Minutes of Meeting (NACC) August 3, 1988
Present: New Member, W. Sousa M. Boudrot, Sec,
W. Vicens C. Schoene (8:27)
J. Lindon L. Bruinooge (Absent)
I. Mackun, Admin. P. Tariot (Absent)
Airport Improvement Project - Discussion
Rick D'Agostino, Mark Pilla were present at this meeting. This project is to
construct, mark and light partial Taxiway E. This project will be done in two
phases. There are questions as to the impact of this project on wetlands. A site
visit will take place next Wednesday night (8/10/88) . No vote was taken.
Amtrak - Public Hearin - Determination
Represented by Sanford Ecological Services of Southboro, Mass. A revised plan
showing corrections to wetland delineations was reviewed. J. Lindon asked if
further changes could be made after hearing closed? (i.e. , nursery, A.T.& I.'..
wells) . The spraying will take place next year (1989 - Jude & July) Mass. Food
& Agriculture is researching the chemicals to be sprayed.
W. Vicens motioned that we agree with the delineation as referenced in the letter
and plans of 6/28, to be field verified after it is marked on the tracks.
A. Resca seconded, motion carried..
Ba field - Public Hearin - Notice of Intent (Lot 3A)
Toscano and Ardito Office Bldg. This project will be a two story office building.
Jerry Fortin of Richard Kaminski's Office represented the owner, 114 Associates
Realty Trust of Andover. Drainage will be handled per master plan into existing
drain pipe on Bayfield Drive. James Bourgeois and Joe Cushing were also present.
Discussion took place -on -the delineation of the wetlands. 14. Vicens motioned
. that we continue the public hearing 2 weeks from tonight (8/17/88) for the purposes
of working out alternative designs of the building and minimizing the filling of
wetlands.
Lot B - Boston Street -- Discussion
Jon Willis, Jr. , attended the meeting, present owner of Lot B -- Boston Street.
Requesting Cert. of Compliance and Bond Release: Drainage pipe goes through the
house (not swale as per plan) . A site visit will be made.
W- V10pn.q mntinnorl f hnf- r.rn amr,nrror f-1— c4 e-o —4�A i- f--,— r , f
a«e -2-
r .
Minutes of Meeting of NACC Aug. 3, 1988
Hawkins Lane - Enforcement Order
Ray Fraser, Peter DeGraff-$ and Coleman McDonough were present at this meeting.
J. Lindon read a synopsis of the project and its problems since inception.
Ray Fraser discussed the BSC report of hydrologic calculations, methodology used,
etc. Both Boston Brook and Hawkins Lane must deal with their own alterations of
hydrology, NACC will not require one project to modify due to other's activity.
NACC will require further calculations for culvert, using TR-55 method. Also,
the hydraulics of the culvert itself need to be considered. The public hearing
will be reopened, if required by the State.
C. Schoene motioned to modify Cite Enforcement Order that is presently in existence
to allow work to continue to complete the replacement wetland.
Secondly, that we empower Jack to lift the Enforcement Order on all other work
except in the vicinity of the crossing once the replacement area is completed.
A. Resca seconded, motion carried.
Jeffrey Place (Tiffany Lane)- Enforcement Order
Chris: Nelson, Don Symonick, Linda Ferrante, and Attorney Callahan attended the
meeting. Chris Nelson presented a revised erosion control plan. J. Lindon also
read a synopsis of the facts involved in- this project. W. Vicens motioned we• lift
the Enforcement Order on Jeffrey Place. C. Schoene seconded
Lot 14 Wintergreen Estates -- Enforcement Order
Jack Lindon described to the Commission the problems within this lot, and what
should be done to rectify the problems, including placing erosion controls and
submitting grading plans. Enforcement Order was not lifted, it was reinforced.
No vote was taken.
Willow St/Flagship Drive - Discussion of Connection
James Bourgeois attended the meeting and discussed plans and alternatives on this
project. There is a question as to whether this is a Limited Project in general.
Jack Lindon to attend Planning Bds meeting to discuss these alternatives.
Safe "N" Sound Mini Storage - Discussion
Bill will review John Todd's letter requesting support for cutting tl►rougli
surface of Route 114.
Coventry Estates - Discussion of Enforcement Order
Site visit next Wednesday.
The Pines -- Discussion
Request for bond release a site visit will be made.
......... ... ... .
•Pg� -3-
Minutes of Meeting of NACC Aug. 3, 1988
Lot 8 Candlestick Road -- Cert. of Compliance
W. Vicens motioned we issue a Partial Certificate of Compliance on Lot 8 with the
exception of the replacement area. C. Schoene seconded, motion carried.
ABC BUS - Discussion
Arthur to write letter stating what has to be done in this area.
Lot 10 Dale Street -- Order of Conditions
W. Vicens motioned we accept the Order of Conditions as amended on Lot__1.,0 )ale
Street. C. Schoene seconded, motion carried.
Lots 4 & 5 Cranberry Lane - Order of Conditions
After some discussion of this area it was deeJA84.,Cnat we request an extension
period and all NACC members visit the site,
W. Vicens motioned to accept the Minutes of the NACC meeting; of July 6, 1988
as amended. C. Schoene seconded, motion carried.
W. Vicens motioned we adjourn at 12:00 A.M.