FM cleanout manhole look like?) (Does it require periodic maintenance: If so,how often and what maintenance?) B. Sta. 59+00 There is a 10"FM in a 12"sleeve. (The sleeve is not large enough to remove and replace the main.) C. There should be periodic ties to a force main of this length. i.e. How far off the streetline etc. 3. Drawing No. 7 & 16 A. Bends on force main should be tied down. 4. Drawing No. 16 A. Note 2. This kind of statement is not acceptable on a record drawing. What good is the drawing? 5. Drawing No. 17 A. There is no stub shown at SMH#62. What is stub in SMH at Wet Well for? Has anybody observed the final manholes. 09/13/00 WED 09:29 FAX 508 872 1492 BOW'DITC$&DEWEY MAX. 191002 161 WORCESTER ROAD,61h FL. OWditCh & DeWey, LLP POST on--ICE BOX 0320 A'F T O R L3 L- YS , b 32 FRAMING AM M.q 017 1-s o 'FF-UPHOMIE(508)8779-5700 FACSIMILE(508)872-1492 ENLAA :ObcM tltch.corn www.bowcutch.com a C... 0 September 13,2000 rn �� C:) -< rn -sa x00C VIA FACSIMILE L978) w r'.p. C:) a)M Heidi Griffin,Town Ptanner m Town of North Andover Office of Community Development and Services xr 27 Charles Street North Andover,MA 01845 Re: Boston Hill-Special PermitlSite Pkw Approval Application Bear Heidi: This letter is to confirm that my client,Mesiti Development,has no objection to the Board continuing its deliberation on the above-referenced application from September 26, 2000 to October 3,2000. Please callif you have any questions or comments on this matter. Thank you for your anticipated cooperation. V truly yours, ,Z' Levey BCL/aec �' cc: Mr- Kenneth Grandstaff(Via Facsimile) Mr. Paul Marchionda,P.E. (Via Facsimile) (I:lclients\lit\023187AUtta tUiU 160560.INOC,1) \ "I( ('I i`f-1-.I d(H71-1 CI i 311 N•MN'ST•\M 11 ICI:STIILMRti.`.NCCJIUSEI-PS,01008 M>'2+-(30111 TI-.3511 t)v'.StMIt J--K,t}t<}T-Ai-7i3Qi