HomeMy WebLinkAbout2013-11-05 Planning Board Supplemental Materials (4) DEVELLIS ZREIN INC. Land Planning. Civil Engineering Landscape Architectrure November 4, 2013 Judy Tymon, Town Planner North Andover Planning Board 1600 Osgood Street North Andover,MA 01.845 Re: Stormwater Review School Department Building, 566 Main Street Dear Ms. Tymon and Members of Board: On behalf of our Client, Kang Associates, Inc., we are pleased to provide response comments to the review letter prepared by Eggleston Environmental, dated October 30, 2013, regarding the above referenced site. The items listed in the review letter are re-typed below in plain text. Our responses to the comments are typed in italics. 1. In accordance with the Site Plan Review requirements,the proposed plan will not increase either the rate or volume of runoff from the site, and the piped connection to the drain in Osgood Street will eliminate flow from the site onto the street surface Agreed 2. Conveyance of the pavement runoff through the grassed swale will also provide some degree of water quality treatment of the flow discharged from the project site. I do recommend the addition of a deep sump catchbasin or other means of pretreating the flow upgradient of the plunge pool, however, in order to minimize the deposition of sediment within the swale and the ongoing maintenance required. The plans are revised to include a deep sump catch basin at the lowest point of the parking. Flow fi°om the catch basin is piped to the beginning of the grassed Swale with a flared end section, having a riprap outlet. The originally proposed stone swale is therefore eliminated. 3. A means of access to the grassed swale for periodic removal of accumulated sediments should be provided. It appears that this would best be accomplished from Osgood Street. The grassed Swale is proposed with relatively gentle side slopes (5:1) and can easily be accessed from Osgood Street for maintenance. 4. As proposed,the bottom of the proposed swale/basin will be approximately two feet below existing grade. Soil testing should be conducted to confirm that the cut will not intercept groundwater. Soil testing has been performed on the site and ground water was generally found to be approximately 10'below existing grade. A copy of the test results are attached. DeVellis Zrein Inc. P.O.Box 307,Foxborough,MA 02035 508-473-4114 School Department Building Responses to Review Letter November 4,2013 Page 2 5. The depth of the existing sewer service line is not identified,but it should be confirmed that it is below the proposed grading or will not otherwise interfere with the construction of the swale. The existing sewer line is proposed to be demolished and cut and capped. 6. Designated snow storage locations should be shown on the plan. The plans are revised to show proposed snow storage areas 7. Consideration should be given to using a cistern to capture roof runoff for irrigation on the site. A cistern system will be discussed with the client, but given the budget constraints, it may be difficult to include it. 8. The Planning Board may want to request cut and fill calculations to assess traffic impacts during construction. Given the site topography, the proposed site grading attempts to utilize site cuts and fills to the extend possible. Additional fill materials may be required to be brought to the site. 9. Other than the proposed haybale line,the plans do not address erosion and sediment control measures to be employed on the site. I do note that the total area of disturbance associated with the project will exceed one acre, however,therefore coverage under EPA's Construction General Permit will be required and the selected contractor will need to prepare a Stormwater Pollution Prevention Plan outlining more detailed sediment control measures in accordance with the EPA Permit. The Planning Board should be provided the opportunity to review the Construction SWPPP before it is finalized. Agreed If you have any questions or need additional information please contact us at 508-473-4114. Sincerely, DEVELt REIN INC. Imad A Zrein, P.E. cc: Kaffee Kang Lisa Eggleston