Loading...
HomeMy WebLinkAboutMiscellaneous - 74 Meridian Way� _- J 3 ro �' - -- !.. _. 362 Date .. �,0.1V ..... . `� ...... TOWN OF NORTH ANDOVER PERMIT FOR MECHANICAL INSTALLATION This certifies that .... � .......... has permission for mechanical installation .......�.U.�. )�,� ......... in the buildings of/j' .......V-0 ..................... at ..... . �.......... r , North Andover, Mass. Fee .. !'^ ' .. Lic. No. '��.� ..... ............ t �?� jGAS INSPECTOR I ^ VYHITE: Applicant CANARY: Building Dept. PINK: Treasurer ��A�1 ti . It +` i jrs Commonwealth of Massachusetts Sheet Metal Permit Date: (. , o jS Permit # G Estimated Job Cost: $ 3 G Q..0 , 0 Permit Fee: $ Plans Submitted: YES NO Plans Reviewed: YES NO Business License # 196 Applicant License # Business Information: Property Owner / Job L cation Information: l Name: J&J B'Cl- 17 eating. & Air Conditioning Name: f- r v � Street: 17 Arlington St.. Street: (D y Dracut, MA 01826 City/Towel: North Andover, MA 01845 City/Town: ry Telephone: 97.8-454-8197 Telephone: -o R , `3 d , 1 Photo I.D. required / Copy of Photo I.D. attached: YES NO staff Initial J-1 / M -1 -unrestricted license *� J-2 / M -2 -restricted to dwellings 3 -stories or less and conunercial up to 10,000 sq. ft. / 2 -stories or less Residential: T--2-fd1hily Iv7ulti-fanuly Condo / Townhouses Other Commercial: ' Office Retail Industrial _ Educational Institutional Other Square Footage: under 10,000 sq. ft. ✓' over 10,000 sq. ft. Number of Stories: Sheet metal work to be completed: New Work: ►'� Renovation: HVAC ✓ Metal Watershed Roofing Kitchen Exhaust System Metal Chimney / Vents Air Balancing Provide detailed description of work to be done: S u oT l ��g i' nr �a ll �i �7a l d u �7`"tv a ►� Gr -Fe h' VA C s INSURANCE COVERAGE: I have a current liabilit insurance policy or its equivalent which meets the requirements of M.G.L. Ch. 112 Yes [p -'No ❑ if you have checked Yes, indicate the ype of coverage by checking the appropriate box below: A liability insurance policy Other type of indemnity ❑ Bond ❑ OWNER'S INSURANCE WAIVER: I am aware that the licensee does not have the insurance coverage required by Chapter 112 of the Massachusetts General Laws, and that my Signature on this permit application waives this requirement. Check One Only Owner ❑ Agent ❑ Signature of Owner or Owner's Agent By checking this boXEl, I hereby certify that all of the details and Information I have submitted (or entered) regarding this application are true and accurate to the best of my knowledge and that all sheet metal work and Installations performed under the permit issued for this application will be in compliance with all pertinent provision of the Massachusetts Building Code and Chapter 112 of the General Laws. Duct inspection required prior to insulation installation: YES NO Date Date By Title City/Town Permit it Fee $ Inspector Signature of Permit Approval I'z oi:ress Inspections Coinments Final Inspection Type of License: ❑ Master ❑ Master -Restricted ❑Journeyperson ❑Journeyperson-Restricted El Comments r - Signature of Licensee License Number: (a 9 Check at www.mass.gov/dpi ACORD,. CERTIFICATE OF LIABILITY INSURANCEDATE(MM/DD/YYYY) 05/27/201S PRODUCER 978, 887, 4900 FAX 978.887.2404 Edward F. Sennott Insurance Agency, Inc. 16 South Main Street P. 0. Box 457 Topsfield, MA 01983 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. INSURERS AFFORDING COVERAGE NAIC # INSURED JW Heating & Air Conditioning, Inc. 17 Arlington Street Dracut, MA 01826 INSURERA: Great American Alliance Ins Co INSURERS: Safety Insurance Company 39454 INSURERC: A.I.M. Mutual Insurance Co INSURER D: INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR DD' NSR TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE DATE MM D POLICY EXPIRATION DATE MM D LIMITS GENERAL LIABILITY PAC6418906-09 06/01/2015 06/01/2016 EACH OCCURRENCE $ 1,000,00( X COMMERCIAL GENERAL LIABILITY PREMISAMAGESTO R NTED Occurrence) $ 300, 00 CLAIMS MADE � OCCUR MED EXP (Any one person) $ 10,00( A PERSONAL & ADV INJURY $ 1,000,00( GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG $ 2,000,000 POLICY PRO LOC JECT AUTOMOBILE LIABILITY 2434550 06/01/2015 06/01/2016 COMBINED SINGLE LIMIT $ ANY AUTO (Ea accident) 1,000,000 ALL OWNED AUTOS X BODILY INJURY $ B SCHEDULED AUTOS (Per person) X HIRED AUTOS X BODILY INJURY $ NON -OWNED AUTOS (Per accident) PROPERTY DAMAGE $ (Per accident) GARAGE LIABILITY AUTO ONLY - EA ACCIDENT $ ANY AUTO OTHER THAN EA ACC $ AUTO ONLY: AGG $ EXCESS/ UMBRELLA LIABILITY UMB6418958-08 06/01/2015 06/01/2016 EACH OCCURRENCE $ 2,000,000 X OCCUR CLAIMS MADE AGGREGATE $ 2,000,00 A $ DEDUCTIBLE RETENTION $ $ WORKERS CORS'LIATIONILIT WMZ-800-8006553-2015 06/02/2015 06/02/2016 X AND EMPLOYERS' LIABILITY TORY LIMITS I I ER E.L. EACH ACCIDENT $ 1,000,00( C ANY OFFICER/MEMBEER/EXCLUDED? ECUTIVF E.L. DISEASE - EA EMPLOYE $ 1/ 0001 00 (Mandatory in If yes, describe under nd E.L. DISEASE - POLICY LIMIT 1 $ 1 000 00 SPECIAL PROVISIONS below OTHER DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES / EXCLUSIONS ADDED BY ENDORSEMENT/ SPECIAL PROVISIONS vGn 11r1%.M 1 C rIVLUCr1 CANCPI I ATIAN SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATIO DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL 10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR REPRESENTATIVES. Evidence of Insurance AUTHORIZED REPRESENTATIVE Peter Sennott/LAR ACORD 25 (2009/01) © 1988-2009 ACORD CORPORATION. All riahtc rpnompri The ACORD name and logo are registered marks of ACORD The Commonwealth of Massachusetts Department of Industrial Accidents Office of Investigations 600 Washington Street Boston, MA 02111 www. mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): J & J Heating & Air Conditioning, Inc. Address: 17 Arlington Street. /State/Zip: Dracut, MA. 01826 Phone #: 978-454-8197 Are you an employer? Check the appropriate box: 1. ® I am a employer with 40 4. ❑ I am a general contractor and I employees (full and/or part-time).* have hired the sub -contractors 2. ❑ I am a sole proprietor or partner- listed on the attached sheet. ship and have no employees These sub -contractors have working for me in any capacity. employees and have workers' [No workers' comp. insurance comp, insurance.t 5. ❑ We area corporation and its required.] 3. F1 am a homeowner doing all work officers have exercised their myself. [No workers' comp. right of exemption per MGL insurance required.] t c. 152, §1(4), and we have no employees. [No workers' comp. insurance required.] Type of project .(required): 6. ❑ New construction ;7.: ❑ Remodeling 8: ❑ Demolition 9. ❑ Building addition 10.❑ Electrical repairs or additions 11.❑ Plumbing repairs or additions 12. ❑ Roof repairs 13. ❑ Other *Any applicant that checks box #1 must also fill out the section below showing their workers' compensation policy information. . t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. tContractors that check this box must attached an additional sheet showing the name of the sub -contractors and state whether or not those entities have employees. If the sub -contractors have employees, they must provide their workers' comp. policy number., I am an employer that is providing workers' compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: A.I.M.. Mutual Insurance Policy # or Self -ins. Lie. M IWMZ-8006553-2015 Expiration.Date` 06/02/16 Job Site Address: City/State/Zip: Attach a copy of the workers' compensation policy declaration page (showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to $1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to $250.00 a st the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigation the DIA Or insurancefcav4,rage verification. I do hereG ce4fy_ upAfer t4e paKnd e es of perjury that the information provided above is true and correct. Phone #: 978-454-8197 Official use only. Do not write in this area, to be completed by city or town official City or Town: Permit/License # 6-/0, Issuing Authority (circle one): 1. Board of Health 2. Building Department 3. City/Town Clerk 4. Electrical Inspector 5. Plumbing Inspector 6. Other Contact Person: Phone #: ACORD CERTIFICATE OF LIABILITY INSURANCE TM DATE(MM/DDNYYY) 05/27/2015 PRODUCER 978, 887, 4900 FAX 978.887.2404 Edward F. Sennott Insurance Agency, Inc. 16 South Main Street P. 0. Box 457 Topsfiel d, MA 01983 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. INSURERS AFFORDING COVERAGE NAIC # INSURED 1&J Heating & Air Conditioning, Inc. 17 Arlington Street Dracut, MA 01826 INSURERA: Great American Alliance Ins Co INSURER B: Safety Insurance Company 39454 INSUREPla A.I.M. Mutual Insurance Co INSURER D: INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR DD' NSR TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE DATE MM D POLICY EXPIRATION DATE MM DD LIMITS AUTHORIZED REPRESENTATIVE Ar/1Drl ee innnnrn�� GENERAL LIABILITY PAC6418906-09 06/01/2015 06/01/2016 EACH OCCURRENCE $ 1,000,00( X COMMERCIAL GENERAL LIABILITY CLAIMS MADE I OCCUR PRMAITO 111TD EM SES Ea occur encs $ 300,00 MED EXP (Any one person) $ 10,00( A PERSONAL & ADV INJURY $ 1,000,00( GENERAL AGGREGATE $ 2,000,00 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG $ 2,000,00( POLICY PRO -LOC JECT AUTOMOBILE LIABILITY ANY AUTO 2434550 06/01/2015 06/01/2016 COMBINED SINGLE LIMIT (Ea accident) $ 1,000,00( BODILY INJURY $ (Per person) B X X X ALL OWNED AUTOS SCHEDULED AUTOS HIRED AUTOS NON -OWNED AUTOS BODILY INJURY $ (Per accident) PROPERTY DAMAGE $ (Per accident) GARAGE LIABILITY AUTO ONLY - EA ACCIDENT $ OTHER THAN EA ACC $ ANY AUTO AUTO ONLY: AGG $ EXCESS/UMBRELLA LIABILITY X OCCUR EICLAIMS MADE UMB6418958-08 06/01/2015 06/01/2016 EACH OCCURRENCE $ 2,000,00 AGGREGATE $ 2,000,000 A $ $ DEDUCTIBLE RETENTION $ $ C WORKERS COMPENSATION AND EMPLOYERS' LIABILITY OFFICER/MEMBER / PARTNERIEXEXCLUDED?ECUTIVEYANY WMZ-800-8006553-2015 06/02/2015 06/02/2016 X TORY LIMITS ER E.L. EACH ACCIDENT $ 1,000,00( E.L. DISEASE - EA EMPLOYE $ 1,000,00( (Mandatory in NH) If yes, describe under E.L. DISEASE - POLICY LIMIT $ 1,000,00 SPECIAL PROVISIONS below OTHER DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES / EXCLUSIONS ADDED BY ENDORSEMENT / SPECIAL PROVISIONS VGr'S 1 Irm m i r rIULUtH rAurCI I ATtnW �� t����r� •� U 19OU-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL 10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR REPRESENTATIVES. Evidence of Insurance AUTHORIZED REPRESENTATIVE Ar/1Drl ee innnnrn�� Peter Sennott/LAR �� t����r� •� U 19OU-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD �d S'AC,�]NUSE,TTS; DRIVER%$ LICENSE Me 0 ISS S 0e END 4d NUMBER '- (105 03 2011 NONE :S996�J�$7� 4h EXP Q5, 221U8 t n R�{CLASS� 12 REST' 15 SEX, M ic9H'Gt+�6 O9 NONE tt K.NE ` tr �t 2 ERIC RJ Bs 2zaG, , 83 LONG DR . .` my x B DRACUT, MA 01826.2048 .. I !A,! L 5 DD 0104.2011 Rev 07-152009 N q OMMONW AL7H OF_M-.$. Hl1S UTS wrightsoft® Load Short Form Job: 51 hight Point Gratfton Date: Oct 28, 2014 (Rest of House) By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 Project• • For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 Design Information Htg Clg Infiltration Outside db (°F) 5 83 Method Simplified Inside db (°F) 70 75 Construction quality Tight Design TD (°F) 65 8 Fireplaces 1 (Average) Daily range - M Inside humidity (%) 50 50 Moisture difference (gr/Ib) 51 24 HEATING EQUIPMENT Make Amana Trade AMANA Model AMH950704BX AHRI ref 2012268 Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat 95 AFUE Area (ft2) 46000 Btuh 44000 Btuh 38 OF 1080 cfm 0.028 cfm/Btuh 0 in H2O COOLING EQUIPMENT Make Amana Trade ASX14 SERIES Cond ASX140361 C* Coil CA*F3642*6D* AHRI ref 5188426 Efficiency 12.3 EER, Sensible cooling Latent cooling Total cooling Actual air flow Air flow factor Static pressure Load sensible heat ratio 15 SEER Area (ft2) 22680 Btuh 9720 Btuh 32400 Btuh 1080 cfm 0.040 cfm/Btuh 0 in H2O 0.90 698 ROOM NAME Area (ft2) Htg load (Btuh) Clg load (Btuh) Htg AVF (cfm) Clg AVF (cfm) Study 144 4587 3383 131 137 Lav 42 1340 698 38 28 Family room 448 5549 4272 158 173 Foyer 170 2573 923 73 37 Dinning room 234 5481 4761 156 192 Eating 120 3131 1821 89 74 Kitchen 210 6100 3839 174 155 Laundry room 60 1482 865 42 35 Mud room 60 1058 815 30 33 Hall 42 695 561 20 23 R nnm 1 l 1 92 5903 4797 168 194 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. AL {J�- wri 9 htsoftp Right -Suite® Universal 2015 15.0.12 RSU05790 2015 -Jun -22 06:54:46 'I'M�.`, ' f ... c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Page 2 (Rest of House) d 1722 37899 26736 1080 1080 Other equip loads 0 0 Equip. @ 0.88 RSM 23448 Latent cooling 2859 TnTA I C nnnn-7 4 r%nn 4 nnn v �•.�v 1/GG J!V.7.7 LVJV! IVQV 1wow Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 14C- + wrightsoft" Right -Suite® Universal 2015 15.0.12 RSU05790 ..c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N 2015 -Jun -22 06:54:46 Page 3 Load Short Form Job: 51 hight Point Gratfton wrightsoft. Date: Oct 28, 2014 2nd floor By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 Project• • For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 Design Information Htg Clg Infiltration Outside db (°F) 5 83 Method Simplified Inside db (°F) 68 75 Construction quality Tight Design TD (°F) 63 8 Fireplaces 1 (Average) Daily range - M Inside humidity (%) 50 50 Moisture difference (gr/Ib) 47 24 HEATING EQUIPMENT Make Amana Trade AMANA Model AMH950704BX AHRI ref 2012268 Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat 95 AFUE Area (fe) 46000 Btuh 44000 Btuh 44 OF 947 cfm 0.027 cfm/Btuh 0 in H2O COOLING EQUIPMENT Make Amana Trade ASX13 SERIES Cond ASX130421C* Coil CA*F3131*6D* AHRI ref 4385601 Efficiency 11.5 EER, Sensible cooling Latent cooling Total cooling Actual air flow Air flow factor Static pressure Load sensible heat ratio 14 SEER Area (fe) 19880 Btuh 8520 Btuh 28400 Btuh 947 cfm 0.053 cfm/Btuh 0 in H2O 0.88 2632 ROOM NAME Area (fe) Htg load (Btuh) Clg load (Btuh) Htg AVF (cfm) Clg AVF (cfm) bedroom 2 234 5390 1801 143 96 bedroom 4 156 4724 2632 125 140 1/2 bath 60 1053 710 28 38 bedroom 3 180 5086 2960 135 157 Master closet 200 2862 927 76 49 master bed 412 8653 4995 230 265 mastrbed bath 180 4838 3403 128 181 ?nd flnnr wall PA '�nnn inn — I JVJJ QVV OL LI Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. At.wri htft® 2015 -Jun -22 06:54:46 r` 9soRight-Suite® Universal 2015 15.0.12 RSU05790 ACCP, ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Page 4 2nd floor d 1508 35704 17827 947 947 Other equip loads 3190 5120 Equip. @ 0.88 RSM 20124 Latent cooling 3106 TOTALS 1508 38894 23230 947 947 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed At 2015 -Jun -22 06:54:46 ,wrightsoft° Right -Suite® Universal 2015 15.0.12 RSU05790 Page 5 RCCA ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N wrightsoft° Load Multizone Summary Report J&J Heating and Air Conditioning 17 Arlington st, Dracut, Me 01826 Infiltration Summary Job: 51 hight Point Gratfton Date: Oct 28, 2014 By: Load and AVF Summary ROOM NAME Area ft2 Heating Clg load Btuh Htg AVF cfm Cooling bedroom 2 ZONE NAME Volume ACH AVF HTM Volume ACH AVF HTM 4724 ft3 cfm Btuh/ft2 ft3 cfm Btuh/ft2 2nd floor 13572 0.46 104 2.8 13572 0.40 91 0.3 (Rest of House) 21060 0.21 74 2.9 21060 0.18 65 0.3 Entire House 1 34632 0.16 178 1.5 34632 0.07 155 0.1 Load and AVF Summary ROOM NAME Area ft2 Htg load Btuh Clg load Btuh Htg AVF cfm ClgAVF cfm bedroom 2 234 5390 1801 143 96 bedroom 4 156 4724 2632 125 140 1/2 bath 60 1053 710 28 38 bedroom 3 180 5086 2960 135 157 Master closet 200 2862 927 76 49 master bed 412 8653 4995 230 265 mastrbed bath 180 4838 3403 128 181 2nd floor wall 86 3099 399 82 21 2nd floor 1508 35704 17827 947 947 Study 144 4587 3383 131 137 Lav 42 1340 698 38 28 Family room 448 5549 4272 158 173 Foyer 170 2573 923 73 37 Dinning room 234 5481 4761 156 192 Eating 120 3131 1821 89 74 Kitchen 210 6100 3839 174 155 Laundry room 60 1482 865 42 35 Mud room 60 1058 815 30 33 Hall 42 695 561 20 23 Room13 192 5903 4797 168 194 (Rest of House) 1722 37899 26736 1080 1080 Entire House 3230 73604 44563 2027 2027 cwri htsoft* 2015 -Jun -22 06:54:46 9 Right -Suite® Universal 2015 15.0.12 RSU05790 �+CA ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Page 1 Building Analysis Job: 51 hight Point Gratfton wrightsoft® g y Date: Oct 28, 2014 Entire House By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Me 01826 Project• • For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 ]esian Cnnditir Location: Btuh/ft2 Indoor: Heating Cooling Worcester, MA, US 15831 Indoor temperature (°F) 69 75 Elevation: 1010 ft 7.8 Design TD (°F) 64 8 Latitude: 420N Ceilings Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 49.4 23.6 Dry bulb (°F) 5 83 Infiltration: Ducts Dally ran °- a F) 17 ( M) Method Simplified 0 Wet bulbg(°F� - 69 Construction quality Tight 0 Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) Adjustments Heating Component Btuh/ft2 Btuh % of load Walls 4.1 15831 21.5 Glazing 18.6 5715 7.8 Doors 18.9 792 1.1 Ceilings 11.0 19365 26.3 Floors 6.0 12383 16.8 Infiltration 2.9 12020 16.3 Ducts 7497 10.2 Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 1736041 445631 100.0 Cooling Component Btuh/ft' Btuh % of load Walls 0.6 2407 5.4 Glazing 26.3 8087 18.1 Doors 6.1 255 0.6 Ceilings 9.5 16641 37.3 Floors 0.7 1510 3.4 Infiltration 0.3 1268 2.8 Ducts 4035 9.1 Ventilation 0 0 Internal gains 10360 23.2 Blower 0 0 Adjustments 0 Total 1 445631 100.0 Latent Cooling Load = 5965 Btuh Overall U -value = 0.153 Btuh/ft2-°F Data entries checked. ' Wrl htsoft9 2015 -Jun -22 06:54:46 9 Ri ht -Suited Universal 2015 15.0.12 RSU05790 ACKA ...c\Desktop\wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Page 1 wrightsoft® Buildin Analysis g y Btuh Job: 51 hightPointGratfton Date: Oct 28, 2014 Walls (Rest of House) 6519 By: Glazing 18.9 J&J Heating and Air Conditioning 7.6 Doors 17 Arlington st, Dracut, Ma 01826 792 2.1 Ceilings 11.2 19307 50.9 Floors 1.9 1007 2.7 Infiltration 2.9 5102 13.5 Project• • 2307 6.1 For: Trust Construction 0 0 Humidification 1267361 51 Mt Joy Dr, Tewksbury, Ma 01876 0 Ventilation 0 0 Adjustments Design Conditions Total 1 Location: 100.0 Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 70 75 Elevation: 1010 ft Design TD (°F) 65 8 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 50.9 23.6 Dry bulb (°F) 5 83 Infiltration: Dally range °F) - 17 ( M) Method Simplified Wet bulb (°I) - 69 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) Component Btuh/ft2 Btuh % of load Walls 4.2 6519 17.2 Glazing 18.9 2865 7.6 Doors 18.9 792 2.1 Ceilings 11.2 19307 50.9 Floors 1.9 1007 2.7 Infiltration 2.9 5102 13.5 Ducts 14.5 2307 6.1 Piping Adjustments 0 0 Humidification 1267361 0 0 Ventilation 0 0 Adjustments 0 Total 1 1378991 100.0 Cooling Component Btuh/ft' Btuh % of load Walls 0.6 973 3.6 Glazing 26.0 3949 14.8 Doors 6.1 255 1.0 Ceilings 9.6 16600 62.1 Floors 0.2 119 0.4 Infiltration 0.3 529 2.0 Ducts 431 1.6 Ventilation 0 0 Internal gains 3880 14.5 Blower 0 0 Adjustments 0 Total 1267361 100.0 Latent Cooling Load = 2859 Btuh Overall U -value = 0.118 Btuh/ft2-°F Data entries checked. Wrl Ilt50ft' 2015 -Jun -2206:54:46 .►_ 9 Right -Suite® Universal 2015 15.0.12 RSU05790 ACCK ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Page 2 Building Analysis Job: 51 hight Point Gratfton wrightsoft® g Y Date: Oct 28, 2014 2nd floor By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 Project• • For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 Desian Conditic Location: Btuh/ft2 Indoor: Heating Cooling Worcester, MA US Elevation: Glazing Indoor temperature (°F) 68 75 1610 ft 0 0 Design TD (°F) 63 8 Latitude: 420N 7.5 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Ducts 3190 8.2 Dally ran a °F) - 17 ( M) Method Simplified 0 Wet bulbg(°F� - 69 Construction quality Tight 28.2 Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) Adjustments Heating Component Btuh/ft2 Btuh % of load Walls 4.1 9312 23.9 Glazing 18.3 2850 7.3 Doors 0 0 0 Ceilings 1.6 57 0.1 Floors 7.5 11376 29.2 Infiltration 2.8 6918 17.8 Ducts 1390 5191 13.3 Piping 0.3 0 0 Humidification Ducts 3190 8.2 Ventilation 15.7 0 0 Adjustments 0 0 Total 1 1388941 100.0 Coolinq Component Btuh/ft2 Btuh % of load Walls 0.6 1434 6.2 Glazing 26.5 4138 18.0 Doors 0 0 0 Ceilings 1.2 40 0.2 Floors 0.9 1390 6.1 Infiltration 0.3 740 3.2 Ducts 3604 15.7 Ventilation 0 0 Internal gains 6480 28.2 Blower 5120 22.3 Adjustments 0 Total 1229461 100.0 Latent Cooling Load = 3106 Btuh Overall U -value = 0.188 Btuh/ft2-°F Data entries checked. �C L * wrightsoft® 2015 -Jun -22 06:54:46 . Right -Suite® Universal 2015 15.0.12 RSU05790 Page 3 ..c\Desktop\wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Component t Constructions Job: 51 hight Point Gratfton wrightsoft® p Date: Oct 28, 2014 Entire House By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 lesion Conditir Location: 1095 Indoor: Heating Cooling Worcester, MA, US 0.63 Indoor temperature (°F) 69 75 Elevation: 1010 ft 21.0 Design TD (°F) 64 8 Latitude: 420N s Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 49.4 23.6 Dry bulb (°F) 5 83 Infiltration: 4.15 3141 Daily range (°F) - 17 ( M) Method Simplified 0.065 Wet bulb (F) - 69 Construction quality Tight 2407 Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) 10.5 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ft'-°F ft? °FBtuh Btuh/ft' Btu Stuh/ft' Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 6.67 ft head ht Doors 11 P0: Door, mtl pur core type Ceilings n 1095 0.065 21.0 4.14 4535 0.63 690 e 1014 0.065 21.0 4.17 4227 0.63 639 s 951 0.065 21.0 4.13 3928 0.63 600 w 757 0.065 21.0 4.15 3141 0.63 477 all 3817 0.065 21.0 4.15 15831 0.63 2407 n 12 0.290 0 18.9 226 7.39 89 e 144 0.290 0 18.6 2673 27.6 3970 s 12 0.290 0 18.3 219 14.0 168 w 140 0.290 0 18.6 2597 27.6 3860 all 308 0.290 0 18.6 5715 26.3 8087 e 21 0.290 10.5 18.9 396 6.06 127 w 21 0.290 10.5 18.9 396 6.06 127 all 42 0.290 10.5 18.9 792 6.06 255 16A-38ad:Attic ceiling, asphalt shingles roof mat, r-38 ceiI ins, 1/2" 618 0.026 38.0 1.69 1044 1.67 1035 gypsum board int fnsh 35 0.026 38.0 1.64 57 1.15 40 all 653 0.026 38.0 1.69 1102 1.65 1075 C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" 1104 0.255 1.0 16.5 18263 14.1 15566 gypsum board int fnsh Floors 19A-Obstp: Part floor, frm flr, 10" thkns 1508 0.368 0 7.54 11376 0.92 1390 19A-30bswp: Part floor, hrd wd flr fnsh, r-30 ins, frm flr, 10" thkns 543 0.034 30.0 1.85 1007 0.22 119 At wri htsoft" 2015 -Jun -22 06:54:46 Zb,.�/.y_ 9 Right -Suite® Universal 2015 15.0.12 RSU05790 Page 1 k ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 51 hight Point Gratfton wrightsoft® Date: Oct 28, 2014 2nd floor By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 •ject intormation For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 lasian Conditir Location: Or Indoor: Heating Cooling Worcester, MA, US Loss Indoor temperature (°F) 68 75 Elevation: 1010 ft ft' Design TD (°F) 63 8 Latitude: 420N Btuh/V Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: n 702 Daily range (°F) - 17 ( M) Method Simplified 0.63 Wet bulb (F) - 69 Construction quality Tight 0.065 Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) 278 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain 12 0.290 ft' Btuhffl °F ft'-°F/Btuh Btuh/ft' Btu Btuh/V Btu Walls 0 18.3 1315 27.6 1985 all 156 0.290 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 702 0.065 21.0 4.09 2875 0.63 443 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud a 441 0.065 21.0 4.09 1806 0.63 278 s 690 0.065 21.0 4.09 2826 0.63 435 w 441 0.065 21.0 4.09 1806 0.63 278 all 2274 0.065 21.0 4.09 9312 0.63 1434 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 e 72 0.290 0 18.3 1315 27.6 1985 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; s 12 0.290 0 18.3 219 14.0 168 6.67 ft head ht w 72 0.290 0 18.3 1315 27.6 1985 all 156 0.290 0 18.3 2850 26.5 4138 Doors (none) Ceilings 16B-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh Floors 19A-Obstp: Part floor, frm fir, 10" thkns 35 0.026 38.0 1.64 57 1.15 40 1508 0.368 0 7.54 11376 0.92 1390 wri htsoft® 2015 -Jun -22 06:54:46 9 Right -Suite® Universal 2015 15.0.12 RSU05790 /1liVl1 ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Page 2 Component Constructions Job: 51 hight Point Gratfton wrightsoft® Date: Oct 28, 2014 (Rest of House) By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 ]esion Conditic Location: Or Indoor: Heating Cooling Worcester, MA, US Loss Indoor temperature (°F) 70 75 Elevation: 1010 ft ft' Design TD (°F) 65 8 Latitude: 420N Btuh/f2 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 50.9 23.6 Dry bulb (°F) 5 83 Infiltration: n 393 Daily range (°F) - 17 ( M) Method Simplified 0.63 Wet bulb (F) - 69 Construction quality Tight 0.065 Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) 361 Construction descriptions Or Area 1.11 -value Insul R Htg HTM Loss Clg HTM Gain 0 18.9 ft' Btuh/ft? °F ft'-°F/Btuh Btuh/ft' Btu Btuh/f2 Btu Walls 27.6 1875 152 0.290 0 18.9 2865 26.0 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 393 0.065 21.0 4.22 1660 0.63 248 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud a 573 0.065 21.0 4.22 2421 0.63 361 s 261 0.065 21.0 4.22 1103 0.63 165 w 316 0.065 21.0 4.22 1335 0.63 199 all 1543 0.065 21.0 4.23 6519 0.63 973 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 n glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; e 6.67 ft head ht w all Doors 11 P0: Door, mtl pur core type Ceilings 16A-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fnsh Floors 19A-30bswp: Part floor, hrd wd flr fnsh, r-30 ins, frm flr, 10" thkns 12 0.290 0 18.9 226 7.39 89 72 0.290 0 18.9 1357 27.6 1985 68 0.290 0 18.9 1282 27.6 1875 152 0.290 0 18.9 2865 26.0 3949 e 21 0.290 10.5 18.9 396 6.06 127 w 21 0.290 10.5 18.9 396 6.06 127 all 42 0.290 10.5 18.9 792 6.06 255 618 0.026 38.0 1.69 1044 1.67 1035 1104 0.255 1.0 16.5 18263 14.1 15566 543 0.034 30.0 1.85 1007 0.22 119 wri htsoft® 2015 -Jun -22 06:54:46 , 9 Right -Suite® Universal 2015 15.0.12 RSU05790 Page 3 ACiCK ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 51 hight Point Gratfton wrightsoft® Date: Oct 28, 2014 Study By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 jEject intorm.ation For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 ]esian Conditic Location: Or Indoor: Heating Cooling Worcester, MA, US Loss Indoor temperature (°F) 70 75 Elevation: 1010 ft ft' Design TD (°F) 65 8 Latitude: 420N Btuh/ft' Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 50.9 23.6 Dry bulb (°F) 5 83 Infiltration: n 108 Daily range (°F) - 17 (M) Method Simplified 0.63 Wet bulb (°F) - 69 Construction quality Tight 0.065 Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) 53 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ft? °F ft' °F/Btuh Btuh/fN Btu Btuh/ft' Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 108 0.065 21.0 4.22 456 0.63 68 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud a 84 0.065 21.0 4.22 355 0.63 53 all 192 0.065 21.0 4.22 811 0.63 121 Partitions (none) Windows 2 glazing, clr outr, air gas, vni frm mat, clr innr, 1/4" gap, 1/4" thk: 2 e 24 0.290 0 18.9 452 27.6 662 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 6.67 ft head ht Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" 144 0.255 1.0 16.5 2382 14.1 2030 gypsum board int fnsh Floors 19A-30bswp: Part floor, hrd wd flr fnsh, r-30 ins, frm flr, 10" thkns 12 0.034 30.0 1.85 22 0.22 3 tiC wri htsoft° Right-Sufte® Universal 2015 15.0.12 RSU05790 2015 -Jun -22 06:54:46 ACCA ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Page 4 wri htsoft® Component Constructions Job: 51 hight Point Gratfton Q Date: Oct 28, 2014 Lav By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 Project• • For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 lesion Conditiln Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 70 75 Elevation: 1010 ft Design TD (°F) 65 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 50.9 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M) Method Simplified Wet bulb (°F) - 69 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) Construction descriptions Or Area LI -value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ft? °F ft? °FBtuh Btuh/ft' Btu Btuh/ft' Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 42 0.065 21.0 4.22 177 0.63 26 gypsum board int fnsh, TxT wood frm, 16" o.c. stud Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 n 12 0.290 0 18.9 226 7.39 89 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 6.67 ft head ht Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" 42 0.255 1.0 16.5 695 14.1 592 gypsum board int fnsh Floors (none) A. {J�" wri htsoft° 2015 -Jun -22 06:54:46 'I.IM,.�. ' f 9 Right-Suftersl Universal 2015 15.0.12 RSU05790 Page 5 ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 51 hight Point Gratfton - wrightsoft® Date: Oct 28, 2014 Family room By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 Location: Or Indoor: Heating Cooling Worcester, MA, US Loss Indoor temperature (°F) 70 75 Elevation: 1010 ft ft' Design TD (°F) 65 8 Latitude: 420N Btuh/ft' Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 50.9 23.6 Dry bulb (°F) 5 83 Infiltration: n 72 Daily range (°F) - 17 ( M) Method Simplified 0.63 Wet bulb (°F) - 69 Construction quality Tight 0.065 Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) 200 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ft'-°F ft' °F/Btuh ROM Btuh Btuh/ft' Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 72 0.065 21.0 4.22 304 0.63 45 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud a 318 0.065 21.0 4.22 1344 0.63 200 s 72 0.065 21.0 4.22 304 0.63 45 all 462 0.065 21.0 4.22 1952 0.63 291 Partitions (none) Windows 2 glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 e 24 0.290 0 18.9 452 27.6 662 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 6.67 ft head ht Doors (none) Ceilings 16A-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" 448 0.026 38.0 1.69 757 1.67 750 gypsum board int fnsh Floors 19A-30bswp: Part floor, hrd wd flr fnsh, r-30 ins, frm flr, 10" thkns 332 0.034 30.0 1.85 616 0.22 73 i4t:L 2015 -Jun -22 06:54:46 wrightsoft° Right -Suite® Universal 2015 15.0.12 RSU05790 "I'M ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Page 6 Component Constructions Job: 51 hight Point Gratfton wrightsoft® Date: Oct 28, 2014 Foyer By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 ]esinn Conditia Location: Or Indoor: Heating Cooling Worcester, MA, US Loss Indoor temperature (°F) 70 75 Elevation: 1010 ft ft' Design TD (°F) 65 8 Latitude: 420N BtuhN Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 50.9 23.6 Dry bulb (°F) 5 83 Infiltration: n 18 Daily range (°F) - 17 ( M) Method Simplified 0.63 Wet bulb (°F) - 69 Construction quality Tiht 0.065 Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) 95 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ft? °F ft� °F/Btuh Btuh/ft' Btu BtuhN Btu Walls Doors 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 18 0.065 21.0 4.22 76 0.63 11 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud w 151 0.065 21.0 4.22 638 0.63 95 all 169 0.065 21.0 4.22 714 0.63 107 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 w 8 0.290 0 18.9 151 27.6 221 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 6.67 ft head ht Doors 11 P0: Door, mtl pur core type w 21 0.290 10.5 18.9 396 6.06 127 Ceilings 16A-38ad:Attic ceiling, asphalt shingles roof mat, r-38 ceiI ins, 1/2" 170 0.026 38.0 1.69 287 1.67 285 gypsum board int fnsh Floors 19A-30bswp: Part floor, hrd wd flr fnsh, r-30 ins, frm flr, 10" thkns 153 0.034 30.0 1.85 284 0.22 34 wrightsoft' Right -Suite® Universal 2015 15.0.12 RSU05790 2015 -Jun -22 06:54:46Page 7 ACOA ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N - wrightsoft® Component Constructions Dinning room J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 Location: Or Indoor: Worcester, MA, US Insul R Indoor temperature (°F) Elevation: 1010 ft Clg HTM Design TD (°F) Latitude: 420N Relative humidity (%) Outdoor: Heating Cooling Moisture difference (gr/Ib) Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M) Method Wet bulb (°F) - 69 Construction quality Wind speed (mph) 15.0 7.5 Fireplaces Job: 51 hight Point Gratfton Date: Oct 28, 2014 By: Heating Cooling 70 75 65 8 50 50 50.9 23.6 Simplified Tight 1 (Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ff--°F ft'-°F/Btuh Btuh/ft' Btuh Btuh/ft' Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 9 0.065 21.0 4.22 38 0.63 6 gypsum board int fnsh, 2'x6" wood frm, 16" o.c. stud w 93 0.065 21.0 4.22 393 0.63 59 all 102 0.065 21.0 4.22 431 0.63 64 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 w 24 0.290 0 18.9 452 27.6 662 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 6.67 ft head ht Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm fir, 10" thkns, 1/2" 234 0.255 1.0 16.5 3871 14.1 3299 gypsum board int fnsh Floors 19A-30bswp: Part floor, hrd wd flr fnsh, r-30 ins, frm flr, 10" thkns 9 0.034 30.0 1.85 17 0.22 2 2015 -Jun -22 06:54:46 .+ + wrightsoft® Right -Suite® Universal 2015 15.0.12 RSU05790 Page 8 .Z& ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 51 hight Point Gratfton wrightsoft® Date: Oct 28, 2014 Eating By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 Location: Area Indoor: Heating Cooling Worcester, MA, US Clg HTM Indoor temperature (°F) 70 75 Elevation: 1010 ft ft? °FBtuh Design TD (°F) 65 8 Latitude: 420N Walls Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 50.9 23.6 Dry bulb (°F) 5 83 Infiltration: 4.22 292 Daily range (°F) - 17 ( M) Method Simplified Wet bulb (°F) - 69 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) Construction descriptions Or Area Ll -value Insul R Htg HTM Loss Clg HTM Gain ft' Btuhtt' °F ft? °FBtuh Btuh/R' Btu Btuh/ft' Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" a 69 0.065 21.0 4.22 292 0.63 44 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions (none) Windows (none) Doors 11 P0: Door, mtl pur core type a 21 0.290 10.5 18.9 396 6.06 127 Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" 120 0.255 1.0 16.5 1985 14.1 1692 gypsum board int fnsh Floors (none) .A Page 9 + wrightsoft* Right -Suite® Universal 2015 15.0.12 RSU05790 2015 -Jun -22 06:age 9 14CCA ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N -- wrightsoft® Component Constructions Kitchen J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 Location: Or Indoor: Worcester, MA, US Insul R Indoor temperature (°F) Elevation: 1010 ft Cig HTM Design TD (°F) Latitude: 42°N Relative humidity (%) Outdoor: Heating Cooling Moisture difference (gr/Ib) Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M) Method Wet bulb (°F) - 69 Construction quality Wind speed (mph) 15.0 7.5 Fireplaces Job: 51 hight Point Gratfton Date: Oct 28, 2014 By: Heating Cooling 70 75 65 8 50 50 50.9 23.6 Simplified Tight 1 (Average) Construction descriptions Or Area Ll -value Insul R Htg HTM Loss Cig HTM Gain ft' BtuhRt2-'F ft'-°F/Btuh Btuh/ft' Btu Btuh/R' Btuh Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" a 102 0.065 21.0 4.22 431 0.63 64 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud s 135 0.065 21.0 4.22 570 0.63 85 all 237 0.065 21.0 4.22 1001 0.63 149 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 e 24 0.290 0 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 6.67 ft head ht Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" 210 0.255 1.0 gypsum board int fnsh Floors 19A-30bswp: Part floor, hrd wd flr fnsh, r-30 ins, frm fir, 10" thkns 15 0.034 30.0 18.9 452 27.6 662 16.5 3474 14.1 2961 1.85 28 0.22 3 wri9 htsoft® 2015 -Jun -22 06:54:46 Right -Suite® Universal 2015 15.0.12 RSU05790 Page 10 A(:CA ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 51 hight Point Gratfton wrightsoft® Date: Oct 28, 2014 Laundry room By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 Location: Area Indoor: Heating Cooling Worcester, MA, US Clg HTM Indoor temperature (°F) 70 75 Elevation: 1010 ft ft? °FBtuh Design TD (°F) 65 8 Latitude: 420N Walls Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 50.9 23.6 Dry bulb (°F) 5 83 Infiltration: 4.22 228 Daily range (°F) - 17 ( M) Method Simplified Wet bulb (°F) - 69 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) Construction descriptions Or Area Ll -value Insul R Htg HTM Loss Clg HTM Gain ft' Btuhtft? °F ft? °FBtuh Btuhtft' Btuh Btuh/ft' Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" s 54 0.065 21.0 4.22 228 0.63 34 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm fir, 10" thkns, 1/2" 60 0.255 1.0 16.5 993 14.1 846 gypsum board int fnsh Floors 19A-30bswp: Part floor, hrd wd flr fnsh, r-30 ins, frm flr, 10" thkns 6 0.034 30.0 1.85 11 0.22 1 Att. wrightsoft® Right -Suite® Universal 2015 15.0.12 RSU05790 2015 -Jun -22 06:54:46 Page 11 "I'M ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N wrightsoft® 17 Arlington st, Dracut, Ma 01826 Component Constructions Mud room J&J Heating and Air Conditioning Job: 51 hight Point Gratfton Date: Oct 28, 2014 By: Project• • For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 70 75 Elevation: 1010 ft Design TD (°F) 65 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 50.9 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 ?Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft' BtuhtV °F ft? °F/Btuh Btuh/ft' Btuh Btuh/ft' Btu Walls (none) Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" 60 0.255 1.0 16.5 993 14.1 846 gypsum board int fnsh Floors (none) 2015 -Jun -22 06:54:46 .� wrightsoft° Right -Suite® Universal 2015 15.0.12 RSU05790 Page 12 ,CCN. ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 51 hight Point Gratfton wrightsoft® Date: Oct 28, 2014 Hall By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 Project• • For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 3asian Conditir Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 70 75 Elevation: 1010 ft Design TD (°F) 65 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 50.9 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 (M) Method Simplified Wet bulb (F) - 69 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ft? °F ft=-°F/Btuh ROM Btuh Btuh/ft' Btu Walls (none) Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" 42 0.255 1.0 16.5 695 14.1 592 gypsum board int fnsh Floors (none) .+ * wrightsoft°° Right -Suite® Universal 2015 15.0.12 RSU05790 2015 -Jun -22 06:54:46 Page 13 )IM ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 51 hight Point Gratfton wrightsoft® �" Date: Oct 28, 2014 Room 13 By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 Location: Or Indoor: Heating Cooling Worcester, MA, US Loss Indoor temperature (°F) 70 75 Elevation: 1010 ft ft' Design TD (°F) 65 8 Latitude: 420N MOW Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 50.9 23.6 Dry bulb (°F) 5 83 Infiltration: n 144 Daily range (°F) - 17 ( M) Method Simplified 0.63 Wet bulb (F) - 69 Construction quality Tight 0.065 Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) 45 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ft?'F ft'-°FBtuh Btuhtt' Btu MOW Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 144 0.065 21.0 4.22 608 0.63 91 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud w 72 0.065 21.0 4.22 304 0.63 45 all 216 0.065 21.0 4.22 913 0.63 136 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 w 36 0.290 0 glazing, clr outr, air gas, vni frm mat, clr innr, 1/4" gap, 1/4" thk; 6.67 ft head ht Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" 192 0.255 1.0 gypsum board int fnsh Floors 19A-30bswp: Part floor, hrd wd flr fnsh, r-30 ins, frm flr, 10" thkns 16 0.034 30.0 wrightsoft° Right -Suite® Universal 2015 15.0.12 RSU05790 AC( ....c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N 18.9 679 27.6 993 16.5 3176 14.1 2707 1.85 30 0.22 4 2015 -Jun -22 06:54:46 Page 14 Job: 51 hight Point Gratfton wrightsoftW Component Constructions Date: Oct 28, 2014 bedroom 4 By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 Location: Or Indoor: Heating Cooling Worcester, MA, US Loss Indoor temperature (°F) 68 75 Elevation: 1010 ft ft' Design TD (°F) 63 8 Latitude: 420N Btuh/ft' Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: n 117 Daily range (°F) - 17 ( M) Method Simplified 0.63 Wet bulb (°F) - 69 Construction quality Tight 0.065 Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) 53 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/(t'--"F ft? °FBtuh Btuh/ft' Btu Btuh/ft' Btuh Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 117 0.065 21.0 4.09 479 0.63 74 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud a 84 0.065 21.0 4.09 344 0.63 53 s 117 0.065 21.0 4.09 479 0.63 74 w 18 0.065 21.0 4.09 74 0.63 11 all 336 0.065 21.0 4.09 1376 0.63 212 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 e 24 0.290 0 18.3 438 27.6 662 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 6.67 ft head ht Doors (none) Ceilings 16B-38ad:Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" 13 0.026 38.0 1.64 21 1.15 15 gypsum board int fnsh Floors 19A-Obstp: Part floor, frm fir, 10" thkns 156 0.368 0 7.54 1177 0.92 144 c wri htsoft• 2015 -Jun -22 06:54:46 9 Right -Suite® Universal 2015 15.0.12 RSU05790 ACCA ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = M.18 Front Door faces: N Page 15 Load Short Form Job: 51 hight Point Gratfton wrightsoft® Date: Oct 28, 2014 Entire House By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 Design Information Htg Clg Infiltration Outside db (°F) 5 83 Method Simplified Inside db (°F) 69 75 Construction quality Tight Design TD (°F) 64 8 Fireplaces 1 (Average) Daily range - M Inside humidity (%) 50 50 Moisture difference (gr/Ib) 49 24 HEATING EQUIPMENT Make n/a Trade n/a Model n/a AHRI ref n/a Efficiency n/a Htg load Heating input 0 Btuh Heating output 0 Btuh Temperature rise 0 OF Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Space thermostat n/a 1080 COOLING EQUIPMENT Make n/a Trade n/a Cond n/a Coil n/a AH RI ref n/a Efficiency n/a Htg load Sensible cooling 0 Btuh Latent cooling 0 Btuh Total cooling 0 Btuh Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Load sensible heat ratio 0 1080 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) 2nd floor d 1508 35704 17827 947 947 (Rest of House) d 1722 37899 26736 1080 1080 Entire House d 3230 73604 44563 2027 2027 Other equip loads 0 0 Equip. @ 0.88 RSM 39082 Latent cooling 5965 Tr)T01 C -70cnA ecnA'7 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. C wri htft" 2015 -Jun -22 06:54:46 �, 9soRight-Suited Universal 2015 15.0.12 RSU05790 AM— ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Page 1