Loading...
HomeMy WebLinkAboutTHIBODEAU P.E., BRUCE i LlMassachusetts Department of Environmental Protection 242-1456 Bureau Of Resource Protection Wetlands MassDEP File Number WPA Form 5 - Order of Conditions Document Transaction Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 North Andover City/Town A. General Information Important: North Andover When filling out 1. From: forms on the Conservation Commission I computer,use : a.check one 2. This issuance is for only the tab key ( ) Order of Conditions b. ❑ Amended Order of Conditions to move your cursor-do not 3.To: Applicant: use the return key. Bruce Thibodeau, P. E. a.First Name b.Last Name Q North Andover Division of Public Works IkA c.Organization 384 Osgood Street d.Mailing Address North Andover MA 01845 e.City/Town f.State g.Zip Code 4. Property Owner(if different from applicant): a.First Name b.Last Name Town of North Andover c.Organization 120 Main Street d.Mailing Address North Andover MA 01845 e.City/Town f.State g.Zip Code 5. Project Location: Town Wide Public Right-of-Way North Andover a.Street Address b.City/Town N/A N/A c.Assessors Map/Plat Number d.Parcel/Lot Number Latitude and Longitude, if known: N/A N/Ae.Latitude f.Longitude 6. Property recorded at the Registry of Deeds for(attach additional information if more than one parcel): Essex North a.County b.Certificate Number(if registered land) c.Book d.Page 7. Dates: 5/29/09 7/22/09 7/30/09 a.Date Notice of Intent Filed b.Date Public Hearing Closed c.Date of Issuance s. Final Approved Plans and Other Documents(attach additional plan or document references as needed): a.Plan Title b.Prepared By c.Signed and Stamped by d.Final Revision Date e.Scale f.Additional Plan or Document Title g.Date wpaform5.doc• rev.11/08 Page 1 of 11 _ , Massachusetts Department of Environmental Protection 242-1456 Bureau of Resource Protection - Wetlands MassDEP File Number WPA Form 5 - Order of Conditions Document Transaction Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 North Andover Cityrrown B. Findings 1. Findings pursuant to the Massachusetts Wetlands Protection Act: Following the review of the above-referenced Notice of Intent and based on the information provided in this application and presented at the public hearing, this Commission finds that the areas in which work is proposed is significant to the following interests of the Wetlands Protection Act(the Act). Check all that apply: a. ® Public Water Supply b. ❑ Land Containing Shellfish c. ® Prevention of Pollution ® Protection of Wildlife d. ® Private Water Supply e. ® Fisheries f. Habitat g. ® Groundwater Supply h. ® Storm Damage Prevention i. ® Flood Control 2. This Commission hereby finds the project, as proposed, is:(check one of the following boxes) Approved subject to: a. ® the following conditions which are necessary in accordance with the performance standards set forth in the wetlands regulations.This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above, the following General Conditions, and any other special conditions attached to this Order.To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these conditions shall control. Denied because: b. ❑ the proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations. Therefore, work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are adequate to protect the interests of the Act, and a final Order of Conditions is issued. A description of the performance standards which the proposed work cannot meet is attached to this Order. c. ❑ the information submitted by the applicant is not sufficient to describe the site,the work, or the effect of the work on the interests identified in the Wetlands Protection Act.Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information and includes measures which are adequate to protect the Act's interests, and a final Order of Conditions is issued. A description of the specific information which is lacking and why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c). Inland Resource Area Impacts: Check all that apply below. (For Approvals Only) 3. ® Buffer Zone Impacts: Shortest distance between limit of project disturbance and Varies Bank or Bordering Vegetated Wetland boundary(if available) a.linear feet Resource Area Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement 4. ❑ Bank a.linear feet b.linear feet c.linear feet d.linear feet 5. ❑ Bordering Vegetated Wetland a.square feet b.square feet c.square feet d.square feet 6. ❑ Land Under W aterbodies a.square feet b.square feet c.square feet d.square feet and Waterways e.c/y dredged f.c/y dredged wpaform5.doc- rev.11108 Page 2 of 11 -LJ) Massachusetts Department of Environmental Protection 242-1456 Bureau of Resource Protection -Wetlands MassDEP File Number Wr A Form 5 — Order of Conditions Document Transaction Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 North Andover City/Town B. Findings (cont.) Resource Area Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement 7. ❑ Bordering Land Subject to Flooding a.square feet b.square feet c.square feet d.square feet Cubic Feet Flood Storage e.cubic feet f.cubic feet g.cubic feet h.cubic feet 8. ❑ Isolated Land Subject to Flooding a.square feet b.square feet Cubic Feet Flood Storage c.cubic feet d.cubic feet e.cubic feet f.cubic feet 9. ❑ Riverfront Area a.total sq.feet b.total sq.feet Sq ft within 100 ft c.square feet d.square feet e.square feet f.square feet Sq ft between 100-200 ft g.square feet h.square feet i.square feet J.square feet Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only) 1o. ❑ Designated Port Areas Indicate size under Land Under the Ocean, below 11. ❑ Land Under the Ocean a.square feet b.square feet c.cty dredged d.cly dredged 12. ❑ Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below 13. ❑ Coastal Beaches a.square feet b.square feet c.cly nourishmt. d.cty nourishmt. 14. ❑ Coastal Dunes a.square feet b.square feet c.cty nourishmt. d.cty nourishmt. 15. ❑ Coastal Banks a.linear feet b.linear feet 16. ❑ Rocky Intertidal Shores a.square feet b.square feet 17. ❑ Salt Marshes a.square feet b.square feet c.square feet d.square feet 18. ❑ Land Under Salt Ponds a.square feet b.square feet c.cly dredged d.cly dredged 19. ❑ Land Containing Shellfish a.square feet b.square feet c.square feet d.square feet 20. ❑ Fish Runs Indicate size under Coastal Banks, Inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above a.aty dredged b.cty dredged 21. ❑ Land Subject to Coastal Storm Flowage a.square feet b.square feet wpaform5.doc• rev.11/08 Page 3 of 11 Massachusetts Department of Environmental Protection 242-1456 Bureau of Resource Protection - Wetlands MassDEP File Number WPA Form 5 — Order of Conditions Document Transaction Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 North Andover City/Town C. General Conditions Under Massachusetts Wetlands Protection Act The following conditions are only applicable to Approved projects. 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state, or local statutes,ordinances, bylaws, or regulations. 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: a. the work is a maintenance dredging project as provided for in the Act; or b. the time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance. If this Order is intended to be valid for more than three years, the extension date and the special circumstances warranting the extended time period are set forth as a special condition in this Order. 5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6. Any fill used in connection with this project shall be clean fill.Any fill shall contain no trash, refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster,wire, lath, paper, cardboard, pipe, tires, ashes,refrigerators, motor vehicles, or parts of any of the foregoing. 7. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such an appeal has been taken, until all proceedings before the Department have been completed. 8. No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of the registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done.The recording information shall be submitted to the Conservation Commission on the form at the end of this Order, which form must be stamped by the Registry of Deeds, prior to the commencement of work. 9. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection" [or, "MassDEP"] � "File Number 242-1456 " wpaform5.doc• rev.11!08 Page 4 of 11 LlMassachusetts Department of Environmental Protection 242-1456 Bureau of Resource Protection -Wetlands MassDEP File Number WPA Form 5 - Order of Conditions Document Transaction Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 North Andover City/Town C. General Conditions Under Massachusetts Wetlands Protection Act 10. Where the Department of Environmental Protection is requested to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before MassDEP. 11. Upon completion of the work described herein,the applicant shall submit a Request for Certificate of Compliance(WPA Form 8A)to the Conservation Commission. 12. The work shall conform to the plans and special conditions referenced in this order. 13. Any change to the plans identified in Condition#12 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing of a new Notice of Intent. 14. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order, and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. 15. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any contractor or other person performing work conditioned by this Order. 16. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate- of Compliance has been issued by the Conservation Commission. 17. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or water body. During construction, the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation Commission, which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. NOTICE OF STORMWATER CONTROL AND MAINTENANCE REQUIREMENTS 18. The work associated with this Order(the"Project") is(1)® is not(2)❑subject to the Massachusetts Stormwater Standards. If the work is subject to the Stormwater Standards, then the project is subject to the following conditions: a) All work, including site preparation, land disturbance, construction and redevelopment,shall be implemented in accordance with the construction period pollution prevention and erosion and sedimentation control plan and, if applicable, the Stormwater Pollution Prevention Plan required by the National Pollution Discharge Elimination System Construction General Permit as required by Stormwater Condition 8. Construction period erosion, sedimentation and pollution control measures and best management practices(BMPs)shall remain in place until the site is fully stabilized. wpaform5.doc• rev.11/08 Page 5 of 11 L11Massachusetts Department of Environmental Protection 242-.1456 Bureau of Resource Protection - Wetlands MassDEP File Number WPA Form 5 - Order of Conditions Document Transaction Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 North Andover City/Town C. General Conditions Under Massachusetts Wetlands Protection Act (cont.) b) No stormwater runoff may be discharged to the post-construction stormwater BMPs unless and until a Registered Professional Engineer provides a Certification that: i. all construction period BMPs have been removed or will be removed by a date certain specified in the Certification. For any construction period BMPs intended to be converted to post construction operation for stormwater attenuation, recharge, and/or treatment, the conversion is allowed by the MassDEP Stormwater Handbook BMP specifications and that the BMP has been properly cleaned or prepared for post construction operation, including removal of all construction period sediment trapped in inlet and outlet control structures; ii. as-built final construction BMP plans are included, signed and stamped by a Registered Professional Engineer, certifying the site is fully stabilized; iii. any illicit discharges to the stormwater management system have been removed, as per the requirements of Stormwater Standard 10; iv. all post-construction stormwater BMPs are installed in accordance with the plans(including all planting plans)approved by the issuing authority, and have been inspected to ensure that they are not damaged and that they are in proper working condition; v. any vegetation associated with post-construction BMPs is suitably established to withstand erosion. c) The landowner is responsible for BMP maintenance until the issuing authority is notified that another party has legally assumed responsibility for BMP maintenance. Prior to requesting a Certificate of Compliance, or Partial Certificate of Compliance, the responsible party(defined in General Condition 18(e))shall execute and submit to the issuing authority an Operation and Maintenance Compliance Statement("O&M Statement)for the Stormwater BMPs identifying the party responsible for implementing the stormwater BMP Operation and Maintenance. Plan ("O&M Plan") and certifying the following: i.)the O&M Plan is complete and will be implemented upon receipt of the Certificate of Compliance, and ii.)the future responsible parties shall be notified in writing of their ongoing legal responsibility to operate and maintain the stormwater management BMPs and implement the Stormwater Pollution Prevention Plan. d) Post-construction pollution prevention and source control shall be implemented in accordance with the long-term pollution prevention plan section of the approved Stormwater Report and, if applicable, the Stormwater Pollution Prevention Plan required by the National Pollution Discharge Elimination System Multi-Sector General Permit. e) Unless and until another party accepts responsibility, the landowner, or owner of any drainage easement, assumes responsibility for maintaining each BMP. To overcome this presumption, the landowner of the property must submit to the issuing authority a legally binding agreement of record, acceptable to the issuing authority, evidencing that another entity has accepted responsibility for maintaining the BMP, and that the proposed responsible party shall be treated as a permittee for purposes of implementing the requirements of Conditions 18(f)through 18(k)with respect to that BMP. Any failure of the proposed responsible party to implement the requirements of Conditions 18(f) through 18(k)with respect to that BMP shall be a violation of the Order of Conditions or Certificate of Compliance. In the case of stormwater BMPs that are serving more than one lot, the legally binding agreement shall also identify the lots that will be serviced by the stormwater BMPs. A plan and easement deed that grants the responsible party access to perform the required operation and maintenance must be submitted along with the legally binding agreement. f) The responsible party shall operate and maintain all stormwater BMPs in accordance with the design plans, the O&M Plan, and the requirements of the Massachusetts Stormwater Handbook. wpaform5.doc• rev.11/08 Page 6 of 11 L11Massachusetts Department of Environmental Protection 242-1456 Bureau of Resource Protection - Wetlands MassDEP File Number WPA Form 5 — Order of Conditions Document Transaction Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 North Andover City/Town C. General Conditions Under Massachusetts Wetlands Protection Act (cont.) g) The responsible party shall: 1. Maintain an operation and maintenance log for the last three(3)consecutive calendar years of inspections, repairs, maintenance and/or replacement of the stormwater management system or any part thereof, and disposal(for disposal the log shall indicate the type of material and the disposal location); 2. Make the maintenance log available to MassDEP and the Conservation Commission ("Commission") upon request; and 3. Allow members and agents of the MassDEP and the Commission to enter and inspect the site to evaluate and ensure that the responsible party is in compliance with the requirements for each BMP established in the O&M Plan approved by the issuing authority. h) All sediment or other contaminants removed from stormwater BMPs shall be disposed of in accordance with all applicable federal, state, and local laws and regulations. i) Illicit discharges to the stormwater management system as defined in 310 CMR 10.04 are prohibited. j) The stormwater management system approved in the Order of Conditions shall not be changed without the prior written approval of the issuing authority. k) Areas designated as qualifying pervious areas for the purpose of the Low Impact Site Design Credit(as defined in the MassDEP Stormwater Handbook, Volume 3, Chapter 1, Low Impact Development Site Design Credits)shall not be altered without the prior written approval of the issuing authority. 1) Access for maintenance, repair, and/or replacement of BMPs shall not be withheld. Any fencing constructed around stormwater BMPs shall include access gates and shall be at least six inches above grade to allow for wildlife passage. Special Conditions(if you need more space for additional conditions, please attach a text document): D. Findings Under Municipal Wetlands Bylaw or Ordinance 1. Is a municipal wetlands bylaw or ordinance applicable? ® Yes ❑ No 2. The North Andover hereby finds(check one that applies): Conservation Commission a. ❑ that the proposed work cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw specifically: 1.Municipal Ordinance or Bylaw 2.Citation Therefore,work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards, and a final Order of Conditions is issued. wpaform5.doc• rev.11/08 Page 7 of 11 Massachusetts Department of Environmental Protection 242-1456 Bureau of Resource Protection - Wetlands MassDEP File Number WPA Form 5 — Order of Conditions Document Transaction Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 North Andover City/Town D. Findings lender Municipal Wetlands Bylaw or Ordinance (cont.) b. ® that the following additional conditions are necessary to comply with a municipal ordinance or bylaw: _North Andover Wetlands Protection Bylaw Chapter 178 1. Municipal Ordinance or Bylaw 2.Citation I The Commission orders that all work shall be performed in accordance with the following conditions and with the Notice of Intent referenced above.To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the f conditions shall control. The special conditions relating to municipal ordinance or bylaw are as follows(if you need more space for additional conditions, attach a text document): See Attached wpaform5.doc- rev.11/08 Page 8 of 11 DEP FILE#242 - 1456 Therefore,the North Andover Conservation Commission (hereafter the "NACC") hereby finds that the following conditions are necessary,in accordance with the Performance Standards set forth in the State Regulations, the local ByLaw and Regulations, to protect those interests noted above. The NACC orders that all work shall be performed in accordance with said conditions and with the Notice of Intent referenced below. To the extent that the following conditions modify or differ from the plans, specifications or other proposals submitted with the Notice of Intent, the conditions shall control. GENERAL CONDITIONS 19. The proposed work includes: routine maintenance activities on unspecified streets throughout the Town of North Andover. Activities include Routine Removal of Winter Sand, Routine Repair of Road Shoulder Erosion Rills, Routine Clearing of Roadside Vegetation, Annual Paving and Sidewalk Repair Operations, and Routine Maintenance of Roadside Drainage System as detailed in the May 29,2009 Interoffice Memorandum. 20. The work shall conform to the following (except as noted in the remainder of this document where revisions may be required): Notice of Intent filed by: Bruce Thibodeau North Andover Division of Public Works 384 Osgood Street North Andover,MA 01845 Interoffice Memorandum: General Permit for General DPW Maintenance Work Dated: May 29, 2009 From: Bruce Thibodeau,Director-Division of Public Works Other Record Documents: Letter from Division of Fisheries &Wildlife Dated:July 1,2009 and incorporated as part of this Order 21. The term "Applicant" as used in this Order of Conditions shall refer to the owner, any successor in interest or successor in control of the property referenced in the Notice of Intent, supporting documents and this Order of Conditions. The NACC shall be notified in writing within 30 days of all transfers of title of any portion of property that takes place prior to the issuance of a Certificate of Compliance. 22. The conditions of this decision shall apply to, and be binding upon, the applicant, owner, its employees and all successors and assigns in interest or control. These obligations shall be expressed in covenants in all deeds to succeeding owners of portions of the property. 242-1456,General Permit for DPW.doc 1 NACC 7/29/2009 DEP FILE #242 - 1456 23. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 24. This Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of property rights. However, the NACC, agent of the NACC or the Department of Environmental Protection (DEP) reserves the right to enter and inspect the property at all reasonable times until a Certificate of Compliance is issued, to evaluate compliance with this Order of Conditions, the Act(310 CMR 10.00),the North Andover Wetland ByLaw and Regulations, and may require any information, measurements, photographs, observations, and/or materials, or may require the submittal of any data or information deemed necessary by the NACC for that evaluation. Further,work shall be halted on the site if the NACC, agent or DEP determines that any of the work is not in compliance with this Order of Conditions. Work shall not resume until the NACC is satisfied that the work will comply and has so notified the applicant in writing. 25. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state or local statutes, ordinances, by-laws or regulations. 26. Portions of the proposed work may occur within estimated habitat of rare wildlife, or with 100-feet of vernal pools. General roadway maintenance may proceed within in these areas if it complies with the Division of Fisheries &Wildlife letter (NHESP Tracking No. 09-26745) referenced above and attached. 27. The work authorized hereunder shall be completed within three years from the date of this order. 28. This Order may be extended by the issuing authority for one but not more than two periods of up to one year each upon application to the issuing authority at least thir days (30) prior to the expiration date of the Order (Refer to Section 8.3 (p.37) of the North Andover Wetland Regulations). 29. The NACC reserves the right to amend this Order of Conditions after a legally advertised public hearing if plans or circumstances are changed or if new conditions or information so warrant. 30. Where the Department of Environmental Protection (DEP) is requested to make a determination and to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before the Department. 31. This Order of Conditions is issued under File No. 242-1456. 32. The following wetland resource areas are affected by the proposed work: Potentially all inland wetland resource areas identified as jurisdictional in the Massachusetts 242-1456,General Permit for DPW.doc 2 NACC 7/29/2009 DEP FILE #242 - 1456 Wetland Protection Act Regulations, 310 CMR 10.02 (1) as well as those identified as jurisdictional by the North Andover Wetlands Protection Bylaw C. 178.2. These resource areas are significant to the interests of the Act and Town ByLaw as noted above and therein. The applicant has not attempted to overcome the presumption of significance of these resource areas to the identified interests. 33. As jurisdictional resource areas have not been identified in this application, the applicant shall contact the North Andover Conservation Department to inspect all proposed work areas to identify possible wetland resource areas prior to the start of maintenance activities. Formal delineation of the wetland resources in proposed work areas by a qualified professional may be required. 34. The NACC finds that the intensive use of the upland areas and buffer zone proposed on this site will cause further alteration of the wetland resource areas. In order to prevent any alteration of wetland resource areas a twenty five foot 25') No- Disturbance Zone and a fifty foot (50') No-Construction Zone shall be established from the edge of the adjacent wetland resource area except as follows: Areas currently disturbed or developed, including(but not limited to) sidewalks, roadways, and associated drainage. The Conservation Administrator and/or other agents of the NACC do not have the authority to waive these setbacks as established under the local bylaw. No disturbance of existing grade, soils or vegetation is permitted in the No- Disturbance zone. (See Section 3.4 &Appendix F of the local Regulations). 35. This document shall be included in all construction contracts, subcontracts, and specifications dealing with the work proposed and shall supersede any conflicting contract requirements. The applicant shall assure that all contractors, subcontractors, and other personnel performing the permitting work are fully aware of the permits terms and conditions. Thereafter,the contractor will be held jointly liable for any violation of this Order resulting from failure to comply with its conditions. 36. No alteration of wetland resource areas or associated buffer zones, other than that approved in this Order,shall occur without prior approval from the Commission. Appropriate mitigation and restoration may be required. 37. Issuance of these Conditions does not in any way imply or certify that the site or downstream areas will not be subject to flooding, storm damage or any other form of water damage. PRIOR TO CONSTRUCTION/MAINTENANCE 38. No work shall be undertaken until all administrative appeal periods from this Order have elapsed or, if such an appeal has been filed,until all proceedings before the Department or Court have been completed. Maintenance of the drainage system is the responsibility of the Town. 242-1456,General Permit for DPW.doc 3 NACC 7/29/2009 DEP FILE #242 - 1456 39. This Order shall be recorded by the applicant at the Registry of Deeds immediately after the expiration of all appeal periods. No work shall be undertaken until the Final Order has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located,within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is to be done. The recording information shall be submitted to the North Andover Conservation Commission on the form at the end of this Order prior to commencement of the work. Any Order not recorded by the applicant before work commences may be recorded by the NACC at the applicant's expense. 40. Prior to the start of work, the applicant shall contact the Conservation Office to inform the department of the start date and location of each proposed project. An on-site conference with an NACC representative, the contractor, and the applicant may be required to ensure that all of the Conditions of this Order are understood. This Order shall be included in all construction contracts, subcontracts, and specifications dealing with the work proposed and shall supersede any conflicting contract requirements. The applicant shall assure that all contractors, subcontractors and other personnel performing the permitted work are fully aware of the permit's terms and conditions. Thereafter, the contractor will be held jointly liable for any violation of this Order of Conditions resulting from failure to comply with its conditions. The applicant or contractor shall notify the NACC in writing of the identity of the on-site construction supervisor hired to coordinate construction and to ensure compliance with this Order. A reasonable period of time shall be provided as notice of the pre-construction meeting(e.g. 72 hours). 41. A sign shall be displayed at the site not less than two square feet or more than three square feet in size bearing the words "Massachusetts DEP, File Number 242-1456." 42. Any changes in the submitted plans caused by the applicant,another Board's decision or resulting from this Order of Conditions must be submitted to the NACC for approval prior to implementation. If the NACC finds said changes to be significant, the NACC will call for another public hearing (at the expense of the applicant). Within 21 days of the close of said public hearing the NACC will issue an amended or new Order of Conditions. Any errors found in the plans or information submitted by the applicant shall be considered as changes. No work shall begin on a project until written approval has been granted by the NACC. 43. It is the responsibility of the applicant, owner, and/or successor(s) to ensure that all conditions of this Order of Conditions are complied with. The project engineer and contractors are to be provided with a copy of this Order of Conditions and referenced documents before commencement of construction. 242-1456,General Permit for DPW.doc 4 NACC 7/29/2009 DEP FILE#242 - 1456 44. If necessary, wetland flagging shall be checked prior to start of construction and shall be re-established where missing. All wetland flagging shall remain visible and enumerated per the approved plan(s) throughout the life of the project and until a Certificate of Compliance is issued so that erosion control measures can be properly placed and wetland impacts can be monitored. The proposed limit of work shall be shall be clearly marked with erosion controls or temporary fencing and shall be confirmed by the NACC Such barriers shall be checked and replaced as necessary and shall be maintained until all construction is complete. Workers should be informed that no use of machinery, storage of machinery or materials, stockpiling of soil, or construction activity is to occur beyond this line at any time. 45. Where erosion controls are necessary, the applicant shall stake hay bales backed by trenched siltation fence (or other approved erosion control barrier) between all construction areas and wetlands. The erosion control barrier will be properly installed and placed as required by the NACC or its agent and shall be inspected and approved by the NACC or its agent prior to the start of construction and shall remain intact until all disturbed areas have been permanently stabilized to prevent erosion. All erosion prevention and sedimentation protection measures found necessary during construction shall be implemented at the direction of the NACC or its agent. The NACC reserves the right to impose additional conditions on portions of this project to mitigate any impacts which could result from site erosion, or any noticeable degradation of surface water quality discharging from the site. For example, installation of erosion control measures may be required in areas not shown on the plan(s) referenced in this Order of Conditions. Should such installation be required by the NACC, they shall be installed within 48 hours of the Commissions request. 46. The applicant shall have on hand at the start of any soil disturbance, removal or stockpiling, a minimum of 5 hay bales and sufficient stakes for staking these bales (or an equivalent amount of silt fence, 1 hay bale to equal 3 feet of fence). Said bales shall be used only for the control of emergency erosion problems and shall not be used for the normal control of erosion. STORMWATER MANAGEMENT CONDITIONS 47. There shall be no increase in the post development discharges from the storm drainage system or any other changes in post development conditions that alter the post development watershed boundaries as currently depicted in the Notice of Intent and approved by this Order of Conditions, unless specifically approved in writing by the Commission. 48. Water quality in down gradient BVW's shall not differ significantly following completion of the project from the pre-development conditions. There shall be no 242-1456,General Permit for DPW.doc 5 NACC 7/29/2009 DEP FILE #242 - 1456 sedimentation into wetlands or water bodies from discharge pipes or surface runoff leaving the site. MNG CONSTRUCTION 49. Any fill used in connection with this project shall be clean fill,containing no trash, refuse, rubbish or debris,including but not limited to lumber,bricks, plaster,wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators,motor vehicles or parts on any of the foregoing. 50. No exposed area shall remain unfinished for more than thirty (30) days, unless approved by the NACC. 51. No re-grading in the buffer zone shall have a slope steeper than 2:1 (horizontal: vertical). Slopes of steeper grade shall be rip-rapped to provide permanent stabilization. 52. There shall be no stockpiling of soil or other materials within 100 feet of any resource area unless agreed to by the NACC or its Administrator. 53. Washings from concrete trucks, or surplus concrete, shall not be directed to, any drainage sy stern, or wetland resource area. 54. All waste generated by, or associated with,the construction activity shall be contained within the limit of work, and away from any wetland resource area. There shall be no burying of spent construction materials or disposal of waste on the site by any other means. The applicant shall maintain dumpsters (or other suitable means) at the site for the storage and removal of such spent construction materials off-site. 'However, no trash dumpsters will be allowed within 50' of areas subject to protection under the Act or local ByLaw. 55. Accepted engineering and construction standards and procedures shall be followed in the completion of the project. 56. Any proposed changes in the approved description of General DPW Maintenance Work as described in the Interoffice Memorandum of May 29, 2009 referenced herein, or any deviation in construction from the approved Interoffice Memorandum, shall require the applicant to submit a written description of the proposed change and plan of proposed work if necessary to determine if the change is substantial enough to require filing a new Notice of Intent or a request to amend this Order of Conditions. 57. During and after work on this project, there shall be no discharge or spillage of fuel, or other pollutants into any wetland resource area. If there is a spill or discharge of any pollutant during any phase of construction the NACC shall be notified by the 242-1456,General Permit for DPW.doc 6 NACC 7/29/2009 DEP FILE#242 - 1456. applicant within one (1) business day. No construction vehicles are to be stored within 100 feet of wetland resource areas, and no vehicle refueling, equipment lubrication, or maintenance is to be done within 100 feet of a resource area. AFTER CONSTRUCTION 58. No underground storage of fuel oils shall be allowed on any lot within one-hundred (100) feet of any wetland resource area. This condition shall survive this Order of Conditions and shall run with the title of the property. This condition is issued under the authority of the Towns Wetland protection ByLaw. 59. Fertilizers utilized for landscaping and lawn care shall be slow release, low-nitrogen types (< 5%), and shall not be used within 25 feet of a resource area. Pesticides and herbicides shall not be used within 100 feet of a wetland resource area. This condition shall survive this Order of Conditions and shall run with the title of the property. This condition is issued under the authority of the Towns Wetland Protection ByLaw and shall remain in perpetuity. 60. Upon completion of construction and grading, all disturbed areas located outside resource areas shall be stabilized permanently against erosion. This shall be done by foaming and seeding according to NRCS standards. Stabilization will be considered complete once full vegetative cover has been achieved. 61. Upon approved site stabilization by Conservation staff, the erosion controls shall be removed and properly disposed of and all exposed unvegetated areas shall be seeded. 62. Upon completion of each maintenance activity the applicant shall provide a summary report of the work done and contact the Conservation Department for a post- construction inspection. 63. The following special conditions shall survive the issuance of a Certificate of Compliance (COC) for this project: ➢ 25' No-Disturbance Zone and a 50' No-Construction Zone shall be established from the edge of adjacent wetland resource areas except in those locations approved under DEP # 242-1456. Future work within 100' of existing wetland resource areas will require a separate filing with the NACC (refer to Section XI (page 18) of the Regulations for performance standards within these zones) The Conservation Administrator and/or other agents of the NACC do not have the authority to waive these setbacks as established under the local ByLaw; ➢ Discharge or spillage of pollutants (Condition #57); 242-1456,General Permit for DPW.doc 7 NACC 7/29/2009 DEP FILE #242 - 1456 ➢ Prohibition of underground fuels (Condition#58); ➢ Limitations on the use of fertilizers, herbicides, and ( esticides Conditions P #59). 242-1456,General Permit for DPW.doc 8 NACC 7/29/2009 LlMassachusetts Department of Environmental Protection 242-1456 Bureau of Resource Protection - Wetlands MassDEP File Number WPA Form 5 — Order of Conditions Document Transaction Number I Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 North Andover Cityrrown E. Signatures and Notary Acknowledgement This Order is valid for three years, unless otherwise specified as a special 7/3 `7 condition pursuant to General Conditions#4, from the date of issuance. 1.Date of Issuance Please indicate the number of members who will sign this form. S' This Order must be signed by a majority of the Conservation Commission. 2.Number of signers The Order must be mailed by certified mail(return receipt requested)or hand delivered to the applicant. A copy also must be mailed or hand delivered at the same time to the appropriate Department of Environmental Protection Regional Office, if not filing electronically, and the property owner, if different from applicant. Signatures: P Notary Acknowledgement Commonwealth of Massachusetts County of Essex North 4.4 I'/ 9 On this Day of Month Year Before me, the undersigned Notary Public, John Mabon personally appeared Name of Document Signer proved to me through satisfactory evidence of identification, which was/were Massachusetts License Description of evidence of identification to be the person whose name is signed on the preceding or attached document, and acknowledged to me that he/she signed it voluntarily for its stated purpose. As member of North Andover Conservation Commission Cityrrown DONN KV EM - NOTARYFLIBUC x . COWJDNWEALTHOFMASSACNAUTS 'gnature of Notary Public My Comm Expires Aug.7,2009 �fJC— Printed Name of Not Public Place notary seal and/or any stamp above. a?orj My Commi on pines(Date) This Order is issued to the applicant as follows: ❑ by hand delivery on ❑ by certified mail, return receipt requested,on Daafe Date wpaform5.doc• rev.11/08 Page 9 of 11 Massachusetts Department of Environmental Protection 242-1456 Bureau of Resource Protection - Wetlands MassDEP File Number \ WPA Form 5 — Order of Conditions Document Transaction Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 North Andover City/Town F. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate MassDEP Regional Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the Department, with the appropriate filing fee and a completed Request of Departmental Action Fee Transmittal Form, as provided in 310 CMR 10.03(7)within ten business days from the date of issuance of this Order.A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. Any appellants seeking to appeal the Department's Superseding Order associated with this appeal will be required to demonstrate prior participation in the review of this project. Previous participation in the permit proceeding means the submission of written information to the Conservation Commission prior to the close of the public hearing, requesting a Superseding Order, or providing written information to the Department prior to issuance of a Superseding Order. The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act(M.G.L. c. 131, §40), and is inconsistent with the wetlands regulations(310 CMR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations,the Department has no appellate jurisdiction. Section G, Recording Information, is available on the following page. wpaform5.doc• rev.11108 Page 10 of 11 LlMassachusetts Department of Environmental Protection 242-1456 Bureau of Resource Protection - Wetlands MassDEP File Number WPA Form 5 — Order of Conditions Document Transaction Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 North Andover City/Town G. Recording Information This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions.The recording information on this page shall be submitted to the Conservation Commission listed below. North Andover Conservation Commission Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. --------------------------------------------------------------------------------------------------------------------------- To: North Andover Conservation Commission Please be advised that the Order of Conditions for the Project at: Town Wide to Public Right-of-Way 242-1456 Project Location MassDEP File Number Has been recorded at the Registry of Deeds of: Essex North County Book Page for: Town of North Andover Division of Public Works Property Owner and has been noted in the chain of title of the affected property in: Book Page In accordance with the Order of Conditions issued on: Date If recorded land, the instrument number identifying this transaction is: Instrument Number If registered land, the document number identifying this transaction is: Document Number Signature of Applicant wpaform5.doc- rev.11/08 Page 11 of 11