Loading...
HomeMy WebLinkAboutUntitled (19) DEP FILE#242 - 1511 APPENDIX A-AFFIDAVIT on oath do hereby depose and state: (authorized agent applicant and/or current owner) (PLEASE CHECK AT LEAST ONE BLOCK) • 1. I am the of (position with applicant) (applicant name or company name) the applicant upon whom Order of Conditions have been placed upon by (DEP or NACC number) the North Andover Conservation Commission. &/or 2. Iamthe of (position with owner) (owner name) the owner upon whose land Order of Conditions have been placed up by (DEP or NACC number) the North Andover Conservation Commission. 3. I hereby affirm and acknowledge that I have received said Order of Conditions and have read the same and understand each (DEP File#) and every condition which has been set forth in said Order of Conditions. 4. I hereby affirm and acknowledge that on this day of 19 I inspected said property together with any and all improvements which have been made to the same and hereby certify that each and every condition set forth in Order of Conditions are presently in compliance. (DEP File#) 5. I hereby affirm and acknowledge that this document will be relied upon by the North Andover Conservation Commission as well as any potential buyers of said property which is subject to said Order of Conditions (DEP File#) Signed under the pains and penalties of perjury this day of 19 (Signature-authorized agent of applicant or owner) C:\Winword\OOC\boilerl.doc 12 NACC 4/29/2011 DEP FILE#242 - 1511 73. Upon completion of construction and grading,all disturbed areas located outside resource areas shall be stabilized permanently against erosion. This shall be done by loaming and seeding according to NRCS standards. Stabilization will be considered complete once full vegetative cover has been achieved. 74. Upon approved site stabilization by Conservation staff, the erosion controls shall be removed and properly disposed of and all exposed unvegetated areas shall be seeded. 75. Upon completion of the project the applicant shall submit the following to the Conservation Commission as part of a request for a Certificate of Compliance: a. WPA Form 8A -"Request for a Certificate of Compliance." b. A letter from the applicant requesting a Certificate of Compliance. c. The name and address of the current landowner. d. Signed statements from the individual property owners shall be submitted with the request for a Certificate of Compliance indicating that they read and understood the recorded Order of Conditions prior to purchasing their property. e. The name and address of the individual/trust or corporation to whom the compliance is to be granted. f. The street address and assessor's map/parcel number for the project. g. The DEP file number. h. A written statement from a Registered Professional Civil Engineer (and/or Registered Professional Land Surveyor) of the Commonwealth certifying that the work has been conducted as shown on the plan(s) and documents referenced above, and as conditioned by the Commission. i. An"As-Built" plan prepared and signed and stamped by a Registered Professional Civil Engineer (and/or Registered Professional Land Surveyor) of the Commonwealth,for the public record. This plan will include: ➢ "As-Built" post-development elevations of all drainage &stormwater management structures constructed within 100 feet of any wetland resource area. NOTE: If portions of the stormwater systems exist partially within the Buffer Zone than the entire structure must be depicted to accurately verify compliance. ➢ "As-Built" post-development elevations and grades of all filled or altered wetland resource areas including the encompassing buffer zone which is regulated as a resource area under the local Wetland Protection Bylaw. ➢ Distances from structures to wetland resource areas. Structures include (but are not limited to) septic systems, additions,fences, sheds, stone walls, pools,retaining walls, subsurface utilities and decks. ➢ A line showing the limit of work and the extent of existing erosion control devices. "Work" includes any disturbance of soils or vegetation. C:\Winword\OOC\boilerl.doc 10 NACC 4/29/2011 DEP FILE#242 - 1511 59. IMPORTANT: Immediately upon completion of the control house foundation, and prior to further construction activities associated with the site, the applicant shall complete a plan prepared by a Registered Professional Land Surveyor of the Commonwealth(R.P.L.S.) which accurately depicts the foundation location and it's proximity to wetland resource areas as approved under this Order of Conditions. Said plan shall be submitted to the Conservation Administrator for approval. Failure to comply may result in a stop work order for the site. 60. Upon beginning work, the applicant shall submit written progress reports every month detailing what work has been done in or near resource areas, and what work is anticipated to be done over the next period. This will update the construction sequence. 61. Approved de-watering activities anticipated shall be supervised and witnessed by the designated erosion control monitor. De-watering activities shall be conducted as detailed in the Notice of Intent and shall be monitored daily by the erosion control monitor to ensure that sediment laden water is appropriately settled prior to discharge toward the wetland resource areas. No discharge of water is allowed directly into an area subject to jurisdiction of the Wetlands Protection Act and/or the North Andover Wetland Bylaw. If emergency de-watering requirements arise, the applicant shall submit a contingency plan to the Commission for approval,which provides for the pumped water to be contained in a settling basin, to reduce turbidity prior to discharge into a resource area. 62. Any fill used in connection with this project shall be clean fill, containing no trash, refuse, rubbish or debris,including but not limited to lumber, bricks, plaster,wire, lath, paper, cardboard, pipe, tires, ashes,refrigerators, motor vehicles or parts on any of the foregoing. 63. All exposed soil finish grade surfaces shall be immediately landscaped and stabilized, or loamed, seeded and mulched,with a layer of mulch hay. All disturbed areas must be graded,loamed and seeded prior to November 1st of each year. Outside of the growing season, exposed soil finish grade surfaces shall be stabilized with a layer of mulch hay until climate conditions allow for seeding. During construction, any area of exposed soils that will be left idle for more than 30 days shall be stabilized with a layer of mulch hay or other means approved by the NACC. 64. No re-grading in the buffer zone shall have a slope steeper than 2:1 (horizontal: vertical). Slopes of steeper grade shall be rip-rapped to provide permanent stabilization. 65. There shall be no stockpiling of soil or other materials within 50 feet of any resource area. Soils or other materials shall be stockpiled in locations approved by this C:\Winword\OOC\boilerl.doc 8 NACC 4/29/2011 DEP FILE#242 - 1511 applicant may propose a monetary release schedule keyed to completion of specific portions of the project for the NACC's review and approval. This condition is issued under the authority of the local ByLaw. 50. The applicant shall designate a Wetland Scientist (or other environmental professional as approved by the NACC or its agent) as an"Erosion Control Monitor" to oversee any emergency placement of controls and regular inspection or replacement of sedimentation control devices. The name and phone number of the erosion control monitor must be provided to the NACC in the event that this person has to be contacted, due to an emergency at the site, during any 24-hour period, including weekends. Proof of the retained monitor must be submitted to the Conservation Department on letterhead by the retained consulting firm. This person shall be given the authority to stop construction for erosion control purposes (or)The Environmental Professional will immediately notify the Conservation agent of any matter that. requires attention by the Commission or the agent. The erosion control monitor will be required to inspect all such devices and oversee cleaning and the proper disposal of waste products. Cleaning shall include removal of any entrapped silt. 51. At least once during each week in which construction activities occurs on-site and following rain events of 1/2" or more, and for as long thereafter as ground remains unstabilized, the applicant shall submit a written report from the"Erosion Control Monitor" to the NACC certifying that, to the best of his/her knowledge and belief based on a careful site inspection, all work is being performed in compliance with this Order of Conditions and that approved setbacks are being adhered to. The erosion control monitor must visually inspect all sedimentation/erosion control measures and assume responsibility for their maintenance on a weekly basis and that they are functioning as intended. In addition, all wetland resource areas must be visually inspected for siltation, turbidity, and/or other water quality impacts. Reports shall contain photographs of the site and construction activities anticipated in the upcoming week. 52. Prior to construction, the applicant shall ensure that all markers previously placed under DEP File #242-1449 are in place, permanently marking the edge of the "25' No- Disturbance Zone". These markers designate the area's sensitivity and assure no further inadvertent encroachment into the wetland. These permanent markers are subject to review and approval by the NACC. The applicant shall instruct all agents to explain these markers to buyers/lessees/landscapers and all persons taking over the property from the applicant. These markers shall remain posted and be replaced as necessary in perpetuity. 53. Prior to the commencement of any work on site, a Registered Land Surveyor (R.L.S.) shall stake the foundation corners of the control house. These measurements will be verified in the field during the pre-construction meeting. C:\Winword\OOC\boilerl.doc 6 NACC 4/29/2011 DEP FILE #242 - 1511 38. The NACC finds the applicant's proposal for removal of 537 s.f. of pavement to be adequate mitigation for work in the No-Disturb/No-Build Zones. 39. Issuance of these Conditions does not in any way imply or certify that the site or downstream areas will not be subject to flooding, storm damage or any other form of water damage. PRIOR TO CONSTRUCTION 40. No work shall be undertaken until all administrative appeal periods from this Order have elapsed or, if such an appeal has been filed, until all proceedings before the Department or Court have been completed. 41. This Order shall be recorded by the applicant at the Registry of Deeds immediately after the expiration of all appeal periods. No work shall be undertaken until the Final Order has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located,within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is to be done. The recording information shall be submitted to the North Andover Conservation Commission on the form at the end of this Order prior to commencement of the work. Any Order not recorded by the applicant before work commences may be recorded by the NACC at the applicant's expense. 42. A sign shall be displayed at the site not less than two square feet or more than three square feet in size bearing the words "Massachusetts DEP, File Number 242-1511." 43. Any changes in the submitted plans caused by the applicant, another Board's decision or resulting from this Order of Conditions must be submitted to the NACC for approval prior to implementation. If the NACC finds said changes to be significant, the NACC will call for another public hearing (at the expense of the applicant). Within 21 days of the close of said public hearing the NACC will issue an amended or new Order of Conditions. Any errors found in the plans or information submitted by the applicant shall be considered as changes. No work shall begin on a project until written approval has been granted by the NACC. 44. It is the responsibility of the applicant, owner, and/or successor(s) to ensure that all conditions of this Order of Conditions are complied with. The project engineer and contractors are to be provided with a copy of this Order of Conditions and referenced documents before commencement of construction. C:\Winword\OOC\boilerl.doc 4 NACC 4/29/2011 DEP FILE#242 - 1511 Re: Compliance with Local Setback Zones Pages 1-5 and Attachments A, B &C 22. The term"Applicant" as used in this Order of Conditions shall refer to the owner, any successor in interest or successor in control of the property referenced in the Notice of Intent, supporting documents and this Order of Conditions. The NACC shall be notified in writing within 30 days of all transfers of title of any portion of property that takes place prior to the issuance of a Certificate of Compliance. 23. The conditions of this decision shall apply to, and be binding upon, the applicant, owner, its employees and all successors and assigns in interest or control. These obligations shall be expressed in covenants in all deeds to succeeding owners of portions of the property. 24. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 25. This Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of property rights. However, the NACC, agent of the NACC or the Department of Environmental Protection (DEP) reserves the right to enter and inspect the property at all reasonable times until a Certificate of Compliance is issued, to evaluate compliance with this Order of Conditions, the Act (310 CMR 10.00), the North Andover Wetland ByLaw and Regulations, and may require any information, measurements, photographs, observations, and/or materials, or may require the submittal of any data or information deemed necessary by the NACC for that evaluation. Further, work shall be halted on the site if the NACC, agent or DEP determines that any of the work is not in compliance with this Order of Conditions. Work shall not resume until the NACC is satisfied that the work will comply and has so notified the applicant in writing. 26. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state or local statutes, ordinances, by-laws or regulations. 27. The work authorized hereunder shall be completed within three years from the date of this order. 28. This Order may be extended by the issuing authority for one but not more than two periods of up to one year each upon application to the issuing authority at least thirty days (30) prior to the expiration date of the Order (Refer to Section 8.3)(p.37) of the North Andover Wetland Regulations). 29. The NACC reserves the right to amend this Order of Conditions after a legally advertised public hearing if plans or circumstances are changed or if new conditions or information so warrant. C:\Winword\OOC\boilerl.doc 2 NACC 4/29/2011 .k" i .i. • s- I x I I 9 I 1 I I i 1 I i i i i 3 1 f S t 1 t 1 t i Q 1 is Massachusetts Department of Environmental Protection Bureau of Resource Protecction -Wetlands it Number: ii, WPA Form 8B - Certificate of Compliance 242-266 Massachusetts Wetlands Protection Act M.G.L. C. 131, §40 Provided by DEP A. Project Information Important: 1 When filling out 1. This Certificate of Compliance is issued to: forms on the , William D. Cox, Jr. Attorney at Law for Dean & Elaine Stratouly computer,use ' only the tab key Name to move your 145 South Main Street cursor-do not Mailing Address use the return MA 01835 key. Bradford City/Town State Zip Code 4_0 j 2. This Certificate of Compliance is issued for work regulated by a final Order of Conditions issued to: G. P. V. Inc. Name 242-266 May 22, 1985 Dated DEP File Number 4 3. The project site is located at: 18 Campion Road (Lot 1A) North Andover Street Address City/Town Map 62 Parcel 99 Assessors Map/Plat Number Parcel/Lot Number the final Order of Condition was recorded at the Registry of Deeds for: G. P. V. Inc. Property Owner(if different) Essex North 1985 266 County Book Page Certificate 4. A site inspection was made in the presence of the applicant, or the applicant's agent, on: 5/5/11 Date wpafrm8b.doc•rev.12/23/09 WPA Form 8B,Certificate of Compliance•Page 1 of 3 Massachusetts Department of Environmental Protection LBureau of Resource Protec ion -Wetlands DEP File Number. $. ic/i=r�.a PCC c, -11 WPA Form 8B - Certificate of Compliance 242-266 Massachusetts Wetlands Protection Act M.G.L. C. 131, §40 Provided by DEP B. Certification Check all that apply: ❑ Complete Certification: It is hereby certified that the work regulated by the above-referenced Order of Conditions has been satisfactorily completed. ® Partial Certification: It is hereby certified that only the following portions of work regulated by the above-referenced Order of Conditions have been satisfactorily completed.The project areas or work subject to this partial certification that have been completed and are released from this Order are: PCOC for 18 Campion Road (Lot 1A) only. ❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the above-referenced Order of Conditions never commenced. The Order of Conditions has lapsed and is therefore no longer valid. No future work subject to regulation under the Wetlands Protection Act may commence without filing a new fi Notice of Intent and receiving a new Order of Conditions. ❑ Ongoing Conditions: The following conditions of the Order shall continue: (Include any conditions contained in the Final Order, such as maintenance or monitoring, that should continue for a longer period). Condition Numbers: i C. Authorization Issued by: �r-J� j �� North Andover Date of Issuance Conservation Commission This Certificate must be signed by a majority of the Conservation Commission and a copy sent to the applicant and appropriate DEP Regional Office (See http://www.mass.govidep/about/regionffindvour.htm). Signatu s: ii ;G Lh ?"-z . I , 1 4 AA 4- er Tip 1.2 C./23/09 WPA Form 8B,Certificate of Compliance•Page 2 of 3 uvpafrm8b.doc•rev.12729/09 t 1 - t r Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands DEP File Number: r .r 1 L WPA Form 8B P' ertificate of Compliance 242 266 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP 1 D. Recording Confirmation { The applicant is responsible for ensuring that this Certificate of Compliance is recorded in the Registry of Deeds or the Land Court for the district in which the land is located. Detach on dotted line and submit to the Conservation Commission. To North Andover Conservation Commission Please be advised that the Certificate of Compliance for the project at 18 Campion Road (Lot 1A) 242-266 Project Location DEP File Number Has been recorded at the Registry of Deeds of Essex North County for Property Owner and has been noted in the chain of title of the affected property on Date Book Page If recorded land, the instrument number which identifies this transaction is If registered land, the document number which identifies this transaction is Document Number Signature of Applicant wpafrm8b.doe•rev.12/23/09 WPA Form 8B,Certificate of Compliance•Page 3 of 3 3 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection-Wetlands MassDEP File#:242-1516 eDEP Transaction#:382729 WPA Form 5 - Order of Conditions City/Town:NORTH ANDOVER Massachusetts Wetlands Protection Act M.G.L. c. 131,§40 A. General Information 1.Conservation Commission NORTH ANDOVER 2. Issuance a. F OOC b.E Amended OOC 3.Applicant Details a.First Name JAMES&MARIE b.Last Name FARO c.Organization d.Mailing Address 374 SHARPNERS POND ROAD e.City/Town NORTH ANDOVER f.State MA g.Zip Code 01845 4.Property Owner a.First Name JAMES&MARIE b.Last Name FARO c.Organization d.Mailing Address 374 SHARPNERS POND ROAD e.City/Town NORTH ANDOVER f.State MA g.Zip Code 01845 5.Project Location a.Street Address 374 SHARPNERS POND ROAD b.City/Town NORTH ANDOVER c.Zip Code 01845 d.Assessors Map/Plat#90B e.Parcel/Lot# 49 f.Latitude 42.63106N g.Longitude 71.047375W 6.Property recorded at the Registry of Deed for: a.County b.Certificate c.Book d.Page NORTHERN ESSEX 2304 324 7.Dates a.Date NOI Filed: 3/4/2011 b.Date Public Hearing Closed: 4/27/2011 c.Date Of Issuance: 5/9/2011 8.Final Approved Plans and Other Documents a.Plan Title: b.Plan Prepared by: c.Plan Signed/Stamped by: d.Revised Final Date: e.Scale: SITE PLAN OF SULLIVAN LAND ENGINEERING JOHN D.SULLIVAN,III,P.E. 04/27/2011 1"=20' GROUP,LLC B. Findings 1.Findings pursuant to the Massachusetts Wetlands Protection Act Page 1 of 10*ELECTRONIC COPY Massachusetts Department of Environmental Protection Provided by MassDEP: of Resource Protection-Wetlands MassDEP File#:242-1516 Bureau WPA Form 5-Order of Conditions eDEP Transaction#:382729 1 Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 City/Town:NORTH ANDOVER Following the review of the the above-referenced Notice of Intent and based on the information provided in this application and presented at the public hearing,this Commission finds that the areas in which work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that apply: a. F Public Water Supply b. r Land Containing Shellfish c.F Prevention of Pollution d. F Private Water Supply e. r Fisheries f F Protection of Wildlife Habitat g. F Ground Water Supply h. F Storm Damage Prevention i. F Flood Control 2.Commission hereby finds the project,as proposed,is: Approved subject to: a.F The following conditions which are necessary in accordance with the performance standards set forth in the wetlands regulations. This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above,the following General Conditions,and any other special conditions attached to this Order.To the extent that the following conditions modify or differ from the plans,specifications,or other proposals submitted with the Notice of Intent,these conditions shall control. Denied because: b.r The proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations.Therefore, work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are adequate to protect interests of the Act,and a final Order of Conditions is issued.A description of the performance standards which the proposed work cannot meet is attached to this Order. c.r The information submitted by the applicant is not sufficient to describe the site,the work or the effect of the work on the interests identified in the Wetlands Protection Act.Therefore,work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information and includes measures which are adequate to protect the interests of the Act,and a final Order of Conditions is issued.A description of the specific information which is lacking and why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c). 3 F Buffer Zone Impacts:Shortest distance between limit of project disturbance and the wetland resource 14 area specified in 310CMR10.02(1)(a). a.linear feet Inland Resource Area Impacts:(For Approvals Only): Resource Area Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement 4. r Bank a.linear feet b.linear feet c.linear feet d.linear feet 5.1- Bordering Vegetated Wetland a.square feet b.square feet c.square feet d.square feet 6. r Land under Waterbodies and Waterways a.square feet b.square feet c.square feet d.square feet e.c/y dredged f.c/y dredged 7.r Bordering Land Subject to Flooding a.square feet b.square feet c.square feet d.square feet Page 2 of 10*ELECTRONIC COPY v \ Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection-Wetlands MassDEP File#:242-1516 WPA Form 5-Order of Conditions eDEP Transaction#:382729 / City/Town:NORTH ANDOVER Massachusetts Wetlands Protection Act M.G.L. c. 131,§40 Cubic Feet Flood Storage e.cubic feet f.cubic feet g.cubic feet h.cubic feet s 8.r Isolated Land Subject to Flooding a.square feet b.square feet Cubic Feet Flood Storage c.cubic feet d.cubic feet e.cubic feet f.cubic feet 4 9.r Riverfront Area a.total sq.feet b.total sq.feet Sq ft within 100 ft c.square feet d.square feet e.square feet f.square feet Sq ft between 100-200 ft g.square feet h.square feet i.square feet j.square feet 1 Coastal Resource Area Impacts: { Proposed Permitted Proposed Permitted Resource Area Alteration Alteration Replacement Replacement t i I k 10.r Designated Port Areas Indicate size under Land Under the Ocean,below t 11.r Land Under the Ocean a.square feet b.square feet r C c.c/y dredged d.c/y dredged 12.E Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below 13.r Coastal Beaches a.square feet b.square feet c.dy nourishment d.c/y nourishment 14.r Coastal Dunes a.square feet b.square feet c.dy nourishment d.dy nourishment 15.r Coastal Banks a.linear feet b.linear feet 16.r Rocky Intertidal Shores a.square feet b.square feet 17.r Salt Marshes a.square feet b.square feet c.square feet d.square feet 18.r Land Under Salt Ponds a a.square feet b.square feet i c.c/y dredged d.c/y dredged 19.r Land Containing Shellfish a.square feet b.square feet c.square feet d.square feet Page 3 of 10*ELECTRONIC COPY i 1 1 i 's t,, Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection-Wetlands MassDEP File#:242-1516 L., --P--xi WPA Form 5 -Order of Conditions eDEP Transaction#:382729 Massachusetts Wetlands Protection Act M.G.L.c. 131, §40 Cityffown:NORTH ANDOVER i Indicate size under Coastal Banks,inland Bank,Land Under the 20.I—Fish Runs Ocean,and/or inland Land Under Waterbodies and Waterways, above 1 i c.c/y dredged d.c/y dredged 1 21.I—Land Subject to Coastal Storm Flowage a.square feet b.square feet 22. I— Restoration/Enhancement(For Approvals Only) If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has been entered in Section B.5.c&d or B.17.c&d above,please entered the additional amount here. a.square feet of BVW b.square feet of Salt Marsh 23. E Streams Crossing(s) If the project involves Stream Crossings,please enter the number of new stream crossings/number of replacement stream crossings. a.number of new stream crossings b.number of replacement stream crossings C. General Conditions Under Massachusetts Wetlands Protection Act The following conditions are only applicable to Approved projects 1. Failure to comply with all conditions stated herein,and with all related statutes and other regulatory measures,shall be deemed cause to revoke or modify this Order. 2. The Order does not grant any property lights or any exclusive privileges;it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state,or local statutes,ordinances,bylaws,or regulations. 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following ant': a.the work is a maintenance dredging project as provided for in the Act;or b.the time for completion has been extended to a specified date more than three years,but less than five years,from the date of issuance.If this Order is intended to be valid for more than three years,the extension date and the special circumstances warranting the extended time period are set forth as a special condition in this Order. 5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6. If this Order constitutes an Amended Order of Conditions,this Amended Order of Conditions does not exceed the issuance date of the original Final Order of Conditions. 7. Any fill used in connection with this project shall be clean fill.Any fill shall contain no trash,refuse,rubbish,or debris,including but not limited to lumber,bricks,plaster,wire,lath,paper,cardboard,pipe,tires,ashes,refrigerators,motor vehicles,or parts of any of the foregoing. 8. This Order is not final until all administrative appeal periods from this Order have elapsed,or if such an appeal has been taken, until all proceedings before the Department have been completed. 9. No work shall be undertaken until the Order has become fmal and then has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located,within the chain of title of the affected property.In the case of recorded land, Page 4 of 10*ELECTRONIC COPY t y i Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection-Wetlands MassDEP File#:242-1516 WPA Form 5- Order of Conditions ,eDEP Transaction#:382729 L City/Town:NORTH ANDOVER ' Massachusetts Wetlands Protection Act M.G.L.c. 131, §40 a the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done.In the case of the registered land,the Final Order shall also be noted on the Land Court 1 1 Certificate of Title of the owner of the land upon which the proposed work is done.The recording information shall be submitted to the Conservation Commission on the form at the end of this Order,which form must be stamped by the Registry of Deeds, prior to the commencement of work.. _ 10. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words, Massachusetts Department of Environmental Protection" [or'MassDEP"] i File Number:"242-1516" 11. Where the Department of Environmental Protection is requested to issue a Superseding Order,the Conservation Commission 1 shall be a party to all agency proceedings and hearings before Mass DEP. 12. Upon completion of the work described herein,the applicant shall submit a Request for Certificate of Compliance(WPA Form 8A)to the Conservation Commission. 13. The work shall conform to the plans and special conditions referenced in this order. 14. Any change to the plans identified in Condition#13 above shall require the applicant to inquire of the Conservation Commission I in writing whether the change is significant enough to require the filing of a new Notice of Intent. I 15. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order,and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. 16. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any contractor or other person performing work conditioned by this Order. 17. Prior to the start of work,and if the project involves work adjacent to a Bordering Vegetated Wetland,the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging.Once in place,the wetland boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. 18. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or 1 other means.At no time shall sediments be deposited in a wetland or water body.During construction,the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed.The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation } Commission,which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. ' I NOTICE OF STORMWATER CONTROL AND MAINTENANCE REQUIREMENTS i 19. The work associated with this Order(the"Project")is(1) r is not(2)F subject to the Massachusetts Stormwater Standards. If the work is subject to Stormwater Standards,then the project is subject to the following conditions; a) All work,including site preparation,land disturbance,construction and redevelopment,shall be implemented in accordance with the construction period pollution prevention and erosion and sedimentation control plan and,if applicable,the ''. Stormwater Pollution Prevention Plan required by the National Pollutant Discharge Elimination System Construction General Permit as required by Stormwater Standard 8.Construction period erosion,sedimentation and pollution control measures and best management practices(BMPs)shall remain in place until the site is fully stabilized. i b) No stormwater runoff may be discharged to the post-construction stormwater BMPs unless and until a Registered Professional Engineer provides a Certification that:i.all construction period BMPs have been removed or will be removed by a date certain specified in the Certification.For any construction period BMPs intended to be converted to post construction operation for stormwater attenuation,recharge,and/or treatment,the conversion is allowed by the MassDEP Stormwater Handbook BMP specifications and that the BMP has been properly cleaned or prepared for post construction operation, including removal of all construction period sediment trapped in inlet and outlet control structures;ii..as-built final construction BMP plans are included,signed and stamped by a Registered Professional Engineer,certifying the site is fully stabilized;iii. any illicit discharges to the stormwater management system have been removed,as per the requirements of Stormwater Page 5 of 10*ELECTRONIC COPY , 'F I Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection-Wetlands MassDEP File#:242-1516 WPA Form 5 -Order of Conditions eDEP Transaction#:382729 lk Massachusetts Wetlands Protection Act M.G.L.c. 131, §40 City/Town:NORTH ANDOVER Standard 10;iv.all post-construction stormwater BMPs are installed in accordance with the plans(including all planting plans)approved by the issuing authority,and have been inspected to ensure that they are not damaged and that they are in proper working condition;v.any vegetation associated with post-construction BMPs is suitably established to withstand erosion. c) The landowner is responsible for BMP maintenance until the issuing authority is notified that another party has legally assumed responsibility for BMP maintenance.Prior to requesting a Certificate of Compliance,or Partial Certificate of Compliance,the responsible party(defined in General Condition 19(e))shall execute and submit to the issuing authority an Operation and Compliance Statement("O&M Statement")for the Stormwater BMPs identifying the party responsible for implementing the stormwater BMP Operation and Maintenance Plan("O&M Plan")and certifying the following:i.)the O&M Plan is complete and will be implemented upon receipt of the Certificate of Compliance,and ii.)the future responsible parties shall be notified in writing of their ongoing legal responsibility to operate and maintain the stormwater management BMPs and implement the Stormwater Pollution Prevention Plan. d) Post-construction pollution prevention and source control shall be implemented in accordance with the long-term pollution prevention plan section of the approved Stormwater Report and,if applicable,the Stormwater Pollution Prevention Plan required by the National Pollutant Discharge Elimination System Multi-Sector General Permit. e) Unless and until another party accepts responsibility,the landowner,or owner of any drainage easement,assumes responsibility for maintaining each BMP.To overcome this presumption,the landowner of the property must submit to the issuing authority a legally binding agreement of record,acceptable to the issuing authority,evidencing that another entity has accepted responsibility for maintaining the BMP,and that the proposed responsible party shall be treated as a permittee for purposes of implementing the requirements of Conditions 19(f)through 19(k)with respect to that BMP.Any failure of the proposed responsible party to implement the requirements of Conditions 19(f)through 19(k)with respect to that BMP shall be a violation of the Order of Conditions or Certificate of Compliance.In the case of stormwater BMPs that are serving more than one lot,the legally binding agreement shall also identify the lots that will be serviced by the stormwater BMPs.A plan and easement deed that grants the responsible party access to perform the required operation and maintenance must be submitted along with the legally binding agreement. f) The responsible party shall operate and maintain all stormwater BMPs in accordance with the design plans,the O&M Plan, and the requirements of the Massachusetts Stormwater Handbook. g) The responsible party shall: 1.Maintain an operation and maintenance log for the last three(3)consecutive calendar years of inspections,repairs, maintenance and/or replacement of the stormwater management system or any part thereof,and disposal(for disposal the log shall indicate the type of material and the disposal location); 2.Make the maintenance log available to MassDEP and the Conservation Commission("Commission")upon request;and 3.Allow members and agents of the MassDEP and the Commission to enter and inspect the site to evaluate and ensure that the responsible party is in compliance with the requirements for each BMP established in the O&M Plan approved by the issuing authority. h) All sediment or other contaminants removed from stormwater BMPs shall be disposed of in accordance with all applicable federal,state,and local laws and regulations. i) Illicit discharges to the stormwater management system as defined in 310 CMR 10.04 are prohibited. j) The stormwater management system approved in the Order of Conditions shall not be changed without the prior written approval of the issuing authority. k) Areas designated as qualifying pervious areas for the purpose of the Low Impact Site Design Credit(as defined in the MassDEP Stormwater Handbook,Volume 3,Chapter 1,Low Impact Development Site Design Credits)shall not be altered without the prior written approval of the issuing authority. I) Access for maintenance,repair,and/or replacement of BMPs shall not be withheld.Any fencing constructed around stormwater BMPs shall include access gates and shall be at least six inches above grade to allow for wildlife passage. Special Conditions: SEE ATTACHED Page 6 of 10*ELECTRONIC COPY . - ( ( it \ Massachusetts Department of Environmental Pro tcto Bureau of Resource Protection A L WPA Form 5 -Ore of Conditions Massachusetts Wetlands Protection A!M OL cg\ /o Provided by Nas DE: Ne_DTE Re*26-318527162 E _s kn* 9 City/Town:NORTH ANDOVER k [ ( ( [ ( ( { ( ( ( [ t ( ( [ [ \ ( ( [ { t [ [ ( ( [ [ ( { [ ( ( [ ( ( ( Page 7o m*ELECTRONIC COPY ( [ Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection-Wetlands MassDEP File#:242-1516 WPA Form 5-Order of Conditions eDEP Transaction#:382729 rt City/Town:NORTH ANDOVER Massachusetts Wetlands Protection Act M.G.L.c. 131, §40 D. Findings Under Municipal Wetlands Bylaw or Ordinance 1. Is a municipal wetlands bylaw or ordinance applicable?r Yes r No 2. The Conservation Commission hereby(check one that applies): a. r DENIES the proposed work which cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw specifically: 1.Municipal Ordinance or Bylaw 2.Citation Therefore,work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards,and a final Order or Conditions is issued.Which are necessary to comply with a municipal ordinance or bylaw: b. F APPROVES the proposed work,subject to the following additional conditions. NORTH ANDOVER WETLANDS 1.Municipal Ordinance or Bylaw 2.Citation CHAPTER 178 PROTECTION BYLAW 3. The Commission orders that all work shall be performed in accordance with the following conditions and with the Notice of Intent referenced above.To the extent that the following conditions modify or differ from the plans,specifications,or other proposals submitted with the Notice of Intent,the conditions shall control. The special conditions relating to municipal ordinance or bylaw are as follows: SEE ATTACHED • tt } Page 8 of 10*ELECTRONIC COPY ( t f 1 Massachusetts Department of Environmental Protection Provided by MassDEP: 3=. Bureau of Resource Protection - Wetlands 242-1516 ), 1 WPA Form 5 — Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# North Andover City/Town E. Signatures This Order is valid for three years, unless otherwise specified as a special condition pursuant to General Conditions#4,from the date of issuance. 1.Date of Issuance Please indicate the number of members who will sign this form. This Order must be signed by a majority of the Conservation Commission. 2. Number of Signers The Order must be mailed by certified mail(return receipt requested)or hand delivered to the applicant.A copy also must be mailed or hand delivered at the same time to the appropriate Department of Environmental Protection Regional Office, if not filing electronically, and the property owner, if different from applicant. c Signatures: / i / 1 i AS -. \\ ./&3/f 4 IC , L� c c_ ❑ by hand delivery on ID by certified mail, return receipt requested, on Date Date F. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate MassDEP Regional Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the Department, with the appropriate filing fee and a completed Request of Departmental Action Fee Transmittal Form, as provided in 310 CMR 10.03(7)within ten business days from the date of issuance of this Order. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. Any appellants seeking to appeal the Department's Superseding Order associated with this appeal will be required to demonstrate prior participation in the review of this project. Previous participation in the permit proceeding means the submission of written information to the Conservation Commission prior to the close of the public hearing, requesting a Superseding Order, or providing written information to the Department prior to issuance of a Superseding Order. The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act(M.G.L. c. 131, §40), and is inconsistent with the wetlands regulations (310 CMR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. f wpaform5.doc• rev.05/19/2010 Page 11 of 12 i t F t f Massachusetts Department of Environmental Protection Provided by MassDEP: 1 Bureau of Resource Protection-Wetlands MassDEP File#:242-1516 WPA Form 5 Oder of Conditions eDEP Transaction#:382729 Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 City/Town:NORTH ANDOVER F. i 1 G. Recording Information This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located, t within the chain of title of the affected property.In the case of recorded land,the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order.In the case of registered land,this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions.The recording information on this page shall be submitted to the Conservation Commission listed below. '` NORTH ANDOVER Conservation Commission Detach on dotted line,have stamped by the Registry of Deeds and submit to the Conservation Commission. To: NORTH ANDOVER Conservation Commission Please be advised that the Order of Conditions for the Project at: 374 SHARPNERS POND ROAD 242-1516 Project Location MassDEP File Number F Has been recorded at the Registry of Deeds of: 3 County Book Page for: y Property Owner JAMES&MARIE FARO i and has been noted in the chain of title of the affected property in: Book Page In accordance with the Order of Conditions issued on: it Date I, If recorded land,the instrument number identifying this transaction is: Instrument Number , If registered land,the document number identifying this transaction is: Document Number fi? ti z i Signature of Applicant Rev 4/1/2010 C.C. Page 10 of 10*ELECTRONIC COPY b k F. pqt DEP FILE#242 - 1516 Therefore, the North Andover Conservation Commission(hereafter the "NACC") hereby finds that the following conditions are necessary, in accordance with the Performance $` Standards set forth in the State Regulations, the local ByLaw and Regulations, to protect those interests noted above. The NACC orders that all work shall be performed in accordance with said conditions and with the Notice of Intent referenced below. To the extent that the following conditions modify or differ from the plans, specifications or other proposals submitted with the Notice of Intent, the conditions shall control. GENERAL CONDITIONS 20. The proposed work includes: Removal of an existing deck and construction of a single family home addition and appurtenant site work and grading, portions of which are within 100 feet of a Bordering Vegetated Wetland (BVW) and an Ephemeral Pool. Removal of a portion of the existing driveway and installation of plantings are also part of the project. 21. The work shall conform to the following: Applicant: James & Marie Faro 374 Sharpener's Pond Road North Andover, MA 01845 Property Owner: Same Notice of Intent Prepared by: John Sullivan, P.E. Sullivan Engineering Group, LLC 22 Mount Vernon Road Boxford, MA 01879 Dated: March 1, 2011 Site Plans prepared by: Sullivan Engineering Group Titled: Site Plan of Land Located in North Andover, Mass. Dated: February 21, 2011 Revised: April 27, 2011 Stamped by: John D. Sullivan II, P.E. Other Record Documents: Alternatives Analysis Prepared by Sullivan Engineering Group, LLC Letter from Division of Fisheries &Wildlife NHESP Tracking No.: 11-29335 Date: March 24, 2011 242-1516 374 Sharpners Pond Road OOC.doc 1 NACC 5/9/2011 DEP FILE #242 - 1516 Intent, supporting documents and this Order of Conditions. The NACC shall be notified in writing within 30 days of all transfers of title of any portion of property that takes place prior to the issuance of a Certificate of Compliance. 23. The conditions of this decision shall apply to, and be binding upon, the applicant, owner, its employees and all successors and assigns in interest or control. These obligations shall be expressed in covenants in all deeds to succeeding owners of portions of the property. 24. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 25. This Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of property rights. However, the NACC, agent of the NACC or the Department of Environmental Protection (DEP) reserves the right to enter and inspect the property at all reasonable times until a Certificate of Compliance is issued, to evaluate compliance with this Order of Conditions, the Act (310 CMR 10.00), the North Andover Wetland ByLaw and Regulations, and may require any information, measurements, photographs, observations, and/or materials, or may require the submittal of any data or information deemed necessary by the NACC for that evaluation. Further, work shall be halted on the site if the NACC, agent or DEP determines that any of the work is not in compliance with this Order of Conditions. Work shall not resume until the NACC is satisfied that the work will comply and has so notified the applicant in writing. 26. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state or local statutes, ordinances, by-laws or regulations. 27. The work authorized hereunder shall be completed within three years from the date of this order. 28. This Order may be extended by the issuing authority for one but not more than two periods of up to one year each upon application to the issuing authority at least thirty days (30) prior to the expiration date of the Order (Refer to Section 8.3 (p.37) of the North Andover Wetland Regulations). 29. The NACC reserves the right to amend this Order of Conditions after a legally advertised public hearing if plans or circumstances are changed or if new conditions or information so warrant. 30. Where the Department of Environmental Protection (DEP) is requested to make a determination and to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before the Department. 242-1516 374 Sharpners Pond Road OOC.doc 2 NACC 5/9/2011 DEP FILE #242 - 1516 31. Any future project which proposes a wetland crossing in order to access certain portions fi of the property will not be qualified as a limited project roadway under 310 CMR 10.53(e). 32. The following wetland resource areas are affected by the proposed work: Buffer Zone to Bordering Vegetated Wetland and an Ephemeral Pool. This resource area is significant to the interests of the Act and Town ByLaw as noted above and therein. The applicant has not attempted to overcome the presumption of significance of this resource area to the identified interests. 33. The NACC agrees with the applicant's delineation of the wetland resource area on the site as shown on the plan dated and referenced herein (Flags VP1 to VP6, B6 to B1, and Al to A9). 34. The NACC finds that the intensive use of the upland areas and buffer zone proposed on this site will cause further alteration of the wetland resource areas. In order to prevent any alteration of wetland resource areas a twenty five foot (25') No-Disturbance Zone and a fifty foot (50') No-Construction Zone to BVW and the fifty foot(50') No-Disturbance Zone and seventy-five foot (75') No-Construction Zone to an Ephemeral Pool shall be established from the edge of the adjacent wetland resource area as depicted on the record plan referenced herein except as follows: Waiver of the 75-foot No-Build Zone to an 4' Ephemeral Pool for construction of a portion of a kitchen addition within the footprint of an existing deck. The Conservation Administrator and/or other agents of the NACC do not have the authority to waive these setbacks as established under the local bylaw. 35. The NACC finds the applicant's proposal for removal and restoration of 168 sq. ft. of driveway turn-around area to be adequate mitigation for disturbance of the 64 sq. ft. No- Build Zone. The area shall be seeded with a wildflower seed mix prior to the start of construction. In addition, 10 native plants (as detailed in the planting schedule on the approved plan) shall be spaced evenly along the southwest property line between flags B5 and VP5. The restoration area shall undergo one year of growth to ensure survival prior to the issuance of a Certificate of Compliance. The area shall be maintained as No- Disturbance Zone in perpetuity. 36. This document shall be included in all construction contracts, subcontracts, and specifications dealing with the work proposed and shall supersede any conflicting contract requirements. The applicant shall assure that all contractors, subcontractors, and other personnel performing the permitting work are fully aware of the permits terms and conditions. Thereafter, the contractor will be held jointly liable for any violation of this Order resulting from failure to comply with its conditions. 37. By acceptance of this Order, the owners agree to indemnify and hold harmless to the Town and its residents for any damage attributable to alterations undertaken on this property pursuant to the Order. Issuance of these Conditions does not in any way imply or certify that the site or downstream areas will not be subject to flooding, storm damage or any other form of water damage. 242-1516 374 Sharpners Pond Road OOC.doc 3 NACC 5/9/2011 r • • 1 DEP FILE #242 - 1516 • { PRIOR TO CONSTRUCTION 38. No work shall be undertaken until all administrative appeal periods from this Order have elapsed or, if such an appeal has been filed, until all proceedings before the Department or Court have been completed. 39. This Order shall be recorded by the applicant at the Registry of Deeds immediately after the expiration of all appeal periods. No work shall be undertaken until the Final Order has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located,within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is to be done. The recording information shall be submitted to the North Andover Conservation Commission on the form at the end of this Order prior to commencement of the work. Any Order not recorded by the applicant before work commences may be recorded by the NACC at the applicant's expense. 40. A sign shall be displayed at the site not less than two square feet or more than three square feet in size bearing the words "Massachusetts DEP, File Number 242-1516" 41. Any changes in the submitted plans caused by the applicant, another Board's decision or resulting from this Order of Conditions must be submitted to the NACC for approval prior to implementation. If the NACC finds said changes to be significant, the NACC will call for another public hearing (at the expense of the applicant). Within 21 days of the close of said public hearing the NACC will issue an amended or new Order of Conditions. Any errors found in the plans or information submitted by the applicant shall be considered as changes. No work shall begin on a project until written approval has been granted by the NACC. 42. It is the responsibility of the applicant, owner, and/or successor(s) to ensure that all conditions of this Order of Conditions are complied with. The project engineer and contractors are to be provided with a copy of this Order of Conditions and referenced documents before commencement of construction. 43. Prior to any work commencing on-site, the applicant shall submit to the NACC for approval, a dated and detailed sequence of construction, including the construction of restoration areas, installation of sedimentation/erosion control devices and re-vegetation to be completed following construction. Approval of the phasing plan is required prior to construction. 242-1516 374 Sharpners Pond Road OOC.doc 4 NACC 5/9/2011 DEP FILE #242 - 1516 t' 44. Wetland flagging shall be checked prior to start of construction and shall be re-established where missing. All wetland flagging shall remain visible and enumerated per the approved plan(s) throughout the life of the project and until a Certificate of Compliance is issued so that erosion control measures can be properly placed and wetland impacts can be monitored. The proposed limit of work shall be shall be clearly marked with erosion controls or temporary fencing and shall be confirmed by the NACC. Such barriers shall be checked and replaced as necessary and shall be maintained until all construction is complete. Workers should be informed that no use of machinery, storage of machinery or materials, stockpiling of soil, or construction activity is to occur beyond this line at any time. 45. Hay bales backed by trenched siltation fence shall be placed between all construction areas and wetlands. The erosion control barrier will be properly installed and placed as shown on the plans approved and referenced herein and shall be inspected and approved by the NACC or its agent prior to the start of construction and shall remain intact until all disturbed areas have been permanently stabilized to prevent erosion. All erosion prevention and sedimentation protection measures found necessary during construction shall be implemented at the direction of the NACC or its agent. The NACC reserves the right to impose additional conditions on portions of this project to mitigate any impacts t` which could result from site erosion, or any noticeable degradation of surface water quality discharging from the site. For example, installation of erosion control measures may be required in areas not shown on the plan(s) referenced in this Order of Conditions. Should such installation be required by the NACC, they shall be installed within 48 hours of the Commission's request. 46. The applicant shall have on hand at the start of any soil disturbance, removal or stockpiling, a minimum of 6 hay bales and sufficient stakes for staking these bales (or an equivalent amount of silt fence, 1 hay bale to equal 3 feet of fence). Said bales shall be used only for the control of emergency erosion problems and shall not be used for the normal control of erosion. { 47. A check payable to the Town of North Andover shall be provided in the amount of$1,500 which shall be in all respects satisfactory to Town Counsel, Town Treasurer, and the NACC, and shall be posted with the North Andover Town Treasurer through the NACC before commencement of work. Said deposit of money shall be conditioned on the completion of all conditions hereof, shall be signed by a party or parties satisfactory to the NACC, and Town Counsel, and shall be released after completion of the project, provided that provisions, satisfactory to the NACC, have been made for performance of any conditions which are of continuing nature. The applicant may propose a monetary release schedule keyed to completion of specific portions of the project for the NACC's review and approval. This condition is issued under the authority of the local ByLaw. 48. The applicant shall designate a Wetland Scientist (or other environmental professional as approved by the NACC or its agent) as an "Erosion Control Monitor" to oversee any emergency placement of controls and regular inspection or replacement of sedimentation 242-1516 374 Sharpners Pond Road OOC.doc 5 NACC 5/9/2011 DEP FILE #242 - 1516 control devices. The name and phone number of the erosion control monitor must be provided to the NACC in the event that this person has to be contacted, due to an emergency at the site, during any 24-hour period, including weekends. The Environmental Professional will immediately notify the Conservation agent of any matter that requires attention by the Commission or the agent. The erosion control monitor will be required to inspect all such devices and oversee cleaning and the proper disposal of waste products. Cleaning shall include removal of any entrapped silt. 49. At least once during each week in which construction activities occurs on-site and for as long thereafter as ground remains unstabilized, the applicant shall submit a written report from the "Erosion Control Monitor" to the NACC certifying that, to the best of his/her knowledge and belief based on a careful site inspection, all work is being performed in compliance with this Order of Conditions and that approved setbacks are being adhered to. The erosion control monitor must visually inspect all sedimentation/erosion control measures and assume responsibility for their maintenance on a weekly basis and that they are functioning as intended. In addition, all wetland resource areas must be visually inspected for siltation, turbidity, and/or other water quality impacts. The Erosion Control Monitor shall be on site during and/or following a major storm event of 1" inch of rain or greater (24 hour event) to ensure that soils remain z` stable, and erosion controls are adequate and secure. >° 50. Prior to construction, the applicant shall permanently mark the edge of the driveway or tree line in all areas adjacent to wetland resource areas with a minimum of nine (9 (6 round,3 square)) wetland markers spaced evenly every 30 feet incorporating the following text: "Protected Wetland Resource Area" and the associated rules. This will designate their sensitivity and assure no further inadvertent encroachment into the wetland. These permanent markers shall be field located and approved by the Conservation Department. The applicant shall instruct all agents to explain these markers to buyers/lessees/landscapers and all persons taking over the property from the applicant. The markers shall remain posted and be replaced as necessary in perpetuity. Markers may be obtained from the North Andover Conservation Department ($2 round (standard marker)/$3 square (rules)). 51. The applicant and/or the legal owner of that portion of land upon which these Orders of Conditions have been placed shall provide to the NACC prior to transferring, or assigning any portion of said land to another party, subject to said Orders of Conditions, the "Compliance Certification Form Affidavit" attached via "Appendix A" signed under the pains and penalties of perjury, stating that said applicant and/or owner has read these Orders of Conditions and is in compliance with each and every condition. This document shall apply to each of the conditions referenced herein and shall be provided to the Conservation Department at least five (5) business days prior to the closing of said land transaction. 52. Once these above mentioned pre-construction requirements are complete,the applicant shall contact the Conservation Office prior to site preparation or construction and shall 242-1516 374 Sharpners Pond Road OOC.doc 6 NACC 5/9/2011 DEP FILE #242 - 1516 arrange an on-site conference with an NACC representative, the contractor, wetland scientist and the applicant to ensure that all of the Conditions of this Order are understood. This Order shall be included in all construction contracts, subcontracts, and specifications dealing with the work proposed and shall supersede any conflicting contract requirements. The applicant shall assure that all contractors, subcontractors and other personnel performing the permitted work are fully aware of the permit's terms and conditions. Thereafter, the contractor will be held jointly liable for any violation of this Order of Conditions resulting from failure to comply with its conditions. The applicant or contractor shall notify the NACC in writing of the identity of the on-site construction supervisor hired to coordinate construction and to ensure compliance with this Order. A reasonable period of time shall be provided as notice of the pre-construction meeting (e.g. 72 hours). STORMWATER MANAGEMENT CONDITIONS g? 53. There shall be no increase in the post development discharges from the storm drainage system or any other changes in post development conditions that alter the post development watershed boundaries as currently depicted in the Notice of Intent and approved by this Order of Conditions, unless specifically approved in writing by the Commission. 54. Water quality in down gradient BVW's shall not differ significantly following completion of the project from the pre-development conditions. There shall be no sedimentation into wetlands or water bodies from discharge pipes or surface runoff leaving the site. DURING CONSTRUCTION 55. Upon beginning work,the applicant shall submit written monthly progress detailing what work has been done in or near resource areas, and what work is anticipated to be done over the next period. This will update the construction sequence. 56. Accepted engineering and construction standards and procedures shall be followed in the completion of the project. 57. The contractor will take all steps necessary to control dust onsite so that adverse effects on adjacent resource areas and / or habitat do not occur. 58. Construction access for the project shall be as detailed on the approved plans referenced herein. The driveway shall be swept daily to remove sediment deposited by construction vehicles accessing the site. 59. Erosion control devices shall be inspected regularly; any entrapped silt shall be removed to an area outside of the buffer zone and wetland resource areas; silt fence 242-1516 374 Sharpners Pond Road OOC.doc 7 NACC 5/9/2011 3',: DEP FILE #242 - 1516 E; and hay bales shall be replaced as necessary. The areas of construction shall remain in stable condition at the close of each construction day. All erosion controls shall be in place throughout the duration of any construction on site or unless authorized by the Conservation personnel. 60. Approved de-watering activities anticipated shall be supervised and witnessed by the x designated erosion control monitor. De-watering activities shall be conducted as shown on the approved plans and shall be monitored daily by the erosion control monitor to ensure that sediment laden water is appropriately settled prior to discharge toward the wetland resource areas. No discharge of water is allowed directly into an area subject to jurisdiction of the Wetlands Protection Act and/or the North Andover Wetland Bylaw. If emergency de-watering requirements arise, the applicant shall submit a contingency plan to the Commission for approval,which provides for the pumped water to be contained in a settling basin, to reduce turbidity prior to discharge into a resource area. 61. Any fill used in connection with this project shall be clean fill, containing no trash, refuse, rubbish or debris, including but not limited to lumber,bricks, plaster,wire, lath,paper, cardboard,pipe, tires, ashes, refrigerators, motor vehicles or parts on any of the foregoing. 62. All exposed soil finish grade surfaces shall be immediately landscaped and stabilized, or loamed, seeded and mulched,with a layer of mulch hay. All disturbed areas must 4' be graded,loamed and seeded prior to November 1st of each year. Outside of the growing season, exposed soil finish grade surfaces shall be stabilized with a layer of mulch hay until climate conditions allow for seeding. During construction, any area of exposed soils that will be left idle for more than 30 days shall be stabilized with a layer of mulch hay or other means approved by the NACC. i 63. No re-grading in the buffer zone shall have a slope steeper than 2:1 (horizontal: vertical). Slopes of steeper grade shall be rip-rapped to provide permanent stabilization. 64. Construction equipment/vehicles shall not be staged overnight within 50 feet of a wetland resource area. 65. There shall be no stockpiling of soil or other materials within 50 feet of any resource x area. Soils or other materials shall be stockpiled in locations approved by this department or within the designated areas as shown on the approved plan referenced herein. Erosion controls shall be placed between resource areas and the stockpile. 66. Washings from concrete trucks, or surplus concrete, shall not be directed to, any drainage system, or wetland resource area. If concrete truck washing is required an area for this activity shall be designated and approved by the Conservation Department at the preconstruction meeting. 242-1516 374 Sharpners Pond Road OOC.doc 8 NACC 5/9/2011 DEP FILE #242 - 1516 Y.. 67. All waste generated by, or associated with, the construction activity shall be contained within the limit of work, and away from any wetland resource area. There shall be no burying of spent construction materials or disposal of waste on the site by any other means. The applicant shall maintain dumpsters (or other suitable means) at the site for the storage and removal of such spent construction materials off-site. However, no trash dumpsters will be allowed within 50' of areas subject to protection under the Act or local ByLaw. 68. During and after work on this project, there shall be no discharge or spillage of fuel, or other pollutants into any wetland resource area. If there is a spill or discharge of any pollutant during any phase of construction the NACC shall be notified by the applicant within one (1) business day. No construction vehicles are to be stored within E, 100 feet of wetland resource areas, and no vehicle refueling, equipment lubrication, or maintenance is to be done within 100 feet of a resource area. AFTER CONSTRUCTION 69. No underground storage of fuel oils shall be allowed on any lot within one-hundred (100) feet of any wetland resource area. This condition shall survive this Order of Conditions and shall run with the title of the property. This condition is issued under the authority of the Town's Wetland protection ByLaw. 70. Fertilizers utilized for landscaping and lawn care shall be organic, slow release, low- nitrogen types (< 5%), and shall not be used within 25 feet of a resource area. Pesticides and herbicides shall not be used within 100 feet of a wetland resource area. This condition shall survive this Order of Conditions and shall run with the title of the property as a deed restriction as proposed in the Alternatives Analysis. This condition is issued under the authority of the Town's Wetland Protection ByLaw and shall remain in perpetuity. 71. Upon completion of construction and grading, all disturbed areas located outside resource areas shall be stabilized permanently against erosion. This shall be done by loaming and seeding according to NRCS standards. Stabilization will be considered complete once full vegetative cover has been achieved. 72. Upon approved site stabilization by Conservation staff, the erosion controls shall be removed and properly disposed of and all exposed unvegetated areas shall be seeded. 73. Upon completion of the project the applicant shall submit the following to the Conservation Commission as part of a request for a Certificate of Compliance: a. WPA Form 8A- "Request for a Certificate of Compliance." b. A letter from the applicant requesting a Certificate of Compliance. c. The name and address of the current landowner. 242-1516 374 Sharpners Pond Road OOC.doc 9 NACC 5/9/2011 DEP FILE #242 - 1516 d. Signed statements from the individual property owners shall be submitted with the request for a Certificate of Compliance indicating that they read and understood the recorded Order of Conditions prior to purchasing their property. e. The name and address of the individual/trust or corporation to whom the compliance is to be granted. f. The street address and assessor's map/parcel number for the project. g. The DEP file number. h. A written statement from a Registered Professional Civil Engineer (and/or Registered Professional Land Surveyor) of the Commonwealth certifying that the work has been conducted as shown on the plan(s) and documents referenced above, and as conditioned by the Commission. i. An"As-Built" plan prepared and signed and stamped by a Registered Professional Civil Engineer (and/or Registered Professional Land Surveyor) of the Commonwealth,for the public record. This plan will include: > "As-Built" post-development elevations of all drainage & stormwater management structures constructed within 100 feet of any wetland resource area. NOTE: If portions of the stormwater systems exist partially within the Buffer Zone than the entire structure must be depicted to accurately verify compliance. > "As-Built" post-development elevations and grades of all filled or altered wetland resource areas including the encompassing buffer zone which is regulated as a resource area under the local Wetland Protection Bylaw. ➢ Distances from structures to wetland resource areas. Structures include (but are not limited to) septic systems, additions, fences, sheds, stone walls, pools, retaining walls, subsurface utilities and decks. > A line showing the limit of work and the extent of existing erosion control devices. "Work" includes any disturbance of soils or vegetation. > Location of all subsurface utilities entering the property. 74. The following special conditions shall survive the issuance of a Certificate of Compliance (COC) for this project: ➢ 25' No-Disturbance Zone and a 50' No-Construction Zone (BVW) and 50' No-Disturbance Zone and 75' No-Construction Zone (Ephemeral Pool) shall be established from the edge of adjacent wetland resource areas except in those locations approved under DEP # 242-1516. Future work within 100' of existing wetland resource areas will require a separate filing with the NACC (refer to Section 3.4 (page 15) of the Regulations for performance standards within these zones) The Conservation Administrator and/or other agents of =` 242-1516 374 Sharpners Pond Road OOC.doc 10 NACC 5/9/2011 DEP FILE #242 - 1516 the NACC do not have the authority to waive these setbacks as established under the local ByLaw; ➢ Resource Area Markers (Condition#50); ➢ Discharge or spillage of pollutants (Condition #68); ➢ Prohibition of underground fuels (Condition #69); ➢ Limitations on the use of fertilizers, herbicides, and pesticides (Condition #70). 242-1516 374 Sharpners Pond Road OOC.doc 11 NACC 5/9/2011 DEP FILE #242 - 1516 APPENDIX A-AFFIDAVIT on oath do hereby depose and state: (authorized agent applicant and/or current owner) (PLEASE CHECK AT LEAST ONE BLOCK) 1. Iamthe of (position with applicant) (applicant name or company name) the applicant upon whom Order of Conditions have been placed upon by (DEP or NACC number) the North Andover Conservation Commission. &/or 2. Iamthe of (position with owner) (owner name) the owner upon whose land Order of Conditions have been placed up by (DEP or NACC number) the North Andover Conservation Commission. 3. I hereby affirm and acknowledge that I have received said Order of Conditions and have read the same and understand each (DEP File#) and every condition which has been set forth in said Order of Conditions. 4. I hereby affirm and acknowledge that on this day of 19 I inspected said property together with any and all improvements which have been made to the same and hereby certify that each and every condition set forth in Order of Conditions are presently in compliance. (DEP File#) 5. I hereby affirm and acknowledge that this document will be relied upon by the North Andover Conservation Commission as well as any potential buyers of said property which is subject to said Order of Conditions H (DEP File#) Signed under the pains and penalties of perjury this day of 19 . (Signature-authorized agent of applicant or owner) } 242-1516 374 Sharpners Pond Road OOC.doc 12 �P NACC 5/9/2011 �?