Minutes for Meeting of November 9 , 1988 �s
Present: Bill Sousa Paul Tariot f
Carl Schoene Lois Bruinooge (10: 00 P.M. )
Jack Lindon Arthur Resca (7 : 25 P.M. ) '
Willie Vicens
Irene Mackun, Administrator
Marie Boudrot, secretary
The NACC invited Mr. James Bomba to our meeting to discuss
various types of performance securities. Be recommended that we
accept only passbooks and performance bonds that are very '
specifically worded.
Barker Street - Discussion
Dick Barrett requested reduction on required bond amounts
(presently $5, 000 per lot) as the replication area will be
completed next week, and an As-Built will be completed on both '.
the sewer and replication areas, and submitted soon, before any
more Form "U 's" are signed. Lots 13-16 are now owned by Dick and
Doug Strong. No decision on bond reduction will be made until the
As-Built is received.
Half-Moon Woods - Discussion
F
Joseph Casey requested a Certificate of Compliance due to the 1'
fact that no work commenced on this project and the order of
Conditions has expired. future work will have to file a Request
for Determination or Notice of Intent if applicable. W. Vicens
motioned we issue a Certificate of Compliance for #242-286 for
work that never commenced and require a filing for any future
work that is applicable under the Act. P.T. Seconded, motion
carried.
The Pines _ Discussion
Ben Osgood Jr. , attended the meeting. W. Vicens asked for some
cleanup work at the channel across the utility lines. Discussion
took place regarding a $15, 000 reduction .in the bond amount
(presently $20, 000) . W. Vicens motioned we reduce the bond on .
The Pines from $20, 000. to $5, 000 . C. Schoene seconded, motion
carried. #
4 •
S
f}
y
Page -2-
Meeting of November 9, 1988
_
Lot 40 p ' Discussion
_. ,Turnpike ,,.,,,_....._.._
Ben Osgood Jr. , attended the meeting. More erosion controls are r;
needed around the replication area, also side slopes need to be
stabilized. W. Vicens motioned we issue a one-year extension
pending receipt of a $2 , 500 bond and notice that erosion controls .'
have been installed. P. Tariot seconded, motion carried.
Lot 3Hawkins Lane -_Public Hearing
Ray Fraser, engineer, represented C. P. McDonough regarding their 3%
Request for Determination. After much discussion, W. Vicens
motioned we issue a Negative Determination on Lot 3 Hawkins Lane
subject to receiving dated and signed plans. A. Resca seconded,
motion carried. v'
Lots 4 & _5Hawkin5 Lane Notices off Intent - Public Hearing, ,
Ray Fraser again represented C. P. McDonough. Discussion of
common driveways and proposed houses took place. Original plans
indicated house locations would have sufficed, i. e. , new Notices
may not have had to be filed for this work. Discussion on
culvert and recently submitted hydraulic calculations and rating
curve for subdivision. Downstream flow will be larger up to a
certain-sized storm event (undetermined) then after that will be '
smaller. Can culvert be modified to reduce flow downstream?
Additional culvert designs will be required. W. Vicens motioned
to close the public hearing on Lots 4 & 5 Hawkins Lane and issue
an Order of Conditions within 21 days. C. Schoene seconded,
motion carried. W. Vicens motioned to table the matter on the
culvert.
Abbott Street - Lots 31 32 and 33 - Notice of Intent - Public
Hear_inca
t
Thomas Neve, the engineer, represented Robert Janusz , the owner.
Work on Lots 31 & 32 will include filling of small depression
(too small to be ILSF) . Lots 32 & 33 are in buffer zone of larger
wetland. Wetland delineation established, but flagging not
present in the field as of this filing. Original Order of S
Conditions for subdivision is under appeal . W. Vicens motioned #
we close public hearing with the stipulation that the wetland E
flags be replaced, and issue Order of Conditions within 21. days. ;
B. Sousa seconded, motion carried.
Brooks School Sewer - Notice of Intent - Public Hearing
Joe Cushing of Kaminski & Associates represented Brooks School .
Proposal includes a forced main sewer, with dewatering, erosion
i7n1jiy{� S��
i fit f
it
S
Page 3 ,.
Meeting of November 9, 1988
Brooks School Sewer Cont. . .
controls, and wetland restoration. W. Vicens motioned that we 5 close the public hearing and issue and Order of Conditions within
21 days. P. Tariot abstained, as did Lois Bruinooge. B. Sousa
seconded, motion carried.
t
Lots 1 7 & 8 North Cross Road - (Francis Estates) Notice of
Intent -- Public Hearing
Bab Masys of R.A.M. Engineering represented the owners. P '
are for septic systems and houses. Septic systems all outside
100 feet from wetland but houses are within buffer zone.
Abutters concerned with detention pond on Lot 7 . Wetland flags
not present in field, as of this filing. Abutter indicated Lot 7
is a low-lying lot and is concerned over the flow of water from
the finished lot. Veronica Mandry and Richard Pandolfo were
among the abutters. Mosquito Brook flows through this area. W.
Vicens motioned to continue the public hearing until Tuesday,
Nov. 22nd. P. Tariot seconded, motion carried.
l
Lot B - Forest Street - Notice of Intent
Curt Young of Wetlands Preservation represented Doug Perkins, the
owner. Proposal includes a 10 foot wide driveway right along the ;wetland edge. Lea Atkinson, an abutter, attended the meeting.
W. Vicens motioned to close the public hearing and issue an Order "
Of Conditions within 21 days. P. Tariot seconded, motion
carried. !
Long Pasture -- Discussion
Phil Christiansen and Curt Young attended to discuss issues
. relative to the NACC denial of this subdivision. Presented
revised plans with shifted location of water line (to end of cul-
de-sac) , maintenance of water flow under some drives to keep
connection between wetland areas. Calculations to reviewed. No
vote taken, to be on next meeting of November 22 , 1988 .
Wintergreen Estates - Discussion
Phil. Christiansen attended the meeting. There is a wetland
replacement area that is not completed, also its location
uncertain due to Rocky Brook Estates land swap. Also additional
filling has occurred at the Tanglewood crossing. Commission
requested that a plan showing everything to be done and a letter
explaining all revised work be submitted with a schedule. An
extension may be issued if this is received.
North Andover Business Park - Discussion
Thomas Neve and James Bourgeois attended meeting to discuss plans
h '
Page 4
Meeting of November 9, 1988
North Andover Business Park Cont. . .
that have been submitted for a road extension.
hearing
be held on November 22 , 1988 . Submitted as a Limited cProject. to
Limited Project Policy Statement - Discussion
Put on next agenda for Nov. 22 , 1988 .
Town Farm School Site - Discussion
W. Vicens drafted a letter to the School Building Committee. A
few minor changes were made, and the letter will be sent. Willie
Will be the new representative for the project.
Certificates of Com Hance
The following is a last of Certificates of Compliance that were
issued by the Commission at this meeting; W. Vicens motioned and
seconded by Paul Tariot, Lot 8 Tucker Farms, Lot 7B Mill Road
(pending receipt of a letter from an engineer) and Lot 8 Salem
Street.
The following requests for Certificates were not issued due to
unfinished work:
Lot 1A - Tucker Farms - erosion controls have accumulated
sediments.
Lot to Christian Way - unstabilized areas .
Borden Chemical - Need an "As-Built"
A
Lot 55 - Bear Hill - unstabil.ized slopes.
i
i
Lot 21 Coventr Lane - Enforcement Order
W. Vicens motioned to lift the Enforcement Order on Lot 21
Coventry Lane. Bill Sousa seconded, motion carried.
Hickory Hill -- Discussion
W. Vicens motioned to accept the revised construction schedule in
its entirety. Bill Sousa seconded, motion carried.
Chestnut Street Salem Turn ike - Orders of Conditions
W. Vicens motioned to issue the Order of Conditions for the four
r
}a �
F j .
' Page 5
a Meeting Of November 9, 1988
Chestnut Street Salem Turn ilce Cont. . .
projects on Chestnut Street as amended. DEQE W242-444 , 445, 446
and 447 . P. Tariot seconded, motion carried.
Butcher Bloy Sewer - Discussion
The plans revised October, 1988 were accepted as fulfillment of
Conditions #13 and 15 of the Order of Conditions.
Meeting Adjourned 1: 05 A.M.