HomeMy WebLinkAbout1987-09-09 Conservation Commission Minutes Approved 28
w -
OFFICE OF
CONSERVATIO14 COMMISSION
"T"
Minutes Meeting of September, 9, 198
Present: 'W. ,ice s A* Bence. se
J. Lin,don L. Bruinooge end
Schoene N. Sullivan, Cons. Admin.
B. Mansour M. udr Sec
Hawkins Lane Acceptance of Plans
C. Scholene presentedplans. The Commission cannot accept the plans until, the no-cut,
easement is shown and the issue of access, to state land s resolved.,
No, vote taken.
Lots 34B , 39, 45 and 46 Carlton Lane
W. Vicns motioned that, a Certificate ' Compliance issued the individual lots
s fB i. ii e
Lot 5 Sh,a,rpHers Posed Road. Cerise of Cep iinee
r is not completedf,
Jefferson Office Park - Extension
W. Vicens motioned we issue a three-month extension on Jefferson Office Park . . . .
#2421-191, C. Schoene seconded, motion carried.
French .farm Certificate of Compliance
No official letter received for Compliance, PL in e have been made. and area looking good
No, vote taken.
Let 4 Gray Street Certificate of Compliance
ice s motioned we issue a Certificate of Compliance on Let 4 Gray Street
, , E, 2 2-318. B. Man.sour seconded, motion carried,
Great Pond Estates s - Appeal o '"s Su reedi Order of Conditions
1.1d. Vicens drafting a letter for the adjudicatory h,earing. 2. It may be necessary to
retain Special Town Counsel and 3 e need to decided whit is CC's goal?
W. Vicens motioned we request an adjudicatory hearing on the Superseding, Order olf
Conditions on File, #242-356, Great Pond Estates.1 C. Schoene, seconded, motion carried
Villa s Discussion of Violation
After some discussion it was motioned by W. Vicens that a wetland, replacement area
twice the size of the one taken be placed somewhere else on the site.. A request that
. replacement plan be presented to NACIC by Nov. 1, 1987, and work completed by August
1988. (It was noted that an extension for the Order of Conditions was required.)
C Scheme seconded, i re carried
In,age 2 P
Minutes of Meeting, ol September 9, 1987 of NACC
Lot 1B, - Salem Turnpike - Safe "N"' Sound Mini Public Hea
Joseph Cushing of' Kaminski" Associlates, represented the owner, . Todd. J. Cushing
presented the new plan to the Commission which, involves a three story building
(100 x 220) , at the site 'in front of the ABC Bus Company. W. VIc,ens, motioned we close
the public hearing on, Lot 1B - Sal,em, Turnpike 'DEQE #242-428 and 11"sste an Order of
Conditions within 21 days. C. Schoene, seconded,, motion carried.
Crouch Machinery (Public Hearin,
Joseph Cushing of Kaminski Ass oicates represented the owner, Kenneth Crouch of Crouch
Machinery. This, is a six acre p�arcel, (#21 Map 28), on the south side of Sutton Street.,
A, two story building and appurtenances, including, access drives and parking areas'.
'Thi's building will house a machine fabrication shop. the NBC C requested a, clarification
from the Fire Chief on the policy of five hydrants and, 360' access, 'to 'the site. W.
Vicens motioned we close the public hearing, and issue an Order of Conditions within 21
days on Sutton Street, D�EQE #2 2-427. B., Mansour seconded, motion carried.
Lot 13 - Tucker Farms Road - Public HearinB,
Alexander Zolanski of Cameron Bishop Engineering Corporation, represented the owner,
Mr. Leone. Discussion took place regarding the, constructio�n of a single family home,
garage, driveway, subsurface disposal system, and related lot gradings. W. Vice
motioned we close the public bearing, on Lot 13 Tucker Farm Road and issue an, Order of
Conditions wit .in 21 days. C. Schoene seconded, mot,ion carried.
Coventry II Plans Under Review
The final set, of plans for this project were approved by the Commission. A modification
to our Order of Cc tens is being made. An, amended Order of Conditions is being
completed. Besides the changes noted in our letter ted June 8, 1987 the, f'ollo�w'ing
changes will be made 1. Construction will be allowed, on Lots 12 and 71 after filing of
a Notice of Intent with NACC, and 2. Construction will b:e allowed on Lot No.61 after
one (1) year of complefton the pond on this lot. Also, they be advised that prior
to, start of construct1 ion, Conditions #40 through 45 have to be met. 1q. Vicens
motioned that, we accept the plans on Coventry II, dated July 1987 and, that we amend
the Order, of Conditions by these two additional conditions and that we allow Lots 12 & 71 be
removed from the list of unbuildable lots to the, list of require&.,� 'B. Mansour
seconded, =tion carried.
Clay Pit 'Hill - Order of Conditions
W. Vicens motioned we issue the amended Order of' Gonditons on, #242-424 Clay Pit Rill
(Continental Cablevision) C. Scheme seconded, motion carried.,
Lot, 4 Gray Street (Breckenridgeestates) - Order of Conditons
B. Mansour moti,oned we issue the amended Order of Conditions on, D.E.Q.E.#242-426
Loit 4 Gray Street. W. Vicens secondied, motion carried.
I age 3
Minutes of Meeting of September 9, 1983 NACC
Deerfield Lane
W. Vicens 'voted to accept, 'the change in the construction schedule on Deerfield Lane
per letter from Curt Young of Wetlands Preservation Ince ) dated August, 27., 1987.
B. Mansocur seconded, motion carried,.
.Bosto�n Brook Estates - Order of Conditions Extended
See letter from, Ralph Joyce Esq. , regarding, extension for the above project. NACC
comments, sent to Planning Board and, applicant.
Minutes of' the following, meetings were accepted by the Comm ass lion,
October 15, 1986
October 22, 1,986
December 10, 1986 and December 17, 1986
July 29, 1987 and August 12, 1987'
For correspondence see this week's Agenda.
'Meeting adjourned at 11: 15 P.M4,